Loading...
HomeMy WebLinkAboutNCC204124_ESC Approval Submitted_20200922ROY COOPER Governor MICHAEL S. REGAN Secretary Brian Wrenn Acting Director NORTH CAROLINA Environmental Quality July 10, 2020 LETTER OF APPROVAL Town of Lewisville Attention: William H. Perkins, Jr., Town Manager 6510 Shallowford Rd Lewisville, NC 27023 RE: Project Name: Lewisville Community Center Project ID: FGRSY-2021-001 Total Acres: 4.36 County: Yadkin River Basin: Yadkin -Pee Dee Project Location: Warren Park Dr - Lewisville Submitted By: Timmons Group Date Received by LQS: July 10, 2020 !y Plan Type: Public -- Express — New This office has received a soil erosion which was submitted as required by (G.S. 113A-57 (4)). The Act requires that all per n approval of a soil erosion contra ist P, (G.S. 113A-54(d) (4)}. The Act fNkair, prior to the activity and the approvin within 30 days of receipt. Failure of submitted plan within the 30-day period j06 0 h "� �si O .,'bE, X 0.� _ to f%9 n;n n@ s that 1Qpap )rity muow approving quti ,.be deemed A16.. Commencement or continuation of a land-distur 'ng activity tU prior to the approval of an erosion and sediment conNQ1 plan is a vi The approval of an erosion and sediment control pl i6�) ti compliance with Federal and State water quality laws, r u1 zns additional information may be requested during the review of y r( reviewed in the order received. C the project listed above Pollution Control Act plan, must obtain activity i dk30days rrcof fb� Act ps ~�0q h's �2� Gar 'dr North Carolina department of Environmental Quality I Division of Energy, Mineral and Lan esour"s E Q --- Winston-Salem Rcgional ❑Mee 1 450 Hanes Mill Road, Suite 300 1 Winston-Salem, North Carolina 27105 336-776-4800 Be advised the NC Construction General Permit (also known as "NCGO I") was renewed on April 1, 2019. The updated permit does not significantly change the measures that are required to be implemented on construction sites. However, there are some organizational and technical updates to the permit. Most notably, there is a new process in which construction sites will obtain official coverage under an NCGOI permit through an electronic process, after the soil erosion and sediment control plan approval is issued. For assistance and guidance with the revised 2019 NCGO1 (Construction Stormwater General Permit NCGO10000) as adopted on April 1, 2019, please use the following link: https:/ldeg.nc.gov/about/d_ivisions/energy-mineral-land-resources/energy-mineral-land- permitslstormwater-pernlitslconstruction-sw If you have questions, please do not hesitate to contact our office at (336) 776-9800. Your cooperation in this matter is appreciated and we look forward to working with you on this project. Sincerely, Scott S ink Assistant gilq ngi Land n i�Q.S61a�s y oG,. G s'o s'�'��o°oc�s'�hos�` �O� O��C� / o ah o rc0F °h �60 Cc: Aso �00�. �h r; � 'bo, r �GO Timmons Group °'ao '07s s0c9�r LopC', O 8642 W. Market St �L ; h� °.b Goo �bj~G + Greensboro, NC 27409 j°��s coo /0�r s s o10 os�� � gG�o,>so O�oaf ch ass a�o'��'1` /00%,�00°60 sr6�0 O c'O/O. 010 �9 • ol GOB Co' �a � E �O 'Or0 hSi 10 s� 6� P6.1 u A U