HomeMy WebLinkAbout20200187 Ver 1_RE_ Avery 1 stormwater alteration request_DWR_20200911
Wanucha, Dave
From:Patterson, Robert D
Sent:Monday, September 14, 2020 11:04 AM
To:Wanucha, Dave
Subject:RE: Avery 1 stormwater alteration request_DWR
No issues that I can see. Thanks.
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts.
To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with
the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your
patience as we continue to serve the public during this challenging time.
From: Wanucha, Dave
Sent: Monday, September 14, 2020 10:00 AM
To: Patterson, Robert D <robert.patterson@ncdenr.gov>
Subject: FW: Avery 1 stormwater alteration request
Robert,
Please take a look and let me know if you see any issues. Since it is working now it should be ok. Riprap ditch
would provide some roughness to slow velocity vs. the proposed pipe. Thanks.
Dave W.
Division of Water Resources
401 & Buffer Transportation Permitting
NC Department of Envirionmental Quality
336-776-9703 office
336-403-5655 mobile
Dave.Wanucha@ncdenr.gov
NC DEQ Winston Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston Salem, NC 27106
1
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or
are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your
requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging
time.
From: Hining, Kevin J <kjhining@ncdot.gov>
Sent: Friday, September 11, 2020 4:25 PM
To: Wanucha, Dave <dave.wanucha@ncdenr.gov>
Subject: Avery 1 stormwater alteration request
Hey Dave,
Our project manager and contractor for Avery bridge #1 has requested a change to the permitted plans, regarding a
stormwater device. The requested change is in regard to structure 409, which is a drop inlet/box and 15” RCP that will
deliver stormwater to rip rap on the bank and into the Linville River. I’ve attached the plans and the 401 permit above,
and a snapshot of the area below (see black oval).
They would like to replace the box and 15” pipe with a rock lined ditch. That’s actually what is in place now, and it
seems to be functioning well, even with all the rain we have had in recent weeks. We still plan to have the rip rap on the
bank, to dissipate the stormwater that leaves the ditch. I figured replacing a pipe with a ditch would be preferred – not
that either is great habitat, but I’m assuming the rock lined ditch will be better habitat for critters that the 15”
pipe. Since it was part of the plans that were permitted with the 401, I wanted to seek your approval before making the
change. Also, wanted to clarify that it is a stormwater measure, so no jurisdictional features should be impacted by the
change.
Let me know if you need additional information.
Thanks, (and this should be my least email to you for the day!:))
Kevin
2
Kevin Hining
Division 11 Environmental Officer
North Carolina Department of Transportation
828-386-7202 cell
kjhining@ncdot.gov
801 Statesville Rd.
PO Box 250
North Wilkesboro, NC 28659
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
_____________________________________________________________
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
3
r L. 1114.4*KC I:.
IME.
„err `ANL AielhoillrAN4
Liam
IGs.1
.
" II ,_��1,.�! QRIPRAP AT 'MBAN �•
III IRA SEE "ETAIL D
•e 1IIIM ,SEE I SET C
•
•
I� N!`, I IN LLE R TORTS, INC. \
lit
rmin
111
GREU
`2 T.NS CI ASS R RIP REP