HomeMy WebLinkAbout20040289 Ver 2_Approval Letter_20060814IV4ichael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
o ~
~~
q~61
Dr. Greg Thorpe, Ph.D., Manager `'~'~r~ '~c, ~,~
~?rt:~, yG, 0~
Planning and Environmental Branch ~ ~'~'%~~~
North Carolina Department of Transportation F '`k~~~`TJR~~`q%RB
1548 Mail Service Center icy
Raleigh, North Carolina, 27699-1548
.f
Subject: Modification to the 401 Water Quality Certification Pursuant to Section 401 of the
Federal Clean Water Act with ADDITIONAL CONDITIONS for the Relocation of US
70 from SR 2314 (Fanjoy Road) to the Iredell/Rowan County Line in Iredell
County, Federal Aid Project No. STP-70 (39), State Project No. 8.1631801, TIP R-
2911A, DWQ Project No. 04-0289
Dear Dr. Thorpe:
Attached hereto is a modification of Certification No. 3460 issued to The North Carolina Department of
Transportation (NCDOT) and dated May 11, 2004. This modification is applicable only to the
additional proposed activities. All authorized activities and conditions of the certification associated
with the original Water Quality Certification, dated May 11, 2004, still apply except where superceded
by this certification.
If we can be of further assistance, please do not hesitate to contact Polly Lespinasse at (704) 663-
1699.
Sincerely,
Attachments
for Alan W. Klimek, P.E.
Director
cc: Steve Lund, US Army Corps of Engineers Asheville Field Office
Trish Simon, Division 12 Environmenta- Officer
Marla Chambers, NC Wildlife Resources Commission
Marella Buncick, US Fish and Wildlife Service
Sonia Gregory, DWQ Central Regional Office
File Copy
One
NvrlhCarolina
~at~rra!!y
North Carolina Division of Water Quality 610 East Center Avenue, Suite 301
Internet: h2o.encstate.nc.us Mooresville, NC 28115
Phone (704) 663-1699
Fax (704) 663-6040
Alan W. Klimek, P.E. Director
Division of Water Quality
August 11, 2006
An Equal OpportunitylAffirmative Action Employer- 50% Recycled110°~° Post Consumer Paper
Modification to the 401 Water Quality Certification Pursuant to Section 401 of the Federal
Clean Water Act with ADDITIONAL CONDITIONS
THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92-
500 and 95-217 of the United States and subject to the North Carolina Division of Water Quality
(DWQ) Regulations in 15 NCAC 2H .0500. This certification authorizes the NCDOT to impact 0.26
acres of jurisdictional wetlands, 0.25 acres of surface waters, and 2373 linear feet of jurisdictional
streams Iredell County. The project shall be constructed pursuant to the modification received August
1, 2006. The authorized impacts are as described below:
Stream Impacts in the Yadkin River Basin
Site Permanent Fill Temporary Fill Permanent Fill in .Temporary Fill in Tota(Stream Stream Impacts
in Intermittent. in Intermittent Perennial Stream Perennial Stream. Impact Requiring
Stream (linear Stream (linear ft) (linear ft) (linear ft) (linear ft) Mitigation
ft linear ft
Original approved impacts at
Site 1 426 426 426
Original approved impacts at
_ Site 2 508 508 508
Original approved impacts at
Site 3 344 344 3
4
4
C Original approved impacts at __ __ ___ _
__
.
_____
Site 4 502 502 502
Original approved impacts at
_ Site 10 216 216 216
New additional impacts at
Site 11 377 377 377
Total 2373 2373 2193*
Total Stream Impact for Project: 2373 linear feet
*180 Linear Feet of Natural Stream Design has been deducted from the total.
Wetland Impacts in the Yadkin River Basin
Site Fill Fill Excavation Mechanized Hand Area under TotaV Wetland
(ac) (temporary) (ac) Clearing Clearing Bridge Impact (ac)
(ac) (ac) (ac) (ac)
Original approved impacts at
Site 2 0.04 0.06 0.02 0.12
_
Original approved impacts at
_ _Site 6 0.0
1 0.01
Original approved impacts at _ _
.
_ ____ _
__ Site 7 0.08 _ 0.05 0.13 ~
L Total 0.12 0.06 0.08 0.26
Total Wetland Impact for Project: 0.26 acres
No additional wetland impacts authorized under this modification.
Open Water Impacts in the Yadkin River Basin
Site
_ Permanent Fill in Open
_ Waters ac Temporary Fill in Open
_ Waters ac Total Fill in Open
Waters {ac)
Ori final approved impacts at Site 1 0.04 0.04
Original approved impacts at Site 2 0.06 0.06
_
_ Original approved impacts at Site 3 _
0.03 0.03
Original approved impacts at Site 4 0.05 0.05
_ Original approved impacts at Site 10 0.04 0.04
_ Original approved impacts at Site 11 0.02 0.02
Total 0.25 0.25
Total Open Water Impact for Project: 0.25 acres
No additional open water impacts authorized under this modification.
