Loading...
HomeMy WebLinkAbout20070489 Ver 1_More Info Received_20050902Re: B-3916, Wake Co., US 401 over Middle Creek Subject: Re: B-3916, Wake Co., US 401 over Middle Creek From: Christina Breen <christina.breen@ncmail.net> Date: Fri, 02 Sep 2005 11:22:12 -0400 To: "Marshall W. Clawson PE" <mclawson@dot.state.nc.us> Marshall, I am so sorry it has taken awhile to get back to you. We are okay with considering the roadside ditch an existing conveyance through the buffer, even though it will be temporarily filled. We would like to see the matting laid prior to fill, and the ditch revegetated with native grasses upon removal of the fill. Both of these will be conditions of the permit. Also, no new conveyances should be built to go through the buffer during construction to handle stormwater during construction. Do you need those plans back, they look like an original set? Marshall W. Clawson PE wrote: Hi Christina, Have you had a chance to asking about the project MC Christina Breen Environmental Specialist II NC Division of Water Quality Transportation Permitting Unit 2321 Crabtree Blvd., Suite 250 Raleigh, NC 27604-2260 Telephone: (919) 733-9604 Fax: (919) 733-6893 lofl look at the plans yet? Roadway is so they can send it to Right of Way. 9/2/2005 11:22 AM Re: B-3916, Wake Co., US 401 over Middle Creek Subject: Re: B-3916, Wake Co., US 401 over Middle Creek From: "Marshall W. Clawson PE" <mclawson@dot.state.nc.us> Date: Thu, 08 Sep 2005 07:57:30 -0400 To: Christina Breen <christina.breen@ncmail.net> Christina, Thanks for the information. We'll do that. I do need the plans back. Just send them to me at 1590 Mail Service Center. MC Christina Breen wrote: Marshall, I am so sorry it has taken awhile to get back to you. We are okay with considering the roadside ditch an existing conveyance through the buffer, even though it will be temporarily filled. We would like to see the matting laid prior to fill, and the ditch revegetated with native grasses upon removal of the fill. Both of these will be conditions of the permit. Also, no new conveyances should be built to go through the buffer during construction to handle stormwater during construction. Do you need those plans back, they look like an original set? Marshall W. Clawson PE wrote: Hi Christina, Have you had a chance to asking about the project MC Christina Breen Environmental Specialist II NC Division of Water Quality Transportation Permitting Unit 2321 Crabtree Blvd., Suite 250 Raleigh, NC 27604-2260 Telephone: (919) 733-9604 Fax: (919) 733-6893 look at the plans yet? Roadway is so they can send it to Right of Way. 1 of 1 10/6/2005 9:42 AM