Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NC0081621_Wasteload Allocation_19930511
FACT SHEET FOR WASTELOAD ALLOCATION Request # 6722 Facility Name: Cabarrus Co. Utilities Dept. Muddy Creek WWTP NPDES No.: NC0081621 Type of Waste: Domestic - 100% Facility Status: Proposed Permit Status: New Receiving Stream: Rocky River Stream Classification: C S ubbasin: 03-07-12 County: Cabarrus� Stream Characteristic: Regional Office: MooresvilleP° i US GS # Requestor: Charles M. Lowe Date: Date of Request: 1/28/92 Drainage Area (mi2): 384 Topo Quad: G 17 NW Summer 7Q10 (cfs): 21 Winter 7Q10 (cfs): Average Flow (cfs): 412 30Q2 (cfs): IWC (%): 2.2 Wasteload Allocation Summary (approach taken, correspondence with region, EPA, etc.) The proposed discharge location is to a section of the Rocky River where a calibrated QUAL2E water quality model has been developed. The recommended BODS and NH3-N limits are consistent with the Rocky River model report of March 31, 1993. Special Schedule Requirements and additional comments from Reviewers: Recommended by: �� Date: �/a / T.3 Reviewed by A I Instream Assessment; Regional Supervisor: Permits & Engineerin RETURN TO TECHNICAL SERVICES BY: .�TrL nz?T.Or, NATint AL RFSOU CES &ND Rm D{r I117 CF 4i1 ii�: •J;{:.N{,. ^.Fi�u JYli1 tS0.t t ILI i ?34i1: CONVENTIONAL PARAMETERS Recommended Limits: Monthly Average Summer Winter WQ or EL Wasteflow (MGD): 0.3 0.3 BOD5 (mg/l): 10 20 wq NH3N (mg/1): 4.0 8.0 wq DO (mg/1): 5 5 wq TSS (mg/1): 30 30 el Fecal Col. (/100 ml): 200 200 el pH (SU): 6-9 6-9 el Residual Chlorine (µg/l): 28 28 el Oil & Grease (mg/1): TP (mg/1): TN (mg/1): _x Parameter(s) are water quality limited. For some parameters, the available load capacity of the immediate receiving water will be consumed. This may affect future water quality based effluent limitations for additional dischargers within this portion of the watershed. •' No parameters are water quality limited, but this discharge may affect future allocations. INSTREAM MONITORING REQUIREMENTS Upstream Location: 200 feet upstream of discharge or SR 1114. Downstream Location: SR 1140 Parameters: Temp., DO, Cond., Fecal Col., pH Special instream monitoring locations or monitoring frequencies: MISCELLANEOUS INFORMATION & SPECIAL CONDITIONS Special Instructions or Conditions Wasteload sent to EPA? (Major) _N_ (Y or N) (If yes, then attach schematic, toxics spreadsheet, copy of model, or, if not modeled, then old assumptions that were made, and description of how it fits into basinwide plan) Additional Information attached? N (Y or N) If yes, explain with attachments. NPDES WASTE LOAD ALLOCATION PERMIT NO.: NCO081621 PERMITTEE NAME: Cabarrus County Utilities Department FACILITY NAME: Muddy Creek WWTP Facility Status: Proposed Permit Status: New Major Minor Pipe No.: 001 Design Capacity: 0.30 MGD Domestic (% of Flow): Industrial (% of Flow): 100 % Comments: Plant expansion to 0.60 MGD planned at time of renewal RECEIVING STREAM: Rocky River Class: C Sub -Basin: 03-07-12 Reference USGS Quad: G 17 NW (please attach) County: Cabarrus Regional Office: Mooresville Regional Office Previous Exp. Date: 00/00/00 Treatment Plant Class: Classification changes within three miles: No change Requested by: Charles M. Lowe Prepared by: Reviewed by: Date: 1/28/92 Date: � C/ `l3 Dab Modeler Date Rec. # "'a."Drainage Area (mi Avg. Streamflow (cfs): Y/a 7Q10 (cfs) Winter 7Q10 (cfs) 30Q2 (cfs) Toxicity Limits: IWC % Acute/Chronic Instream Monitoring: Parameters. ?emo. , D d or���41'�y ', A Fila / �e )/174 y, Upstream i Location D D '-4 Downstream Y Location crk / / 0 Effluent Characteristics Summer Winter BOD5 (mg/1) 10 a 0 NH3-N (mg/1) y. 0 O D.O. (mg/l) S 0 IS-0 TSS (mg/1) 30 30 F. Col. (/100 ml) a 0 0 R coo pH (SU) Comments: u N o w W CO 00 Q coo C.C. ("n o to co co I ElCEO 1 00 [) / -COS \ 0` t _ ..•� o - i O _ OOLI r (_o I JJJ O� s� o 500 161 \ i - � �� � i, ���� � -- �S /mil _ i i/i' w� �.._�`� �) `'; /� •\ \ 1'� v o, A 11 1 ILIf - ' J I �� I v ! ❑ ji 600 n �J Cn b50 ` I Vi O o •,1 O -, 6 ko 6S l I { 09 O ' • m _ - I ,, . of d �J f WLA Notes SRB 4/2/93 Cabarrus County Utilities Dept. Muddy Creek WWTP NC0081621 - Cabarrus County has applied for a permit for a new 0.30 MGD facility discharging to the Rocky River. At the proposed discharge point the Rocky River has a 7Q 10 of 21 cfs. - The proposed discharge location is approximately 12 miles below the Concord Regional Rocky River WWTP (NC0036269). This location falls within the Rocky River study area for which as QUAL2E model and a water quality management plan were developed. Because of high instream waste concentrations at the proposed discharge location, it is recommended that the facility receive summer permit limits of 32 mg/1 BODu, as recommended by the March 31, 1993 report "A QUAL2E-UNCAS Application to the Rocky River and Mallard Creek". - It is recommended that the facility receive a summer BOD5 limit of 10 mg/l and 4 mg/1 NH3. Assuming a CBOD to BOD5 ratio of 1.5 for this 100% domestic discharge, this will result in a BODu limit of 33 mg/l. This limit will protect the instream NH3 target of 1.0 mg/l. It is recommended that the facility receive winter limits of 20 mg/l BOD5 and 8 mg/l NH3. 1.4 Expected Wastewater Characteristics The wastewater expected to be discharged to the Muddy Creek Wastewater Treatment Plant will primarily be domestic wastewater. The existing industrial users and the proposed Midland Business Park will discharge employee sanitary wastes. It is not expected that there will be any significant industrial users contributing process wastewater to the system. Should any future industrial user approach 25,000 gpd flow of process wastewater, the County will implement an industrial pretreatment program. The wastewater is expected to have the characteristics of normal domestic wastewater. Because the entire sewer system will be new construction, the dilution effect of infiltration/inflow will be less then in comparable older systems. For design purposes, the wastewater is assumed to have the range of characteristics shown in Table 1-4. 1.5 Design Ca acity 1..1 Sewer Lines Based on the above information, the gravity sewer lines will be sized to flow one-half full at basin -wide peak flows for the 2012 projected wastewater flows. A peaking factor of 3.8 was used to determine peak hourly flow rates based 1-6 on 2012 flows. The actual stream bed slopes were used. The resulting outfall pipe sizes .are 18-inch diameter from the Midland Business Park to an unnamed tributary just east of Midland, and 21-inch diameter from there to the wastewater treatment plant. The above pipe sizes were compared to the required capacity for a pipe flowing full at peak flow for the ultimate basin development. For ultimate considerations, the pipe sizes required were 21-inch and 24-inch respectively for the two pipe reaches. Based on the uncertainty of the ultimate capacity projections, the less restrictive criteria of one-half full at 2012 flow was used. Appendix A contains detailed computations regarding outfall sizing. 1.5.2 Wastewater Treatment Plant Based on the above considerations, and using a peak month to average annual flow ratio of 1.2, the wastewater treatment plant will be designed for an initial peak monthly average wastewater flow of 0.3 MGD, expandable in increments to 1.8 MGD. The initial plant will provide capacity to the year 2000. It is expected that a larger regional facility will replace the Muddy Creek WWTP before flows exceed 1.8 MGD. 1.6 Proposed Effluent Limits Table 1-5 presents the requested permit limits for the proposed Phase I project and ultimate limits at greater than 1.8 MGD capacity. Because of the high assimilative capacity of the Rocky River below Muddy Creek, no limits are proposed for Ammonia or dissolved oxygen. The justification for secondary limits is contained in Section 5. 1-7 TABLE 1-5 Proposed Effluent Limits Muddy Creek WWTP Cabarrus County, North Carolina :..:...:.......::. Initial Phase I Development Flow (MGD) 0.3 0.3 BODS (mg/1) 30 30 TSS (mg/1) 30 30 Proposed Ultimate Development Flow (MGD) 1.8 1.8 BODS (mg/1) 30 30 TSS (mg/1) 30 30 w i w 9. C a ti IrD IrD W. » A� Z O r_r t% MECHANICALLY AERATED O FUTURE EXPANSION CLEANED GRIT BAR SCREEN CHAMBER __RAS_ 0.6MGD 0.6MGD ram_ I — — - I I .15MG 400 1 gpd/sf I 700gpm I CHLORINE CONTACT CHAMBER 21—INC[i RAW SEWAGE I EFFLUE N1 PUMPING I .15MG 400 TO ROCKY RIVER � I gpd/sf 0.6MGD RAS----- J C,DUAL AERATION DUAL BASINS CLARIFIERS I � I I �— — .0336MG — — — 0336MG I � I 1 SLUDGE — — — DRYING BEDS LANDFILL 6,000 SF l— — — 0336MG — — — 0336MG —i DUAL LEGEND DUAL AEROBIC SLUDGE DIGESTERS HOLDING LIQUID TANKS — — — — SLUDGE PROCESS SCHEMATIC SECTION 5 STREAM MODELING RESULTS 5.1 Previous State Stream Modeling The North Carolina DEM has completed a detailed modeling effort of the Rocky River from Concord's Rocky River Regional WWTP downstream to approximately five miles below the confluence with Muddy Creek. This modeling effort was originally reported in a DEM Memorandum dated January 12, 1988, and was revised and refined in a subsequent Memorandum dated April 3, 1989. The modeling was done using the QUAL2E model, a widely accepted stream modeling program. The models were calibrated using stream flow hydraulic and quality data obtained in October 1986 and March 1988. The most significant finding from the first modeling effort, was the high (6.0/day) reaeration coefficient necessary to calibrate the model when sediment oxygen demand (SOD) was considered. The State's level B desk top model uses rearation coefficients based on the Tsivoglou Method which predicted a reaeration coefficient of only 1.64/day for the study reaches. The first modeling effort recommended the wasteload allocation shown in Table 5-1 for the Rocky River Regional WWTP. TABLE 5-1 State DEM Wasteload Allocations for Concord's Rocky River Regional WWTP Based on Stream Modeling Results Summer n#er Modeling of January 1988 Flow (MGD) 24 24 BODS (mg/1) 12 24 NH3-N (mg/1) 2 4 Dissolved Oxygen (mg/1) 6 6 Modeling of April 1989 Flow (MGD) 24 24 BODS (mg/1) 17 25 NH3-N (mg/1) 4 10 Dissolved Oxygen (mg/1) 6 3 5-1 The revised modeling effort included more detailed site specific information on the relationship between stream flow, velocity, width, and depth. This modeling effort resulted in an increased rearation coefficient of 7.0/day, which was even higher than the previous model. The revised modeling effort proposed the second set of wasteload allocation shown in Table 5-1. These later limits were used in writing the current NPDES permit for the Rocky River Regional WWTP. Both DEM modeling efforts predicted a minimum dissolved oxygen sag approximately three to four miles below the Rocky River Regional WWTP. This is approximately 10 to 11 miles above the site of the proposed Muddy Creek WWTP. Therefore, the proposed discharge will be well into the dissolved oxygen recovery zone from the Rocky River Regional WWTP. 5.2 Current State Stream Modeling The State DEM intends to re -issue all Yadkin River Basin NPDES permits in 1994. In preparation for this basin -wide wasteload allocation, the State is expanding the Rocky River Stream Model described above to include the upper reaches of the Rocky River from its source near Mooresville downstream to Concord's Rocky River Regional WWTP. Preliminary discussions with DEM modelers and Mooresville