The application provides adequate assurance that the discharge of fill material into the waters and
wetlands of the Yadkin River Basin in conjunction with the proposed development will not result in a
violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of
North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302,
303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application and
conditions hereinafter set forth.
This approval is only valid for the purpose and design that you submitted in your modified application
dated received August 1, 2000. All the authorized activities and conditions of certification associated
with the original Water Quality Certification dated May 11, 2004, still apply except where superseded
by this certification. Should your project change, you are required to notify the DWQ and submit a
new application. If the property is sold, the new owner must be given a copy of this Certification and
approval letter, and is thereby responsible for complying with all the conditions. If any additional
wetland impacts, or stream impacts, for this project (now or in the future) exceed one acre or 150
linear feet, respectively, additional compensatory mitigation may be required as described in 15A
NCAC 2H .0506 (h) (6) and (7). For this approval to remain valid, you are required to comply with all
the conditions listed below. In addition, you should obtain all other federal, state or local permits
before proceeding with your project including (but not limited to) Sediment and Erosion Control, Non-
Discharge and Water Supply Watershed regulations. This Certification shall expire on the same day
as the expiration date of the corresponding Corps of Engineers Permit.
Condition(s) of Certification:
1. The culvert installation wilt result in an additional loss of 377 linear feet of stream. We understand
that you have chosen to satisfy mitigation for the 377 linear feet of impacts to streams through an in-
lieu payment to the North Carolina Ecosystem Enhancement Program (EEP). EEP has indicated in
a letter dated July 7, 2006, that they will assume responsibility for satisfying the federal Clean Water
Act compensatory mitigation requirements for this project.
2. Erosion and sediment control practices must utilize Best Management Practices (BMP) and be in full
compliance with all specifications governing the proper design, installation, and operation and
maintenance of such BMP in order to protect surface water standards:
a. The design, installation, operation, and maintenance of the sediment and erosion control
measures must be such th~it they equal, or exceed, the requirements specified in the most
recf~nt version of the North Carolina Sediment and Erosion Control Manual. The devices
shall be maintained on all construction sites, borrow pit sites, and waste pile (spoil)
projects, including contractor-owned or leased borrow pits associated with the project.
b. For borrow pit sites, the erosion and sediment control measures must be designed,
installed, operated, and maintained in accordance with the most recent version of the
North Carolina Surface Mining Manual.
c. The reclamation measures and implementation of these measures must be in accordance
with the requirements of the Sedimentation Pollution Control Act.
3. Upon completion of the project, the NCDOT shall complete and return the enclosed "Certification of
Completion Form" to notify the DWQ when all work included in the 401 Certification has been
completed. The responsible party shall complete the attached form and return it to the
401/Wetlands Unit of the Division of Water Quality upon completion of the project.
4. All other conditions written into the previous Water Quality Certification, dated May 11, 2004, for the
project still apply.
5. Continuing Compliance. NCDOT shall conduct its activities in a manner so as not to contravene any
state water quality standard [including any requirements for compliance with section 303(d) of the
Clean Water Act] and any other appropriate requirements of state and federal law. If DWQ
determines that such standards or laws are not being met (including the failure to sustain a
designated or achieved use) or that state or federal law is being violated, or that further conditions
are necessary to assure compliance, DWQ may reevaluate and modify this certification to include
conditions appropriate to assure compliance with such standards and requirements in accordance
with 15 A NCAC 2H.0507(d). Before codifying the certification, DWQ shall notify NCDOT and the
USACE, provide public notice in accordance with 15A NCAC 2H.0503, and provide opportunity for
public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be
provided to NCDOT in writing, shall be provided to the USACE for reference in any permit issued
pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit
for the project.
Violations of any condition herein set forth may result in revocation of this Certification and may result
in criminal and/or civil penalties. This Certification shall become null and void unless the above
conditions are made conditions of the Federal 404 Permit. This Certification shall expire upon the
expiration of the 404 Permit.
If this Certification is unacceptable to you, have the right to an adjudicatory hearing upon written
request within sixty (60) days following receipt of this Certification. This request must be in the form of
a written petition conforming to Chapter 1508 of the North Carolina General Statutes and filed with the
Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. If
modifications are made to an original Certification, you have the right to an adjudicatory hearing on
the modifications upon written request within sixty (60) days following receipt of the Certification.
Unless such demands are made, this Certification shall be final and binding.
This the 11th day of August 2006
DIVISION OF WATER QUALITY
for Alan W. Klimek, P.E.
Director
WQC No. 3460