HomeMy WebLinkAbout20200918 Ver 1_More Info Received_20200914Strickland, Bev
From: Daniel Kuefler <daniel.kuefler@wetlands-epg.com>
Sent: Monday, September 14, 2020 1:11 PM
To: Johnson, Alan
Subject: [External] Re: Glen AFTON
Attachments: Glen Afton PCN form_Signed_091420.pdf
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Alan,
Must have inadvertently attached an unsigned page on that PCN form, but the online version would have had to
be signed in order to submit. I've attached a signed copy of the form here - please let me know if you need
anything else.
Daniel
On Mon, Sep 14, 2020 at 9:55 AM Johnson, Alan <alanJohnsonkncdenr.gov> wrote:
I need a signed application. I am looking at the corps app. Did you sign the online version
DWR
D4n 0 WAtt■ RC#Oumq{
Alan D Johnson — Senior Environmental Specialist
NC Dept. of Environment & Natural Resources (NCDENR)
Division of Water Resources - Water Quality Regional Operations
610 East Center Ave., Suite 301, Mooresville, NC 28115
Phone: (704) 235-2200 Fax: (704) 663-6040
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be
disclosed to third parties unless the content is exempt by statute or other regulation.
1
Daniel Kuefler
Wetlands & Environmental Planning Group
Leonard S. Rindner, PLLC
www.wetlands-epg.com
336.554.2728
oliiii� 1s
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.4 January 2009
Pre -Construction Notification (PCN) Form
A. Applicant Information
1. Processing
1 a. Type(s) of approval sought from the Corps:
X❑ Section 404 Permit ❑ Section 10 Permit
1 b. Specify Nationwide Permit (NWP) number: 39 or General Permit (GP) number:
1 c. Has the NWP or GP number been verified by the Corps?
❑ Yes X❑ No
1 d. Type(s) of approval sought from the DWQ (check all that apply):
❑X 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit
401 Water Quality Certification — Express Riparian Buffer Authorization
1 e. Is this notification solely for the record
because written approval is not required?
For the record only for DWQ
401 Certification:
❑ Yes El No
For the record only for Corps Permit:
❑ Yes X❑ No
1f. Is payment into a mitigation bank or in -lieu fee program proposed for
mitigation of impacts? If so, attach the acceptance letter from mitigation bank
or in -lieu fee program.
❑ Yes X❑ No
1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h
below.
❑ Yes ❑X No
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes X❑ No
2. Project Information
2a. Name of project:
Glen Afton Shops
2b. County:
Cabarrus
2c. Nearest municipality / town:
Kannapolis
2d. Subdivision name:
2e. NCDOT only, T.I.P. or state project no:
3. Owner Information
3a. Name(s) on Recorded Deed:
M & L Property Developement, LLC
3b. Deed Book and Page No.
Book 13346, Page 45; Book 13316, Page 144
3c. Responsible Party (for LLC if
applicable):
Richard Meeks
3d. Street address:
313 S Main St., Suite 100
3e. City, state, zip:
Kannapolia, NC 28081
3f. Telephone no.:
794-796-8125
3g. Fax no.:
3h. Email address:
rmeeks34@gmail.com
Page 1 of 10
PCN Form — Version 1.4 January 2009
4. Applicant Information (if different from owner)
4a. Applicant is:
❑ Agent ❑ Other, specify:
4b. Name:
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name:
Heath Caldwell
5b. Business name
(if applicable):
Wetland & Environmental Planning Group
5c. Street address:
10612-D Providence Road, PMB 550
5d. City, state, zip:
Charelotte, NC 28277
5e. Telephone no.:
704-904-2277
5f. Fax no.:
5g. Email address:
heath.caldwell@wetlands-epg.com
Page 2 of 10
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID):
56010362330000, 56010371750000
1 b. Site coordinates (in decimal degrees):
Latitude: 35.42325 Longitude:-80.67571
1 c. Property size:
3.442 acres
2. Surface Waters
2a. Name of nearest body of water to proposed project:
Afton Run
2b. Water Quality Classification of nearest receiving water:
C
2c. River basin:
Rocky/03040105
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
The topography is gently to moderately sloped with the elevation ranging from 640 to 670 ft. (Figure 1). The site is an open, abandoned lawn and
field, with a disturbed semi -wooded drainage. There is a sanitary sewer line right of way traversing the site. There is roadside frontage along
Kannapolis Parkway and an overhead power line right of way parallels the road corridor.
