Loading...
HomeMy WebLinkAbout20060447 Ver 3_Mitigation Receipt_20200917 Wildlands Holdings II, LLC · Wildlands Engineering, Inc · 1430 South Mint Street, Suite 104, Charlotte, NC 28203 Mitigation Credit Transfer Certificate September 17, 2020 Olde Towne WEH, LP 56 Hunter Street Apex, NC 27502 Attn: Mr. Eric Rifkin RE: Bank Name: Neuse 01 Umbrella Mitigation Banking Instrument (UMBI) Bank Site: Buck Swamp Nutrient Offset & Riparian Buffer Bank Bank Sponsor: Wildlands Holdings II, LLC DWR Project #: 2012-0144 Riparian Buffer Credits Purchased: 11,363 sq. ft. Neuse 03020201 River Basin Project name: Olde Towne Mixed-use Development Applicable Local Government/Municipality Jurisdiction: NCDWR Dear Mr. Rifkin, You have elected to fulfill your permitted riparian buffer offset mitigation requirements for the above- mentioned project by paying into the WEI – Neuse 01 Umbrella Mitigation Banking Instrument (UMBI) – Buck Swamp Nutrient Offset & Riparian Buffer Bank sponsored by Wildlands Holdings II, LLC, wholly owned by Wildlands Engineering, Inc. (“The Bank”). The applicant has received an authorization certificate for riparian buffer impacts and is required to mitigate as part of the Consolidated Mitigation Rules 15A NCAC 02B .0295. Payment into a private mitigation bank is acceptable per this rule. NCDWR specified and verified the amount of the riparian buffer offset necessary for approval of the permit as 11,363 sq. ft. of Buffer Mitigation credits. Wildlands Holdings II, LLC has receipt of a copy of the 401 Water Quality Certification Authorization Certificate from the NC Department of Environmental Quality approving the Riparian Buffer mitigation purchase from the Bank. The Bank has received full payment for mitigation for the above referenced project. You must also comply with any other state, federal or local government permits or authorization associated with this activity including SL 2009-337, and Act to Promote Compensatory Mitigation Banks. This payment into the Bank is not transferable. If you have any questions regarding the purchase of these credits, please contact me at (704) 332-7754 x124 or ayarsinske@wildlandseng.com. Wildlands Holdings II, LLC · Wildlands Engineering, Inc · 1430 South Mint Street, Suite 104, Charlotte, NC 28203 Sincerely, Ashley N. Yarsinske Wildlands Engineering, Inc. Marketing & Credit Sales ayarsinske@wildlandseng.com O: (704) 332-7754 ext. 124 M: (757) 572-5269 Cc: Ms. Katie Merritt, NC Division of Water Resources (bi-annually) Ms. Jennifer Burdette, Sr. Environmental Consultant, Water Resources, McAdams 9/17/2020Wildlands Holdings III, LLCRobert W. Bugg USAGE Wilmington District Compensatory Mitigation Responsibility Transfer Form, Page 2 Conditions for Transfer of Compensatory Mitigation Credit: • Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions. • Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. • Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative records for both the permit and the Bank/1LF Instrument. It is the Permittee's responsibility to ensure that the USACE Project Manager (address below) is provided with a signed copy of this form. If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the USACE, the Sponsor must obtain case -by -case approval from the USAGE Project Manager and/or North Carolina Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current District guidance and a new version of this form must be completed and included in the USACE administrative records for both the permit and the Bank/ILF instrument. Comments/Additional Conditions: This mitigation responsibility transfer form is for the phase one mitigation payment for the Olde Towne mixed -use development, in accordance with special condition 18 of the standard permit, and the phased mitigation table below: Phase Number Impact Areas Mitigation Required Mitigation Payment Deadline 1 H and 1 0.137 acre of October 26, 2020 wetland credit or prior to impacts taking place, whichever occurs first 2 A, B, C, D, E 531 If of stream and December 31, 2027 0.67 acre of or prior to impacts wetland credits taking place, whichever occurs first Page 2 of 3 The Wilmington District Is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer satisfaction Survey located at our website at http-.//regulatory.usacesurvey.com/ to complete the survey online. U.S. ARMY CORPS OF ENGINEERS Wilmington District This form is not valid unless signed below by the USACE Project Manager and by the Mitigation Sponsor on Page 1 Once signed, the Sponsor should provide copies of this form along with an updated bank ledger to: 1) the Permittee, 2) the USACE Project Manager at the address below, and 3) the Wilmington District Mitigation Office, Attn: Todd Tugwell, 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 (email: todd.tugwell@usace.army.milj. Questions regarding this form or any of the permit conditions may be directed to the USACE Project Manager below, USACE Project Manager: James Lastinger USACE Field Office: Raleigh Regulatory Field Office US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 Email: James.C.Lastinger@usace.army.mil USACE Project Manager Signature September 14.2024 _ Date of Signature Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is available at htti3.Hdbits.usace.army.mil. Page 3 of 3 Form Updated 14 September 2017