Loading...
HomeMy WebLinkAboutNCS000572_RE Facility Comments_20200918Gwinn, Matt From: Dishmon, Joyce Martin <Joyce.Dishmon@duke-energy.com> Sent: Tuesday, September 15, 2020 2:06 PM To: Gwinn, Matt Subject: RE: [External] RE: Dan River Minor Mod External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Matt, I have no additional comments. I am assuming that the Regional Office visit on 9/9/20 meets the criteria of the requirement for an inspection to determine that stormwater can be discharged via outfalls SW009 and SW010. Do you have an estimated date the permit modification will be signed and can you send an electronic copy of the final permit mod? Thank you for your assistance. Joyce From: Gwinn, Matt <matt.gwinn@ncdenr.gov> Sent: Tuesday, September 15, 2020 1:40 PM To: Dishmon, Joyce Martin <Joyce.Dish mon@duke-energy.com> Subject: RE: [External] RE: Dan River Minor Mod Hi Joyce, Here is final draft of the Dan River Minor Mod. I wanted to give you an opportunity to look over it with the changes I stated below before it is issued. Please let me know once you have had a chance to look it over, and I will officially issue the minor mod. Thank you, Matt From: Dishmon, Joyce Martin <Joyce.Dish mon@duke-energy.com> Sent: Tuesday, September 15, 2020 11:09 AM To: Gwinn, Matt <matt.gwinn@ncdenr.gov> Subject: RE: [External] RE: Dan River Minor Mod External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Matt, When complete can you send an electronic copy? Thanks, Joyce 1 From: Gwinn, Matt <matt.gwinn@ncdenr.gov> Sent: Tuesday, September 15, 2020 8:31 AM To: Dishmon, Joyce Martin <Joyce.Dishmon@duke-energy.com> Subject: RE: [External] RE: Dan River Minor Mod Hi Joyce, I am planning to do the final edits on the draft minor modification for Dan River soon, and I wanted to see if you would had prepared any comments on the draft I sent you. After the inspection the only change that will likely be made to the draft minor modification will be to change the coal ash constituent monitoring for outfall 10 from semi-annual only during coal ash transport to a semi-annual frequency. This would mean that the priority pollutant metals and boron in table 6 would be on the same monitoring frequency as the other parameters in this table. Thank you, Matt From: Dishmon, Joyce Martin <Joyce.Dish mon@duke-energy.com> Sent: Wednesday, September 2, 2020 4:40 PM To: Gwinn, Matt <matt.gwinn@ncdenr.gov> Subject: [External] RE: Dan River Minor Mod External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Matt, I have attached an electronic copy of the renewal update submitted in August. The hardcopy was received 8/6/20 in the mail service center. Thank you for forwarding the draft minor modification. I will respond with any comments this week. Tyler Pearson is scheduled to visit the site on 9/9/20. Regards, Joyce Dishmon Permitting and Compliance, Carolinas Office: 336-623-0238 Cell: 336-394-5524 Email: ioyce.dishmon@duke-energy.com From: Gwinn, Matt <matt.gwinn@ncdenr.gov> Sent: Wednesday, September 2, 2020 2:31 PM To: Dishmon, Joyce Martin <Joyce.Dishmon@duke-energy.com> Cc: Lucas, Annette <annette.lucas@ncdenr.gov> Subject: [EXTERNAL] Dan River Minor Mod Hi Joyce, I hope you're doing well. I apologize for the confusion, the inspection Tyler requested is mainly for the permit minor modification. I think the Regional Office would like to go ahead and conduct a full inspection as the permit renewal for Dan River will be coming up soon. Our goal is to issue the permit minor modification prior to the expiration of your existing permit at the end of September. There is not a draft of the renewed permit yet, but I can provide you with a draft of the permit minor modification. The draft permit modification is still awaiting comments from the Regional Office. If you have any comments on the minor modification please let me know in time to incorporate them into the minor modification before it will need to be issued. Here is part of the draft approval letter which notes the changes made in the minor modification: This modification includes the following changes from your current permit: • Modifications to the permit in Part II on page on 9 of 18, to designate the sampling location for SW002; • Modifications to the permit in Part II on page 10 of 18, to include Outfall SWO02 in the analytical monitoring requirements listed in Table 5; • Modifications to the permit in Part II on page 10 of 18 to designate the sampling location for SW010; • Modifications to the permit in Part II on pages 6-10 of 18 to update verbiage that referred to construction/demolition activities that have now been completed; and • Revisions to the permit cover page to reflect the latest amendment date. On the topic of the permit renewal. I had requested some information for the permit renewal including a summary of monitoring data, and I wanted to check on the status of that information. In our earlier emails on August 18t" you had said you would provide the information by Thursday of that week. I just wanted to make sure you hadn't already sent it and that it was lost somewhere along the way. Matt Gwinn Stormwater Program Environmental Technician II Division of Energy, Mineral and Land Resources North Carolina Department of Environmental Quality Office: (919) 707-3648 Email: matt,gwinna-ncdenr.gov Web site: deg.nc.gov/SW Physical Address: 512 North Salisbury Street, Office 640L, Raleigh, NC 27604 Mailing Address: 1612 Mail Service Center, Raleigh, NC 27699-1612 E NORTI I CARO;.IN � Rpw#nAnt N 6 Mdran�Fp�isl pWa11by Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of staff and the public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. We appreciate your patience as we continue to serve the public during this challenging time.