3b. List the total estimated acreage of all existing wetlands on the property: NA
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 482
3d. Explain the purpose of the proposed project:
The project consists of grading, fill, and BMP for a commercial development
3e. Describe the overall project in detail, including the type of equipment to be used:
Fill and grading of the site will use standard equipment- excavator, dump truck, track how, etc.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project including all prior phases in the past?
X❑ Yes ❑ No ❑ Unknown
Comments:
4b. If the Corps made the jurisdictional determination, what type
of determination was made?
❑x Preliminary ❑ Final
4c. If yes, who delineated the jurisdictional areas?
Name (if known): Nic Nelson
Agency/Consultant Company: WEPG
Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
SAW-2019-00103
A PJD was submitted and the site was field verified by David Schaffer on 11/8/19. See JD section for more details and updates.
5. Project History
5a. Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past?
❑ Yes X❑ No ❑ Unknown
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project?
Yes ® No
6b. If yes, explain.
Page 3 of 10
PCN Form — Version 1.4 January 2009
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
❑ Wetlands X❑ Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
Wetland impact
number
Permanent (P) or
Temporary T
2b.
Type of impact
2c.
Type of wetland
2d.
Forested
2e.
Type of jurisdiction
Corps (404,10) or
DWQ (401, other)
2f.
Area of
impact
(acres)
W1 Q
Choose one G
Choose one
Yes/No
W2
Choose one
Choose one
Yes/No
W3
Choose one
Choose one
Yes/No
W4
Choose one
Choose one
Yes/No
W5
Choose one
Choose one
Yes/No
W6
Choose one
Choose one
Yes/No
2g. Total Wetland Impacts:
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
Stream impact
number
Permanent (P) or
Temporary (T)
3b.
Type of impact
3c.
Stream name
3d.
Perennial (PER) or
intermittent (INT)?
3e.
Type of
jurisdiction
3f.
Average
stream
width
(feet)
3g.
Impact
length
(linear
feet)
S1 P
FIII
Stream A-1
INT
Corps
2
45
S2
Choose one
S3
Choose one
S4
Choose one
S5
Choose one
S6
Choose one
3h. Total stream and tributary impacts
45
3i. Comments:
35 LF disturbance for slope tie-in, 10 LF disturbance for rip rap apron Rip rap will be installed at preconstruction streambed elevations.
Page 4 of 10
PCN Form — Version 1.4 January 2009
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then indivi ually list all open water impacts below.
4a.
Open water
impact number
Permanent (P) or
Temporary T
4b.
Name of waterbody
(if applicable)
4c.
Type of impact
4d.
Waterbody
type
4e.
Area of impact (acres)
01 -
Choose one
Choose
02
Choose one
Choose
03
Choose one
Choose
04
Choose one
Choose
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If pond or lake construction proposed, then complete the chart below.
5a.
Pond ID number
5b.
Proposed use or
purpose of pond
5c.
Wetland Impacts (acres)
5d.
Stream Impacts (feet)
5e.
Upland
(acres)
Flooded
Filled
Excavated
Flooded
Filled
Excavated
P1
Choose one
P2
Choose one
5f. Total:
5g. Comments:
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If any impacts require mitigation, then you MUST fill out Section D of this form.
6a. Project is in which protected basin?
❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other:
6b.
Buffer Impact
number —
Permanent (P) or
Temporary T
6c.
Reason for impact
6d.
Stream name
6e.
Buffer
mitigation
required?
6f.
Zone 1
impact
(square
feet)
6g.
Zone 2
impact
(square
feet
B1 -
Yes/No
B2
Yes/No
B3
Yes/No
B4
Yes/No
B5
Yes/No
B6
Yes/No
6h. Total Buffer Impacts:
6i. Comments:
Page 5 of 10
D. Impact Justification and Mitigation
1. Avoidance and Minimization
la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Impacts associated with the proposed development were limited through site selection, location, design, and location/orientation of the proposed
lots and access routes. Shown on the attached exhibits, the buildings are placed on the Kannapolis Parkway side of the entry drive for the gravity
access to sewer. Also, placing the buildings on the opposite side of the entry drive would require more fill and more stream impacts.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Construction techniques will implement approved erosion control methods to avoid/minimize to onsite/adjacent offsite receiving conveyances. This
includes using 2:1 slopes instead of 3:1 to avoid impacting Stream C-1 and reduce impacts on Stream A-1 by 32 LF. Slopes are used instead of a
retaining wall due to phasing of the project and pedestrian/vehicular safety and liability after construction is complete.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State?
