HomeMy WebLinkAbout20070489 Ver 1_More Info Received_20050902Re: B-3916, Wake Co., US 401 over Middle Creek
Subject: Re: B-3916, Wake Co., US 401 over Middle Creek
From: Christina Breen <christina.breen@ncmail.net>
Date: Fri, 02 Sep 2005 11:22:12 -0400
To: "Marshall W. Clawson PE" <mclawson@dot.state.nc.us>
Marshall,
I am so sorry it has taken awhile to get back to you. We are okay with considering the roadside ditch an
existing conveyance through the buffer, even though it will be temporarily filled. We would like to see
the matting laid prior to fill, and the ditch revegetated with native grasses upon removal of the fill. Both
of these will be conditions of the permit. Also, no new conveyances should be built to go through the
buffer during construction to handle stormwater during construction.
Do you need those plans back, they look like an original set?
Marshall W. Clawson PE wrote:
Hi Christina,
Have you had a chance to
asking about the project
MC
Christina Breen
Environmental Specialist II
NC Division of Water Quality
Transportation Permitting Unit
2321 Crabtree Blvd., Suite 250
Raleigh, NC 27604-2260
Telephone: (919) 733-9604
Fax: (919) 733-6893
lofl
look at the plans yet? Roadway is
so they can send it to Right of Way.
9/2/2005 11:22 AM
Re: B-3916, Wake Co., US 401 over Middle Creek
Subject: Re: B-3916, Wake Co., US 401 over Middle Creek
From: "Marshall W. Clawson PE" <mclawson@dot.state.nc.us>
Date: Thu, 08 Sep 2005 07:57:30 -0400
To: Christina Breen <christina.breen@ncmail.net>
Christina,
Thanks for the information. We'll do that. I do need the plans back. Just send them to me at 1590 Mail
Service Center.
MC
Christina Breen wrote:
Marshall,
I am so sorry it has taken awhile to get back to you. We are okay with considering the roadside ditch
an existing conveyance through the buffer, even though it will be temporarily filled. We would like
to see the matting laid prior to fill, and the ditch revegetated with native grasses upon removal of the
fill. Both of these will be conditions of the permit. Also, no new conveyances should be built to go
through the buffer during construction to handle stormwater during construction.
Do you need those plans back, they look like an original set?
Marshall W. Clawson PE wrote:
Hi Christina,
Have you had a chance to
asking about the project
MC
Christina Breen
Environmental Specialist II
NC Division of Water Quality
Transportation Permitting Unit
2321 Crabtree Blvd., Suite 250
Raleigh, NC 27604-2260
Telephone: (919) 733-9604
Fax: (919) 733-6893
look at the plans yet? Roadway is
so they can send it to Right of Way.
1 of 1 10/6/2005 9:42 AM