field office water quality engineers indicate that the upper Rocky River may be over allocated. More restrictive effluent limits may be required for upstream dischargers. Preliminary results of this modeling effort are expected by this Fall. 5.3 Stream Modeling in Support of Muddy Creek WWTP Discharge A computer model of the Rocky River adapted from the State's level B desk top model was developed for the Rocky River from Concord's Rocky River Regional WWTP to the Yadkin River. The model was enhanced to allow for the effects of major tributary inflow, multiple discharge points, and specific overriding of desk top procedures where more definitive information on velocity, depth, or reaction rates is available. This allowed the desk top model to be calibrated and used much the same as QUALM 5-2 5.3.1 Model Procedure The approximately 56 river miles of the Rocky River below the Rocky River Regional WWTP was divided into 89 reaches varying in length from 0.1 mile just below the most upstream discharge to five miles in the lower reaches. USGS topographic quadrangles were used to measure the approximate slope in feet/mile for each reach. Tributary inflows were obtained based on relationships for 30Q2 and 7Q10 per square mile of drainage basin based on information developed by USGS for the Rocky River at the Rocky River Regional WWTP and below Oakboro. Upstream or tributary inflow was considered for upstream Rocky River, Coldwater Creek, Dutch Buffalo Creek, Goose Creek, Crooked Creek, Big Bear Creek, and Richardson Creek. Instream clean water quality parameters were based on the same factors as the State's modeling efforts. Dissolved oxygen was assumed to be at 90% saturation at the design temperature. Table 5-2 presents the flow and clean water quality parameters. The nitrogenous biological oxygen demand was estimated as 4.5 times the ammonia nitrogen (as l) concentration. Ultimate carbonaceous biological oxygen demand (CBOD) for wastewater discharges was assumed as 2.5 times the five-day biological oxygen demand. TABLE 5-2 Upstream and Tributary Flow and Water Quality Parameters Used in Stream Modeling Muddy Creek WWTP Caharrnc County V(n #h (•......�:.... Rocky a Concord Coldwater Dutch Buffalo Goose Crooked Big Bear Richardson Drainage Area (sq mi) 278.00 112.00 94.00 63.00 59.00 182.00 160.00 Annual Average (cfs) 300.000 112.00 94.00 63.00 59.00 182.00 160.00 7Q10 Summer (cfs) 14.000 4.00 4.20 2.82 2.64 8.14 7.16 7Q10 Winter (cfs) 25.000 7.14 7.51 2.82 2.64 8.14 7.16 30Q2 (cfs) 33.000 9.43 9.91 6.64 6.22 19.19 16.87 Summer DO (mg/1) 7.500 7.500 7.500 7.500 7.500 7.500 7.500 Winter DO (m /1) 9.275 9.275 9.275 9.275 9.275 9.275 9.275 Summer CBOD (m /1) 2.00 2.00 2.00 2.00 2.00 2.00 2.00 3.00 3.00 0.45 0.45 Winter CBOD (m /1) 3.00 3.00 3.00 3.00 3.00 Summer NBOD (mg/1) 1 0.45 1 0.45 0.45 0.45 1 0.45 Winter NBOD (mg/1) 0.45 1 0.45 0.45 1 0.45 0.45 0.45 0.45 5-3 5.3.2 Model Calibration The modified desk top model was calibrated using the hydraulic relationships, and data used in calibrating the State's April 3, 1989 model. The stream flow at the time of calibration data collection was approximately 89 % of the predicted 7Q 10. Therefore, for calibration, the stream flows shown in Table 5-2 were multiplied by 0.89. Where calibration data was available, the model reaeration rate was adjusted by reach until the predicted profile matched the calibration data as closely as possible. Below Hwy 24-27, the reaeration rate was calculated using the Churchill equation. The Churchill equation most closely approximated the observed reaeration rates in the upper reaches where calibration data was available. For this reason, it was selected over the Tsivoglou equation. Rocky River DO Profile Model Model Calibration 12 1 O corcad WWTP Q=11.7 MHO, Mz 13.5 ffq , Mi3_a4 RIgX 00=6 mgA 8R 1114 E im 7= \ O 4 coawd WWM codes CM* 2 ��yp,��/��y MuWy ama W*7P sne 1 Wi[T� G17f1aylOp1 IO 0 2 4 6 8 10 12 14 16 18 20 River Miles Below Discharge — SattlraDoal DO — OO with $OD — Perma Lim[ CD MeasurW Values L" G 1 I*IL _�• •. 1 16u. v- -7-j n.dubl auuu Results for Roc B ver Dissolved Oxygen Profile Model Using Modified Desk Top Model 5-4 Figure 5-1 presents the results of model calibration. The observed Dissolved oxygen at SR 1114 was much higher than could reasonably be predicted using generally accepted maximum reaeration coefficients. The State's April, 1989 calibration also underestimated the dissolved oxygen at SR 1114. DO Below Concord WWTP 10 Rocky River 10/8-9/86 9 8 7 :Dp 6 + + c = 5 O 4 3 2 Z) Predicted + Observed 1 0 0 0.8 1.6 2.4 3.2 4 4.8 5.6 6.4 7.2 $ 8.8 9.6 10.4 11.2 12 12.8 13.6 14.4 15.2 Distance in miles .5... %-a"Ul"LJVLI nV,Suus rrum lvk-UhM April !Y89 Rocky River Dissolved Oxygen Profile Model (Source, DEM Memorandum dated April 3, 1989) For comparative purposes, the State's April, 1989 calibration run is presented in Figure 5-2. The distance scales between Figures 5-1 and 5-2 are offset by approximately 2.4 miles since the State's station 0+00 is approximately 2.4 miles above the Rocky River Regional WWTP. The model used in this study has Station 0+00 at the WWTP discharge point. Appendix B contains a complete printout of the calibration modeling results used in this study. 5-5 5.3.3 Proposed Wasteload Allocation The calibrated model was then used to predict stream dissolved oxygen under several potential wasteload allocations. The first run considered summer conditions with the Rocky River Regional Yv'WTP operating at current permit limits and current flows. Current flows result in less dilution at the Muddy Creek WWTP site and consequently more severe discharge restrictions. The model was used to predict the dissolved oxygen profile with and without the proposed Muddy Creek WWTP discharge. Figure 5-3 presents the predicted dissolved oxygen profile with a 0.3 MGD secondary treatment discharge at Muddy Creek added to the existing discharges at Concord and Oakboro. Also plotted is the predicted profile without any discharge at Muddy Creek considering only the existing Rocky River Regional WWTP and the Oakboro WWTP discharge. The two profiles are virtually indistinguishable, indicating that the proposed discharge has negligible effect on the Rocky River. The low predicted dissolved oxygen response is a result of two factors. The first being the relative magnitude of the small proposed discharge to the total Rocky River flow. The second is the high reaeration capacity of the Rocky River below Muddy Creek. The above demonstrated response supports the suitability of secondary limits at the proposed Muddy Creek WWTP. A second model run was made using the full 24 MGD permit allocation at Concord's Rocky River Regional WWTP and an ultimate capacity of 2.5 MGD from the Muddy Creek WWTP. Figure 5-4 presents the results of this model run. At a discharge level of 2.5 MGD, the Muddy Creek WWTP exerts a noticeable impact on the predicted dissolved oxygen response compared to the response without the discharge. However, the stream standards are still maintained, indicating the suitability of secondary limits at higher ultimate flows. 5-6 CD E C O 0 Rocky River DO Profile Model Proposed Allocation w/ Muddy Creek WWTP 12 caxwd wwrp Q=12 MGD, BOD5=17 "W, NM=4 nV, DO=6 mo 10- Muddy creek wwrP j 0�-- 0 or3� ��BODS=30 mg/1, NH3=25 mg�l, D0=gll 0 m �J 41 II .; conc«d WWTP creekire Bq wwrP ssear Creek/oalmoro WWTP 2� I cokkw ' Goose creek Dutch Melo Cnmk 1� ��CrOOW creek �nard�, Creek 0 \ 0 5 10 15 20 25 30 35 40 45 5055 River Miles Below Upstream Discharge seftn w DO — DO *U d* Crk WWTP -- Stream Sw lord — DO wlow" W" Ci C ? T1_.__ �! _� _7 T ■ � 1 ibUl G -� i 1 CwLMU I%MKy rover Dissowea oxygen Yrolile with 0.3 MGD Secondary Treatment Discharge - Muddy Creek WWTP, Cabarrus County, North Carolina Of interest is the predicted response in the reaches below Concord's Rocky River Regional WWTP. This model predicts a DO standard violation at the permitted flow, BOD5 and NH3-N levels. While calibrated to the same data, the modified desk top model used in this study appears to be more conservative than the QUAL2E model used by the State in setting the Rocky River Regional WWTP permit limits. Appendix C contains the complete printout for the model run at ultimate allocations. 5-7 I Rocky River DO Profile Model �I Proposed Allocation w/Muddy Creek WWTP E C 0 0 12 Cormd WWTP 0=24 MGD, BODE=17 ffW, NH3=4 nW, DO=B nW 101 Muddy creek WWTP O= 2.5 MGD, BOD5=30 nVl NH3=25 mgA, D0=0 mgl Oakbm WWTP 8 =0.5 ww. am=w ma. Nib=25 mat W=6 niftA 4 concord WWTP 1 MW* Creek WWTP Bile \8'ip Beer Creek/oeidoro WWTP 2 / coi*mw Creek Goose creek Dulch &fielo meek c rand Creek �wdwo, Creek 0 0 5 10 15 20 25 30 35 40 45 W M River Miles Below Upstream Discharge (— setraion Do — Do WMud* CA WWTP —storm SwWwd — Do wfC+.r.nc wwTP: r igurr z-w rreaictea tcocKy Kiver Dissolved Oxygen Profile with 2.5 MGD Secondary Treatment Discharge - Muddy Creek WWTP, Cabarrus County, North Carolina Computation Jeb Ne00187-037-018 No HDR Proted Muddy Creek NPDES Application c«npu�d RDH Dag10i0�191 s�, Prelimin En ' Engineering Report Owked 'Task Wastewater Flow Pro' coons shw/ or -5— Estimate of wastewater flows from Midland Business Park Data Sources Timesaver Standard page 1006 15 NCAC 2H .0219 .k, fidland Business Park Conceptual Land Use Plan Corporate Office Development Tracts Area 113.2 acres Density 50 employees/acre Wastewater generation 25 gpd/employee Ultimate Wastewater Flow 141,500 gpd Industrial Tracts Assume 50% Warehouse & 50% General Industry Area 166.5 acres Density - Warehouse 5 employees/acre Density -General 25 employees/acre/shift Number of Shifts 2 Showers - General 10% Wastewater generation Employees 25 gpd/employee Showers 10 gpd/employee/shift Ultimate Wastewater Flow 129,038 gpd Small Lot Industrial Tracts Area Density Wastewater generation Ultimate Wastewater Flow Total Ultimate Wastewater Flow 45.4 acres 20 employees/acre 15 gpd/employee r 22,700 gpd : . .job N-. 