HomeMy WebLinkAboutNC0085120_Compliance Evaluation Inspection_20200825 (2)ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
Mr. Jason Collinsworth, Maintenance Manager
Lowe's Home Centers, LLC.
711 Tomlin Mill Road
Statesville, North Carolina 28625
Dear Mr. Collinsworth:
NORTH CAROLINA
Environmental Quality
August 25, 2020
Subject: Compliance Evaluation Inspection
Lowe's RDC 960 WWTP
NPDES Permit No. NCO085120
Iredell County
Enclosed is a copy of the Compliance Evaluation Inspection Report for the inspection conducted at the subject
facility on August 18, 2020, by Mr. Wes Bell of this Office. Please inform the facility's Operator -in -Responsible
Charge (ORC) of our findings by forwarding a copy of the enclosed report.
Should you have any questions concerning this letter, please do not hesitate to contact Mr. Bell at (704) 235-
2192, or via email at wes.bell(a),ncdenr.gov.
Sincerely,
DocuSigned by:
A14CC681 AF27425...
W. Corey Basinger, Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
Enclosure:
Inspection Report
�� Office
Carolina Department of Environmental Quality I Division of Water Resources
Mooresville Regional 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115
NOR7H ORROLINA i
k"r1_1 m Em^'m'"^e^ai Qmli /`� 704.663.1699
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 u 3 I NCO085120 I11 121 20/08/18 I17 18I � I 19 I s I 201 I
211IIIII 111111III II III III1 I I IIIII IIIIIIIII II r6
Inspection
Work Days Facility Self -Monitoring Evaluation Rating 131 QA ---------------------- Reserved -------------------
67
2.0 701d I 71 I„ I 72 I r., I 71 I 74 79
L—I tyI I I I I I I I I80
L-1
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES Dermit Number)
08:50AM 20/08/18
19/05/01
Iredell Distribution Center WWTP
711 Tomlin Mill Rd
Exit Time/Date
Permit Expiration Date
Olin NC 28660
11:12AM 20/08/18
24/03/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Rocky Lane Everidge/ORC/704-876-8500/
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Trevis Sprull,711 Tomlin Mill Rd Statesville NC 28625/General Manager/704-876-8500/
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit 0 Flow Measurement Operations & Maintenar Records/Reports
Self -Monitoring Progran 0 Sludge Handling Dispo: Facility Site Review Effluent/Receiving Wate
Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Wes Bell DocuSigned by: DWR/MRO WQ/704-663-1699 Ext.2192/ 8/24/2020
2 re&
A61696D90CC3437...
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
W. Corey Basinger DWR/Division of Water Quality/704-235-2194/
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
DocuSigned by:
8/25/2020
AlaccsalAFvazs... Page#
NPDES yr/mo/day Inspection Type
NC0085120 I11 12I 20/08/18 117 18 i c i
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
On -Site Representatives:
The following Lowe's personnel were in attendance during the inspection: Rocky Everidge, Willie
Gregory and Madeline McIntyre.
Page#
Permit: NCO085120 Owner -Facility: Iredell Distribution Center WWTP
Inspection Date: 08/18/2020 Inspection Type: Compliance Evaluation
Permit
Yes
No
NA
NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
❑
❑
0
❑
application?
Is the facility as described in the permit?
0
❑
❑
❑
# Are there any special conditions for the permit?
❑
❑
0
❑
Is access to the plant site restricted to the general public?
0
❑
❑
❑
Is the inspector granted access to all areas for inspection?
0
❑
❑
❑
Comment: The last compliance evaluation inspection at this facility was performed by DWR staff on
8/15/18.
Record Keeping
Yes
No
NA
NE
Are records kept and maintained as required by the permit?
0
❑
❑
❑
Is all required information readily available, complete and current?
0
❑
❑
❑
Are all records maintained for 3 years (lab. reg. required 5 years)?
0
❑
❑
❑
Are analytical results consistent with data reported on DMRs?
0
❑
❑
❑
Is the chain -of -custody complete?
0
❑
❑
❑
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
❑
❑
❑
Has the facility submitted its annual compliance report to users and DWQ?
