Loading...
HomeMy WebLinkAboutSW4200901_Project Optic FINAL Geotech_20200914T P.IiGIHF.FIi[NG ATLANTIC COAST ENGINEERING AND TESTING, INC. 8 LOCKHEED COURT GREENSBORO, N.C. 27409 PHONE: 336-664-5900 June 19, 2020 Mr. Brent Long Choat Construction Company 2907 Providence Road, Suite 400 Charlotte, North Carolina 28211 RE: Preliminary Subsurface Evaluation for Project Optic - Proposed Manufacturing Building US Hwy 220/1-73 at NC Hwy 65 Stokesdale, North Carolina ACET File Number AC-6015 Dear Mr. Long: The authorized subsurface investigation and geotechnical engineering evaluation of existing soil conditions for the proposed new manufacturing building at referenced location in Stokesdale, North Carolina has been completed. The report of findings, evaluations, conclusions, and recommendations is presented below. SCOPF The scope of this report comprises the following objectives: 1. Evaluate, on a preliminary basis, the subsurface soil and groundwater conditions as the site of the planned manufacturing development as they relate to the proposed construction; 2. Evaluate, on a preliminary basis, soil bearing pressures within the proposed construction area and determine the suitability of the site soils to adequately support the proposed structures on a system of shallow footing foundations, and; 3. Provide, on a preliminary basis, geotechnical-related recommendations for foundation design, anticipated construction problems, site preparation requirements, and quality control measures. Page 1 of 8 Page 2 of 8 Project Optic June 19, 2020 AC-6015 PROPOSED CONSTRUCTION Scaled, dated 4/14/2020, information prepared by Timmons Group, including, but not limited to: existing and proposed topography, proposed 254,095 ftz building layout, paved drives and parking, stormwater control feature, and future expansion on the 42.88 acre site. We understand that the development will include a one-story slab -on -grade industrial building with paved drives and parking to be constructed at or near elevation 912. INVESTIGATION Nineteen (19) standard penetration borings and one offset boring were advanced using truck -mounted Simco 2500HT rigs, and drilled at the approximate locations shown on the Boring Location Plan provided in this report. The boring locations are designated on the attached Boring Location Plan and were located in the field by Atlantic Coast Engineering & Testing, Inc. personnel using clearing equipment and GPS. At designated intervals and in accordance with ASTM D-1586, "N" values of the soil were determined by performing Standard Penetration Resistance Test. The split -spoon samples were physically examined and visually classified in the field and taken to the laboratory for confirmation. GENERAL SITE AND SUBSURFACE CONDITIONS Site Description The current project site, 42.88 acres, and adjacent future site, 17.28 acres, are located in the southwest quadrant of the intersection of US Hwy 220/1-73 at NC Hwy 65 in Stokesdale, Rockingham County, North Carolina. The site is wooded with trees native to the region and no rock outcrops were observed. A stream flows from the southeast corner of the current project site in a southwest direction south of the proposed stormwater control pond. A second stream flows from north to south along the west side of the future manufacturing area. There are no severe gullies and the property generally slopes from the north to the south. The proposed FFE is 912.10 and elevations within the building footprint and building boring logs generally range from 922 to 906, indicating that some cuts and fills will be required to balance the site. Based on the topographic print the elevations across the site generally range from 925 to 872. Rockingham County is within the Piedmont physiographic province of North Carolina. In this area, the underlying parent bedrock has weathered in place to form the mantle of residual soil. The bedrock in this area is predominantly mica gneiss that has weathered to form residual sandy silts and silty sands. Project Optic June 19, 2020 AC-6015 Borings Within Building Footprint Page 3 of 8 Eleven (11) standard penetration borings and one offset boring were drilled in the building area at the approximate location on the boring location plan. A 3" to 7" thick surface veneer of topsoil overlays the apparent residual soils encountered. Below the topsoil surface layer, soils generally encountered consisted of red, light red, and light brown stiff to firm fine grained micaceous sandy silt. Boring B-12 encountered auger refusal at 15' below existing ground surface elevation. All building footprint borings, except B-12, were extended to a depth of 20' below existing ground surface elevation. Borin s Within Paved Drives and Parkin Six (6) standard penetration borings were drilled in the parking and drive areas at the approximate location on the boring location plan. A 4" to 5" surface layer of topsoil was encountered over apparent residual soils. Red to brown red stiff and stiff to firm fine grained micaceous sandy silt was encountered to 7' below existing ground surface elevation. All parking and drive area borings were extended to a depth of 7' below existing ground surface elevation. Seasonal High Water Table We understand bottom of pond elevation is 876. Two (2) power borings, B-14 and B-15, were drilled at the approximate locations shown on the attached Boring Location Plan to determine the seasonal high water table elevation. A 4" surface layer of topsoil was encountered at boring B-14. Below the topsoil, apparent residual soil was encountered consisting of light red fine grained micaceous sandy silt to elevation 877 and dark red fine grained micaceous sandy silt from elevation 877 to elevation 870. Borings B-14 was terminated at elevation 870. A 6" surface layer of topsoil was encountered at boring 13-15. Below the topsoil, apparent residual soil was encountered consisting of light red fine grained micaceous sandy silt to elevation 878 and dark red fine grained micaceous sandy silt from elevation 878 to elevation 872. Borings B-15 was terminated at elevation 872. Based on B-14 boring log, seasonal high water table is below elevation 870. Detailed soil stratifications, consistency, elevations, boring termination depths and ground water conditions of each boring location are shown on the enclosed Test Boring Records. Page 4 of 8 Project Optic June 19, 2020 AC-6015 EVALUATIONS CONCLUSIONS AND RECOMMENDATIONS General The following discussions are based on the anticipated site development as presented in this report, the data obtained from the soil test borings drilled by Atlantic Coast Engineering and Testing, Inc., and experience with soils and subsurface conditions similar to those encountered at this site. If the understanding of the project as presented in this report differs significantly from the final plans, please contact Atlantic Coast Engineering and Testing, Inc. The preliminary evaluations, conclusions and recommendations are formulated, in part, by interpolating soil and subsurface conditions encountered at the borings between boring locations. Occasionally, soil and subsurface conditions at the boring locations differ from conditions at the site locations. If soil and subsurface conditions encountered during construction differ from those described in this report, please contact Atlantic Coast Engineering and Testing, Inc. Ground Water No water was encountered at time of boring at any of the borings. After 48 hours, due to clearing procedures to gain drilling access, borings B-2, B-3, B-6, B-8, B-13, and B-17 could not be relocated for a 48 hour water check. All other borings had no water and/or evidence of possible water (hole cave-in). Seismic Classification In accordance with the 2012 North Carolina Building Code, Table 1613.5.2, the planned facility site can be designated as Seismic Class D. Refusal Material Based on our understanding of planned elevation the presence of refusal materials (MR) at boring B-12 at 15' (elev. 897) below existing ground surface elevation should not inhibit construction. Should proposed elevations of structures intersect the zone of refusal materials some difficult excavation could be encountered in the area when preparing narrow trenches. Generally, in large area excavations, soils exhibiting standard penetration resistances (SPR) less than 75 blows per foot can be effectively removed with conventional mechanical construction equipment such as backhoe pans, or dozers. Soils exhibiting SPR between 75 and 100 blows per foot can generally be efficiently removed with some ripping. Partially weathered rock or PWR (SPR greater than 100 blows per foot) can generally be efficiently removed using heavy construction equipment (i.e., single -tooth Paae 5 of 8 Project Optic June 19, 2020 AC-6015 rippers). "Refusal" materials often can only be removed effectively and efficiently if rippers are used in conjunction with some blasting or hand tools such as "jackhammers". Foundation and Construction The preliminary boring data indicates that the proposed one story manufacturing structure can be supported by a system of strip footings bearing on approved soils encountered across the site or by approved structural fill soils. Minimum widths of all footings should be determined by using a design soil bearing pressure not to exceed 2000 psf. Footing excavations should not be left open for long periods of time. If water stands in the footing excavations for extended periods of time, the exposed soils could be loosened and repair would then be required prior to concrete placement. It is recommended that the footings be placed within the same working day after excavations are opened, or bearing surfaces in the bottom of the footing excavations be protected with a three to four inch thick lean (2000 psi) concrete "mud -mat". Earth Pressures Based on our experience the following earth pressure coefficients (no factor of safety included), assuming no excess hydrostatic pressure and a relatively level backfill, are recommended: PARAMETER COMPACTED FILL SOIL At -rest Coefficient, Ko 0.53 Active Coefficient, Ka 0.36 Passive Coefficient, Kp 2.77 Soil/Concrete Friction Factor 0.4 Modulas of Subgrade Reaction 25 lbs/in3 Pavement Areas Drives and parking area soils should provide suitable support for pavement sections. When plans are finalized regarding loading and elevations please contact us for pavement design information. Page 6 of 8 Project Optic June 19, 2020 AC-6015 SITE PREPARATION Site. Clearing and Stripping The proposed building locations should be cleared and stripped of existing soils with more than 5% organic matter by weight. The cleared areas should extend a minimum of 10 feet beyond the perimeters of the proposed structure. Site Proofrolling After the proposed building areas have been stripped of organics and rough -graded, this area should be proofrolled using a pneumatic -tired roller having a minimum 20-ton static weight (i.e., loaded dump truck or pan). The tires of the roller should make at least four passes over each section with the last two passes perpendicular to the first two. The speed of the roller should approximate that of a slow walk. Areas that do not tighten up after four passes should be compacted with additional passes until deflection under the roller ceases. Areas that continue to deflect should be undercut and backfilled with approved structural fill material. Floor Slab Support The area to support the floor slab should be proofrolled as described above in this report, and any structural fill placed in a floor slab support area should be compacted in accordance with recommended project specification shown below. Structural Fill The soils encountered in the borings are relatively light weight and moisture sensitive but generally should be acceptable for structural fill if the moisture contents are closely controlled and monitored during placement and compaction. A soil sample tested in accordance with ASTM D-698 has a soil unit weight of 86.8 lbs/ft3 at 29.4% moisture. Structural fill should be placed as follows: 1. Laboratory proctor density tests should be performed on representative samples of each different type of soil that is desired to be used for fill. The results of these determine the acceptability of the soil for use as fill and provide the data necessary for quality control during fill placement. 2. Suitable fill soils should be placed in thin lifts. Each lift should be compacted mechanically with a sheepsfoot roller. Proofrolling the surface of the fill with a heavily -loaded rubber -tired vehicle, such as a dump truck or pan, will be desirable to help seal the surface and inhibit water absorption during periods of rain. The scaling operation is particularly important at the end of a workday and the end of the work week. Project Optic .tune 19, 2020 AC-6015 Page 7 of 8 Structural fill soils to support foundations should be compacted to a minimum of 95% of the standard proctor maximum dry density (ASTM D-698); however, the upper 12 inches of the structural fill directly beneath the floor slab should be compacted to 100% of the standard proctor maximum dry density. 4. The structural fill should be placed so that the outside limit of the fill extends beyond the outside edge of the footings a minimum horizontal distance of at least 10 feet. ADDITIONAL SERVICES When plans are finalized, please contact Atlantic Coast Engineering and Testing, Inc. for our review. Additional soil and foundation engineering, testing, and consulting services recommended for this project are summarized below. Additional Borings When plans are finalized regarding locations and elevations of the proposed structures, we may recommend additional borings to further identify existing site conditions uncovered during construction. Undercuttin2 and Proofrolling Ins ection We recommend that an experienced soil engineering technician verify the bearing strength of the soils and assist the contractor in delineating any soils which may require removal and replacement with suitable and properly compacted structural fill. The recommendations presented in this report are contingent upon the inspection program outlined here. Quali1y Control of Fill Placement and Compaction An experienced soil engineering technician should witness all required filling operations and take sufficient in -place density test to verify that the specified fill compaction is achieved. The site soils are light weight sandy silt and particular attention should be directed to fill lift thickness, moisture content of soils, and sealing the soils at the end of each workday. Page 8 of S Project Optic June 19, 2020 AC-6015 The attached Test Boring Records and Boring Location Plan complete this preliminary report. Should you have any questions, please contact our office at your convenience. ATLANTIC COAST ENGINEERING AND TESTING, INC. ���►� C��++++ C.B. Higgins, Jr., Manager H Q j • i r EAL • 5060 I4bnald M. Wojek, P.E. ' = I*CPE 05060 add • �yATH a� P.NGINF.F.RSNG NOMENCLATURE AND SYMBOLS 1 Undisturbed sample (UD) recovered Undisturbed sample (UD) not recovered Standard Penetration Resistance (ASTM D 1586) O Unified Soil Classification (by visual inspection) 10012" Number of blows (100) to drive the spoon a number of inches (2) AX, BX, NX Core barrel sizes which obtain cores I'/a, I %, and 2'/s inches in diameter, respectively 65% Percentage of rock core recovered RQD Rock quality designation - % of core segments 4 or more inches long — Water table at least 24 hours after drilling _= Water table one hour or less after drilling PENETRATION RESISTANCE RESULTS # of Blows Approximate N Value Relative Density 0-4 Very Loose 5 - 10 Loose SANDS 11 - 20 Firm 21 - 30 Very Firm 31 -50 Dense Over 50 Very Dense 4 of Blows Approximate N Value Consistency 0-1 Very Soft 2-4 Soft SILTS and CLAYS 5-8 Firm 9 - 15 Stiff 16 - 30 Very Stiff 31 -50 Hard Over 50 Very Hard DRILLING PROCEDURES Soil sampling and standard penetration testing performed in accordance with ASTM D 1586. The standard penetration resistance is the number of blows of a 140-pound hammer falling 30 inches to drive a 2 inch O.D., 1.4 inch L.D. split spoon sampler one foot. Core drilling in accordance with ASTM designation D 2113. The undisturbed sampling procedure is described by ASTM specification D 1587. FF�b-ECT _ Project Optic Stokesdale, NC AC-6015 W&TER --'rCOT UTEPFD: none at TOB none at 48 hrs s � � l:J O � 3" 11` 20' SOIL DESCRIPTICY 6/5/20 sopi";G Ho_ B-1 Building 80RNc TERMIHATED 20` U-' 6 topsoil - I 926 Stiff red fine grained (micaceous sandy silt Apparent Residual 921 916 Stiff to firm light brown fine grained micaceous sandy silt Boring terminated at 20' 911 906 I PENETRATION RESISTANCE (SLCY6 PEP. FOQT] IQ 70 40 1r0 80 Im t i o.TE CT _ Project optic Stckesdale, NC AC-6015 WATER ENCODUTEEED . pone at TOB none at 48 hrs r F LJ u SOIL DESCRIPTION 6/5/20 BOWNG HO_ B-2 Building BOMNG TERMINATED 20' PEHETRATFON nESf5TktjCE w (Bl0'rY PER FOOT) HT 2 0 RIhlG RE0 a R 6/5/20 P