00197-037-018 IN.. HDR j Muddy Creek NPDES Apphcation com xA*d RDH IDeb 10/10/91 Zek sot Preliminary ee ' Report C,,,W pift Wastewater Flow Pro' 'ons st" of 5-- Historical Water Records for Major Water Users in Gallons/Month Bethel Pepsi McCoy Mid -Knit Total Year Month School Cola Oil Company 89 NOV 103,074 33,510 61328 142631 157,543 DEC 101,055 44,581 9,604 27,212 182,452 90 JAN 115,566 41,439 %866 152364 182,235 FEB 57,970 49,368 13,494 14,863 135,695 MAR 77,343 32,912 7,929 15,798 133,982 APR 70,462 18,700 5,999 15,521 110,682 MAY 60,663 54,006 7,802 18,640 1419111 JUN 92,378 26,105 5,603 21,610 145,696 JUL 311566 331810 52827 20,622 91,825 AUG 71405 41,215 4,997 16,755 70,372 SEP 14,436 49,144 5,932 341206 103,718 OC`r 86,843 257806 6,351 31,371 150,371 NOV 80,111 29,920 51064 26,517 141,612 DEC 86,170 25,881 6,149 29,509 147,709 91 JAN 79,587 32,762 6,141 31,715 150,205 FEB 69,938 20,495 4,765 24,250 119,448 MAR 71,958 21,318 5,139 30,862 129,277 APR 64,178 2%322 Z730 282820 125,050 MAY 61,112 18,176 Z094 30,862 112,244 JUN 86,244 24,160 1444 35,141 146,989 JUL 46,301 14,362 1,578 35,755 97,996 AUG 17,279 25,282 1,429 104,892 148,882 SEP 19,074 17,279 11518 25,469 63,340 OCT 97,988 23,936 11870 40,706 164,500 Total 1,598,701 733,489 129,653 691,091 3,152,934 Average 66,613 30,562 51402 28,795 131,372 Maximum 115,566 54,006 13,494 104,892 182,452 STD 29,557 101812 Z968 179561 30,079 AVG+STD 96,169 41,374 8,370 46,356 161,452 Row Wise Sum of AVG+STD (Rounded) 192,000 Job No. 00197-037-018 jNo. 13-11 no"k ftied Muddy Creek NPDES Application cw,i.d RDH Deb 10/10/91 &A*a PreUminary Engineering Report ChakW Dab Twit Wastewater Flow Pro' tions ghW 3 a 5-- Use 192,000 gallons per month as existing industrial flow Assuming 21 working days per month gives 9,143 gpd industrial flow Further assume that new industrial growth will go to Midland Business Park Therefore, the only growth in this figure will be plant expansion of existing facilities For lack of better information, assume that flows will double within 20 years From Midland Business Park calculations, Ultimate industrial flow is Use 20 year build out for midland industrial park Total Industrial Flow from Midland Area Flow in MGD 1990 2002 2012 Ultimate Existing Industry 0.0091 0.0137 0.0183 0.0183 Midland Business Park 0.0000 0.1465 0.2930 0.2930 Total 0.0091 0.1602 0.3113 0.3113 293,000 gpd Job No. 00187-037-qo �No. HDR Estimate of residential wastewater flows from Midland area Muddy Creek Drainage Area Plus Industrial Park 7,200 Acres Defined Sewer Service Area 3,500 Acres 1990, 2002, & 2012 Population Projections From County Planning Department (Ultimate Figures based on 1 Dwelling Unit Per Acre Gross Density & 2.56 persons/household) 1990 2002 2012 Ultimate Drainage Area 1,619 F 11943 2,331 18,432 Sewer Service Area 1,026 12231 11477 8,960 Residential Flow Projections in MGD, based on 70 gpcd 1990 2002 2012 Ultimate Drainage Area 0.1133 0.1360 0.1632 1.2902 Sewer Service Area 0.0718 0.0862 0.1034 0.6272 Estimate of commercial wastewaetr flow from Midland area Use 0.03 acres � commerical development r p per person Use 500 gal/day/acre for commercial acerage Commercial flow in MGD, based on population projections above 1990 2002 2012 Ultimate 0243 Drainage Area F01-.0154 0.0291 0.0350 0.2765 Sewer Service Area 0.0185 0.0222 0.1344 Total Residential and Commercial Flow From Midland Area Flow in MGD 1990 2002 2012 Ultimate Drainage Area 0.1376 0.1652 0.1981 1.5667 Sewer Service Area 0.0972 0.1046 0.1255 0.7616 Computation Job No. 00197-037-018 N.. I - al] UO ftled Muddy Creek NPDES Application COMUWd RDH or. 10/10/91 Preliminary Engineering Report ChWkW Dab r k Wastewater Flow Projections ShW a Calculation of Total Flow for Muddy Creek WWTP Based on Previous Spreadsheets and 10 gpcd Infiltration/Inflow Allowance Entire Muddy Creek Drainage Area Flow in MGD Residential Flow Commercial Flow Existing Industrial Flow Midland Business Park Infiltation/Inflow Total Immediate Sewer Service Area Flow in MGD Residential Flow Commercial Flow Existing Industrial Flow Midland Business Park Infiltration/Inflow Total 1990 2002 2012 Ultimate 0.1133 0.1360 0.1632 1.2902 0.0243 0.0291 0.0350 0.2765 0.0091 0.0137 0.0183 0.0183 0.0000 0.1465 0.2930 0.2930 0.0162 0.0194 0.0233 0.1843 0.1629 0.3448 0.5327 2.0623 1990 2002 2012 Ultimate 0.0718 0.0862 0.1034 0.6272 0.0154 0.0185 0.0222 0.1344 0.0091 0.0137 0.0183 0.0183 0.0000 0.1465 0.2930 0.2930 0.0103 0.0123 0.0148 0.0896 0.1066 0.2772 0.4516 1.1625 Computation Job No. 00197-037-018 INo. ---7 HDR ftied Muddy Creek NPDES Application com xmd RDH Dab 11/04/91 sU*d Preliminary Engineering Report Check d om. .Task Outfall Pipe Sizing ShW or z Initially, consider designing outfall to flow full at ultimate basin development peak flow conditions. Stream Slope From Hwy 601 to Unnamed tnbutary east of Midland 0.345 ft/100ft Unamde tnbutary east of Midland to Rocky River 0.189 ft/100ft Determine Peak Flow Use equation PF = 4.75-1.25*log(10*Q) Avg Flow 2.06 MGD Peak Flo 6.40 MGD Using Feild's Hydraulic Calculator For s= 0.345 ft/100ft s= 0.189 ft/100ft n= 0.013 n= 0.013 Q = 6.40 MGD Q = 6.40 MGD Need D 21 inches Need D 24 inches Next, consider 1/2 full design at peak 2012 flow conditions Stream Slope From Hwy 601 to Unnamed tnbutary east of Midland 0.345 ft/100ft Unamde tributary east of Midland to Rocky River 0.189 ft/100ft Determine Peak Flow Use equation Avg Flow Peak Flow @ 1/2 full PF = 4.75-1.25*log(10*Q) 0.54 MGD 2.07 MGD Job No. 00197-037-018 1 No. Computation MWO Proied Muddy Creek NPDES Application c«Tp,ad RDH Do. 11/04/91 subject Preliminary Engineering Report a,.ok.d Da% raex 4utfall Pipe Sizing ShW z of 2_ Using Feild's Hydraulic Calculator For s= n= Q= Need D 0.345 ft/100ft s= 0.189 ft/100ft 0.013 n= 0.013 2.07 MGD Q = 2.07 MGD 18 inches Need D 21 inches Use 18-inch Pipe from Hwy 61 to unnamed tributary east of Midland Use 21-inch Pipe from unnamed tributary east of Midland to WWT? Rocky @iv.r D.O. Model Calibration Select "Summer"or"Winter" summer Cull Cult QTrib Qact QTrib Actual Reach Cum Tribs x di Slope Elevation 7010 7Q10 avg Qavg u t Cum t No. (1) ----- (miles) (miles) (fpe) (MSL) -------------------------------------------------------------------- (cfs) (cfsl (cfs) (cfs) (mi/day) (days) (days) 0 0.00 0.00 3.12 498 0.000 30.50 0.00 318.10 9.79 0.00 0.00 1 0.10 0.10 3.12 498 0.000 30.50 0.00 318.10 9,79 0.01 0.01 1 0.20 0.10 3.12 497 0.000 30.50 0.00 318.10 9.79 0.01 0.02 3 0.30 0.10 3.12 497 0.000 30,50 0.00 318.10 9.79 0.01 0.03 4 Coldwater 0.40 0.10 3,12 497 3.543 34.05 112.00 430.10 10.31 0.01 0.04 5 0.60 0.20 3.12 496 3.543 34,05 112.00 430.10 10.31 0.02 0.06 6 0.80 0.20 3.12 496 3.543 34.05 112.00 430.10 10.31 0.02 0.08 7 1.00 0.20 3.12 495 3.543 34.05 112.00 430.10 10.31 0.02 0.10 8 1.25 0.25 3.12 494 3.543 34.05 112.00 430.10 10.31 0.02 0.12 9 1.50 0.15 3.12 493 3.543 34.05 112.00 430.10 10.31 0.02 0.15 10 1.75 0.25 3.12 493 3.543 34.05 112.00 430.10 10.31 0.02 0.17 11 1.00 0.25 3.12 492 3.543 34.05 112.00 430.10 10.31 0.02 0.20 12 Hwy 601 2.10 0.10 2.96 491 3.543 34.05 111,00 430.10 10.31 0.01 0.21 13 2.50 0.40 2.96 490 3.543 34.05 112.00 430.10 10.31 0.04 0.24 14 2.75 0.25 2.96 490 3.543 34.05 112.00 430.10 10.31 0.02 0.27 15 Hamby Branch 3.00 0.25 2.96 489 3.543 34.05 112.00 430.10 10.31 0.02 0.29 16 3.25 0.25 2.96 488 3.543 34.05 112.00 430.10 10.31 0.02 0.32 17 3.50 0.25 2.96 487 3.543 34.05 112.00 430.10 10.31 0.02 0.34 18 3.75 0.25 2.96 487 3.543 34.05 112.00 430.10 10.31 0.02 0.37 19 4.00 0.25 2.96 486 3.543 34.05 112,00 430.10 10.31 0.02 0.39 20 4.25 0.25 2.96 485 3.543 34.05 112.00 430.10 10.31 0.02 0.41 21 SR 1006 4.55 0.30 2.96 484 3.543 34.05 112.00 430.10 10.31 0.03 0.44 22 4.75 0.20 2.96 484 3.543 34.05 112.00 430.10 10.31 0.02 0.46 23 5.00 0.25 2.96 483 3.543 34.05 112.00 430.10 10.31 0.02 0.49 24 Dutch Buffalo 5.35 0.35 2.96 482 7.267 37.77 206.00 524.10 10.82 0.03 0.52 25 5.50 0.15 2.96 481 7.267 37.77 206.00 524.10 10.82 0.01 0.53 26 6.00 0.50 2.96 480 7.267 37.77 206,00 524.10 10.82 0.05 0.58 27 6.50 0.50 2.96 478 7.267 37.77 206,00 524.10 10.82 0.05 0.63 28 7.00 0.50 2.96 477 7.267 37.77 206.00 524.10 10.82 0.05 0.67 29 7.50 0.50 2.96 475 7,267 37.77 206.00 524.10 10.82 0.05 0.72 30 8.00 0.50 2.96 474 7.267 37.77 206.00 524.10 10,82 0.05 0.76 31 8.50 0.50 2.96 473 7.267 37.77 206.00 524.10 10.82 0.05 0.81 32 9.00 0.50 2.96 471 7.267 37.77 206.00 524.10 10.82 0.05 0.86 33 9.50 0.50 2.96 470 7.267 37.77 206.00 524.10 10.82 0.05 0.90 34 10.00 0.50 2.96 468 7.267 37.77 206.00 524.10 10.82 0.05 0.95 35 Hwy 24-27 10.25 0.25 3.07 467 7.267 37.77 206,00 524.10 10,82 0.02 0.97 36 11,00 0.75 3.07 465 7,267 37.77 206.00 524.10 10.82 0.07 1.04 37 11.50 0.50 3.07 463 7.267 37.77 206.00 524.10 10.82 0.05 1.09 38 12.00 0.50 3.07 462 7.267 37.77 206.00 524.10 10.82 0.05 1.13 39 12.50 0.50 3.07 460 7.267 37.77 206.00 524.10 10.82 0.05 1.18 40 13.00 0.50 3.07 459 7.267 37.77 206,00 524.10 10.82 0.05 1.23 41 SR 1114 13.55 0.55 3.07 457 7.267 37.77 206,00 524.10 10.82 0.05 1.28 42 14.00 0.45 3.07 456 7.267 37.77 206.00 524.10 10.82 0.04 1.32 43 14.50 0.50 3.07 454 7.267 37.77 206.00 524.10 10.82 0.05 1.36 44 Muddy Creek WWTP 14.65 0.15 4.12 454 7.267 37.77 706,00 524.10 10.82 0.01 1.38 45 14.75 0.10 4.12 453 7.267 37.77 206,00 524.10 10.82 0.01 1.39 46 15.00 0.25 4.12 452 7.267 37.77 206,00 524.10 10.82 0.02 1.41 47 48 15.25 0.25 4.12 451 7.267 37.77 106.00 524.10 10.82 0.02 1.43 49 15.50 0.25 4.12 450 7.267 37.77 206,00 524.10 10.82 0.02 1.46 50 15.75 0.25 4.12 449 7,267 37.77 206,00 524.10 10.82 0.02 1.48 16.00 0.25 4.12 448 7.267 37.77 206,00 524.10 10.82 0.02 1.50 HDR Engineering, Inc. of Morth Carolina Rocky Rver D.O. Model Calibration Select "Sutter"or"Winter" summer Cute Cull QTrib Qact QTrib Actual Reach Cut ?ribs a da Slope Elevation 7010 7Q10 avq Qavq u t Cum t No. (1) (miles) --------------------------------------------------------------------------------------------- (miles) (fpe) (MSL) (cfs) (cfs) (cfs) (cfs) (eilday) (days) (days) 51 16.25 0.25 4.12 447 7.267 37.77 206.00 524.10 10.82 0.02 1.53 52 16.50 0.25 4.12 446 7.267 37.77 106.00 524.10 10.82 0.02 1.55 53 Goose Creek 16.90 0.40 8.80 445 10.084 40.59 269.00 587.10 11.19 0.04 1.58 54 17.00 0.10 8.80 444 10.084 40.59 269.00 587.10 11.19 0.01 1.59 55 17.50 0.50 8.80 439 10.084 40.59 269.00 587.10 11.19 0.04 1.64 56 18.00 0.50 6.28 435 10.084 40.59 269.00 587.10 11.19 0.04 1.68 57 18.50 0.50 6.28 432 10.084 40.59 269.00 587.10 11.19 0.04 1.73 58 19.00 0.50 6.28 429 10.084 40.59 269.00 587.10 11.19 0.04 1.77 59 19.50 0.50 8.12 425 10.084 40.59 269.00 587.10 11.19 0.04 1.82 60 20.00 0.50 8.12 421 10.084 40.59 269.00 587.10 11.19 0.04 1.86 61 Crooked Creek 20.70 0.70 13.54 416 12.723 43.23 328.00 646.10 11.53 0.06 1.92 62 21.00 0.30 13.54 412 12.723 43.22 328.00 646.10 11.53 0.03 1.95 63 22.00 1.00 13.54 398 12.723 43.23 328.00 646.10 11.53 0.09 2.04 64 23.00 1.00 13.54 385 12.723 43.23 328.00 646.10 11.53 0.09 2.12 65 24.00 1.00 13.54 371 12.723 43.23 328.00 646.10 11.53 0.09 2.21 66 25.00 1.00 7.49 357 12.723 43.23 328.00 646.10 11.53 0.09 2.30 67 26.00 1.00 7.49 350 12.723 43.23 328.00 646.10 11.53 0.09 2.38 68 27.00 1.00 7.49 342 12.723 43.23 328.00 646.10 11.53 0.09 2.47 69 28.00 1.00 7.49 335 12.723 43.23 328.00 646.10 11.53 0.09 2.56 70 29.00 1.00 7.49 328 12.723 43.23 328.00 646.10 11.53 0.09 2.64 71 30.00 1.00 7.49 320 12.723 43.23 328.00 646.10 11.53 0.09 2.73 72 31.00 1.00 7.49 313 12.723 43.23 328.00 646.10 11.53 0.09 2.82 73 32.00 1.00 7.49 305 12.723 43.23 328.00 646.10 11.53 0.09 2.90 74 33.00 1.00 7.49 298 12.723 43.23 328.00 646.10 11.53 0.09 2.99 75 34.00 1.00 7.49 290 12.723 43.23 328.00 646.10 11.53 0.09 3.08 76 35.00 1.00 7.49 283 12.723 43.23 328.00 646.10 11.53 0.09 3.16 77 Biq Bear/Oakboro 35.95 0.95 8.57 275 22.411 52.91 510.00 828.10 12.68 0.07 3.24 78 37.00 1.05 8.57 266 22.411 52.91 510.00 828.10 12.68 0.08 3.32 ?9 38.00 1.00 8.57 258 22.411 52.91 510.00 828.10 12.68 0.08 3.40 80 39.00 1.00 8.57 249 22.411 52.91 510.00 828.10 12.68 0.08 3.48 81 Richardson Creek 40.15 1.15 2.16 239 29.567 60.07 670.00 988.10 13.46 0.09 3.56 82 41.00 0.85 2.16 238 29.567 60.07 670.00 988.10 13.46 0.06 3.63 83 42.00 1.00 2.16 235 29.567 60.07 670.00 988.10 13.46 0.07 3.70 84 43.00 1.00 2.16 233 29.567 60.07 670.00 988.10 13.46 0.07 3.78 85 44.00 1.00 2.16 231 29.567 60.07 670.00 988.10 13.16 0.07 3.85 86 45.00 1.00 2.16 229 29.567 60.07 670.00 988.10 13.46 0.07 3.92 87 50.00 5.00 2.16 218 29.567 60.07 670.00 988.10 13.46 0.37 4.30 S8 55.00 5.00 2.16 207 29.567 60.07 670.00 988.10 13.46 0.37 4.67 89 55.85 0.85 2.16 206 29.567 60.07 670.00 988.10 13.46 0.06 4.73 HDR Enqineerinq, Inc. of North Carolina Rocky River D.O. Model Calibration Select "Sunder"or"Winter" V H Cal Calibration Calibration Beach Cum Tribs x Cue t Override V