HomeMy WebLinkAboutNCG551185_Compliance Evaluation Inspection_20200911EPA
United States Environmental Protection Agency
Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 N 52 NCG551185 20/09/11 C S31112171819 20
21 66
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved-------------------
N67707172 73 74 75 80
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
66 Lake Lure Highway
66 Lk Lure Hwy
Bat Cave NC 28710
Entry Time/Date Permit Effective Date
Exit Time/Date Permit Expiration Date
10:00AM 20/09/11 13/08/01
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Other Facility Data
11:00AM 20/09/11 18/07/31
Name, Address of Responsible Official/Title/Phone and Fax Number
Curtis McCart,66 Lk Lure Hwy Bat Cave NC 28710//626-786-9333/Contacted
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Operations & Maintenance Self-Monitoring Program Effluent/Receiving Waters
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s)Agency/Office/Phone and Fax Numbers Date
Daniel J Boss DWR/ARO WQ/828-296-4658/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#1
9/14/2020
NPDES yr/mo/day
20/09/11
Inspection Type
C3111218
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
On 9/11/2020, I (Daniel Boss) conducted a compliance evaluation inspection of the wastewater
treatment facility at 66 Lake Lure Highway. I met with Kendall (resident) for the inspection and Kendall
had Curtis McCart on speaker phone for assistance.
The system was checked for proper operation one week prior by Sid Gaskin who installed the system.
The UV bulb was replaced and is now working.
This wastewater system consists of a septic tank, fixed film biomass pod system, recirculation tank,
UV disinfection, and cascade aeration.
The cascade was covered with rocks, but they were not inhibiting the effluent flow and I could still see
the effluent pipe. The effluent appeared clear and did not have a detectable odor.
Samples have not been taken for this system. Sampling and analysis should be done annually if the
system is discharging.
NCG551185 17 (Cont.)
Page#2
Permit:NCG551185
Inspection Date:09/11/2020
Owner - Facility:
Inspection Type:
66 Lake Lure Highway
Compliance Evaluation
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping?
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment:
Septic Tank Yes No NA NE
(If pumps are used) Is an audible and visual alarm operational?
Is septic tank pumped on a schedule?
Are pumps or syphons operating properly?
Are high and low water alarms operating properly?
This system has only been in operation for 3 years with only partial residency. The septic
tank was checked one week ago and it did not need pumping yet.
Comment:
Sand Filters (Low rate)Yes No NA NE
(If pumps are used) Is an audible and visible alarm Present and operational?
Is the distribution box level and watertight?
Is sand filter free of ponding?
Is the sand filter effluent re-circulated at a valid ratio?
# Is the sand filter surface free of algae or excessive vegetation?
# Is the sand filter effluent re-circulated at a valid ratio? (Approximately 3 to 1)
This is not a sand filter system, but rather a fixed film biomass pod system. It appeared to
be operating fine.
Comment:
Disinfection - UV Yes No NA NE
Are extra UV bulbs available on site?
Are UV bulbs clean?
Is UV intensity adequate?
Is transmittance at or above designed level?
Is there a backup system on site?
Is effluent clear and free of solids?
This system has only one UV bulb. If it malfunctions, there is a visual alarm light on the
control box.
Comment:
Effluent Pipe Yes No NA NE
Is right of way to the outfall properly maintained?
Page#3
Permit:NCG551185
Inspection Date:09/11/2020
Owner - Facility:
Inspection Type:
66 Lake Lure Highway
Compliance Evaluation
Effluent Pipe Yes No NA NE
Are the receiving water free of foam other than trace amounts and other debris?
If effluent (diffuser pipes are required) are they operating properly?
Comment:
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional?
Is sample collected below all treatment units?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
representative)?
Effluent sampling and analysis are not being conducted, but should be done annually as long
as the system is discharging.
Comment: