LETTER OF APPROVAL
Town of Lewisville
Attention: William H. Perkins, Jr., Town Manager
6510 Shallowford Rd
Lewisville, NC 27023
RE: Project Name: Lewisville Community Center
Project ID: FGRSY-2021-001
Total Acres: 4.36
County: Yadkin
River Basin: Yadkin -Pee Dee
Project Location: Warren Park Dr - Lewisville
Submitted By: Timmons Group
Date Received by LQS: July 10, 2020 !y
Plan Type: Public -- Express — New
This office has received a soil erosion
which was submitted as required by
(G.S. 113A-57 (4)).
The Act requires that all per n
approval of a soil erosion contra ist P,
(G.S. 113A-54(d) (4)}. The Act fNkair,
prior to the activity and the approvin
within 30 days of receipt. Failure of
submitted plan within the 30-day period
j06 0
h "�
�si O .,'bE, X 0.� _
to f%9 n;n n@
s that 1Qpap
)rity muow
approving quti
,.be deemed A16..
Commencement or continuation of a land-distur 'ng activity tU
prior to the approval of an erosion and sediment conNQ1 plan is a vi
The approval of an erosion and sediment control pl i6�) ti
compliance with Federal and State water quality laws, r u1 zns
additional information may be requested during the review of y r(
reviewed in the order received. C
the project listed above
Pollution Control Act
plan,
must obtain
activity
i dk30days
rrcof fb� Act
ps ~�0q h's
�2� Gar 'dr
North Carolina department of Environmental Quality I Division of Energy, Mineral and Lan esour"s
E Q ---
Winston-Salem Rcgional ❑Mee 1 450 Hanes Mill Road, Suite 300 1 Winston-Salem, North Carolina 27105
336-776-4800
Be advised the NC Construction General Permit (also known as "NCGO I") was renewed on
April 1, 2019. The updated permit does not significantly change the measures that are required to
be implemented on construction sites. However, there are some organizational and technical
updates to the permit. Most notably, there is a new process in which construction sites will obtain
official coverage under an NCGOI permit through an electronic process, after the soil erosion
and sediment control plan approval is issued. For assistance and guidance with the revised 2019
NCGO1 (Construction Stormwater General Permit NCGO10000) as adopted on April 1, 2019,
please use the following link:
https:/ldeg.nc.gov/about/d_ivisions/energy-mineral-land-resources/energy-mineral-land-
permitslstormwater-pernlitslconstruction-sw
If you have questions, please do not hesitate to contact our office at (336) 776-9800. Your
cooperation in this matter is appreciated and we look forward to working with you on this
project.
Sincerely,
Scott S ink
Assistant gilq ngi
Land n i�Q.S61a�s
y oG,.
G s'o s'�'��o°oc�s'�hos�` �O� O��C�
/ o ah o rc0F
°h �60
Cc: Aso �00�. �h r; � 'bo, r �GO
Timmons Group °'ao '07s s0c9�r LopC', O
8642 W. Market St �L ; h� °.b Goo �bj~G +
Greensboro, NC 27409 j°��s coo
/0�r s s o10
os�� � gG�o,>so
O�oaf ch ass a�o'��'1`
/00%,�00°60 sr6�0
O
c'O/O. 010
�9
•
ol
GOB
Co'
�a � E
�O 'Or0
hSi 10
s� 6�
P6.1
u
A
U