Override H n Kd Kn Ka lowQ No (1) ----- (miles) (days) (fps) (fps) (ft) (ft) (/day) (/day) (/day) (/day) 0 0.00 0.00 0.60 0.60 1.08 1.08 0.11 0.26 0.30 0.00 1 0.10 0.01 0.60 0.60 1.08 1.08 0.11 0.26 0.30 0.00 2 0.20 0.02 0.60 0.60 1.08 1.08 0.11 0.26 0.30 0.00 3 0.30 0.03 0.60 0.60 1.08 1.08 0.11 0.26 0.30 0.00 4 Coldwater 0.40 0.00 0.63 0.63 1.11 1.11 0.11 0.26 0.30 0.00 5 0.60 0.02 0.63 0.63 1.11 1.11 0.11 0.26 0.30 0.00 6 0.80 0.04 0.63 0.63 1.11 1.11 0.11 0.26 0.30 0.00 7 1.00 0.06 0.63 0.63 1.11 1.11 0.11 0.26 0.30 0.00 8 1.25 0.08 0.63 0.63 1.11 1.11 0.11 0,26 0.30 0.00 9 1.50 0.11 0.63 0.63 1.11 1.11 0.11 0.26 0.30 0.00 10 1.75 0.13 0.63 0.63 1.11 1.11 0.11 0.26 0.30 0.00 11 2.00 0.16 0.63 0.63 1.11 1.11 0.11 0.26 0.30 0.00 12 Hwy 601 2.10 0.16 0.63 0.63 1.11 1.11 0.11 0.26 0.30 0.00 13 2.50 0.20 0.63 0.63 1.11 1.11 0.11 0.26 0.30 0.00 14 2.75 0.23 0.63 0.63 1.11 1.11 0.11 0.26 0.30 0.00 15 Hamby Branch 3.00 0.25 0.63 0.63 1.11 1.11 0.11 0.26 0.3Q 0,00 16 3.25 0.28 0.63 0.63 1.11 1.11 0.11 0.26 0.30 0.00 17 3.50 0.30 0.63 0.63 1.11 1.11 0.11 0.26 0.30 0.00 18 3.75 0.33 0.63 0.63 1.11 1.11 0.11 0.26 0.30 0.00 19 4.00 0.35 0.63 0.63 1.11 1.11 0.11 0.26 0.30 0.00 20 4.25 0.37 0.63 0.63 1.11 1.11 0.11 0.26 0.30 0.00 21 SR 1006 4.55 0.40 0.63 0.63 1.11 1.11 0.11 0.26 0.30 0.00 22 4.75 0.42 0.63 0.63 1.11 1.11 0.11 0.26 0.30 0.00 23 5.00 0.45 0.63 0.63 1.11 1.11 0.11 0.26 0.30 0,00 24 Dutch Buffalo 5.35 0.00 0.66 0.66 1.14 1.14 0.11 0.26 0.30 0.00 25 5.50 0.01 0.66 0.66 1.14 -1.14 0.11 0.16 0.30 0.00 26 6.00 0.06 0.66 0.66 1.14 1.11 0.11 0.26 0.30 0.00 !7 6.50 0.11 0.66 0.66 1.14 1.14 0.11 0.26 0.30 0.00 28 7.00 0.15 0.66 0.66 1.14 1.14 0.11 0.26 0.30 0.00 29 7.50 0.20 0.66 0.66 1.14 1.14 0.11 0.26 0.30 0.00 30 8.00 0.24 0.66 - 0.66 1.14 1.14 0.11 0,26 0.30 0.00 31 8.50 0.29 0.66 0.66 1.14 1.14 0.11 0.26 0.30 0.00 32 9.00 0.34 0.66 0.66 1.14 1.14 0.11 0.26 0.30 0,00 33 9.50 0.38 0.66 0.66 1.14 1.14 0.11 0.26 0.30 0.00 34 10.00 0.43 0.66 0.66 1.14 1.14 0.11 0.26 0.30 0.00 35 Hwy 24-27 10.25 0.45 0.66 0.66 1.14 1.14 0.11 0.27 0.30 0.00 36 11,00 0.52 0.66 0.66 1.14 1.14 0.11 0.27 0.30 0,00 37 11,50 0.57 0.66 0.66 1.14 1.14 0.11 0.17 0.30 0.00 38 12.00 0.61 0.66 0.66 1.14 1.14 0.11 0.27 0.30 0.00 39 12.50 0.66 0.66 0.66 1.14 1.14 0.11 0.27 0.30 0.00 40 13.00 0.71 0.66 0.66 1,14 1.14 0.11 0.27 0.30 0.00 41 SR 1114 13.55 0.76 0.66 0.66 1.14 1.14 0.11 0.27 0.30 0.00 42 14.00 0.80 0.66 0.66 1.14 1.14 0.11 0.27 0.30 0.00 43 14.50 0.85 0.66 0.66 1.14 1.14 0.11 0.27 0.30 0.00 44 Muddy Creek WWTP 14.65 0.00 0.66 0.66 1.14 1.14 0.13 0.28 0.30 0.00 45 46 14.75 0.01 0.66 0.66 1.14 1.14 0.13 0.28 0,30 0.00 47 15.00 0.03 0.66 0.66 1.14 1.14 0.13 0.28 0.30 0.00 48 15.25 0.06 0.66 0.66 1.14 1.14 0.13 0.28 0.30 0.00 49 15.50 0.08 0.66 0.66 1.14 1.14 0.13 0.28 0.30 0.00 50 15.75 0.10 0.66 0.66 1.14 1.14 0.13 0.18 0.30 0.00 16,00 0.12 0.66 0.66 1.14 1.14 0.13 0.28 0.30 0.00 HDR Engineering, Inc. of North Carolina Rocky &fiver D.O. Kodel Calibration Select "Summer"or"Winter" y H Cal Calibration Calibration Beach Cue cribs a Cue t Override V Override H n Kd Kn Ka IoKQ ---No. (1) (miles) (days) (fps) ----------------------------------------- (fps) (ft) (ft) (/day) (/daY) (/day) (/daY) 51 52 16.25 0.15 0.66 0.66 1.14 1.14 ---------------------------- 0,13 0.28 0.30 0.00 53 Goose Creek 16,50 16.90 0.17 0.00 0.66 0.68 0.66 0.68 1.14 1.16 1.14 1.16 0.13 0.28 0.30 0.00 54 17.00 0.01 0.68 0.68 1.16 1.16 0.21 0.21 0.33 0.33 0.30 0.30 0.00 0.00 55 56 17.50 0.05 0.68 0.68 1.16 1.16 0.21 0.33 0.30 0.00 18.00 0.10 0.68 0.68 1.16 1.16 0.17 0.30 0.30 0.00 57 58 18.50 0.14 0.68 0.68 1.16 1.16 0,17 0,30 0.30 0.00 19.00 0.19 0.68 0.68 1.16 1.16 0.17 0.30 0.30 0.00 59 60 19.50 0.23 0.68 0.68 1.16 1.16 0.20 0.32 0.30 0.00 61 Crooked Creek 20.00 20.70 0.28 0.00 0.68 0.70 0.68 0.70 1.16 1.18 1.16 1.18 0.20 0.32 0.30 0.00 62 11.00 0.03 0.70 0.70 1.18 1.18 0.27 0.27 0.36 0.36 0.30 0.30 0.00 0.00 63 22.00 0.11 0.70 0.70 1.18 1.18 0.27 0.36 0.30 0.00 64 65 23.00 0.20 0.70 0.70 1.18 1.18 0.27 0,36 0.30 0.00 66 24.00 0.29 0.70 0.70 1.18 1.18 0.27 0.36 0.30 0.00 67 25.00 0.37 0.70 0.70 1.18 1.18 0.19 0.32 0.30 0.00 68 16.00 0.46 0.70 0.70 1.18 1.18 0.19 0,32 0.30 0.00 69 27.00 0.55 0.70 0.70 1.18 1.18 0.19 0.32 0.30 0.00 70 28.00 0.63 0.70 0.70 1.18 1.18 0.19 0.32 0.30 0.00 71 29.00 0.72 0.70 0.70 1.18 1.18 0.19 0.32 0.30 0.00 72 30.00 0.81 0.70 0.70 1.18 1.18 0.19 0.32 0.30 0,00 73 31.00 0.89 0.70 0.70 1.18 1.18 0.19 0.32 0.30 0.00 74 32.00 0.98 0.70 0.70 1.18 1.18 0.19 0.32 0.30 0.00 75 33.00 1.07 0.70 0.70 1.18 1.18 0.19 0.32 0.30 0.00 76 34.00 1.15 0.70 0.70 1.18 1.18 0.19 0.32 0.30 0.00 77 Big Bear/Oakboro 35.00 35.95 1.24 0.00 0.70 0.77 0.70 0.77 1.18 1.24 1.18 0.19 0.32 0.30 0.00 78 37.00 0.08 0.77 0.77 1.24 1.24 1.24 0.21 0.21 0.33 0.33 0.30 0.30 0.00 0.00 79 80 38.00 0.16 0.77 0.77 1.24 1.24 0.21 0.33 0.30 0.00 81 Richardson Creek 39.00 40.15 0.24 0.00 0.77 0.82 0.77 0.82 1.24 1.28 1.24 1.28 0.21 0.09 0.33 0.30 0.00 82 41.00 0.06 0.82 0.82 1.28 1.28 0.09 0.26 0.26 0.30 0.30 0.00 0.00 83 84 42.00 0.14 0.82 0.82 1.28 1.28 0.09 0.26 0.30 0.00 85 43.00 0.21 0.82 0.82 1.28 1.28 0.09 0.26 0.30 0.00 86 44.00 0.29 0.82 0.82 1.28 1.28 0.09 0,26 0.30 0.00 87 45.00 0.36 0.82 0.82 1.28 1.28 0.09 0.26 0.30 0,00 88 50.00 0.73 0.82 0.82 1.28 1.28 0.09 0.26 0.30 0.00 89 55.00 1.10 0.82 0.82 1.28 1.28 0.09 0.26 0.30 0.00 55.85 1.17 0.82 0.82 1.28 1.28 0.09 0.26 0.30 0.00 HDR Engineering, Inc, of North Carolina Bock? Eiver D.O. Model Calibration Select "Summer"or"Winter" Ed(Tc) Ea(TC) Calibration Calibration Beach Cum Tribs a Ka midQ Ka bighQ Override Ed(T) Kn(T) Override Ka(T) Dai Daa ---No. (1) (miles) (/day) (/day) (/day) (/day) (/day) (/day) (/day) (19/1) (m9/1) 0 0.00 0.00 1.64 0-18-----O-3Z---------3-00-----3-00-----1-�8-----I-�B- 1 0.10 0.00 1.61 0.28 0.32 3.00 3.00 1.58 1.54 2 0.20 0..00 1.64 0.28 0.32 3.00 3.00 1.58 1.49 3 0.30 0.00 1.64 0.28 0.32 3.00 3.00 1.58 1.44 4 Coldwater 0.40 0.00 1.73 0.28 0.32 3.00 3.00 1.54 1.54 5 0.60 0.00 1.73 0.28 0.32 3.00 3.00 1.54 1.45 6 0.80 0.00 1.73 0.28 0.32 3.00 3.00 1.54 1.37 7 1.00 0.00 1.73 0.28 0.32 3.00 3.00 1,54 1.29 8 1.25 0.00 1.73 0.28 0.32 3.00 3.00 1.54 1.20 9 1.50 0.00 1.73 0.28 0.32 3.00 3.00 1.54 1.12 10 1.75 0.00 1.73 0.28 0.32 3.00 3.00 1.54 1.04 11 2.00 0.00 1.73 0.28 0.32 3.00 3.00 1.54 0.97 12 Hwy 601 2.10 0.00 1.64 0.28 0.32 3.00 3.00 1.54 0.94 13 2.50 0.00 1.64 0.28 0.32 3.00 3.00 1.54 0.84 14 2.75 0.00 1.64 0.28 0.32 3.00 3.00 1.54 0.78 15 Hamby Branch 3.00 0.00 1.64 0.28 0.32 3.00 3.00 1.54 0.72 16 3.15 0.00 1.64 0.28 0.32 3.00 3.00 1.54 0.67 17 3.50 0.00 1.64 0.28 0.32 3.00 3.00 1.51 0.63 18 3.75 0.00 1.64 0.28 0.32 3.00 3.00 1.54 0,58 19 4.00 0.00 1.64 0.28 0.32 4.00 4.00 1.54 0.38 20 1.25 0.00 1.64 0.28 0.32 4.00 4.00 1.54 0.35 21 SR 1006 4.55 0.00 1.64 0.28 0.32 4.00 4.00 1.54 0.31 22 4.75 0.00 1.64 0.28 0.32 6.00 6.00 1.51 0.12 23 5.00 0.00 1.64 0.28 0.32 6.00 6.00 1.54 0.11 24 Dutch Buffalo 5.35 0.00 1.72 0.28 0.32 6.00 6.00 0.89 0.89 25 5.50 0.00 1.72 0.28 0.32 6.00 6.00 0.89 0.82 26 6.00 0.00 1.72 0.28 0.32 6.00 6.00 0.89 0.62 27 6.50 0.00 1.72 0.28 0.32 6.00 6.00 0.89 0.47 28 7.00 0.00 1.72 0.28 0.32 6.00 6.00 0.89 0.36 29 7.50 0.00 1.72 0.28 0.32 6.00 6.00 0.89 0.27 30 8.00 0.00 1.72 0.28 0.32 6.00 6.00 0.89 0.21 31 8.50 0.00 1.72 0.28 0.32 6.00 6.00 0.89 0.16 32 9.00 0.00 1.72 0.28 0.32 6.00 6.00 0.89 0.12 33 9.50 0.00 1.72 0.28 0.32 6.00 6.00 0.89 0.09 34 10.00 0.00 1.72 0.28 0.32 6.24 6.74 0.89 0.06 35 Hwy 24-27 10.25 0.00 1.79 0.28 0.32 6.24 6.24 0.89 0,05 36 11.00 0.00 1.79 0.28 0.32 6.21 6.21 0.89 0.03 37 38 11.50 0.00 1.79 0.28 0.32 6.24 6.24 0.89 0.03 39 12.00 0.00 1.79 0.28 0.32 6.24 6.21 0.89 0.02 40 12.50 0.00 1.79 0.28 0.32 6.24 6.24 0.89 0.01 13.00 0.00 1.79 0.28 0.32 6.24 6.24 0.89 0,01 41 SR 1114 13.55 0.00 1.79 0.28 0.32 6.24 6.21 0.89 0.01 42 14.00 0.00 1.79 0.28 0.32 6.24 6.24 0.89 0.01 43 14.50 0.00 1.79 0.28 0.32 6.24 6.21 0.89 0.00 44 Muddy Creek WWTP 14.65 0.00 2.40 0.29 0.32 6.24 6.24 0.61 0.61 45 46 14.75 0.00 2.40 0.29 0.32 6.24 6.24 0.61 0.57 41 15.00 0.00 2.40 0.29 0.32 6.24 6.21 0.61 0,50 48 15.25 0.00 2.40 0.29 0.32 6.24 6.24 0.61 0.43 49 15.50 0.00 2.40 0.29 0.32 6.24 6.21 0.61 0.37 50 15.75 0.00 2.10 0.29 0.32 6.24 6.24 0,61 0.32 16.00 0.00 2.40 0.29 0.32 6.24 6.24 0.61 0.28 HDB Engineerinq, Inc. of North Carolina Rocky Giver D.O. Model Calibration Select "Sutter"or"hinter" Kd(Tc) Ka(Tc) Calibration Calibration Beach Cut Tribs a Ka tidQ Ka high0 Override Kd(T) Kn(T) Override Ka(T) Dai Daa ---No. (t) (tiles) (IdaY) (IdaY) (IdaY) ---------0-29-----a-3�---------6-�4-----6-24-----0-61-----o-Z4- (ldaq) (/day) (/daY) (IdaY) (oq/1) (tgll) 51 52 16.25 0.00 1.40 53 Goose Creek 16.50 16.90 0.00 0,00 2.40 5.30 0.29 0.34 0.32 0.32 6.24 6.24 0.61 0.21 54 17.00 0.00 5.30 0.34 0.32 6.25 6.25 6.25 6.25 0.61 0.61 0.61 0.58 55 17.50 0.00 5.30 0.34 0.32 6.25 6.25 0.61 0.44 56 18.00 0.00 3.78 0.32 0.32 6.25 6.25 0,61 0.33 57 58 18.50 0.00 3.78 0.32 0.32 6.25 6.25 0.61 0.25 19.00 0.00 3.78 0.32 0.32 6.25 6.25 0.61 0.19 59 60 19.50 0.00 4.89 0.33 0.32 6.25 6.25 0.61 0.14 20.00 0.00 4.89 0.33 0.32 6.25 6.25 0.61 0.11 61 Crooked Creek 20,70 0.00 8.40 0.38 0.32 6.27 6.27 0.60 0.60 62 21.00 0.00 8.40 0.38 0.32 6.27 6.27 0.60 0.51 63 22.00 0.00 8.40 0.38 0.32 6.27 6.27 0.60 0.30 64 23.00 0.00 8.40 0.38 0.32 6.27 6.27 0,60 0.17 65 24.00 0.00 8.40 0.38 0.32 6.27 6.27 0.60 0.10 66 67 25.00 0.00 4.64 0.33 0.32 6.27 6,27 0.60 0.06 68 26.00 0.00 4.64 0.33 0.32 6.27 6.27 0.60 0.03 69 27.00 0.00 4.64 0.33 0.32 6.27 6.27 0.60 0.02 70 28.00 0.00 4.64 0.33 0.32 6.27 6.17 0,60 0.01 71 29.00 0.00 4.64 0.33 0.32 6.27 6.27 0.60 0.01 72 30.00 0.00 4.64 0.33 0.32 6.27 6.27 0.60 0.00 73 31.00 0.00 4.64 0.33 0.32 6.27 6.27 0.60 0.00 74 32.00 0.00 4.64 0.33 0.32 6.27 6.17 0.60 0.00 75 33.00 0.00 4.64 0.33 0.32 6.27 6,27 0.60 0.00 76 34.00 0.00 4.64 0.33 0.32 6.27 6.27 0.60 0.00 77 Biq BearlOakboro 35.00 35.95 0.00 0.00 4.64 5.84 0.33 0.35 0.31 0.32 6.27 6.32 6.27 0.60 0.00 78 37.00 0.00 5.84 0.35 0.32 6.32 6.32 6.32 0.52 0,52 0.52 0.31 79 80 38.00 0.00 5.84 0.35 0.32 6.32 6.32 0.52 0.19 81 Richardson Creek 39.00 40,15 0.00 0.00 5.84 1.56 0.35 0.32 6.32 6.32 0.52 0.11 82 41.00 0.00 1.56 0,27 0.27 0.32 0.32 6.35 6.35 6.35 6.35 0.49 0.49 0.49 0.33 83 84 41.00 0.00 1.56 0.17 0.32 6.35 6.35 0,49 0.20 85 43.00 0.00 1.56 0.27 0.32 6.35 6.35 0.49 0.13 86 44.00 0.00 1.56 0.27 0.32 6.35 6.35 0,49 0.08 87 45.00 0.00 1.56 0.27 0.32 6.35 6.35 0.49 0.05 88 50.00 0.00 1.56 0.27 0.32 6.35 6.35 0.49 0.00 89 55.00 0.00 1.56 0.27 0.32 6.35 6.35 0.49 0.00 55.85 0.00 1.56 0.27 0.32 6.35 6.35 0.49 0.00 HOR Engineering, Inc. of North Carolina Rocks Eiver D.O. Model Calibration Select "Sumter"or"Winter" Conside Reach Cut Tribs E CBODi CBODa Dca XBODi XBODI Dna Cue Da Sat DO DOa Dsa ---No---- (1) (tiles) (igl1) (t9/1) (Q911J ------------------------------------------ (tg/1) (t9/1J (o9/1J (d9/1J It9/1J (e9/1) (t9/1J 0 1 0.00 20.84 20.84 0.00 1.47 1.47 0.00 1.58 --------------------------- 8.11 6.53 0.00 2 0.10 20.84 20.78 0.06 1.47 1.47 0.00 1.60 8.11 6.51 0.03 3 0.20 20.84 20.73 0.11 1.47 1,47 0.01 1.61 8.11 6.50 0.05 4 Coldwater 0.30 0.40 20.84 18.73 20.67 18.73 0.17 0.00 1.47 1.41 1.46 1.41 0.01 0.00 1.63 8.11 6.49 0.08 5 6 0.60 18.73 18.63 0.10 1.41 1.40 0.01 1.54 1.56 8.11 8.11 6.57 6.55 0.00 0.05 7 0.80 18.73 18.53 0.19 1.41 1.39 0.02 1.58 8.11 6.54 0.10 8 1.00 18.73 18.43 0.27 1.41 1.39 0.02 1.59 8.11 6.52 0.14 9 