ROJE 7 : Project optic Stokesdale, IBC AC-6015 WATER Et,COL�ii k ERED none at T03 none at 48 hrs r� 7L] 10' 14' 20' SOIL oESCRIPTIOX Topsoil Stiff to firm red fine grained micaceous sandy silt Apparent Residual Stiff pink red fine grained micaceous sandy silt Firm light brown fine grained micaceous sandy silt Boring terminated at 20' TEST 8 0 R1GG am,G N o_ B-3 Building BORINC TERMINATED 20' j PENETRATION RESISTANCE t6LOWS PER FOOT} J 'u 0 10 10 40 rc a() I ()C RECORD PROJECT: Project Optic Stokesdale, NC AC--6G15 W�,TER ENCOTLTTER�vD : none at TOB none at 48 hrs 311 11' 20' SOIL, OESCRIPTICX 6/6/20 som?gG No_ B-4 Building EGRING TERMIHATED 20' Topsoil : � 908 ` Stiff to firm red fine grained micaceous sandy silt Apparent Residual 903 898 Firm light brown fine grained micaceous sandy . silt Boring terminated at 20` I I 893 8B8 TEST 8 0R1N'G 8 EG0R PENETAATr ON RESISTANCE ISLOY6 PER FOOT) IQ 70 40 E,7 as I CxJ ' — ,. t��� _r am u q—r_, - 'ram a �_ 6/6/20 PE,O ECT : Project Optic Stokesdale, NC AC-6015 WATER E'TCOMITP,RED : none at TOB none at 48 hrs 4 SOIL DESCRIPTION B O R 1 F; G NO. B-5 Parking / Drives BORING TERMINATED 7' PNETQATION RESISTA04CE (BLOws PER FOOT) 1Q 20 40 &0 80 100 _.411 ' 7' T opsoi l 920 Stiff red fine grained micaceous sandy silt Apparent Residual Boring terminated at 7' 915 910 TEST S 0 81G 4E00R �.J`f � � � c -- �- a � , Jam - _ ri, 14 r 7 i � _._-V. .� _q�.y �_ ✓z._• ��C9� <i��1 ... Ei SY�. �Y•.�� pFM�,-ACT_ Project Optic Stokesdale, NC AC-6015 WATER E?TCODUTERED - none at T03 none at 48 hrs � u1 SOIL. OESCRIPTEOH 6/5/20 B--6 Building 8ORiNG TERMINATED 20' PENCTRXT104 RESISTANCE I8lOri5 ?Ea POCTt to 70 40 60 30 iaj 411 7' 16' 20 Topsoil 913 Stiff to firm red fine grained micaceous sandy silt Apparent Residual 908 Firm light red fine grained micaceous sandy silt 903 898 Firm light brown fine grained micaceous sandy silt Boring terminated at 20' 893 TEST H 0IR 1 -N G R E G 0 R _ ..-� �S. F = .� --� �.✓ :^ � s � �. � :r � c-s "sK � 's.J �'� Pe. f'.! & a � 5 � �, � 4� �.7 c '' � 7 :.,i Gam' PROS CT: project Optic Stokesdale, NC AC-6015 WM:E-R 8-NCOUNTER,ED; none at TOB none at 48 hrs r � u SOIL DESCRIFTIOH 6/5/20 SORING No_ B-7 Building SORIHG TERMINATED 20' j PENETRATfON RESISTANCE v [eLO'ffS PEFt FCOT1 A s g Rt.„�� PROJECT: Project Optic Stokesdale, NC AC-6015 'WI&TER ENCOTJLITER.ED ; none at TOB none at 48 hrs F w SOIL OESCRIrTIOX 6/5/20 BoRiNc N©_ B-8 Building EORING TERMINATED 20' PENETRATION RES1STXNCE 18�-OM PER FOOT) 10 70 40 EO .80 1CYO 41, 11' 16' 20' I opsoi 1 � 917 ] } I Stiff to firm red fine grained micaceous sandy silt Apparent Residual 912 907 902 Firm brown red fine grained micaceous snarly silt Firm light brown fine grained micaceous sandy silt Boring terminated at 20' 9 897 � EE S T 1 G RECORD PRO.TE CT ; Project Optic Stokesdal e, NC AC--5015 WA.'EER EUCCU TERED : none at TOB none at 48 hrs s � 3' w SOIL DESCRIPTIOK 6/5/20 s o P- I N c?q o_ B-9 Parking / Drives S©RIND TERIA{ DATED 7' PEHLTRATION RESFSTANCE w #aLOYri PER FOOT; 0 to 70 40 cc 20 fclJ 41] 7 E 421 7 Topsoil 913 ' Stiff red fine grained micaceous sandy silt Apparent Residual Firm light brown red fine grained micaceous sandy silt Boring terminated at 7' 908 903 T E 3T BORIMIG E ELF 0 R ��� ANr.-z�� r cox ; _- 6/5/20 PFMTECT: Project Optic Stokesdale, NC AC-6015 WA -TER tsNCOU NT'E�,D - none at TOB none at 48 hrs N � SDIL DESCRIPTION coninc Ho_ B-10 Building EORING TERM,,1RAT€D 20' j PENETRATION RES1STAriCE w 18LOYf PER FOOT) 0 10 20 40 60 80 100 3" ' Topsoil 913 Stiff to firm red fine grained micaceous ' sandy silt Apparent Residual 7` 908 Stiff light brown fine grained micaceous sandy silt 11' 903 Firm green brown fine grained micaceous sandy silt 898 20' L— - 893 Boring terminated at 20' i 3 � E'T H 0 S 1G RECORD 7 e ,-� ,ram 4 m �--� r, _ -, -- Y 5�3i.,-vim p Ro TE CT ; Project Optic Stokesdale, SIC AC-6015 WATER FNCOUNTERED ; none at TOB none at 48 hrs �LQ � U ' SOIL DESCRIMOX 6/5/20 SORING No_ B-11 Building KRING TERMINATED 20' PENCTRATJON RESISI'AHCE cu IBLOM PER FOOTI '+U 0 IQ 70 40 60 80 1W 411 4' 7' 20' Topsoil 906 Stiff red fine grained micaceous sandy silt Apparent Residual Firm light red fine grained micaceous sandy silt 901 Firm light brown fine grained micaceous sandy silt Boring