Loading...
HomeMy WebLinkAbout20170359 Ver 2_Construction Scheduling email_20200917Strickland, Bev From: Arrance, Keven <karrance@hazenandsawyer.com> Sent: Thursday, September 17, 2020 1:10 PM To: Fuemmeler, Amanda J CIV (USA) Cc: Leslie, Andrea J; Homewood, Sue; Annino, Amy M Subject: RE: [External] Grandfather Golf & Country Club - 2021 work Follow Up Flag: Follow up Flag Status: Flagged External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Hi Amanda, Your recollection of our previous conversation is correct. Since that time, the Club has changed the timing of the planned work a bit. The only work proposed to be performed in 2021 is completion of the work that was submitted in the 2019 permit application package for the dredge project. The current schedule has the dam repairs and associated work as well as the additional area of bank stabilization along the Linville River delayed to 2022. Therefore, there is no change to the previously authorized impacts in terms of project scope or footprint for the 2021 work. We would handle the permitting for the dam work and the bank stabilization next year, in preparation for construction in 2022. Please let me know your thoughts on what is needed at this time to prepare for the 2021 construction effort to complete the dredge project. If you prefer to talk through the plans, I am available today and tomorrow as well as much of next week by phone, generally until 3:30pm each day. Thanks, Ms. Keven Arrance Senior Principal Scientist I Hazen and Sawyer 4011 WestChase Blvd., Suite 500, Raleigh, NC 27607 919 863-9350 (direct); 919 522-4269 (mobile) karrance(�Oazenandsawyer.com I hazenandsawyer.com From: Fuemmeler, Amanda J CIV (USA) <Amanda.Jones@usace.army.mil> Sent: Thursday, September 17, 2020 12:43 PM To: Arrance, Keven <karrance@hazenandsawyer.com> Cc: Leslie, Andrea J <andrea.leslie@ncwildlife.org>; Homewood, Sue <sue.homewood@ncdenr.gov>; Annino, Amy M <amy.annino@ncdenr.gov> Subject: RE: [External] Grandfather Golf & Country Club - 2021 work Caution! External email — think before you click Hi Keven, For some reason this one got dumped into my spam so trying to catch up... From I remember from our last conversation, I indicated we could modify the existing permit and solicit comments from the agencies on the proposed changes (new stability berm/dam rehab which has minor impacts and more importantly changes to dewatering scenarios (which I thought included pumping around) to address NOV issues). I thought I was waiting on this information/modification and this modification may not even need to go out on Public Notice but we would at least send a notice out the agencies asking for comments. From my understanding from WRC based on the most recent on -site meeting, they would recommend Grandfather commit to pumping clean water around the work area and lake continuously and not refilling the lake until April 16 (so that part of the permit/conditions would be modified to reflect this). I'm not sure if this is what you are asking so let me know if we need to have a call to clarify.. From: Arrance, Keven <karrance@hazenandsawyer.com> Sent: Wednesday, September 09, 2020 12:27 PM To: Fuemmeler, Amanda J CIV (US) <Amanda.Jones@usace.army.mil>; Annino, Amy M <amy.annino@ncdenr.gov>; Leslie, Andrea J <andrea.leslie@ncwildlife.org> Subject: [External] Grandfather Golf & Country Club - 2021 work External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Good afternoon, all. GGCC is looking at their schedules for completion of the dredge project, repair of the dam, and a new area of bank stabilization immediately upstream of the west channel/east channel split. One possible scenario is that completion of the dredge project be done in 2021 and the dam repair and new bank stabilization be done in 2022. They asked for confirmation from the three of you that completion of the previously approved dredge project (dredging of the west channel) can be performed beginning January 1, 2021 under the current Individual 404 permit, Individual 401 water quality certification, and trout water variance with no change to the original authorizations' restrictions, conditions, and requirements. Regardless of the schedule scenario selected, the contractor who did the work this year will not be involved in future work on Club property, at least not any that involve in -water work. A contractor who is experienced and competent with water handling in sensitive waterways and watersheds will be selected for the upcoming work. Please confirm. Thank you for your time. Ms. Keven Arrance Senior Principal Scientist I Hazen and Sawyer 4011 WestChase Blvd., Suite 500, Raleigh, NC 27607 919 863-9350 (direct); 919 522-4269 (mobile) karrance(a�hazenandsawyer.com I hazenandsawyer.com