1.25 18.73 18.30 0.37 1.41 1.38 0.03 1.61 8.11 6.50 0.19 10 1.50 18.73 18.18 0.47 1.41 1.36 0.04 1.63 8.11 6.49 0.24 1.75 18.73 18.06 0.55 1.41 1.35 0.05 1.64 8.11 6.47 0,29 11 12 Hwy 601 2.00 2.10 18.73 18.73 17.94 17.89 0.63 0.65 1.41 1.34 0.06 1.65 8.11 6.46 0.33 13 14 2.50 18.73 17.70 0.76 1.41 1.41 1.34 1.32 0.06 0.07 1.65 1.67 8.11 8.11 6.46 6.45 0.35 0.41 2.75 18.73 17.59 0.82 1.41 1.31 0.07 1.67 8.11 6.44 0.44 15 Hanby Branch 16 3.00 18.73 17.47 0.88 1.41 1.30 0.08 1.68 8.11 6.44 0.47 17 3.25 18.73 17.35 0.93 1.41 1.29 0.08 1.68 8.11 6.43 0.50 18 3.50 18.73 17.21 0.97 1.41 1.28 0.09 1.68 8.11 6.43 0.53 19 3.75 18.73 17.12 1.02 1.41 1.27 0.09 1.69 8.11 6.43 0.55 20 4.00 18.73 17.01 0.91 1.41 1.26 0.08 1.38 8.11 6.74 0.50 21 SR 1006 4.25 4.55 18.73 18.73 16.90 16.76 0.94 0.96 1.41 1.25 0.08 1.37 8.11 6.75 0.52 22 4.75 18.73 16.67 0.73 1.41 1.41 1.21 1.23 0.08 0.06 1.35 0.92 8.11 8.11 6.76 7.20 0.53 23 24 Dutch Buffalo 5.00 5.35 18.73 15.13 16.56 15.13 0.73 0.00 1.41 1,22 0.06 0.90 8.11 7.21 0.41 0.41 15 5.50 15,13 15.07 0.06 1.20 1.20 1.20 1.19 0.00 0.01 0.89 0.88 8.11 8.11 7,1Z 7.23 0.00 26 11 6.00 15.13 14.88 0.21 1.20 1.18 0.02 0.85 8.11 7.26 0,03 0.13 28 6.50 15.13 14.69 0.32 1.20 1.16 0.03 0.83 8.11 7.29 0.20 29 7.00 15.13 14.50 0.41 1.20 1.14 0.04 0.80 8.11 7.31 0.26 30 7.50 15.13 14.32 0.47 1.20 1.13 0.04 0.79 8.11 7.33 0.30 31 8.00 15.13 14.14 0.51 1.20 1.11 0.05 0.77 8.11 7.34 0.33 32 8.50 15.13 13.96 0.55 1.20 1.09 0.05 0.75 8.11 7.36 0.36 33 9.00 15.13 13.78 0.57 1.20 1.08 0.05 0.74 8.11 7.37 0.37 34 9.50 15.13 13.60 0.58 1.20 1.06 0.05 0.73 8.11 7.39 0.39 35 Hwy 24-27 10.00 10.25 15.13 15.13 13.43 13.34 0.58 0.58 1.20 1.20 1.04 0.05 0.69 8.11 7.42 0.39 36 11.00 15.13 13.08 0.58 1.20 1.04 1.01 0.05 0.05 0.69 0.67 8.11 8.11 7.43 7.44 0.39 37 38 11.50 15.13 12.92 0.58 1.20 1.00 0.05 0.66 8.11 7.45 0.40 0.40 39 12.00 15.13 12.75 0.58 1.20 0.98 0.05 0.65 8.11 7.46 0.41 40 12.50 15.13 12.59 0.58 1.20 0.97 0.05 0.64 8.11 7.47 0.41 41 SR 1114 13.00 13.55 15.13 15.13 12.43 12.25 0.57 0.57 1.20 0.95 0.05 0.63 8.11 7.48 0.41 42 14.00 15.13 12.11 0.56 1.20 1.20 0.94 0.93 0.05 0.05 0.61 0.62 8.11 8.11 7.49 7.50 0.11 43 44 Muddy Creek WWTP 14.50 14.65 15.13 11.96 11.96 11.96 0.55 0.00 1.20 0.91 0.05 0.61 8.11 7.50 0.41 0.41 45 14.75 11.96 11.93 0.03 0.91 0.91 0.91 0.91 0.00 0.00 0.61 0.61 8.11 8.11 7.50 7.50 0.00 46 47 15.00 11.96 11.85 0.10 0.91 0.90 0.01 0.61 8.11 7.51 0.02 0.08 48 15.25 11.96 11.77 0.16 0.91 0.90 0.01 0.61 8.11 7.51 0.12 49 15.50 11.96 11.69 0.21 0.91 0.89 0.02 0.60 8.11 7.51 0.16 50 15.75 11.96 11.61 0.26 0.91 0.88 0.02 0.60 8.11 7.51 0.19 16.00 11.96 11.53 0.30 0.91 0.88 0.03 0.60 8.11 7.51 0.22 HDR Engineering, Inc. of Xorth Carolina Rocky River D.O. Model Calibration Select "Summer"or"Winter" Conside Reach Cum (ribs a CBODi CBODa Dca NBOD1 NBODa Dna Cum Da Sat DO DOa Dsa No. (1) ---- (miles) -------------------------------------------------------------------------------------------------- (mg/1) (ogli) (eg/1) fm9/1) (e9ili fog/1) (e9111 fmg/1) fe9/1) fe9/11 51 16.25 11.96 11.15 0.33 0.91 0.87 0.03 0.60 8.11 7.52 0.25 52 16.50 11.96 11.38 0.36 0.91 0.86 0.03 0.60 8.11 7.52 0.27 53 Goose Creek 16.90 10.73 10.73 0.00 0.87 0.87 0.00 0.61 8.11 7.50 0.00 54 17.00 10.73 10.69 0.03 0.87 0.87 0.00 0.61 8.11 7.50 0.02 55 17.50 10.73 10.53 0.16 0.87 0.86 0.01 0.61 8.11 7.50 0.12 56 18.00 10.73 10.40 0.24 0.87 0.85 0.02 0.60 8.11 7.52 0.19 57 18.50 10.73 10.25 0.31 0.87 0.83 0.03 0.59 8.11 7.52 0.24 58 19.00 10.73 10.11 0.36 0.87 0.82 0.03 0.58 8.11 7.53 0.28 59 19.50 10.73 9.92 0.42 0.87 0.81 0.03 0.59 8.11 7.52 0.31 60 20.00 10.73 9.78 0.44 0.87 0.80 0.04 0.59 8.11 7.53 0.33 61 Crooked Creek 20.70 9.30 9.30 0.00 0.81 0.81 0.00 0.60 8.11 7.51 0.00 62 21.00 9.30 9.21 0.08 0.81 0.80 0.01 0.60 8.11 7.51 0.06 63 22.00 9.30 8.91 0.28 0.81 0.78 0.02 0.60 8.11 7.52 0.20 64 23.00 9.30 8.62 0.39 0.81 0.76 0.03 0.59 8.11 7.53 0.28 65 24.00 9.30 8.34 0.44 0.81 0.74 0.03 0.57 8.11 7.54 0.33 66 25.00 9.30 8.23 0.41 0.81 0.72 0.03 0.50 8.11 7.61 0.36 67 26.00 9.30 7.99 0.42 0.81 0.70 0.04 0.48 8.11 7.63 0.38 68 27.00 9.30 7.77 0.41 0.81 0.68 0.04 0.47 8.11 7.64 0.39 69 28.00 9.30 7.55 0.41 0.81 0.66 0.04 0.46 8.11 7.66 0.39 70 29.00 9.30 7.34 0.40 0.81 0.64 0.03 0.44 8.11 7.67 0.39 71 30.00 9.30 7.13 0.39 0.81 0.62 0.03 0.13 8.11 7.68 0.40 72 31.00 9.30 6.93 0.38 0.81 0.61 0.03 0.42 8.11 7.69 0.40 73 32.00 9.30 6.73 0.37 0.81 0.59 0.03 0.41 8.11 7.71 0.40 74 33.00 9.30 6.54 0.36 0.81 0.57 0.03 0.39 8.11 7.72 0.40 15 34.00 9.30 6.36 0.35 0.81 0.56 0.03 0.38 8.11 7.73 0.40 76 35.00 9.30 6.18 0.34 0.81 0.54 0.03 0.37 8.11 7.74 0.40 77 Big BearlOakboro 35.95 7.11 7.11 0.00 1.12 1.12 0.00 0.52 8.11 7.59 0.00 78 37.00 7.11 6.91 0.16 1.12 1.09 0.02 0.49 8.11 7.63 0.15 79 38.00 7.11 6.72 0.24 1.12 1.07 0.01 0.16 8.11 7.65 0.24 80 39.00 7.11 6.54 0.29 1.12 1.04 0.01 0.45 8.11 7.67 0.29 81 Richardson Creek 40.15 6.00 6.00 0..00 1.03 1.03 0.00 0.49 8.11 7.62 0.00 82 41.00 6.00 5.90 0.08 1.03 1.01 0.02 0.43 8.11 7.68 0.12 83 42.00 6.00 5.78 0.15 1.03 0.99 0.03 0.38 8.11 7.73 0.21 84 43.00 6.00 5.67 0.18 1.03 0.97 0.04 0.35 8.11 7.76 0.27 85 44.00 6.00 5.55 0.20 1.03 0.94 0.01 0.33 8.11 7.79 0.30 86 45.00 6.00 5.44 0.22 1.03 0.92 0.04 0.31 8.11 7.80 0.33 87 50.00 6.00 4.92 0.22 1.03 0.82 0.04 0.27 8.11 7.85 0.36 88 55.00 6.00 4.45 0.20 1.03 0.72 0.04 0.24 8.11 7.88 0.36 89 55.85 6.00 4.37 0.19 1.03 0.71 0.04 0.23 8.11 7.88 0.36 BDR Engineering, Inc. of North Carolina Rock] River D,O, Model Calibration Select "Summer"or"Winter" ring SOD --------- Permit CalibrationCalibration Reach Cum Tribs a DOa Limit DO CBOD No. (1) --------------------------------------------------------- (miles) (mg/1) (mg/l) (egll) (mg/1) 0 0.00 6.53 5,00 1 0.10 6.49 5.00 2 0.20 6.45 5.00 3 0.30 6.41 5.00 4 Coldwater 0.40 6.57 5.00 5 0.60 6.50 5.00 6 0.80 6.44 5.00 7 1.00 6.38 5.00 B 1.25 6.31 5.00 9 1.50 6,24 5.00 10 1.75 6.18 5.00 11 2.00 6.13 5.00 12 Hwy 601 2.10 6.12 5,00 6.13 22.28 13 2.50 6.04 5.00 14 2.75 6.00 5.00 15 Hamby Branch 3.00 5.97 5.00 6.03 17.10 16 3.25 5.93 5.00 17 3.50 5.90 5.00 18 3.75 5.87 5.00 19 1.00 6.24 5.00 20 4.25 6.23 5.00 21 SR 1006 1.55 6.23 5.00 6.57 18.48 22 4.75 6.79 5.00 23 5.00 6.80 5.00 14 Dutch Buffalo 5.35 7.22 5.00 25 5.50 7.19 5.00 26 6.00 7.13 5.00 27 6.50 7.08 5.00 28 7.00 7.05 5.00 29 7.50 7.03 5.00 30 8.00 7.01 5.00 31 8.50 7.00 5.00 32 9.00 7.00 5.00 33 9.50 7.00 5.00 34 10.00 7.04 5.00 35 Hwy 24-27 10.25 7.04 5.00 6.83 10.56 36 11,00 7.01 5.00 37 11.50 7.05 5.00 38 11.00 7.06 5,00 39 12.50 7.06 5.00 40 13.00 7.07 5.00 41 SR 1114 13.55 7.08 5.00 8.15 42 14.00 7.08 5.00 43 14.50 7,09 5.00 44 Muddy Creek WWTP 14.65 7.50 5.00 45 14.75 7,48 5.00 46 15.00 7.43 5.00 47 15.25 7.39 5.00 48 15.50 7.35 5.00 49 15.75 7,32 5.00 50 16.00 7.29 5.00 H➢R Rngineering, Inc, of North Carolina Rocky River D.O. Kodel Calibration Select "Summer"or"Winter" ring SOD --------- Permit CalibrationCalibration Reach Cum cribs a DOa Limit DO CBOD No. (8) (miles) (mg/1) (mgll) (mg/l) (mg/1) ----------------------------------------------------------------------- 51 16.25 7.27 5.00 52 16.50 7.25 5.00 53 Goose Creek 16.90 7.50 5.00 54 17.00 7.48 5.00 55 17.50 7.38 5.00 56 18.00 7.33 5.00 57 18.50 7.28 5.00 58 19.00 7.25 5.00 S9 19.50 7.21 5.00 60 20.00 7.19 5.00 61 Crooked Creek 20.70 7.51 5.00 62 21.00 7.45 5.00 63 22.00 7.31 5.00 64 23.00 7.24 5.00 65 21.00 7.21 5.00 66 25.00 7.25 5.00 67 26.00 7.25 5.00 68 27.00 7.26 5.00 69 28.00 7.27 5.00 70 29.00 7.28 5.00 71 30.00 7.29 5.00 72 31.00 7.30 5.00 73 32.00 7.31 5.00 74 33.00 7.32 5.00 75 34.00 7.33 5.00 76 35.00 7.34 5.00 77 Big Hear/Oakboro 35.95 7.59 5.00 78 37.00 7.47 5.00 79 38.00 7.41 5.00 80 39.00 7.37 5.00 81 Richardson Creek 40.15 7.62 5.00 82 41.00 7.56 5.00 83 42.00 7.52 5.00 84 43.00 7.50 5.00 85 44.00 7.48 5.00 86 45.00 7.48 5.00 87 50.00 7.49 5.00 88 55.00 7.51 5.00 89 55.85 7.52 5.00 :^reposed Allocations w( Ruddy Creek WWTP Select "Summer"or"Winter" summer Cumm Cumm QTrib Qact QTrib Actual Reach Cum Tribs a da Slope Elevation 7Q10 7Q10 avg Qavg u t Cum t No (1) (miles) (miles) (fpm) (KSL) cfs ( 1 cfs ( J cfs ( ) (cfs) (ai/day) (days) (days) 0 0.00 0.00 3.12 498 0,000 ----------------------------------------------------- 51.14 0.00 337.14 12.48 0.00 0.00 1 0.10 0.10 3.12 498 0.000 51.14 0.00 337.14 12.48 0.01 0,01 2 0.20 0.10 3.12 497 0.000 51.14 0.00 337.14 12.48 0.01 0,02 3 0.30 0.10 3.12 497 0.000 51.11 0.00 337.14 11.48 0.01 0.02 4 Coldwater 0.40 0.10 3.12 497 4,000 55.14 112.00 449.14 12.93 0.01 0.03 5 0.60 0.20 3.12 496 4.000 55,14 112.00 449.14 12.93 0.02 0.05 6 0.80 0.20 3.12 496 4.000 55.14 112.00 449.14 12.93 0.02 0,06 7 1.00 0.20 3.12 495 4.000 55.14 112.00 449.14 11,93 0.02 0.08 8 1.25 0.25 3.12 494 4.000 55.14 112.00 449.14 12,93 0.02 0.10 9 1.50 0.25 3.12 493 4.000 55.11 112.00 449.14 12,93 0.02 0.12 10 1.75 0.25 3.12 493 4.000 55.14 112.00 449.14 12.93 0.02 0.14 11 2.00 0.25 3.12 492 4.000 55.14 112.00 449.14 12.93 0.02 0.16 12 Hwy 601 2.10 0.10 2.96 491 4.000 55.14 112.00 449.14 12.93 0.01 0.16 13 2.50 0.40 2.96 490 4.000 55.14 112.00 449.14 12.93 0.03 0.19 14 2.75 0.25 2.96 490 4.000 55.14 112.00 449.14 12.93 0.02 0.21 15 Hamby Branch 3.00 0.25 2.96 489 4.000 55.14 112.00 449.14 12.93 0.02 0.23 16 3.25 0.25 2.96 188 4.000 55.14 112.00 449.14 12.93 0.02 0.25 17 3.50 0.25 2.96 487 4.000 55.14 112.00 449.14 12.93 0.02 0.27 18 3.75 0.25 2.96 487 4,000 55.14 112.00 449.14 12.93 0.02 0.29 19 4,00 0.25 2.96 486 4.000 55.14 112.00 449.14 12.93 0.02 0.31 20 1.25 0.25 2.96 485 4.000 55.14 112.00 449.14 12.93 0.02 0.33 21 SE 1006 4.55 0.30 2.96 484 4.000 55.14 112.00 449.14 12.93 0.02 0.35 22 4.75 0.20 2.96 484 4,000 55.14 112.00 449.14 12.93 0,02 0.37 23 5.00 0.25 2.96 483 4.000 55,14 112.00 449.14 12.93 0.02 0.39 24 Dutch Buffalo 5.35 0.35 2.96 482 8,204 59.34 206.00 543.14 13.38 0.03 0.11 25 5.50 0.15 2.96 481 8.204 59.34 206.00 543.14 13.38 0.01 0.42 26 6.00 0.50 2.96 480 8.204 59.34 206.00 543.14 13.38 0.04 0.46 27 6.50 0.50 2.96 478 8.204 59.31 206.00 543.14 13.38 0.01 0.50 28 7.00 0.50 2.96 477 8.204 59.34 206.00 543.14 13.38 0.04 0.51 29 7.50 0.50 2.96 475 8.204 59.34 206.00 543.14 13.38 0.01 0.57 30 8;00 0.50 2.96 474 8.204 59.34 206.00 543.14 13.38 0.04 0.61 31 8.50 0.50 2.96 473 8.204 59.34 206.00 543.11 13.38 0.04 0.65 32 9.00 0.50 2.96 471 8.204 59.34 206.00 543.14 13.38 0.04 0.69 33 9.50 0.50 2.96 470 8.204 59.34 206.00 543.14 13.38 0.04 0.72 34 10.00 0.50 2.96 468 8.204 59.34 206.00 543.14 13.38 0.04 0.76 35 Hwy 24-27 10.25 0.25 3.07 467 8,204 59.34 206,00 543.14 13.38 0.02 0.78 36 11.00 0.75 3,07 465 8.204 59.34 206.00 543.14 13.38 0.06 0.84 37 11.50 0.50 3.07 463 8.204 59.34 206.00 543.14 13.38 0.04 0.87 38 12.00 0.50 3.07 462 8,204 59.34 206.00 543.14 13,38 0.04 0.91 39 12.50 0.50 3.07 460 8.204 59.34 206.00 543.14 13.38 0.04 0.95 40 13.00 0.50 3.07 459 8.204 59.34 206.00 543,14 13.38 0.04 0.99 41 S8 1114 13.55 0.55 3.07 457 8.204 59.34 206.00 543.14 13.38 0.04 1.03 42 14.00 0.45 3.07 456 8.204 59.34 206.00 543.14 13.38 0.03 1.06 43 14.50 0.50 3.07 454 8,204 59.34 206.00 543.14 13.38 0.04 1.10 44 Muddy Creek WWTP 14.65 0.15 4.12 454 12.073 63.21 206.00 543.14 13.79 0.01 1.11 45 14.75 0.10 4.12 453 12.073 63.21 206.00 543.14 13.79 0.01 1.12 46 15.00 0.25 4.12 452 12.073 63.21 206.00 543.14 13.79 0.02 1.13 47 15,25 0.25 4.12 451 12.073 63.21 206.00 543.14 13.79 0.02 1.15 48 15.50 0.25 4.12 450 12.073 63.21 206.00 543.14 13.79 0.02 1.17 49 