Loading...
HomeMy WebLinkAboutNCC204018_NOI Application_20200917Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 9/11/2020 3:28:46 PM (NCG01 NOI Submission) Approve by Garcia, Lauren V 9/14/2020 9:18:59 AM (Review- Construction NOI 31331) • The task was assigned to Garcia, Lauren V by round robin distribution 9/11/2020 3:29 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: September 15, 2020 5:00 PM 9/11/2020 3:29 PM Submit by McCoy, Suzanne 9/17/2020 11:19:51 AM (Payment Verification for NCC204018) * Jennifer Diaz • McCoy, Suzanne assigned the task to McCoy, Suzanne 9/17/2020 11:19 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: October 26, 2020 5:00 PM 9/14/2020 9:19 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting r No an NOI that was r Yes rejected before? Previous Rejected 31249 NOI No. Prior Reviewer Lauren Garcia Name 1a. Project Name * Boykin PV1 Solar Power Plant 1 b. Specific Lot This field may be used to list specffc lot numbers. Numbers 2. County* Cumberland 3. Highway or Street James Dail Road Address * Street narre only is acceptable if no address number assigned yet 4. City or Township* Wade 5. State * NC 6. Zip Code * 28395 7. Latitude * Enter the latitude in decimal degrees 35.1048 8. Longitude* Enter the longitude in decimal degrees (MJSTbe negative) -78.7458 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 06/01/2020 Estimated Construction Project Start Date 10. Date to End* 06/30/2021 Estimated Construction Project End Cute 11. SIC (Primary) * Other (9999) Standard Industrial Classification for Ceveloprrent 12. Acres to be 158.10 disturbed* (including off -site borrow and waste areas) 13. Total site area 158.10 (acres) * 14. Post- 7.91 construction (Estimated) impervious area (acres) * NCC Project NCC-CUMBE-2020-Boykin PV1 Solar Power Plant Tracking ID Assigned automatically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Bakers Swamp Waterbody * %rre of waterbody into which stormwater runoff will discharge 15b. Waterbody 18-28-2-2 Index No.* NCWaterbody Index Number Stormwater r No discharges will flow Pf Yes to additional wate rs * 15c. Additional Reece Creek Receiving Waterbody name Waterbody 15d. Waterbody 18-28-2 Index No. NCWaterbody Index Number 15e. Additional Waterbody nacre Receiving Waterbody 15f. Waterbody NCWaterbody Index Number Index No. 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. Rarmttee Inforrration - Legally Fbsponsible Entity and Individual ........................................................................................................................................................... Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally P9sponsible Entity Name * Fresh Air Energy )00(VIII, LLC If pernittee is an individual (i.e., organization does not apply), enter first and last nave in this field. Note: The organization name must match the business entity name registered with the NC Secretary of State. You can verify the registration here. 2. First Name * Roger If Corporation, enter Faegistered Agent First Narre 3. Last Name* Baele If Corporation, enter Fbgistered Agent Last I\brre 3b. Title Sr. Vice President EPC 4. Permitee E-mail rbaele@ecoplexus.com Address* 5. Permittee 984-244-5069 Telephone No.* 6. Permittee Mailing Street Address Address* P.O. Box 13902 Address Line 2 City State / Province / Fbgion Durham NC Postal / Zip Code Country 27709 us Check box if the r" Yes street address the same as mailing address 7. Permittee Street Street Address Address* 600 Park Offices Drive Address Line 2 Ste. 285 City State / Province / Pegion Durham NC Fbstal / Zip Code Country 27709 us 8. Type of Non -Government Ownership* C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Jim Contact - First Name * 2. Primary Site Halley Contact - Last Name * 3. Title Director Civil Engineering 4. Site Contact E- jhalley@ecoplexus.com mail Address* 5. Site Contact 984-244-5069 Telephone No. 6. Organization Ecoplexus Inc. Name 7. Site Contact Street Address Mailing Address* P.O. Box 13902 Address Line 2 city Durham Fbstal / Zip Code 27709 8. Consultant Name (Optional) Lee Price First and Last nacre 9. Consultant E-mail leep@bapa.eng.pro This person will be copied on all correspondence. 10. Consultant 919-929-0481 Telephone No. State / Rovince / Region NC Country us D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 05/01/2020 Approved * 2. E&SC Plan Project CUMBE-2019-149 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Fayetteville (FRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan 2020-05-01 NCDEQ Approval - Boykin.pdf 96.12KB Approval letter or Mast beRDFformat Grading Permit 6. Site Location Map Helpful for linear project review (Optional) Mast be RDFform3t. Rease do not upload entire set of E&SCplans. 7. Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies for linear projects if necessary. 8. NOI Certification NCG01-eNO1-Certification-Form-20190919-DEMLR- Form 1.67MB SW -Boykin - signed.pdf Mast be FCFfon-rat This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Roger E. Baele Title Senior Vice Presided of EPC/Operations Organization Legally Plesponsible Entity Fresh Air Energy X)0(VIII, LLC Date * 09/11 /2020 F. Tracking and COC Info NOI Tracking No. 31331 NC Reference No. NCG01-2020-4018 Uses 'count_nurrber' variable (increrrented by SP) Certificate of NCC204018 Coverage (COC) Uses 'count number' variable (increrrented by SP) No.* Count Number 4018 Sequential nurrber for subrrittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.) Initial Invoice No. NCC204018-2020 Invoice Due Date 10/14/2020 Initial Fee $ 100.00 Invoice Status OPEN