❑ Yes X❑ No
2b. If yes, mitigation is required by (check all that apply):
❑ DWQ ❑ Corps
2c. If yes, which mitigation option will be used for this
project?
❑ Mitigation bank
El Payment to in -lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter)
Type: Choose one
Type: Choose one
Type: Choose one
Quantity:
Quantity:
Quantity:
3c. Comments:
4. Complete if Making a Payment to In -lieu Fee Program
4a. Approval letter from in -lieu fee program is attached.
❑ Yes
4b. Stream mitigation requested:
linear feet
4c. If using stream mitigation, stream temperature:
Choose one
4d. Buffer mitigation requested (DWQ only):
square feet
4e. Riparian wetland mitigation requested:
acres
4f. Non -riparian wetland mitigation requested:
acres
4g. Coastal (tidal) wetland mitigation requested:
acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
PCN Form — Version 1.4 January 2009
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
Yes x No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c.
6d.
6e.
Zone
Reason for impact
Total impact
Multiplier
Required mitigation
(square feet)
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund).
6h. Comments:
Page 7 of 10
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified
❑ Yes 0 No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
❑ Yes ❑ No
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project?
35.8 %
2b. Does this project require a Stormwater Management Plan?
X❑ Yes ❑ No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
Storm water on the site will be handled by the facilities shown on the attached plans. The stormwater plan has not yet been approved by the City of
Kannapolis but has been designed to meet thier criteria.
2e. Who will be responsible for the review of the Stormwater Management Plan?
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project?
Kannapolis
X❑ Phase II
❑ NSW
3b. Which of the following locally -implemented stormwater management programs
❑ USMP
apply (check all that apply):
❑ Water Supply Watershed
❑ Other:
3c. Has the approved Stormwater Management Plan with proof of approval been
❑ Yes ❑X No
attached?
4. DWQ Stormwater Program Review
El Coastal counties
❑ HQW
4a. Which of the following state -implemented stormwater management programs apply
❑ORW
(check all that apply):
❑Session Law2006-246
❑ Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
❑ Yes 0 No
attached?
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements?
❑ Yes ❑ No
5b. Have all of the 401 Unit submittal requirements been met?
❑ Yes ❑ No
Page 8 of 10
PCN Form — Version 1.4 January 2009
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal/state/local) funds or the
❑ Yes ❑X No
use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
❑ Yes ❑ No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
❑ Yes ❑ No
letter.)
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards,
❑ Yes 0 No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after -the -fact permit application?
❑ Yes 0 No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in
❑ Yes 0 No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact
analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
No additional phases are proposed at this time.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
Wastewater generated on the site will be transported to the nearest treatment facility via sewer lines.
Page 9 of 10
PCN Form — Version 1.4 January 2009
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or
❑ Yes ❑X No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act
❑ Yes 0 No
impacts?
5c. If yes, indicate the USFWS Field Office you have contacted.
-
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat? A Threatened/Endangered species assessment was conducted in which no species were identified. Please refer
to the Threatened and Endangered Species Report for additional information on listed, protected species.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat?
❑ Yes ❑X No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
No essential fish habitat in this region.
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
❑ Yes ❑X No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
SHPO's website: http://gis.ncdnr.gov/hpoweb/
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain?
❑ Yes ❑X No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination?
www.fema.gov ; https:Hlocation.cabarruscounty.us/mapcabarrus/
Digitally signed by Daniel
Daniel Kuefler Kuefler
071520
Daniel Kuefler
Date: 2020.09.1413:08:39
-04'00'
Applicant/Agent's Printed Name
Date
Applicant/Agent's Signature
(Agent's signature is valid only if an authorization
letter from the applicant isprovided.)
Page 10 of 10