15.75 0.25 4.12 449 12.073 63.21 206.00 543.14 13.79 0.02 1.19 50 16.00 0.25 4.12 448 12.073 63.21 206.00 543.14 13.79 0.02 1.21 HDB Engineering, Inc, of North Carolina iroposed Allocations W/ Muddy Creek WWTP Select "Sumter"or"Winter" summer Cult Cult QTrib Qact QTrib Actual Reach Cum Tribs x di Slope Elevation 7Q10 7Q10 avq Qavq u t Cum t No. ----------------------------------------------------------------------------------------------------------------------------- (1) (miles) (miles) (fpm) (NSL) (cfs) (cfs) (cfs) (cfs) (mi/dap) (days) (days) 51 16.25 0.25 4.12 447 12.073 63.21 206,00 543.14 13.79 0.02 1.22 52 16.50 0.25 4.12 446 12.073 63.21 206.00 543.14 13.79 0.02 1.24 53 Goose Creek 16.90 0.40 8.80 445 14.890 66.03 269.00 606.14 14.07 0.03 1.27 54 17.00 0.10 8.80 444 14,890 66.03 269.00 606.14 14.07 0.01 1.28 55 17.50 0.50 8.80 439 14.890 66.03 269.00 606.14 14,07 0.04 1.31 56 18.00 0.50 6.28 435 14,890 66.03 269.00 606.14 14.07 0.04 1.35 57 18.50 0.50 6.28 432 14.890 66.03 269.00 606.14 14.07 0.04 1.38 58 19.00 0.50 6.28 429 14.890 66.03 269.00 606.14 14.07 0.04 1.42 59 19.50 0.50 8.12 425 14.890 66.03 269.00 606.14 14.07 0.04 1.46 60 20.00 0.50 8.12 421 14.890 66.03 269.00 606.14 14.07 0.04 1.49 61 Crooked Creek 20.70 0.70 13.54 416 17.529 68.67 328.00 665.14 14.33 0.05 1.54 62 21.00 0.30 13,54 412 17.529 68.67 328.00 665.14 14.33 0.02 1.56 63 22.00 1.00 13.54 398 17.529 68.67 328.00 665.14 14.33 0.07 1.63 64 23.00 1.00 13.54 385 17.529 68.67 328,00 665.14 14.33 0.07 1.70 65 24.00 1.00 13.54 371 17.529 68.67 328.00 665.14 14.33 0.07 1.77 66 25.00 1.00 7,49 357 17,529 68.67 328.00 665.14 14.33 0.07 1.84 67 26.00 1.00 7.49 350 17.529 68.67 328.00 665.14 14.33 0.07 1.91 68 27.00 1.00 7.49 342 17.529 68.67 328.00 665.14 14.33 0.07 1.98 69 28.00 1.00 7,49 335 17.529 68.67 328.00 .665.14 14.33 0.07 2.05 70 29.00 1.00 7.49 328 17.529 68.67 328.00 665.14 14.33 0.07 2.12 71 30.00 1.00 7.49 320 17.529 68.67 328.00 665.14 14.33 0.07 2.19 72 31.00 1.00 7.49 313 17.529 68.67 328.00 665.11 14.33 0.07 2.26 73 32.00 1.00 7.49 305 17.529 68.67 328.00 665.14 14.33 0.07 2.33 74 33.00 1.00 7.49 298 17.529 68.67 328.00 665.14 11.33 0.07 2.40 75 34.00 1.00 7.49 290 17.529 68.67 328.00 665.14 14.33 0.07 2.47 76 35.00 1.00 7.49 283 17.529 68.67 328.00 665.14 14.33 0.07 2.54 77 Biq Bear/Oakboro 35.95 0.95 8.57 275 26,443 77.58 510.00 847.14 15.18 0.06 2.60 78 37.00 1.05 8.57 266 26.443 77.58 510.00 847.14 15.18 0.07 2.67 79 38.00 1.00 8.57 258 26.443 77.58 510.00 847.14 15.18 0.07 2.74 80 39.00 1.00 8.57 249 26.443 77.58 510.00 847.14 15.18 0.07 2.80 81 Richardson Creek 40.15 1.15 2.16 239 33.599 84.74 670.00 1,007.14 15.82 0.07 2.87 82 41.00 0.85 2.16 238 33.599 84.74 670.00 1,007.14 15.82 0.05 2.93 83 42.00 1.00 2.16 235 33.599 84.74 670.00 1,007.14 15.82 0.06 2.99 84 43.00 1.00 2.16 233 33,599 84.74 670.00 1,007.14 15.82 0.06 3.05 85 WOO 1.00 2.16 231 33.599 84.74 670.00 1,007.14 15.82 0.06 3.12 86 45.00 1.00 2.16 229 33.599 84.74 670.00 1,007.14 15.82 0.06 3.18 87 50.00 5.00 2.16 218 33.599 84.74 670.00 1,007.14 15.82 0.32 3.50 88 55.00 5.00 2.16 207 33.599 84.74 670.00 1,007.14 15.82 0.32 3.81 89 55.85 0.85 2.16 206 33.599 84.74 670.00 1,007.14 15.82 0.05 3.87 HDR Engineering, Inc. of North Carolina Proposed Allocations w/ Muddy Creek WWTP Select "Sunder"or"Winter" V H Cal Calibration Calibration Beach Cut Tribs I Cut t Override V Override H n Kd Kn Ka lowQ No. (1) --------------------------------------------------------------------------------------------------------------------------- (tiles) (days) (fps) (fps) (ft) (ft) (/day) (/day) (/day) (/day) 0 0.00 0.00 0.76 0.76 1.23 1.23 0.11 0.27 0.30 0.00 1 0.10 0.01 0.76 0.76 1.23 1.23 0.11 0.27 0.30 0.00 2 0.20 0.02 0.76 0.76 1.23 1.23 0.11 0.27 0.30 0.00 3 0.30 0.02 0.76 0.76 1.23 1.23 0.11 0.27 0.30 0.00 4 Coldwater 0.40 0.00 0.79 0.79 1.25 1.25 0.11 0.27 0.30 0.00 5 0.60 0.02 0.79 0.79 1.25 1.25 0.11 0.27 0.30 0.00 6 0.80 0.03 0.79 0.79 1.25 1.25 0.11 0.27 0.30 0.00 7 1.00 0.05 0.79 0.79 1.25 1.25 0.11 0.27 0.30 0,00 8 1.25 0.07 0.79 0.79 1.25 1.25 0.11 0.27 0.30 0.00 9 1.50 0.09 0.79 0.79 1.25 1.25 0.11 0.27 0.30 0.00 10 1.75 0.10 0.79 0.79 1.25 1.25 0.11 0.27 0.30 0.00 11 2.00 0.12 0.79 0.79 1.25 1.25 0.11 0.27 0.30 0.00 12 Hwy 601 2.10 0.13 0.79 0.79 1.25 1,25 0.11 0.27 0.30 0.00 13 2.50 0.16 0.79 0.79 1.25 1.25 0.11 0.27 0.30 0.00 14 2.75 0.18 0.79 0.79 1.25 1.25 0.11 0.27 0.30 0.00 15 Hamby Branch 3.00 0.20 0.79 0.79 1.25 1.25 0.11 0.27 0.30 0.00 16 3.25 0.22 0.79 0.79 1.25 1.25 0.11 0.27 0.30 0.00 17 3.50 0.24 0.79 0.79 1.25 1.25 0.11 0.27 0.30 0.00 18 3.75 0.26 0.79 0.79 1.25 1.25 0.11 0.27 0.30 0.00 19 4.00 0.28 0.79 0.79 1.25 1.25 0.11 0.27 0.30 0.00 20 4.25 0.30 0.79 0.79 1.25 1.25 0.11 0.27 0.30 0.00 21 SE 1006 4.55 0.32 0.79 0.79 1.25 1.25 0.11 0.27 0.30 0.00 22 4.75 0.34 0.79 0.79 1.25 1.25 0.11 0.27 0.30 0.00 23 5.00 0.36 0.79 0.79 1.25 1.25 0.11 0.27 0.30 0.00 24 Dutch Buffalo 5.35 0.00 0.82 0.82 1,28 1.28 0.11 0.27 0.30 0.00 25 5.50 0.01 0.82 0.82 1.28 1.28 0.11 0.27 0.30 0.00 26 6.00 0.05 0.82 0.82 1.28 1.28 0.11 0.27 0.30 0.00 27 6.50 0.09 0.82 0.82 1.28 1.28 0.11 0.27 0.30 0.00 28 7.00 0.12 0.82 0.82 1.28 1.28 0.11 0.27 0.30 0.00 29 7.50 0.16 0.82 0.82 1.28 1.28 0.11 0.27 0.30 0.00 30 8.00 0.20 0.82 0.82 1.28 1.28 0.11 0.27 0.30 0.00 31 8.50 0.24 0.82 0.82 1.28 1.28 0.11 0.27 0.30 0.00 32 9.00 0.27 0.82 0.82 1.28 1.28 0.11 0.27 0.30 0.00 33 9.50 0.31 0.82 0.82 1.28 1.28 0.11 0.27 0.30 0.00 34 10.00 0.35 0.82 0.82 1.28 1.28 0.11 0.27 0.30 0.00 35 Hwy 24-27 10.25 0.37 0.82 0.82 1.28 1.28 0.11 0.27 0.30 0.00 36 11.00 0.42 0.82 0.82 1.28 1.28 0.11 0.27 0.30 0.00 37 11.50 0.46 0.82 0.82 1.28 1.28 0.11 0.27 0.30 0.00 38 12.00 0.50 0.82 0.82 1.28 1.28 0.11 0.27 0.30 0.00 39 12.50 0.53 0.82 0.82 1.28 1.28 0.11 0.27 0.30 0.00 40 13.00 0.57 0.82 0.82 1.28 1.28 0.11 0.27 0.30 0.00 41 SE 1114 13.55 0.61 0.82 0.82 1.28 1.28 0.11 0.27 0.30 0.00 42 14.00 0.65 0.82 0.82 1.28 1.28 0.11 0.27 0.30 0.00 43 14.50 0.68 0.82 0.82 1.28 1.28 0.11 0.27 0.30 0.00 44 Muddy Creek WWTP 14.65 0.00 0.84 0.84 1.30 1.30 0.13 0.29 0.30 0.00 45 14.75 0.01 0.84 0.84 1.30 1.30 0.13 0.29 0.30 0.00 46 15.00 0.03 0.84 0.81 1.30 1.30 0.13 0.29 0.30 0.00 47 15.25 0.04 0.84 0.84 1.30 1.30 0.13 0.29 0.30 0.00 48 15.50 0.06 0.84 0.84 1.30 1.30 0.13 0.29 0.30 0.00 49 15.75 0.08 0.84 0.84 1.30 1.30 0.13 0.29 0.30 0.00 50 16.00 0.10 0.84 0.84 1.30 1.30 0.13 0.29 0.30 0.00 HDB Engineering, Inc. of North Carolina ^rcposed Allocations K/ Kuddy Creek WWTP Select "Sueeer"or"Winter" V H Cal Calibration Calibration Beach Cue Tribs x Cue t Override V Override H n Kd Kn Ka IoWQ No. (1) ----------------------------------------------------------------------------------------------------------------- (eiles) (days) (fps) (fps) (ft) (ft) (/day) (/day) (/day) (/day) 51 16.25 0.12 0.84 0.84 1.30 1.30 0.13 0.29 0.30 0.00 52 16.50 0.13 0.84 0.84 1.30 1.30 0.13 0.29 0.30 0.00 53 Goose Creek 16.90 0.00 0.86 0.86 1.31 1.31 0.21 0.34 0.30 0.00 54 17.00 0.01 0.86 0.86 1.31 1.31 0.21 0.34 0.30 0.00 55 17.50 0.04 0.86 0.86 1.31 1.31 0.21 0.34 0.30 0.00 56 18.00 0.08 0.86 0.86 1.31 1.31 0.17 0.31 0.30 0.00 57 18.50 0.11 0.86 0.86 1.31 1.31 0.17 0.31 0.30 0,00 58 19.00 0.15 0.86 0,86 1.31 1.31 0.17 0.31 0.30 0.00 59 19.50 0.18 0.86 0.86 1.31 1.31 0.20 0.33 0.30 0.00 60 20.00 0.22 0,86 0.86 1.31 1.31 0.20 0.33 0.30 0.00 61 Crooked Creek 20.70 0.00 0.88 0.88 1.32 1.32 0.27 0.38 0.30 0,00 62 21.00 0.02 0.88 0.88 1.32 1.32 0.27 0.38 0.30 0.00 63 22.00 0.09 0.88 0.88 1.32 1.32 0.27 0.38 0.30 0.00 64 23.00 0.16 0.88 0.88 1.32 1.32 0.27 0.38 0.30 0.00 65 24.00 0.23 0.88 0.88 1.32 1.32 0.27 0.38 0.30 0.00 66 25.00 0.30 0.88 0.88 1.32 1.32 0.19 0.33 0.30 0.00 67 26.00 0.37 0.88 0.88 1.32 1.32 0.19 0,33 0.30 0.00 68 27.00 0.44 0.88 0.88 1.32 1.32 0.19 0.33 0.30 0.00 69 28.00 0.51 0.88 0.88 1.32 1.32 0.19 0.33 0.30 0.00 70 29.00 0.58 0.88 0.88 1.32 1.32 0.19 0.33 0.30 0.00 71 30.00 0.65 0.88 0.88 1.32 1.32 0.19 0.33 0.30 0.00 72 31.00 0.72 0.88 0.88 1.32 1.32 0.19 0.33 0.30 0.00 73 32.00 0.79 0.88 0.88 1.32 1.32 0.19 0.33 0.30 0.00 74 33.00 0.86 0.88 0.88 1.32 1.32 0.19 0.33 0.30 0.00 75 34.00 0.93 0.88 0.88 1.32 1.32 0.19 0.33 0.30 0.00 76 35.00 1.00 0.88 0.88 1.32 1.32 0.19 0.33 0.30 0.00 77 Big Bear/Oakboro 35.95 0.00 0.93 0.93 1.37 1.37 0.21 0.34 0.30 0.00 78 37.00 0.07 0.93 0.93 1.37 1.37 0.21 0.34 0.30 0.00 79 38.00 0.14 0.93 0.93 1.37 1.37 0.21 0.34 0.30 0.00 80 39.00 0.20 0.93 0.93 1.37 1.37 0.21 0.34 0.30 0.00 81 Richardson Creek 40.15 0.00 0,97 0.97 1.40 1.40 0.09 0.26 0.30 0.00 82 41.00 0.05 0.97 0.97 1.40 1.40 0.09 0.26 0.30 0.00 83 42.00 0.12 0.97 0.97 1.40 1.40 0.09 0.26 0.30 0.00 84 43.00 0.18 0.97 0.97 1.40 1.40 0.09 0.26 0.30 0.00 85 44.00 0.24 0.97 0.97 1.40 1.40 0.09 0.26 0.30 0.00 86 45.00 0.31 0.97 0.97 1.40 1.40 0.09 0.26 0.30 0.00 87 50.00 0.62 0.97 0.97 1.40 1.40 0.09 0.26 0.30 0.00 88 55.00 0.91 0.97 0.97 1.40 1.40 0.09 0.26 0.30 0.00 89 55.85 0.99 0.97 0.97 1.40 1.40 0.09 0.26 0.30 0.00 HDR Engineering, Inc. of Korth Carolina Proposed Allocations K/ Muddy Creek WWTP Select "Summer"or"Winter" Kd(Tc) Ka(Tc) Calibration Calibration Beach Cum Tribs r Ka midQ Ka highQ Override Kd(T) Kn(T) Override Ka(T) Dai Daz No. (1) --------------------------------------------------------------------------------------------------------------------------- (miles) (/day) (/day) (/day) (/day) (/day) (/day) (/day) (mg/1) (mg/1) 0 0.00 0.00 2.09 0.36 0.48 3.00 3.34 1.70 1.70 1 0.10 0.00 2.09 0.36 0.48 3.00 3.34 1.70 1.66 2 0.20 0.00 2.09 0.36 0.48 3.00 3.34 1.70 1.61 3 0.30 0.00 2.09 0.36 0.48 3.00 3.34 1.70 1.57 4 Coldwater 0.40 0.00 2.17 0.36 0.48 3.00 3.34 1.87 1.87 5 0.60 0.00 2.17 0.36 0.48 3.00 3.34 1.87 1.78 6 0.80 0.00 2.17 0.36 0.48 3.00 3.34 1.87 1.69 7 1.00 0.00 2.17 0.36 0.48 3.00 3.34 1.87 1.60 8 1.25 0.00 2.17 0.36 0.48 3.00 3.34 1.87 1.50 9 1.50 0.00 2.17 0.36 0.48 3.00 3.34 1.87 1.41 10 1.75 0.00 1.17 0.36 0.48 3.00 3.34 1.87 1.32 11 2.00 0.00 2.17 0.36 0.48 3.00 3.34 1.87 1.24 12 Hwy 601 2.10 0.00 2.06 0.36 0.48 3.00 3.34 1.87 1.21 13 1.50 0.00 2.06 0.36 0.48 3.00 3.34 1.87 1.09 14 2.75 0.00 2.06 0.36 0.48 3.00 3.34 1.87 1.02 15 Hamby Branch 3.00 0.00 2.06 0.36 0.48 3.00 3.34 1.87 0.96 16 3.25 0.00 2.06 0.36 0.48 3.00 3.34 1.87 0.90 17 3.50 0.00 2.06 0.36 0.48 3.00 3.34 1.87 0.84 18 3.75 0.00 2.06 0.36 0.48 3.00 3.34 1.87 0.79 19 4.00 0.00 2.06 0.36 0.48 4.00 4.46 1.87 0.54 20 4.15 0.00 2.06 0.36 0.48 4.00 4.46 1.87 0.50 21 SB 1006 4.55 0.00 2.06 0.36 0.48 4.00 4.46 1.87 0.45 12 4.75 0.00 2.06 0.36 0.48 6.00 6.69 1.87 0.20 23 5.00 0,00 2.06 0.36 0.48 6.00 6.69 1.87 0,17 24 Dutch Buffalo 5.35 0.00 2.13 0.36 0.48 6.00 6.69 2.05 2,05 25 5.50 0.00 2.13 0.36 0.48 6.00 6.69 2.05 1.90 26 6.00 0.00 2.13 0,36 0.48 6.00 6.69 2.05 1,48 27 6.50 0.00 2.13 0.36 0.48 6.00 6.69 2.05 1,15 28 7.00 0.00 2.13 0.36 0.48 6.00 6.69 2.05 0.90 29 7.50 0.00 2.13 0.36 0.48 6.00 6.69 2.05 0.70 30 8.00 0.00 2.13 0.36 0.48 6.00 6.69 2.05 0.54 31 8.50 0.00 2.13 0.36 0.48 6.00 6.69 2.05 0.42 32 9.00 0.00 2.13 0.36 0.48 6.00 6.69 2,05 0.33 33 9.50 0.00 2.13 0.36 0.48 6.00 6.69 2.05 0.26 34 10.00 0.00 2.13 0.36 0.48 6.34 7.07 2.05 0.18 35 Hwy 24-27 10.25 0.00 2.21 0.36 0.48 6.34 7.07 2.05 0.15 36 11.00 0.00 2.21 0.36 0.48 6.34 7.07 2.05 0.10 37 11.50 0.00 2.21 0.36 0.48 6.34 7.07 2.05 0.08 38 12,00 0.00 2.21 0.36 0.48 6.34 7.07 2.05 0.06 39 12.50 0.00 2.21 0.36 0.48 6.34 7.07 2.05 0,05 40 13.00 0.00 2.21 0.36 0.48 6.34 7.07 2.05 0.04 41 SR 