terminated at 20' I 896 891 886 TEST SOPHNIG BECK 6/6/20 P p.0 iE CT : Project Optic Stokesdale, NC AC-6015 WATER ENCOUNTERED- none at TOB none at 48 hrs SOIL DESCRIP IOX z o R (!,t [; No- B-12 Bui 1 di ng BORING TEAMIHATED 15' PENETPATION RESISTANCE w (3LQVr-j PER FOOT) J rL 0 10 70 to Ed ao 100 3„I 12' 15' Topsoil 912 i Stiff to firm red fine grained micaceous sandy silt Apparent Residual 907 902 897 Stiff to very hard light brown fine grained micaceous sandy silt Auger refusal at 15' Boring terminated at 15' TEST BOR I IN G 8 E00R0 Alffl Az"tA � ��i� fir- �, = 6/6/20 FPCOJECT _ Project Optic Stokesdale, NC AC-6015 WATER ENCIDUUTER D z none at TOB none at 48 hrs U_ Ui u SOIL DESCRIPTIOX acRiNG Ho_ B-12A Building BORING TERMINATED 20' PEHETR kTION RESISTANCE w (SLCtiY`a PER FOOT} w a .a as +o W ao ;co 3„ 13' 20' Topsoil L 912 1 1 i f I l 1 l I Stiff red fine grained micaceous sandy silt Apparent Residual 907 902 Stiff to firm light brown fine grained micaceous sandy silt terminated at 20' � 897 HBoring p_., e w ^a;'aT�, iN-c F-.; a"' fa f3.l� 3 •9•F_-: r"�`��r^: ''F�'g'� 6/6/20 PROJECT: Project Optic Stokesdale, NC AC-6015 WATER EiiCOUNTER ED : none at TDB none at 48 hrs z � �` tJ SOIL OESCRIPT€OX ,aRiuc No_ B-13 Building E 0 R I N G TERM,IHAT ED 20' FENETA kTJON RESISTktgCE (BLOW', FER FOOT) J w 10 70 40 Ed 80 T 5E' E 4' 7' 11' 20' Topsoil 907 I Stiff red fine grained micaceous sandy silt Apparent Residual Firm light red fine grained micaceous sandy silt 902 Firm light brown red fine grained micaceous sandy silt 897 Firm light brown fine grained micaceous sandy silt Boring terminated at 20' 892 887 TEST NR1 H 0 RECORD A z A-_ a _ —,-._.'✓_`^ 6/6/20 PROJECT : Project Optic Stokesdale, NC AC-6015 WATER FITCOTLTTERF-D ; none at TDB none at 48 hrs z� .. 41 SOIL DESCRIPTIOX so Rl 1,1 c No. B-14 Sediment Basin BORING TERMINATED 10' PKhGTAATION RESiST,04CE IST.OM PER FOOTI 10 70 1Q FA a Ioa 4"1 31 10' Topsoil 880 875 Light red fine grained micaceous sandy silt Apparent Resiudal Dark red fine grained micaceous sandy silt Boring terminated at 10' 870 TEST 8 0 R IG' SECORD 6/6/20 P Rb TE cT : Project Optic Stokesdale, IBC AC-6015 WATER E!TCCT TERED - nDne at 10B none at 48 hrs z � ~' u SOIL DESCRI?T€OX 8 a R i ; x o_ B-15 Sediment Basin BORII(G TERMINATED 10' PENCTRATiOH AESiSTANCE IBLO'rfa PER FOOT] W 0C 6" ` 4' 10' Topsoil 882 Light red fine grained micaceous sandy silt Apparent Residual Dark red fine grained micaceous sandy silt Boring terminated at 10' I 877 872 TEST B0 E I V1 G 8 E � 0 RD PPbJ—,CT_ Project Optic Stokesdale, NC AC-6015 WATER ENCOTUTERFD : none at TOB none at 48 hrs SOIL DESCRIPTIOX 6/6/20 E D R( h G H 0_ B-16 Parking / .Drives N R iN G 1 E R M I N A T C Q 7' PENETRATION nESISiANCE w (a�OM PER FOQTI J 'J 0 10 70 40 &7 20 tcc 4 1Topsoil 7' 904 i Stiff red fine grained micaceous sandy silt Apparent Residual Boring terminated at 7' 899 894 TEST E 0R1NG E E G 0 R 0 f"i.! .5 a ` 5 ' � S `�=•�7 d""' 1 NT 6/6/20 PROJECT: Project Optic Stokesdale, HC AC-6015 WA,TEP EZIC01PL{IERED: none at TOB none at 48 drs SM DESCRIPTION 0 RI u C�q o_ 3-17 Park i ng / Drives SCRixu TERMUNATED V PP;ETRAT104 RESISTANCE u iBLOM) PER FOOT) J w 0 t0 X 40 FA 20 TGo 5�� 7 7' Topsoi 1 895 1 Stiff red fine grained micaceous sandy silt Apparent Residual Boring terminated at 7' 890 885 TEST 8RIG BEGORD 6/6/20 pRbJEcT; Project Optic Stokesdale, IBC AC-6015 WlkTRYQ- ENCOU'LrTERED : none at TOB none at 48 hrs ~ w t� w C] � 4" 7' SOIL DESCRIPTION E o a( N c n D. B-18 Parking / Drives SUNG TERMINATED 7' PSNETR1.TrON REsrsTAfdcE (eL.0',6 PER FOOT) W o 10 70 40 ea a0 iao ' Topsoil � 895 i I Stiff to firm red fine grained micaceous sandy silt Apparent Residual Boring terminated at 7' 1 890 885 Pao -ECT: Project Optic Stokesdale, NC AC-6015 W:LTER EtiCOUCiTERED - none at TOB none at 48 hrs LU SOIL DESCRIYTtOX 6/6/20 s o r,) h G x o_ B-19 Parking / Drives EORING 7ERIMNATED 7` PENCTRAi1O1q AES[STAtdC� w #BL0'r�—S PEFt FOOT) ;u 0 t0 70 40 &C a 1ai 411 ` . I 7' Topsoil I i 904 Stiff red fine grained micaceous sandy silt Apparent Residual Boring terminated at 7' 899 894 T E 8T B 0 R1V'G 8EC.0RP -- _ - - - _- _�� � - ����. .�� _.zr_•i �s �Ci�.S ... a-+�Jtvi'i�� 3ii�.: '--T------- prr [ it i 1 .7 f , r , 4 _� V -- _� l�iar�' ^`_ ""_ -_-- , F�'• \,! ] J '. % Jam/ i � � ' . / -I � _�` ~i 1 1 1` •_- -., .