HomeMy WebLinkAbout20190230 Ver 3_USACE Permit_20200916 ,tom��T of DEPARTMENT OF THE ARMY �,�..u,� �� �'���// �x WILMINGTON DISTRICT,CORPS OF ENGINEERS w 4 *,- m 69 DARLINGTON AVENUE A 11,1 ' WILMINGTON,NORTH CAROLINA 28403-1343 Gy, AP F �O STATES O4 p1�' August 31, 2020 Regulatory Division/1200A Action ID No. SAW-2019-00428 North Carolina Department of Transportation (NCDOT) Attn: Mr. Philip S Harris III 1598 Mail Service Center Raleigh, North Carolina 27699 Dear Mr. Harris: Reference the Department of the Army (DA) permit dated July 19, 2019, issued to the North Carolina Department of Transportation (NCDOT) for impacts associated with the construction of a 8.2 mile four-lane median-divided freeway, along with associated bridges, interchange ramps, and service roads along US 158 near the town of Garysburg in Northampton County, North Carolina, TIP Project R-2582A. Also reference your permit modification request letter and attachments received on August 3 and 12, 2020. NCDOT requests to modify impacts to jurisdictional waters and wetlands at Sites 1, 3, and 8 by proposing the following: Site 1: Extend riprap 20 linear feet on streambanks downstream of the proposed culvert to stabilize the bank in the vicinity of a power pole. Site 3: Add temporary fill to a wetland area that is constantly inundated. Add 130 linear feet of toe protection to stabilize slope along inundated wetland. Additional temp. fill in wetlands of 4,085 sq. ft./ 0.09 acres. Site 8: Placement of additional riprap will be needed to provide bank stabilization downstream of the culvert replacement. Approximately 30 linear feet of Class B stone or larger will be placed on both sides of the stream, extending the bank stabilization to the ROW line. Stone will be placed on the streambanks and not in the stream, impacting no additional surface waters. Following evaluation of the information submitted in your modification request, the Corps has determined that the request is appropriate and reasonable for stabilization activities provided the following conditions are met: -2- a. Mod. Special Condition #1) All work will be conducted in accordance with the updated plans submitted in association with the modification request sent on August 3, 2020, and August 12, 2020. b. Mod. Special Condition #2) NCDOT shall obtain all required Local, State, and Federal permits for this modification prior to conducting the requested work. This decision is not contrary to the public interest, and no public notice is required for this modification. Should you have questions, please contact Mr. Kyle Barnes of the Washington Regulatory Field Office at telephone (910) 251-4584, or at kyle.w.barnes©usace.army.mil. FOR THE DISTRICT ENGINEER 111oz . Date: 2020.08.31 /1/€41/4_0-2_, 10:28:02 -04'00' Monte Matthews Lead Project Manager Email Copies Furnished: Mr. Gary Jordan U.S. Fish and Wildlife Services Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 28516 Ms. Amanetta Somerville U.S. Environmental Protection Agency Region 4 NEPA Program Office 61 Forsyth Street, SW Atlanta, Georgia 30303 Mr. Travis Wilson North Carolina Wildlife Resources Commission 1718 Hwy 56 West Creedmoor, North Carolina 27522 -3- Mr. Garcy Ward North Carolina Division of Water Resources 943 Washington Square Mall Washington, North Carolina 27889 Ms. Twyla Cheatwood Fisheries Biologist Southeast Region, Habitat Conservation Division NOAA Fisheries Beaufort, North Carolina 28516