Loading...
HomeMy WebLinkAbout20181245 Ver 2_Design Calcs 9_11_20_20200911STILLWELL ENGINEERING, P.A. TINSEL TOWN DEV.– FERGUSON STREET STORM WATER CALCULATIONS William Stillwell, P.E. 9/11/2020 STILLWELL ENGINEERING, PA PO BOX 838 SYLVA, NC 28779 NC FIRM LIC# C-2996 PH: 828.586.6066 w.stillwell@stillwellengineering.net 1 STORM WATER MANAGEMENT CALCULATIONS A. BUILT UPON AREA (B.U.A.) a. PARCEL #1: · TOTAL PROPOSED PARCEL ACREAGE: 3.0 ACRES · DEVELOPABLE PROPERTY EXCLUDING REMAINING STREAMS AND BUFFER ZONE: 2.31 ACRES · RESIDENTIAL DEV. ADDED B.U.A.: 0.37 ACRES · ACCESS ROAD ADDED B.U.A.: .14 ACRES · TOTAL ADDED B.U.A.: 0.51 ACRES · 2.31 AC / 0.50 AC = 22% B.U.A. - LOW DENSITY DEVELOPMENT b. PARCEL #2: · TOTAL PARCEL DEVELOPABLE ACREAGE: 3.23 ACRES · POST-CONSTRUCTION B.U.A.: 2.35 ACRES · 2.35 AC / 3.23 AC = 73 % B.U.A. - HIGH DENSITY DEVELOPMENT REQUIRED TO TREAT RUNOFF FROM 1-INCH STORM EVENT FOR PROPOSED TRACTOR SUPPLY COMPANY SITE ONLY. INCORPORATE BIORETENTION AREA FOR CONTROL AND TREATMENT: 1. REQUIRED VOLUME: a. PRE-EXISTING IMPERVIOUS AREA: GRAVEL SURFACE: 16,282 SF STRUCTURES AND SLABS: 4,963 SF TOTAL PRE-EXISTING IMPERVIOUS AREA: 21,245 SF = 0.49 ACRES b. POST-CONSTRUCTION BUILT UPON AREA:2.35 ACRES c. TOTAL NET BUILT UPON AREA ADDITION: 2.35 ACRES - 0.49 ACRES = 1.86 ACRES d. BIORETENTION AREA VOLUME REQUIRED: IMPERVIOUS FRACTION (Ia): 1.86 AC / 3.23 AC = 0.58 Rv = RUNOFF COEFFICIENT = 0.05 + 0.9 X Ia = 0.57 DESIGN VOLUME: 3,630 X Rv X Rd X A = 3,630 X 0..57 X 1 IN X 3.23 AC = 6,683 CF PROVIDED BY BIORETENTION AREA: 6,703 CF e. BIORETENTION AREA POND ELEVATIONS: · PROPOSED FLOOR ELEV: 2,145.00' · OUTLET ELEVATION: 2,145.00' + 1' = 2,146.00' B. DRAINAGE DISCHARGE OUTFALL PROTECTION FROM 10 YR PEAK FLOW STORM. 1. DISCHARGE OUTFALL - FES-14 a. TREATED STORM WATER DISCHARGE WILL BE DIRECTLY INTO THE REMAINING REMAINING POND AREA, 1-FOOT ABOVE ELEVATION OF NORMAL WATER LEVEL OF POND. ORIGINAL CALCULATIONS INDICATE A FLUCTUATION OF APPROXIMATELY 0.36 INCHES FOR THE 10 YR / 24 HOUR STORM b. 10 YR STORM INTENSITY WITH TIME OF CONCENTRATION OF 5 MINUTES IS 6.65 IN/HR (I) PER NOAA STATION "CULLOWHEE" 2 c. STORM WATER FLOW, Q = C*I*A WHERE C = COMPOSITE RUNOFF COEFFICIENT (0.95 - ASPHALT/ROOF/CONCRETE); I = 6.65 IN/HR; A = 2.35 ACRES d. Q = 0.95 * 6.65 IN/HR * 2.35 AC = 14.85 CUBIC FEET PER SECOND (CFS) e. DISCHARGE VELOCITY: · OUTFALL PIPE DIA: 24", MATERIAL: HDPE, n=.013 · PIPE SLOPE: 2.73% · FOR PIPE FLOWING HALF FULL - Q = (1.49/.013) *1.57 * .5^(2/3) * .0273^1/2 = 18.73 CFS · USING CRITERIA FOR 1/2 FULL FLOW, OUTLET VELOCITY = 18.73 CFS/1.57 SF = 11.9 FT/S · PER FIGURES 8.06C AND 8.06D OF CHAPTER 8 OF THE NCDEQ EROSION AND SEDIMENT CONTROL PLANNING DESIGN MANUAL, REQUIRED STONE SIZE IS CLASS I RIP RAP TO BE INSTALLED BETWEEN OUTFALL AND NORMAL WATER LEVEL. 2. DISCHARGE OUTFALL FES-12 a. FLOW IS FROM A ROADWAY CULVERT CROSSING FERGUSON ROAD. b. ESTIMATE FLOW FROM 10 YR STORM EVENT WITH TIME OF CONCENTRATION OF 5 MIN, I = 6.65 IN/HR FOR FERGUSON ROAD DRAINAGE INTO CULVERT DITCH c. TOTAL PAVED AREA DRAINING TO CULVERT: 0.25 ACRES d. ESTIMATED FLOW = Q = 0.95 * 6.65 IN/HR * 0.25 AC = 1.58 CFS e. DESIGN OUTLET FLOW PROTECTION FOR VELOCITY RESULTING FROM 1/2 FULL PIPE FLOW. e. DISCHARGE VELOCITY: · OUTFALL PIPE DIA: 18", MATERIAL: HDPE, n=.013 · PIPE SLOPE: 1.13% · FOR PIPE FLOWING HALF FULL - Q = (1.49/.013) * 0.883 SF * .375^(2/3) * .0113^1/2 = 5.60 CFS (4.0 CFS IN EXCESS OF ESTIMATED FLOW FROM ROAD CULVERT) · USING CRITERIA FOR 1/2 FULL FLOW, OUTLET VELOCITY = 5.6 CFS/0.883 SF = 6.34 FT/S · PER FIGURES 8.06C AND 8.06D OF CHAPTER 8 OF THE NCDEQ EROSION AND SEDIMENT CONTROL PLANNING DESIGN MANUAL, USE CLASS A RIP RAP WITH APRON LENGTH OF 4 * 1.5FT = 6FT 3. FOREBAY OUTFALL FES-1 a. DISCHARGE VELOCITY: USING CIRCULAR CHANNEL RATIOS: d/Dfull = 0.32 RESULTING IN v/Vfull = 0.75. Vfull = 21.54 FT/S, v = 16.16 FT/S b. PER FIGURES 8.06C AND 8.06D OF CHAPTER 8 OF THE NCDEQ EROSION AND SEDIMENT CONTROL PLANNING DESIGN MANUAL, USE CLASS 1 RIP RAP 24" DEEP WITH APRON LENGTH OF 8 * 2 FT = 16FT 4. EMERGENCY SPILLWAY a. DESIGN FOR 25 YR STORM INTENSITY WITH TOC OF 5 MIN IS 7.62" (I) PER NOAA STATION "CULLOWHEE" b. FLOW Q = 0.95 * 7.62 IN/HR * 2.35 AC = 17.0 CUBIC FEET PER SECOND (CFS) c. OPEN CHANNEL FLOW FOR AVERAGE SLOPE 11 FOOT BOTTOM SPILLWAY WITH CLASS 2 RIP RAP LINER AND FLOW DEPTH OF .34': Q = (1.49/.078) * 4.068 * .311 * .28^.5 = 17.17 CFS