❑
❑
❑
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operatc
❑
❑
❑
on each shift?
Is the ORC visitation log available and current?
❑
❑
❑
Is the ORC certified at grade equal to or higher than the facility classification?
❑
❑
❑
Is the backup operator certified at one grade less or greater than the facility classification'
❑
❑
❑
Is a copy of the current NPDES permit available on site?
0
❑
❑
❑
Facility has copy of previous year's Annual Report on file for review?
❑
❑
0
❑
Page# 3
Permit: NCO085120 Owner -Facility: Iredell Distribution Center WWTP
Inspection Date: 08/18/2020 Inspection Type: Compliance Evaluation
Record Keeping Yes No
NA NE
Comment: The records reviewed during the inspection were organized and well maintained.
Discharge
Monitoring Reports (eDMRs) were reviewed for the period July 2019 through June 2020. All
monitoring frequencies were correct. A daily maximum effluent TSS violation was reported
in November 2019. The Division has separately addressed this limit violation through the
issuance of a Notice of Violation (NOW
The ORC will revise and resubmit the March 2020 eDMR (correct all the effluent
temperatures) and April 2020 eDMR (correct effluent PH values on the 6th and 14th and
include ORC visitation on 24th).
Laboratory Yes No
NA NE
Are field parameters performed by certified personnel or laboratory? 0 ❑
❑ ❑
Are all other parameters(excluding field parameters) performed by a certified lab? 0 ❑
❑ ❑
# Is the facility using a contract lab? 0 ❑
❑ ❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees ❑ ❑
0 ❑
Celsius)?
Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees? ❑ ❑
0 ❑
Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees? ❑ ❑
M ❑
Comment: On -site field analyses (pH and temperature) are performed under Lowes' field laboratory
certification #5016. Statesville Analytical (Certification #440) has also been contracted to
Provide analytical support for all effluent analyses except field.
Effluent Sampling
Is composite sampling flow proportional?
Is sample collected below all treatment units?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
representative)?
Comment: The subject permit requires effluent grab samples.
Operations & Maintenance
Is the plant generally clean with acceptable housekeeping?
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable
Solids, pH, DO, Sludge Judge, and other that are applicable?
Yes No NA NE
❑ ❑ ■ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ■ ❑
❑ ❑ ■ ❑
■ ❑ ❑ ❑
Yes No NA NE
■ ❑ ❑ ❑
■ ❑ ❑ ❑
Comment: The facility was being properly operated and well maintained. The ORC and staff
incorporate a comprehensive process control program with all measurements being
properly documented and maintained on -site.
Page# 4
Permit: NCO085120 Owner -Facility: Iredell Distribution Center WWTP
Inspection Date: 08/18/2020 Inspection Type: Compliance Evaluation
Operations & Maintenance Yes No NA NE
Bar Screens
Yes
No
NA
NE
Type of bar screen
a.Manual
b.Mechanical
❑
Are the bars adequately screening debris?
0
❑
❑
❑
Is the screen free of excessive debris?
0
❑
❑
❑
Is disposal of screening in compliance?
0
❑
❑
❑
Is the unit in good condition?
E
❑
❑
❑
Comment: Screenings are disposed at the County landfill.
Equalization Basins
Yes
No
NA
NE
Is the basin aerated?
0
❑
❑
❑
Is the basin free of bypass lines or structures to the natural environment?
0
❑
❑
❑
Is the basin free of excessive grease?
N
❑
❑
❑
Are all pumps present?
0
❑
❑
❑
Are all pumps operable?
0
❑
❑
❑
Are float controls operable?
0
❑
❑
❑
Are audible and visual alarms operable?
0
❑
❑
❑
# Is basin size/volume adequate?
0
❑
❑
❑
Comment: The facility is equipped with three equalization basins: however, only two are currently in
service.
Aeration Basins
Mode of operation
Type of aeration system
Is the basin free of dead spots?
Are surface aerators and mixers operational?
Are the diffusers operational?
Is the foam the proper color for the treatment process?
Does the foam cover less than 25% of the basin's surface?
Is the DO level acceptable?
