HomeMy WebLinkAbout20201134 Ver 1_More Info Received_20200911Strickland, Bev
From:
Audra Miller <lakehomelkn@gmail.com>
Sent:
Friday, September 11, 2020 10:38 AM
To:
Perez, Douglas J
Subject:
[External] Re: Lot 7 Tadlock Trail (DWR # 20-1134)
Attachments:
CBC Access point shoreline stabalization - Copyjpg; VA Fieldstone walljpg; VA
Fieldstone in rip rap fashion2jpg; VA Fieldstone wall with capjpg; CBC Estimates Lot 7
& 8 Tadlock Trail.doc; Catawba Riparian buffer.pdf, Lot 7 shoreline Measurements.pdf,
Lot 8 shoreline Measurements.pdf
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Good Morning Doug,
I've attached the application along with the proposal and images. I consolidated both your emails to me in 1
email reply for both lots with all the information. Please advise what else is required.
Thank you,
Audra Miller
Broker/Owner
P 704-634-8431
W www.anchorlkn.com
.Anchor ` fealty
00
Start your home search
The North Carolina Real Estate Commission reauires that real estate brokers disclose the different
ways we may work with potential buyers and sellers. This disclosure may be
found here: http://www.ncrec.gov/Brochures/WorkingwAgents.pdf
CONFIDENTIALITY NOTICE: This e-mail, including any attachments, is for the sole use of the intended recipient(s) and may
contain confidential and privileged information protected by law. Any unauthorized review, use, disclosure or distribution is
prohibited. If you are not the intended recipient, please contact the sender by reply e-mail and destroy all copies of the original
message.
On Fri, Sep 11, 2020 at 10:00 AM Perez, Douglas J <doug_perezkncdenr.gov> wrote:
Hello,
I am emailing you today about your shoreline stabilization project application. I noticed two things. First, I will
need you to read, fill out and sign, and return to me a copy of the Catawba Riparian Buffer Form. I have
attached the form in two different formats. Please fill out whichever one works best on your computer. In the
Catawba Riparian Buffer Rules it states that there is a 50' buffer. Within the first 30' from full pond, there is to
be no grading or tree removal. If trees are removed, then they must be re -planted with native species trees, of a
3" diameter at shoulder height, and at least 8' tall. Secondly, I will need a sketch of the shoreline showing the
length of the shoreline, proposed square footage of impact both above and below full pond, and the potential
construction corridor. If you could clarify the above issues, that would be most appreciated.
Doug Perez
DWR ,.
Dlrlslon of Wxrer Resaumes
Doug Perez — Environmental Specialist
NC Dept. of Environment & Natural Resources (NCDENR)
Division of Water Resources - Water Quality Regional Operations
610 East Center Ave., Suite 301, Mooresville, NC 28115
Phone: (704) 235-2162 Fax: (704) 663-6040
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be
disclosed to third parties unless the content is exempt by statute or other regulation.
YZITT- y iG \ V J
f T
L• -q y v 'o:i ,� �-�, ~` vim/ •'+� r l.'71,
WWI
r
mmI
.. • r - k A_:_ h •t i '' °!�►� .,,;� V y�� �� ..� SOT
.'li Air
wlIT
� l4
• A �f� ` ry
Val
44.
, f 1 y
-
Tic
41
c
1 a:. T_. YS °- ! n .r J�_j?��1� `•+kL1� d �4� t a...
*•..''-..- � — _F -a 1 i ' ¢_•. Lam..' SGl .. 'ia. _e id - ►I��� �c •.t. - n`.. aS�.i �r,. � f.; _'
- �:�;,,. •x .� . - : , ' s J , � e- ;� • �_ w � �� fir►
y_ 'F,• ..-Y � _.a"P1� ' f_.{,r�'/i� �`i .>�:6L r� •�<as tip
oe
TM,
' fr C .y �i� T i.l. i �i'.�t � � . 1) Z 4 ,l, �J! i� 1..�' -Li �a:�y V' � 1'V°' - j � �,• �
as f i. .�. t 3. 1 f eJf V
v -''A�r
ee
k. ti
�-.`� � � �
�a� :�- � �_ ..v .
�r
�I�►umEJ
r:
;�.
oip F
r
CATAWBA RIPARIAN BUFFER NOTIFICATION FORM
Project Name/address: ' � � � C; � � � � � � � �"3 11County: � 18NAn
Owner: -f (\iU_ M- �0
Print
Contractor/agent: _
re
Print Signature
The approval is for the purpose and design described in your application. impacts not indicated in the
application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC
02H .0506 and 15A NCAC 02B .0243(8)]
Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless
approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed.