-.. � _ NV-14,,O� - - ---'�- _ -- _ ! / t} ,\ `___�i II J�1r l ��.yr-��-�'__r/ ' � �J - /' � -.< •'S ,'r r3 / Q L O CJ] FQ ,� 'in To proL= our clients, the public attd ourselves, our reports = submitted as the omEdential property of the clicuts, and aLuhcrizatim of 52atcmcnu cciodusims, ndza= from orregztdmg our renoms is resa d pmdmg our wriuca agprovaL. ATLANTIC COAST ENGINEERING AND TESTING, INC. S LOCKHEED COURT GREENSBORO, N.C. 27409 �24tiG J �S�" PHONE: 336-664-5900 FNGINF.FRtNG Client: Choat Construction C an Client's No. Report of: MOISTURE -DENSITY (PROCTOR) RELATIONSHIP OF SOIL Report No. ND-1 Laboratory No. Job No. AC-6015 A. ORIGIN AND DESCRIPTION OF SAMPLE Project: Project Optic, US Hwy 220/1-73 at NC Hwy 65, Stokesdale, IBC Specific Location of Sample: corrlposite sample of up r 5' of B-1, B-2, B-3, B-4, 3-5, B-6, B-7, B-10, B-11 & B-12 Soils Technician Sampling: T. Venable & M. Gray Date 6/11/20 Est . Vol . of Soil Represented by Sample Cu. Yds. Number of S?mplmgs to Form Composite of Sample Weight of Total Sample: _ 56 Ibs; Description of Soil (Visual -Manual Procedure): _ fine grained micaceous sandy s Color: red Odor: none Natural Field Density: Loose ❑; Dense �]; Consistency: Soft ❑; Firm ®; Stiff ❑; very Stiff ❑; Hard ❑. Grairtsiza Distribution B. PHYSICAL CHARACTERISTICS Sample Moisture Content: __ 33.3 % Sieve Size E % Passing Plasticity (By Visual -Manual Procedure ❑: Non -Plastic ❑; Low P'astic ;;X; Medium Plastic ; High Plastic C, i Soil Classification: Classification System: USCS I C. MOISTURE -DENSITY TEST 88 87 86 85 wall 25 26 27 ail Mois 29e Content 0(°�) 31 32 33 34 Method of Test: E$j ASTM 0698, Method ; ASTM 01557, Method ; 71 Other (Define) OPTIMUM MOISTURE CONTENT 29.4 OX MAXIMUM DRY DENSITY86.8 Lbs./Cu. Ft, SUGGESTED OPERATING MOISTURE RANGE TO OBTAIN MAXIMUM DRY DENSITY = a to — % Lab .Technician D. Lovette Remarks: Distribution: June 18, 2020 Project No. R-2020-133-001 Mr. Darren Lovette Atlantic Coast Engineering and Testing, Inc. 8 Lockheed Court Greensboro, NC 27409 Transmittal Laboratory Test_Results NC-65 & US-220 North Drill Site Please find attached the laboratory test results for the above referenced project. The tests were outlined on the Project Verification Form that was transmitted to your firm prior to the testing. The testing was performed in general accordance with the methods listed on the enclosed data sheets. The test results are believed to be representative of the samples that were submitted for testing and are indicative only of the specimens which were evaluated. We have no direct knowledge of the origin of the samples and imply no position with regard to the nature of the test results, i.e. pass/fail and no claims as to the suitability of the material for its intended use. The test data and all associated project information provided shall be held in strict confidence and disclosed to other parties only with authorization by our Client. The test data submitted herein is considered integral with this report and is not to be reproduced except in whole and only with the authorization of the Client and Geotechnics. The remaining sample materials for this project will be retained for a minimum of 90 days as directed by the Geotechnics' Quality Program. We are pleased to provide these testing services. Should you have any questions or if we may be of further assistance, please contact our office. Respectively submitted, Geotechnics, Inc. 1&;4'ell Michael P. Smith Regional Manager We understand that you have a choice in your laboratory services and we thank you for choosing Geotechnics. DCN: Uala Twminina! Lefler Dare: 1'2&/63 Rev.: 2200 Westinghouse Blvd., Suite 103 • Raleigh, NC 27604 • Phone (919) 876-0405 • Fax (919) 876-0460 • www.geotechnics.net technics qeotschrid & geosynthetic testing MOISTURE CONTENT ASTM D 2216-10 Client: Atlantic Coast Eng. & Testing, Inc. Client Reference: NC-65 & US-220 North Drill Site Project No.: R-2020-133-001 Lab ID: -001 Boring No.: NA Depth (ft): NA Sample No.: S-1 Tare Number 727 Wt. of Tare & Wet Sample (g) 721.93 Wt. of Tare & Dry Sample (g) 608.44 Weight of Tare (g) 142.52 Weight of Water (g) 113.49 Weight of Dry Sample (g) 