1114 13.55 0.00 2.21 0.36 0.48 6.34 7.07 2.05 0.03 42 14.00 0.00 2.21 0.36 0.48 6.34 7.07 2.05 0.02 43 14.50 0.00 2.21 0.36 0.48 6.34 7.07 2.05 0.02 44 Muddy Creek WWTP 14.65 0.00 3.05 0.38 0.48 6.36 7.09 1.90 1.90 45 14.75 0.00 3.05 0.38 0.48 6.36 7.09 1.90 1.81 46 15.00 0.00 3.05 0.38 0.48 6.36 7.09 1.90 1.59 47 15.25 0.00 3.05 0.38 0.48 6.36 7.09 1.90 1.40 48 15.50 0.00 3.05 0.38 0.48 6.36 7.09 1.90 1.23 49 15.75 0.00 3.05 0.38 0.48 6.36 7.09 1.90 1.08 50 16.00 0.00 3.05 0.38 0.48 6.36 7.09 1.90 0.95 HDB Engineering, Inc. of North Carolina Proposed Allocations W/ Muddy Creek WWTP Select "Sunder"or"Winter" Rd(Tc) Ra(Tc) Calibration Calibration Beach Cum Tribs x Ka midQ Ka highQ Override Ad(T) An(T) Override Ka(T) Da Daa No. (1) --- - --------------------------------------------------------------------------------------------------- (miles) (/day) (/day) (/day) (/day) (/day) (/day) (/day) (mg/1) (mgll) 51 16.25 0.00 3.05 0.38 0.48 6.36 7.09 1.90 0.84 52 16.50 0.00 3.05 0.38 0.48 6.36 7.05 1,90 0.74 53 Goose Creek 16.90 0.00 6.66 0.45 0.48 6.37 7.10 1.91 1.91 54 17.00 0.00 6.66 0.45 0.48 6.37 7.10 1.91 1.82 55 17.50 0.00 6.66 0.45 0.48 6.37 7.10 1.91 1.41 56 18.00 0.00 4.75 0.41 0.48 6.37 7.10 1.91 1.10 57 18.50 0.00 4.75 0.41 0.48 6.37 7.10 1.91 0.85 58 19.00 0.00 4.75 0.11 0.48 6.37 7.10 1.91 0.66 59 19.50 0.00 6.14 0.44 0.48 6.37 7.10 1.91 0.51 60 20.00 0.00 6.14 0.44 0.48 6.37 7.10 1.91 0.40 61 Crooked Creek 20.70 0.00 10.44 0.50 0.48 6.38 7.11 1.88 1.88 62 21.00 0.00 10.44 0.50 0.48 6.38 7.11 1.88 1.62 63 12.00 0.00 10.44 0.50 0.48 6.38 7.11 1.88 0.98 64 23.00 0.00 10.44 0.50 0.48 6.38 7.11 1.88 0.60 65 24.00 0.00 10.44 0.50 0.48 6.38 7.11 1.88 0.37 66 25.00 0.00 5.77 0.43 0.48 6.38 7,11 1.88 0.22 67 26.00 0.00 5.77 0.43 0.48 6.38 7.11 1.88 0.14 68 27.00 0.00 5.77 0.43 0.48 6.38 7.11 1.88 0.08 69 28.00 0.00 5.77 0.43 0.48 6.38 7.11 1,88 0,05 70 29.00 0.00 5.77 0.43 0.48 6.38 7.11 1.88 0.03 71 30.00 0.00 5.77 0.43 0.48 6.38 7.11 1.88 0.02 72 31.00 0.00 5.77 0.43 0.48 6.38 7.11 1.88 0.01 73 32.00 0.00 5.77 0.43 0.48 6.38 7.11 1.88 0.01 74 33.00 0.00 5.77 0.43 0.48 6.38 7.11 1.88 0.00 75 34.00 0.00 5.77 0.43 0.48 6.38 7.11 1.88 0.00 76 35.00 0.00 5.77 0.43 0.48 6.38 7.11 1.88 0.00 77 Big Bear/Oakboro 35.95 0.00 7.00 0.45 0.48 6.41 7.14 1.22 1.22 78 37.00 0.00 7,00 0.45 0.48 6.41 7.14 1.22 0.74 79 38.00 0.00 7.00 0.45 0.48 6.41 7.14 1.22 0.46 80 39.00 0.00 7.00 0.45 0.48 6.41 7.14 1.22 0.29 81 Richardson Creek 40.15 0.00 1.84 0.35 0.48 6.43 7.17 1.08 1.08 82 41.00 0.00 1.84 0.35 0.48 6.43 7.17 1.08 0.74 83 42.00 0.00 1.84 0.35 0.48 6.43 7.17 1.08 0,47 84 43.00 0.00 1.84 0.35 0.48 6.43 7.17 1.08 0.30 85 44.00 0.00 1.84 0.35 0.48 6.43 7.17 1.08 0.19 86 45.00 0.00 1,84 0.35 0.48 6.43 7.17 1.08 0.12 87 50.00 0.00 1.84 0.35 0.48 6.43 7.17 1.08 0.01 88 55.00 0.00 1.84 0.35 0.48 6.43 7.17 1.08 0,00 89 55.85 0.00 1.84 0.35 0.48 6.43 7.17 1.08 0.00 HDR Engineering, Inc. of Korth Carolina Proposed Allocations w/ Muddy Creek WWTP Select "Sutter"or"Winter" Conside Beach Cue Tribs a CBODi CBODa Dcl NBODi NBODa Dna Cut Da Sat DO DOx Dsa No. (1) ---------------------------------------------------------------------------------------------------------------------------- (tiles) (eg/1) (mg/1) (mg/1) (tg/1) (eg/l) (t9/1) (tg/1) (eg/1) (egll) (mg/1) 0 0.00 31.41 31.41 0.00 13.20 13.20 0.00 1.70 8.11 6.41 0.00 1 0.10 31.41 31.32 0.09 13.20 13.14 0.05 1.80 8.11 6.32 0,02 2 0.20 31.41 31.23 0.17 13.20 13.09 0.10 1.89 8.11 6.23 0.04 3 0.30 31.41 31.14 0.26 13.20 13,05 0.11 1.97 8.11 6.14 0.06 4 Coldwater 0.40 29.03 29.03 0,00 12.13 12.13 0.00 1.87 8.11 6.24 0.00 5 0.60 29.03 28.87 0.16 12.13 12.04 0.09 2.02 8.11 6.09 0.04 6 0.80 29.03 28.71 0.30 12.13 11.95 0.17 2.16 8.11 5.95 0.07 7 1.00 29.03 28.55 0.44 12.13 11.87 0.25 2.29 8.11 5.82 0.10 8 1.25 29.03 28.35 0.61 12.13 11.76 0.34 2.45 8.11 5.67 0.14 9 1.50 29.03 28.16 0.76 12.13 11.65 0.42 2.59 8.11 5.53 0.17 10 1.75 29.03 27.96 0.90 12.13 11.54 0.50 2.72 8.11 5.40 0.21 11 2.00 29.03 27.77 1.03 12.13 11.44 0.57 2.84 8.11 5.28 0.24 12 Hwy 601 2.10 29.03 27.70 1.07 12.13 11.40 0.59 2.87 8.11 5.24 0.25 13 2.50 29.03 27.40 1.25 12.13 11.23 0.69 3.04 8.11 5.08 0.30 14 2.75 29.03 27.21 1.36 12.13 11.13 0.75 3.13 8.11 4.99 0.32 15 Haeby Branch 3.00 29.03 27.03 1.45 12.13 11.02 0.80 3.21 8.11 4.90 0.34 16 3.25 29.03 26.84 1.54 12.13 10.92 0.85 3.29 8.11 4.83 0.37 17 3.50 29.03 26.66 1.62 12.13 10.82 0.89 3.36 8.11 4.76 0.39 18 3.75 29.03 26.48 1.70 12.13 10.72 0.93 3.42 8.11 4.70 0.41 19 4.00 29.03 26.29 1.55 12.13 10.63 0.85 2.94 8.11 5.17 0.38 20 4.25 29.03 26.11 1.59 12.13 10.53 0.87 2.97 8.11 5.15 0.39 21 SR 1006 4.55 29.03 25.90 1.64 12.13 10.41 0.90 2.99 8.11 5.13 0.40 22 4.75 29.03 25.76 1.27 12.13 10.34 0.69 2.16 8.11 5.95 0.32 23 5.00 29.03 25.58 1.28 11.13 10.21 0.70 2.16 8.11 5.96 0.32 24 Dutch Buffalo 5.35 23.91 23.91 0.00 9.55 9.55 0.00 2.05 8.11 6.07 0.00 25 5.50 23.91 23.82 0.09 9.55 9.50 0.05 2.04 8.11 1.07 0.02 26 6.00 23.91 23.50 0.35 9.55 9.33 0.19 2.02 8.11 6.10 0.10 27 6.50 23.91 23.19 0.55 9.55 9.16 0.29 1.99 8.11 6.12 0.15 28 7.00 23.91 22.88 0.70 9.55 9.00 0.37 1.97 8.11 6.15 0.19 29 7.50 23.91 22.58 0.81 9.55 8.84 0.43 1.94 8.11 6.17 0.23 30 8.00 23.91 22.28 0.90 9.55 8.69 0.47 1.91 8.11 6.20 0.25 31 8.50 23.91 21.98 0.96 9.55 8.54 0.50 1.89 8.11 6.23 0.27 31 9.00 23.91 21.69 1.01 9.55 8.38 0.52 1.86 8.11 6.25 0.29 33 9.50 23.91 21.41 1.01 9.55 8.24 0.51 1.83 8.11 6.28 0.30 34 10.00 23.91 21.12 1.01 9.55 8.09 0.52 1.71 8.11 6.40 0.30 35 Hwy 24-27 10.25 23.91 20.97 1.02 9.55 8.02 0.53 1.71 8.11 6.11 0.30 36 11.00 23.91 20.55 1.03 9.55 7.81 0.53 1.67 8.11 6.45 0.31 37 11.50 23.91 20.28 1.03 9.55 7.67 0.53 1.64 8.11 6.47 0.31 38 12.00 23.91 20.00 1.03 9.55 7.54 0.52 1.62 8.11 6.50 0.32 39 12.50 23.91 19.74 1.03 9.55 7.40 0.52 1.59 8.11 6.52 0.32 40 13.00 23.91 19.48 1.02 9.55 7.27 0.51 1.57 8.11 6.55 0.32 41 SR 1114 13.55 23.91 19.19 1.01 9.55 7.13 0.51 1.54 8.11 6.57 0.32 42 14.00 23.91 18.96 1.00 9.55 7.02 0.50 1.52 8.11 6.59 0.32 43 14.50 23.91 18.71 0.99 9.55 6.89 0.49 1.50 8.11 6.61 0.32 44 Muddy Creek WWTP 14.65 22.15 22.15 0.00 13.36 13.36 0.00 1.90 8.11 6.21 0.00 45 14.75 22.15 22.09 0.06 13.36 13.31 0.04 1.91 8.11 6.20 0.02 46 15.00 22.15 21.94 0.19 13.36 13.20 0.15 1.93 8.11 6.18 0.05 47 15.25 22.15 21.79 0.31 13.36 13.08 0.24 1.95 8.11 6.17 0.09 48 15.50 22.15 21.64 0.41 13.36 12.97 0.31 1.96 8.11 6.16 0.11 49 15.75 22.15 21.49 0.50 13.36 12.86 0.38 1.96 8.11 6.15 0.14 50 16.00 22.15 21.35 0.58 13.36 12.75 0.44 1.97 8.11 6.14 0.16 MDR Engineering, Inc. of North Carolina Proposed Allocations W/ Muddy Creek WWTP Select "Sutter"or"Winter" Conside Beach Cue Tribs a CBODi CBODa Dcx NBODi NBODa Dna Cut Da Sat DO DOa Dsa No. ---------------------------------------------------------------------------------------------------------------------------- (1) (tiles) (t9/1) (t9/1) (19/1) (19/1) (t911) (09/1) (t9/1) (0911) (t9/1) (t911) 51 16.25 22.15 21.20 0.65 13.36 12.64 0.49 1.97 8.11 6.14 0.18 51 16,50 22.15 21.05 0.71 13.36 12.53 0.53 1.97 8.11 6.14 0.20 53 Goose Creek 16.90 20.24 20.24 0.00 12.02 12.02 0.00 1.91 8.11 6.20 0.00 54 17.00 20.24 20.18 0.06 12.02 11.97 0.04 1.92 8.11 6.19 0.02 55 17.50 20.24 19.86 0.33 12.02 11.77 0.21 1.95 8.11 6.16 0.08 56 18.00 20.24 19.60 0.49 12.02 11.58 0.34 1.93 8.11 6.19 0.14 57 18.50 20.24 19.31 0.64 12.02 11.38 0.43 1.92 8.11 6.19 0.18 58 19.00 20.24 19.03 0.74 12.02 11.19 0.51 1.91 8.11 6.20 0.21 59 19.50 20.24 18.67 0.87 12.02 11.00 0.56 1.94 8.11 6.17 0.23 60 20.00 20.24 18.38 0.93 12.02 10.82 0.60 1.93 8.11 6.19 0.25 61 Crooked Creek 20.70 17.75 17.75 0.00 10.42 10.42 0.00 1.88 8.11 6.24 0.00 62 21.00 17.75 17.56 0.17 10.42 10.32 0.10 1.89 8.11 6.23 0.04 63 22.00 17.75 16.96 0.58 10.42 9.98 0.32 1.89 8.11 6.22 0.15 64 23.00 17,75 16.37 0.81 10.42 9.65 0.45 1.87 8.11 6.25 0.21 65 24.00 17.75 15.81 0.94 10.42 9.34 0.52 1,83 8.11 6.28 0.25 66 25.00 17.75 15.59 0.87 10.42 9.03 0.56 1.65 8.11 6.46 0.28 67 26.00 17.75 15.13 0.89 10.42 8.74 0.57 1.60 8.11 6.51 0.29 68 27.00 17.75 14.68 0.90 10.42 8.45 0.57 1.55 8.11 6.56 0,30 69 28.00 17.75 14.25 0.89 10.42 8.18 0.57 1.51 8.11 6.61 0.31 70 29.00 17.75 13.82 0.87 10.42 7.91 0.56 1.16 8.11 6.65 0.31 71 30.00 17.75 13.41 0.86 10.42 7.65 0.54 1.42 8.11 6.70 0.31 72 31.00 17.75 13.02 0.83 10.42 7.40 0.53 1.37 8.11 6.74 0.31 73 32.00 17.75 12.63 0.81 10.42 7.16 0.51 1.33 8.11 6.78 0.31 74 33.00 17.75 12.26 0.79 10.42 6.93 0.50 1.29 8.11 6.82 0.31 75 34.00 17.75 11.89 0.77 10.42 6.70 0.48 1.25 8.11 6.86 0.31 76 35.00 17.75 11.54 0.74 10.42 6.48 0.46 1.21 8.11 6.90 0.31 77 Big Bear/Oakboro 35.95 11.17 11.17 0.00 6.91 6.91 0.00 1.22 8.11 6.90 0.00 78 37.00 11.17 10.83 0.27 6.91 6.68 0.18 1.19 8.11 6.92 0.12 79 38.00 11.17 10.51 0.42 6.91 6.48 0.27 1.16 8.11 6.95 0.19 80 39.00 11.17 10.21 0.51 6.91 6.28 0.33 1.13 8.11 6.98 0.23 81 Richardson Creek 40.15 9.51 9.51 0.00 5.78 5.78 0.00 1.08 8.11 7.03 0.00 81 41.00 9.51 9.34 0.15 5.78 5.64 0.12 1.00 8.11 7.11 0.09 83 42.00 9.51 9.13 0.26 5.78 5.47 0.21 0.94 8.11 7.18 0.17 84 43.00 9.51 8.94 0.32 5.78 5.31 0.26 0.88 8.11 7.23 0.21 85 44.00 9.51 8.74 0.36 5.78 5.15 0.29 0.84 8.11 7.27 0.24 86 45.00 9.51 8.55 0.38 5.78 5.00 0.31 0.81 8.11 7.30 0.26 87 50.00 9.51 7.66 0.38 5.78 4.30 0.30 0.70 8.11 7.41 0.29 88 55.00 9.51 6.87 0.35 5.78 3.70 0.26 0.61 8.11 7.50 0.29 89 55.85 9.51 6.74 0.34 5.78 3.61 0.26 0.60 8.11 7.51 0.29 HDR Engineering, Inc. of North Carolina Proposed Allocations w/ Muddy Creek WWPP Select "Sumter"or"Winter" ring SOD --------- Pereit CalibrationCalibration Beach Cum !ribs - a DOa bieit DO CBOD No. (1) -------------------------------------------------------------------------- (tiles) (mg/1) (tg/1) (mg/1) (mg/1) 0 0.00 6.41 5.00 1 0.10 6.30 5.00 2 0.20 6.19 5.00 3 0.30 6.08 5.00 4 Coldwater 0.40 6.24 5.00 5 0.60 6.05 5.00 6 0.80 5.88 5.00 7 1.00 5.72 5.00 8 1.25 5.53 5.00 9 1.50 5.35 5.00 10 1.75 5.19 5.00 11 2.00 5.01 5.00 12 Hwy 601 2.10 4.99 5.00 6.13 22.28 13 2.50 4.78 5.00 14 2.75 4.67 5.00 15 Haeby Branch 3.00 4.56 5.00 6.03 17.10 16 3.25 4.46 5.00 17 3.50 4.37 5.00 18 3.75 4.29 5.00 19 4.00 4.79 5.00 20 4.25 4.76 5.00 21 SR 1006 4.55 4.72 5.00 6.57 18.48 22 1.75 5.63 5.00 23 5.00 5.64 5.00 24 Dutch Buffalo 5.35 6.07 5.00 25 5.50 6.05 5.00 26 6.00 6.00 5.00 11 6.50 5.97 5.00 28 7.00 5.95 5.00 29 7.50 5.95 5.00 30 8.00 5.95 5.00 31 8.50 5.95 5.00 32 9.00 5.96 5.00 33 9.50 5.98 5.00 34 10.00 6.10 5.00 35 Hwy 24-27 10.25 6.10 5.00 6.83 10.56 36 11.00 6.14 5.00 37 11.50 6.16 5.00 38 12.00 6.18 5.00 39 12.50 6.20 5.00 40 13.00 6.22 5.00 41 SR 1114 13.55 6.25 5.00 8.15 42 14.00 6.27 5.00 43 14.50 6.29 5.00 44 Muddy Creek WWTP 14.65 6.21 5.00 45 14.75 6.19 5.00 46 15.00 6.13 5.00 47 15.25 6.08 5.00 48 15.50 6.04 5.00 49 15.75 6.01 5.00 50 16.00 5.98 5.00 HDR Engineering, Inc. of North Carolina Pioposed Allocations x/ Muddy Creek WWTP Select "Sueeer"or"Winter" ring SOD --------- Permit CalibrationCalibration Beach Cue !ribs a DOa Lieit DO CBOD No. (1) (eiles) (mg/1) (eg/1) (eg/1) (mg/1) -------------------------------------------------------------------------- 51 16.25 5.96 5.00 52 16.50 5.94 5.00 53 Goose Creek 16.90 6.20 5.00 54 17.00 6.18 5.00 55 17.50 6.08 5.00 56 18.00 6.05 5.00 57 18.50 6.02 5.00 58 19.00 5.99 5.00 59 19.50 5.94 5.00 60 20.00 5.93 5.00 61 Crooked Creek 20.70 6.24 5.00 62 21,00 6.18 5.00 63 22.00 6.07 5.00 64 23.00 6.03 5.00 65 24.00 6.03 5.00 66 25.00 6.18 5.00 67 26.00 6.22 5.00 68 27.00 6.26 5.00 