Is the DO level acceptable?(1.0 to 3.0 mg/1)
Yes No NA NE
Ext. Air
Diffused
❑
❑
❑
❑
❑
■
❑
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
Page# 5
Permit: NCO085120
Inspection Date: 08/18/2020
Aeration Basins
Owner -Facility: Iredell Distribution Center WWTP
Inspection Type: Compliance Evaluation
Yes No NA NE
Comment: Aqueous lime and sodium bicarbonate are added (as -needed basis) to maintained
appropriate alkalinity/pH levels.
Secondary Clarifier
Yes
No
NA
NE
Is the clarifier free of black and odorous wastewater?
0
❑
❑
❑
Is the site free of excessive buildup of solids in center well of circular clarifier?
❑
❑
0
❑
Are weirs level?
0
❑
❑
❑
Is the site free of weir blockage?
0
❑
❑
❑
Is the site free of evidence of short-circuiting?
0
❑
❑
❑
Is scum removal adequate?
0
❑
❑
❑
Is the site free of excessive floating sludge?
0
❑
❑
❑
Is the drive unit operational?
❑
❑
0
❑
Is the return rate acceptable (low turbulence)?
0
❑
❑
❑
Is the overflow clear of excessive solids/pin floc?
0
❑
❑
❑
Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth)
0
❑
❑
❑
Comment:
Flow Measurement - Effluent
Yes
No
NA
NE
# Is flow meter used for reporting?
0
❑
❑
❑
Is flow meter calibrated annually?
0
❑
❑
❑
Is the flow meter operational?
0
❑
❑
❑
(If units are separated) Does the chart recorder match the flow meter?
❑
❑
0
❑
Comment: The flow meter is calibrated twice per year and was last calibrated on 2/26/2020 by
Clearwater. Inc.
Disinfection - UV
Yes
No
NA
NE
Are extra UV bulbs available on site?
0
❑
❑
❑
Are UV bulbs clean?
0
❑
❑
❑
Is UV intensity adequate?
0
❑
❑
❑
Is transmittance at or above designed level?
0
❑
❑
❑
Is there a backup system on site?
❑
❑
0
❑
Is effluent clear and free of solids?
0
❑
❑
❑
Comment:
Page# 6
Permit: NC0085120
Inspection Date: 08/18/2020
Pump Station - Effluent
Is the pump wet well free of bypass lines or structures?
Are all pumps present?
Are all pumps operable?
Are float controls operable?
Is SCADA telemetry available and operational?
Is audible and visual alarm available and operational?
Comment:
Owner -Facility: Iredell Distribution Center WWTP
Inspection Type: Compliance Evaluation
Effluent Pipe
Is right of way to the outfall properly maintained?
Are the receiving water free of foam other than trace amounts and other debris?
If effluent (diffuser pipes are required) are they operating properly?
Yes
No
NA
NE
■
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
❑
❑
■
❑
■
❑
❑
❑
Yes
No
NA NE
■
❑
❑
❑
■
❑
❑
❑
❑
❑
■
❑
Comment: The effluent appeared clear with no floatable solids or foam. The receiving stream did not
appear to be negatively impacted.
Aerobic Digester
Yes
No
NA
NE
Is the capacity adequate?
0
❑
❑
❑
Is the mixing adequate?
0
❑
❑
❑
Is the site free of excessive foaming in the tank?
0
❑
❑
❑
# Is the odor acceptable?
0
❑
❑
❑
# Is tankage available for properly waste sludge?
0
❑
❑
❑
Comment: Wastewater solids are removed from the aerated sludge holding tank by Myers Septic Tank
Service and disposed at the North Wilkesboro WWTP.
Standby Power
Is automatically activated standby power available?
Is the generator tested by interrupting primary power source?
Is the generator tested under load?
Was generator tested & operational during the inspection?
Do the generator(s) have adequate capacity to operate the entire wastewater site?
Is there an emergency agreement with a fuel vendor for extended run on back-up power?
Is the generator fuel level monitored?
Yes No NA NE
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
Comment: The backup generator is automatically tested once per week under load. The on -site
maintenance staff services the generator.
Page# 7