Loading...
HomeMy WebLinkAbout310429_Compliance Evaluation Inspection_20200914Division of Water Resourcesn1g, Facility Number U Division,'of Soil and Water Conservation O Other Agency Type of Visit: Co Hance Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: Arrival Time: (Q "' Departure Time: County: Region: Vy1 !-0 Farm Name: V j o'A LpGo Owner Email: Owner Name: TAOEJ ?TtdCC STtf-WN Cr Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Title: Integrator: Phone: Certified Operator: Certification Number: 170 ( 8 Back-up Operator: Location of Farm: Latitude: Certification Number: Longitude: Design 'Current Design Current " . ° Design Current' Swine ° Capacity "Pop. Wet �'oultry Capacity Pop. Cattle ,Capacity ° Pop. Wean to Finish Wean to Feeder IS52 O Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Othei Other Layer Non -Layer Design Current Non-L� Pullets Other Poults Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? [—]Yes E(No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes gNo ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes o ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes dNo ❑ NA ❑ NE of the State other than from a discharge? Page T of 3 21412015 Continued Facility Number: 11 - jDate of inspection: 1444T C3oZO Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes [ (No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes [?No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: I Spillway?: _ Designed Freeboard (in): _ Observed Freeboard (in): 4+0 _ 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) ❑ Yes EA ❑ NA ❑ NE 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes RTNo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes dNo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [], Vo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes [ o ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes [�No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes [�!rNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): SC'� 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes fNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes E:�4o ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes E),,Tqo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes E21<o ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19: Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes [2No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes Ea -No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ®No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes �_No ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facility Number: - a Date of Inspection: — a—O�-b 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes --E] No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes E] No ❑ NA ONE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes _Q No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes .—❑ No [](NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes E] No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes —❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes _❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA RNE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes —❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes �O No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawines of facility to better explain situations (use additional pages as necessary). �+,c(�d2 S�-QG�,►, Iffje f'k1�}'� fp,corJ s c ieo( 4.3 J s &clvde rros� (�ceri` �s ��„ia;�er WA, UP d-.*_ WA volvel c¢\)".� Reviewer/Inspector Name: Phone: Reviewer/Inspector Signature: ��— Date: q-rY ac,,,Ao Page 3 of 3 V 21412015