Loading...
HomeMy WebLinkAbout20040289 Ver 1_Meeting Minutes_20020920 September 20, 2002 Subject: Draft Minutes Interagency Permit Drawing Review Meeting on September 19, 2002, for R2911A, Iredell County. Team Members John Hendrix - USAGE (Present) Cynthia Van Der Wiele - NCDWQ (Present) Marla Chambers - NCWRC (Present) Marella Buncick - USFWS (Absent) Christopher Militscher -USEPA-Raleigh (Present) Matt Haney - NCDOT PDEA (Present) Participants: David Chang - NCDOT Hydraulics Diane Hampton - NCDOT Division 9 Jerry Parker - NCDOT PDEA Ted Bitterfield -USEPA Marshall Clawson - NCDOT Hydraulics Nidal Albadawi - NCDOT Design Services Anne Gamber - NCDOT Hydraulics The meeting began with Marshall Clawson giving a brief description of [he project. The project consists of the widening of US 70 from SR 2318 near Statesville to Rowan County line. 1. Sites 1,2 and 3: No comments. 2. Site 4: The hydraulics unit will check if the upstream pipe is perched. Action taken: The pipe is an outlet for a dam. Site 5: John Hendrix had not been advised of the crossing at Y8 in the alternate selection process and if the crossing is necessary then all alternatives would need to be reinvestigated. Nidal Albadawi stated that the Y line was necessary to provide access to the people who lived in the Forest Acres Mobile Home Park. John Hendrix stated that he would not approve permit with Site 5 as presented. From an email sent September 20, 2002, John Hendrix offered these alternatives: 1) Eliminate Y8 and proceed with the permit process; 2) Provide the review team with a full assessment of the access issue, including affected parties/parcels, existing access routes, alternatives for regaining lost access, and specific alternatives to the proposed spur road location, if that concept is the best solution available. Action taken: Virginia Mabry will coordinate with PDEA planner to address this issue. 4. Sites 6 and 7: No comments. 5. Sites 8 and 9: These sites were deemed non-jurisdictional and omitted.