465.92 Water Content (%) 24.4 Notes : Tested By RFF Date 6117/20 Checked By GEM Date 61IW20 page 1 of 1 OCN' CT-S1 DATE: 3116113 REVISION: 4 2200 Westinghouse Blvd., Suite 103 • Raleigh, NC 27604 • Phone (919) 876-0405 • Fax (919) 876-0460 • www.geotechnics.net SIEVE ANALYSIS ASTM D 422-63 (2007) Client: Atlantic Coast Eng. & Testing, Inc. Client Reference: NC-65 & US-220 North Drill Site Project No.: R-2020-133-001 Lab ID: R-2020-133-001-001 Boring No.: NA Depth (ft): NA Sample No.: S-1 Soil Color: Red otechnics gemech�,kal &� g�Riy��hetic �es�n� SIEVE ANALYSIS HYDROMETER USCS cobbles ravel sand silt and clay fraction USDA cobbles gravel sand I silt Iclay 100 90 80 70 o 40 U G7 IL 30 20 10 0 4" 1000 100 10 1 0.1 0.01 0.001 Particle Diameter (mm) Sieve Sizes (mm) USCS Summary Percentage Greater Than #4 Gravel 0.00 #4 To #200 Sand 30.00 Finer Than #200 Silt & Clay 70.00 USCS Symbol: ML, TESTED USCS Classification: SANDY SIL T (Non -Plastic) page 1 of 2 DCN: CT-53TW DATE: 6119119 REVISION' 0 S£xceAFxcef QA0preadsheets1Siavel4ydi.x1s 2200 Westinghouse Blvd., Suite 103 • Raleigh, NC 27604 • Phone (919) 876-0405 • Fax (919) 876-0460 • www.geotechnics.net Client: Client Reference: Project No.: Lab I D: WASH SIEVE ANALYSIS ASTM D 422-63 (2007) Atlantic Coast Eng. & Testing, Inc. NC-65 & US-220 North Drill Site R-2020-133-001 R-2020-133-001-001 Boring No.: NA Depth (ft): NA Sample No.: S-1 Soil Color: Red ectechnics genPer�€rical & geasynthetic caring Moisture Content of Passing 3/4" Material Moisture Content of Retained 314" Material Tare No.: 727 Tare No.: NA Wt. of Tare & Wet Sample (g): 721.93 Weight of Tare & Wet Sample (g): NA Wt. of Tare & Dry Sample (g): 608.44 Weight of Tare & Dry Sample (g): NA Weight of Tare (g): 142.52 Weight of Tare (g): NA Weight of Water (g): 113.49 Weight of Water (g): NA Weight of Dry Soil (g): 465.92 Weight of Dry Soil (g): NA Moisture Content Wet Weight of -314" Sample (g): Dry Weight of - 3/4" Sample (g) Wet Weight of +3/4" Sample (g) Dry Weight of + 3/4" Sample (g) Total Dry Weight of Sample (g): 24.4 Moisture Content 0.0I NA Weight of the Dry Sample (g): 465.92 465.92 Weight of Minus #200 Material (g): 326.14 0.00 Weight of Plus #200 Material (g): 139.78 0.00 465.92 Sieve Sieve Weight of Soil Percent Accumulated Percent Accumulated Size Opening Retained Retained Percent Finer Percent Retained Finer (mm) O N N N %) 12" 300 0.00 0.00 0.00 100.00 100.00 6" 150 0.00 0.00 0.00 100.00 100.00 3" 75 0.00 0.00 0.00 100,00 100.00 2" 50 0.00 { * } 0.00 0.00 100.00 100.00 1 1/2" 37.5 0.00 0.00 0.00 10000 10(1.00 1" 25.0 0.00 0.00 0.00 100.00 100.00 3/4" 19.0 0.00 0.00 0.00 100.00 100.00 1/2" 12.5 0.00 0.00 0.00 100.00 100.00 3/8" 9.50 0,00 0.00 0.00 100.00 100.00 #4 4.75 0.00 0.00 0.00 100.00 100.00 #10 2.00 0.92 0.20 0.20 99.80 99.80 #20 0.85 2.72 (*") 0.58 0.78 99.22 99.22 #40 0.425 3.65 0.78 1.56 98.44 98.44 #60 0.250 3.74 0.80 2.37 97.63 97.63 #140 0.106 92.05 19.76 22.12 77.88 77.88 #200 0.075 36.70 7.88 30.00 70.00 70.00 Pan - 326.14 70.00 100.00 - - Notes : {' j The + 3/4" sieve analysis is based on the Total Dry Weight of the Sample { **) The - 3/4" sieve analysis is based on the Weight of the Dry Sample Tested By TB Date 6/17/20 Checked By GEM Date 6118/20 page 2 of 2 DM CTS3TW DATE 6119119 REVISION: 6 S:ExceAExce) CA ISpreadsheets4SieveHyddxis 2200 Westinghouse Blvd., Suite 103 • Raleigh, NC 27604 • Phone (919) 876-0405 • Fax (919) 876-0460 • www.geotechnics.net ATTERBERG LIMITS ASTM D 4318-10 Client: Atlantic Coast Eng. & Testing, Inc. Client Reference: NC-65 & US-220 North Drill Site Project No.: R-2020-133-001 Lab 1D: R-2020-133-001-001 As Received Water Content Tare Number 727 Wt. of Tare & Wet Sample (g) 721.93 Wt. of Tare & Dry Sample (g) 608.44 Weight of Tare (g) 142.52 Weight of Water (g) 113.49 Weight of Dry Sample (9) 465.92 Water Content (%) 24.4 ectechnics seatechnic�l & geasylltnelic �e5;irg Boring No.: NA Depth (ft): NA Sample No.: S-1 Color: Red ( MInus No. 40 sieve material) NON - PLASTIC MATERIAL Tested By SS Date 6116120 Checked By GEM Date 6117120 IDCN: CTS4C, DATE: 4127117, REVISION: 4e S:0xceAFxcet QAISpreadsheet, lUrnit NP_xls 2200 Westinghouse Blvd., Suite 103 • Raleigh, NC 27604 • Phone (919) 876-0405 • Fax (919) 876-0460 • www.geotechnics.net