69 28.00 6.30 5.00 70 29.00 6.34 5.00 71 30.00 6.39 5,00 72 31.00 6.43 5.00 73 32.00 6.47 5.00 74 33.00 6.51 5.00 75 34.00 6.55 5.00 76 35.00 6.59 5.00 77 Big Bear/Oakboro 35.95 6.90 5.00 78 37.00 6.81 5.00 79 38.00 6.77 5.00 80 39.00 6.75 5.00 81 Richardson Creek 40.15 7.03 5.00 82 41.00 7.01 5.00 83 42.00 7,01 5.00 84 43.00 7.01 5.00 85 44,00 7.02 5.00 86 45.00 7.04 5.00 87 50.00 7.12 5.00 88 55.00 7.21 5.00 89 55.85 7.22 5.00 HDR Engineering, Inc, of North Carolina DIVISION OF ENVIRONMENTAL MANAGEMENT May 28, 1992 TO: - Boyd DeVane THROUGH: Ruth Swanek., Trevor Clements FROM: Stephen Bevington,19 VX SUBJECT: Cabarrus County Utilities Department Muddy Creek / Rocky River WWTP Environmental Assessment Technical Support has completed a review of the environmental assessment (EA) for the proposed Muddy Creek /Rocky River WWTP. The EA includes proposed effluent limits for flows of 0.3 and 1.8 MGD (Table 2). These limits may be sufficient to protect water quality in the Rocky River. However, it is important to note that the final effluent limits for toxicants, including ammonia, will depend upon dilution available in Rocky River as well as conditions at other NPDES discharges. Final limits will be determined with consideration of the Yadkin Basinwide plan and Rocky River QUAL2E water quality model now being developed. cc Rex Gleason, MRO To: Permits and Engineering Unit Water Quality Section Date: March 19, 1992 NPDES STAFF REPORT AND RECOMMENDATIONS iLiv ILD County: Cabarrus REG NPDES Permit No.: NCO081621 MRO No.: 9 2- 1 2 MAR 2 6 1"2 PART I - GENERAL INFORMATION TECHNICAL SUPPORT BRANCH 1. Facility and Address: Muddy Creek WWTP Cabarrus County Utilities Department 2326 Hwy. 73 West Concord, N.C. 28026 2. Date of Investigation: March 5, 1992 3. Report Prepared By: Michael L. Parker, Environ. Engr. II 4. Person Contacted and Telephone Number: Raymond D. Hamilton, P.E.,(704)338-1800 5. Directions to Site: From the junction of Highway 601 and SR 1115 in southern Cabarrus County, travel southeast on SR 1115 approximately 1.1 mile to the junction with SR 1113. Turn left (north) on SR 1113 and travel approximately 0.6 mile. The entrance to the proposed WWTP site is on the right side of SR 1113 via a dirt access road. 6. Discharge Point(s), List for all discharge Points: - Latitude: 350 12' 32" Longitude: 800 29' 27" Attach a USGS Map Extract and indicate treatment plant site and discharge point on map. USGS Quad No.: G 17 NW 7. Size (land available for expansion and upgrading): There is ample area available for the construction of the proposed facility (approx. 15 acres). 8. Topography (relationship to flood plain included): The site appears to be located adjacent to the 100 year flood plain of the receiving stream, however, no WWT units will be constructed within the flood plain. 9. Location of Nearest Dwelling: The nearest dwelling is approximately 2000 feet from the WWTP site. Page Two 10. Receiving Stream or Affected Surface Waters: Rocky River a. Classification: C b. River Basin and Subbasin No.: Yadkin 03-07-12 C. Describe receiving stream features and pertinent downstream uses: The receiving stream channel was approx. 75 feet wide and estimated to be 3-5 feet deep. The surrounding area is almost entirely agricultural/rural in use and the nearest known discharger (upstream) is the City of Concord (NC0036269). PART II - DESCRIPTION OF DISCHARGE AND TREATMENT WORKS 1. Type of Wastewater: 100% Domestic (Anticipated) 0% Industrial a. Volume of Wastewater: 0.300 MGD (Initial Phase) b. Types and quantities of industrial wastewater: The applicant does not anticipate any industrial wastewater from existing businesses currently located within the project service area. Should industrial wastewater generators connect to this facility, pretreatment may be necessary. C. Prevalent toxic constituents in wastewater: None with the exception of chlorine are expected in the waste stream. d. Pretreatment Program (POTWs only): Not needed at this time. 2. Production Rates (industrial discharges only) in Pounds: N/A 3. Description of Industrial Process (for industries only) and Applicable CFR Part and Subpart: N/A 4. Type of Treatment (specify whether proposed or existing): The proposed WWT facilities will consist of an influent pump station, a flow splitter box, a mechanical bar screen, an aerated grit chamber, dual aeration basins (0.15 MGD capacity), dual secondary clarifiers, dual aerobic sludge digesters, dual sludge holding tanks, a sludge drying bed, gaseous chlorine disinfection facilities, a chlorine contact chamber, and a parshall flume with recorder for flow measurement. 5. Sludge Handling and Disposal Scheme: Sludge will be land applied to an area which will be permitted at a later date. Sludge drying beds will be available for inclement weather. 6. Treatment Plant Classification: Less than 5 points; no rating (include rating sheet). Class III Page Three 7. SIC Code(s): 4952 Wastewater Code(s): Primary: 01 Secondary: N/A 8. MTU Code(s): 05003 PART III - OTHER PERTINENT INFORMATION 1. Is this facility being constructed with Construction Grants Funds (municipals only)? No 2. Special monitoring requests: None pending receipt of the WLA. 3. Additional effluent limits requests: None pending receipt of the WLA. 4. Air Quality and/or Groundwater concerns or hazardous waste utilized at this facility that may impact water quality, air quality or groundwater? No AQ or GW concerns nor will hazardous waste be utilized at this facility. PART IV - EVALUATION AND RECOMMENDATIONS Cabarrus County (CC) proposes to construct a 0.300 MGD WWTP (to be built in 0.150 MGD phases) to serve the Town of Midland and surrounding area of southeastern Cabarrus County. This area is projected to receive significant growth in the near future as a result of a nearby highway expansion and the planned development of a Midland business park. The facility will also provide much needed sewer service to those residents who have failing septic tank systems. At the present time, wastewater in the proposed service area is domestic only. The WWT facilities will also eliminate the proposed discharge from the Midland Business Park (NC0065498). A preliminary modeling of the receiving stream by the applicant's engineer considered stream characteristics based on anticipated effects from the Rocky River WWTP located approx. 15 miles upstream of the proposed facility. Preliminary results indicate that the recovery zone for D.O. is well above the proposed discharge location, therefore, secondary limitations are anticipated. This, however, cannot be assured until Technical Support can complete a WLA for this facility. Additional WWT facilities may be required pending receipt of the WLA. Page Four The applicant proposes to extend the outfall pipe from this facility into the center of the Rocky River, thereby, aiding in dispersion of the effluent. Pending receipt and approval of the WLA, it is recommended that an NPDES be issued to the County. Signature of Report Preparer Date ZLI �1: Water Quality go6gional Supervisor Date �550 629 'o 1145 ki t VNI ) SooT/ :./ 1: �= I 55 yo Q \1 - 550 140 C � - -� 1 �� � -.� �.� it \ .--.1 11� / �\� i(� ,� •,� , i� SS \,l •• ((�I _A Ye. czCh Ill 30 r , f rr l // \ / ( 1�; In of 11 600 If ° ", ° "/ (�1 .>_ -:-�\� �• /,,' i c — _ • �\`-� h� \�```, J \ •�b' / ,�, �I 61/ O%(C�; 56 559 .7 (`' -,'550_ 56 j/ (' •.� /� 1 owl ° goo--~�1���1 /� � -% (1 �• \ - � ((� ��:�.� l\ � \\� ,1�5 ., �/ ( ,,\ _,\ �,' _ l--50 �---�,-- - State of North Carolina Department of Environment, Health, and Natural Resources Division of Environmental Management 512 North Salisbury Street • Raleigh, North Carolina 27604 James G. Martin, Governor George T. Everett, Ph.D. William W. Cobey, Jr., Secretary February 27, 1992 Director Mr. David D. Patrick, Jr. HDR Engineering Suite 1400 128 South Tryon Street Charlotte, North Carolina 28202-5001 Dear Mr. Patrick: The Division of Environmental Management has reviewed the draft Environmental Assessment (DEA) for the proposed Muddy Creek/Rocky River Wastewater Treatment Plant and interceptor pipelines. Our Technical Support Branch has identified concerns with the proposed limits (see attached memo). Please contact Mr. Steve Bevington if you have any questions (phone 919-733-5083). The DEA needs to be revised to reflect DEM's recommended limits. The remainder of the document appears suitable for review by the full department. Once the document has been revised to address DEM's recommended limits, please submit 12 copies for internal EHNR review. Feel free to contact me if you have any questions. ARC/kls Patrick.ltr/ARC/WPl Enclosure cc: Steve Bevington Dale Overcash Boyd DeVane Sincerely, Alan R. Clark REGIONAL OFFICES Asheville Fayetteville Mooresville Raleigh Washington Wilmington Winston-Salem 704/251-6208 919/486-1541 704/663-1699 919/571-4700 919/946-6481 919/395-3900 919/896-7007 Pollution Prevention Pays P.O. Box 29535, Raleigh, North Carolina 27626-053.5 Telephone 919-733-7015 An Equal Opportunity Affirmative Action Employer DIVISION OF ENVIRONMENTAL MANAGEMENT February 18, 1992 MEMORANDUM TO: Alan Clark THROUGH: Ruth Swanek RCS Trevor Clemente FROM: ev ngtcin if SUBJECT: Cabarrus County Utilities Department Muddy Creek / Rocky River WWTP Environmental Assessment The proposed limits presented in the Muddy Creek / Rocky River Environmental Assessment (EA) are unlikely to be consistent with recommendations from the Technical Support Branch. Secondary treatment limits, as proposed in Table 2, may be insufficient to protect water quality in the Rocky River for two reasons. First, as the facility reaches its maximum planned capacity of 1.8 MGD, an ammonia limit will be required to prevent toxicity. The final ammonia limit will depend upon dilution available in the Rocky River as well as conditions at the Concord Regional WWTP and other NPDES discharges. The second reason why the proposed limits may be insufficient to protect water quality is that the proposed facility is likely to interact with several other waste water sources. A basinwide plan, now being developed for the Yadkin riverbasin, will involve allocating waste with consideration of all interacting sources. An updated QUAL2E river model for the Rocky River is nearing completion, and will be used to determine the appropriate limits for the proposed facility. In addition to an ammonia limit, the proposed facility would have to meet a Fecal Coliform limit of 200 per 100 ml and should plan on dechlorination if chlorine is to be used for disinfection. Table 2 should be amended to include a Fecal Coliform limit and, if chlorine disinfection is planned for, a chlorine limit of 28 ug/l. In section II. B., it is stated that the project will eventually serve the existing commercial/industrial establishments at the intersection of US Hwy 601 and NC Hwy 24-27. This section of the report should be expanded to state what kind of commercial/industrial facilities are present and whether wastewater from these facilities is expected to be of domestic quality. It should also be noted that the river model discussed in the EA (Section V. I.) cannot be evaluated because it is not presented in full detail. Also, new data from time of travel and sediment oxygen demand studies have become available since this model was calibrated. cc: Rex Gleason MRO Regional Water Quality Supervisor