Loading...
HomeMy WebLinkAboutWQCS00055_NOV-2020-DV-0368 Response_20200908NEN° City of Henderson o� Public Works Department moo"� Post Office Box 1434 •900 S. Beckford Drive Henderson, NC 27536-1434 Phone: (252) 431-60301 Fax: (252) 431-0124 September 8, 2020 NC Dept of Environmental. Quality Mr. Scott Vinson, Regional Supervisor Water Quality Regional Operations Section SEP 16 2020 Raleigh Regional Office Division of Water Resources, NCDEQ 1628 Mail Service Center Raleigh Regional Office Raleigh, NC 27699-1628 Re: Response to Notice of Violation & Intent to Issue Civil Penalty Tracking No. — NOV-2020-DV-0368 Sanitary Sewer Overflows —July 2020 Henderson Collection System Permit No. — WQCS00055 Dear Mr. Vinson: I am writing in response to the above mentioned violation that we received on August 26, 2020. The spill in incident 202002254 at the Sandy Creek Pump Station was due to a failure on the battery backup for the PLC and SCADA system. We received a call on July 30 that the alarm was going off at the Sandy Creek Pump Station. Henderson Water Reclamation Crews responded to find the PLC and SCADA systems had shut down due to a failure in the battery backup. Crews rebooted the battery backup, immediately putting the station back to normal operation and stopping the SSO. All debris and contaminated dirt was removed and lime was placed on the affected area. Oxygen levels were taken upstream and downstream from the spill. The DO levels were not low enough to feed chemicals into the creek. After the SSO we had Lord and Company, the SCADA provider, evaluate the battery backup to figure out why it failed. They concluded that the power supply and the batteries needed to be replaced. We replaced the batteries and the power supply. We also installed a Watchdog timer as a redundant backup to notify the plant when the PLC is running on the backup battery. Thank you very much for the opportunity to respond. We take our responsibility to maintain compliance for our collection system very seriously. I trust that you find the City's actions for compliance are satisfactory. Please feel free to contact our staff or myself should you need any further information. Sincerely, �- 0.( - Lee Owen Assistant Public Works Director A Attachments: HWRF Field Parameter Data Sheet CC: Edward Terrell Blackmon, City Manager Andy Perkinson, Public Works Director Joey Long, Distribution & Collection System Supervisor— Collection System ORC Christy Lipscomb, KLRWP Director/ORC, HWRF ORC Teddy Felts, Chief Plant Operator File City of Henderson WRF/ Field Parameter Data Sheet Page 1 of 1 Date 7130120 Analyst(s) DJ. SD. EC Signature (s) Location Time Conductivity (US/cm) DO mg1L pH (SU) Temp C° Comment SandX Creek PS Upstream 1616 5.8 Sandy Creek PS Downstream 1 1620 1.8 Sandy Creek PS Downstream 2 1622 3.2 Sandy Creek PS Downstream 3 1624 1.7 J IPUBLIC WORKSl06_PW_UTILITIE:SID1_Sewer102_SSOINOVt20201NOV-2020-DV-03681HWRF Field Parameter Data Sheet