Loading...
HomeMy WebLinkAbout20180413 Ver 1_LCU_newfloatingdock_20200916ADD ADDITION RIP RAP TO EXISTING RIP RAP FOR MINIMIZING SCOURING DURING HIGH TIDES AND WIND EVENTS. ,EPLACE EXISTING ARTICULATED CONCRETE MAT RAMP VITH CONCRETE RAMP (PRE-ENGINEERED OR POURED IN 'LACE) DEPENDING ON MARINE ENGINEER SUGGESTION. kDD ADDITION BREAKWATER TO EDGE OF RAMP TO AINIMIZE SCOURING AND CROSS CURRENTS DURING USE. )EPENDING ON WATER DEPTH AN ADDITION FEW FEET XTENSION TO RAMP IF MINIMAL DISTURBANCE TO XISTING RIVER BOTTOM CAN BE ACHIEVED AND COST ACTORS. INSTALL NEW 8FT BY 24FT CONCRETE FLOATING DOCK WITH PILING. NUMBER OF PILINGS TO BE DETERMINED. REPLACE DAMAGED HARDWARE ON EXISTING FLOATING DOCK AS NEEDED. M. ol GRAPHIC SCALE LOCAIMS AND RATINGS ARE PROVIDED CH TIE --- DATE - MEAT .FELTS Pam, \ a t0 P9 FT. __ - t "-10' VAAA■ NORTH WHARF 1 4,17 J. CENTER WHARF ISU RAMP 1111" WHARF