Minimal shaping and sloping along the immediate shoreline is allowed. (15A NCAC 02B .0243(6)]
Benching and grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243
(6)]
Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved
by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)]
Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The
work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction
material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)]
Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater
discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or
sheet flow at non -erosive velocities to the lake. [15A NCAC 028.0243(5), (6)]
Acknowledgement of Notification
1 1 kr �, hereby state that I have been informed of the Catawba
Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved
by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be
taken such that the construction will be built within substantial compliance and intent of the 401 Water
quality Certification and Buffer Rules, the approved plans) and specification(s), and other supporting
materials.
Signature (owne_``-�� n' Date: t I�
CBC Stone & Recycling
638 Oakridge Farm Hwy
Mooresville, NC 28115
Phone: 704-660-5111
Fax: 704-660-5969
info 0cbcstoneandrecyycling.com
Proposal
September 9, 2020
Audra Miller
Lot 7 & 8 Tadlock Trail
Denver, NC 28037
Phone: 704-634-8431
Email: lakehomelkn@gmail.com
Job Location: Lot 7 & 8 Tadlock Trail
Work to be done b, Land
Lot 7 - Only option: Install an approx. 136' x 6' high enhanced boulder rip rap @
$85.00 per linear foot
Price - $69,360.00
Lot 8 - Option 1: Install an approx. 311' x 4.5' high VA Fieldstone wall @ $85.00 per
square foot
Price - $118,957.50
Install an approx. 311' x 2' wide TN Crab Orchard cap @ $45.00 per square foot
Price - $27,990.00
Lot 8 - Option 2: Shape and slope approx. 311' of shoreline. Install matting and VA
Fieldstone boulder rip rap @ $250.00 per linear foot
Price - $77,750.00
Lot 8 - Option 3: Shape and slope approx. 311' of shoreline. Install matting and
boulder rip rap from quarry @ $175.00 per linear foot
Price - $54,425.00
Lot 8 - Only option: Install an approx. 189' x 6' high enhanced boulder rip rap with
45 plants (required) and river rock in between @ $85.00 per square foot
Price - $96,390.00
*Water level will be a factor in determining the start and completion of shoreline
work*
Shoreline Permit and Checks payable to:
Duke Energy for $100.00 for Rip Rap or $350.00 for Wall
DENR (application will be submitted electronically. DENR will email you a request to pay
the $240.00 fee online)
CBC Stone & Recycling for $250.00 for permit processing. This is non- refundable for any
reason.
*Duke Energy for $350 (this fee only applies if the dock has not been transferred into
property owner's name. Please call Lake Services at Duke Energy at 800-443-5193 if
you are not sure if the dock under the correct name. Duke Energy will return
shoreline permit applications if the dock is not in the applicant's name and it will
have to be resubmitted along with the transfer fee)
Payment terms and payable to CBC Stone & Recycling
25% due at signing of contract
25% due at start of project
25% draw if needed
25% due upon completion
If the contract is terminated for any reason other than permit denial, a $1,000.00
termination fee will be deducted from any refund due back to customer.
CBC Stone & Recycling is not responsible for underground utilities, irrigation, landscape,
pylons, concrete, driveways, reseeding, or Acts of God.
Customer understands that they are responsible for disconnecting irrigation lines, pumps,
or electrical lines prior to the start of projects and will be responsible for reconnections of
such items upon completion unless otherwise noted in the contract. It is customer's
responsibility to have underground utilities marked. We recommend calling U Loco 1-800-
632-4949 if you are not able to locate yourself.
This quote is provided at no cost and prices are good for six months from date of issuance.
A 10% late fee will be added to the bill if not paid at time of completion. If paid with a credit
card a 3% fee will be added.
ACCEPTED
Date
If agreeable with the above contract, please sign original and mail back to CBC at the
address listed above along with two pictures of your shoreline, a certified copy oof
your with seal and the specified checks needed to get your process
started.
IF NOT INCLUDED IN THIS PROPOSAL IT IS NOT INCLUDED IN PRICE. NOTHING
IMPLIED WITHOUT BEING IN WRITING. IF YOU FEEL WE MISSED SOMETHING IN THE
PROPOSAL, PLEASE LET US KNOW TO CORRECT UP FRONT.
E TA
32895
8094
6 096
M
September 11, 2020 1:818
0 0.01 0.01 0.02 mi
0 0.01 0.02 0.04 km
Esri., Inc., Lincoln County, NC
A49
506d8
50649
347150
91473
sae
32895 34412
so94
3369
September 11, 2020 1:1,364
0 0.01 0.02 0.04 mi
0 0.02 0.04 0.07 km
Esri., Inc., Lincoln County, NC