Loading...
HomeMy WebLinkAboutNC0085120_Compliance Evaluation Inspection_20200825 (2)ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Mr. Jason Collinsworth, Maintenance Manager Lowe's Home Centers, LLC. 711 Tomlin Mill Road Statesville, North Carolina 28625 Dear Mr. Collinsworth: NORTH CAROLINA Environmental Quality August 25, 2020 Subject: Compliance Evaluation Inspection Lowe's RDC 960 WWTP NPDES Permit No. NCO085120 Iredell County Enclosed is a copy of the Compliance Evaluation Inspection Report for the inspection conducted at the subject facility on August 18, 2020, by Mr. Wes Bell of this Office. Please inform the facility's Operator -in -Responsible Charge (ORC) of our findings by forwarding a copy of the enclosed report. Should you have any questions concerning this letter, please do not hesitate to contact Mr. Bell at (704) 235- 2192, or via email at wes.bell(a),ncdenr.gov. Sincerely, DocuSigned by: A14CC681 AF27425... W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ Enclosure: Inspection Report �� Office Carolina Department of Environmental Quality I Division of Water Resources Mooresville Regional 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115 NOR7H ORROLINA i k"r1_1 m Em^'m'"^e^ai Qmli /`� 704.663.1699 United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN 1 2 u 3 I NCO085120 I11 121 20/08/18 I17 18I � I 19 I s I 201 I 211IIIII 111111III II III III1 I I IIIII IIIIIIIII II r6 Inspection Work Days Facility Self -Monitoring Evaluation Rating 131 QA ---------------------- Reserved ------------------- 67 2.0 701d I 71 I„ I 72 I r., I 71 I 74 79 L—I tyI I I I I I I I I80 L-1 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES Dermit Number) 08:50AM 20/08/18 19/05/01 Iredell Distribution Center WWTP 711 Tomlin Mill Rd Exit Time/Date Permit Expiration Date Olin NC 28660 11:12AM 20/08/18 24/03/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Rocky Lane Everidge/ORC/704-876-8500/ Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Trevis Sprull,711 Tomlin Mill Rd Statesville NC 28625/General Manager/704-876-8500/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit 0 Flow Measurement Operations & Maintenar Records/Reports Self -Monitoring Progran 0 Sludge Handling Dispo: Facility Site Review Effluent/Receiving Wate Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Wes Bell DocuSigned by: DWR/MRO WQ/704-663-1699 Ext.2192/ 8/24/2020 2 re& A61696D90CC3437... Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date W. Corey Basinger DWR/Division of Water Quality/704-235-2194/ EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. DocuSigned by: 8/25/2020 AlaccsalAFvazs... Page# NPDES yr/mo/day Inspection Type NC0085120 I11 12I 20/08/18 117 18 i c i Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) On -Site Representatives: The following Lowe's personnel were in attendance during the inspection: Rocky Everidge, Willie Gregory and Madeline McIntyre. Page# Permit: NCO085120 Owner -Facility: Iredell Distribution Center WWTP Inspection Date: 08/18/2020 Inspection Type: Compliance Evaluation Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ ❑ 0 ❑ application? Is the facility as described in the permit? 0 ❑ ❑ ❑ # Are there any special conditions for the permit? ❑ ❑ 0 ❑ Is access to the plant site restricted to the general public? 0 ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? 0 ❑ ❑ ❑ Comment: The last compliance evaluation inspection at this facility was performed by DWR staff on 8/15/18. Record Keeping Yes No NA NE Are records kept and maintained as required by the permit? 0 ❑ ❑ ❑ Is all required information readily available, complete and current? 0 ❑ ❑ ❑ Are all records maintained for 3 years (lab. reg. required 5 years)? 0 ❑ ❑ ❑ Are analytical results consistent with data reported on DMRs? 0 ❑ ❑ ❑ Is the chain -of -custody complete? 0 ❑ ❑ ❑ Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported COCs Are DMRs complete: do they include all permit parameters? ❑ ❑ ❑ Has the facility submitted its annual compliance report to users and DWQ? ❑ ❑ ❑ (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operatc ❑ ❑ ❑ on each shift? Is the ORC visitation log available and current? ❑ ❑ ❑ Is the ORC certified at grade equal to or higher than the facility classification? ❑ ❑ ❑ Is the backup operator certified at one grade less or greater than the facility classification' ❑ ❑ ❑ Is a copy of the current NPDES permit available on site? 0 ❑ ❑ ❑ Facility has copy of previous year's Annual Report on file for review? ❑ ❑ 0 ❑ Page# 3 Permit: NCO085120 Owner -Facility: Iredell Distribution Center WWTP Inspection Date: 08/18/2020 Inspection Type: Compliance Evaluation Record Keeping Yes No NA NE Comment: The records reviewed during the inspection were organized and well maintained. Discharge Monitoring Reports (eDMRs) were reviewed for the period July 2019 through June 2020. All monitoring frequencies were correct. A daily maximum effluent TSS violation was reported in November 2019. The Division has separately addressed this limit violation through the issuance of a Notice of Violation (NOW The ORC will revise and resubmit the March 2020 eDMR (correct all the effluent temperatures) and April 2020 eDMR (correct effluent PH values on the 6th and 14th and include ORC visitation on 24th). Laboratory Yes No NA NE Are field parameters performed by certified personnel or laboratory? 0 ❑ ❑ ❑ Are all other parameters(excluding field parameters) performed by a certified lab? 0 ❑ ❑ ❑ # Is the facility using a contract lab? 0 ❑ ❑ ❑ # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees ❑ ❑ 0 ❑ Celsius)? Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees? ❑ ❑ 0 ❑ Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees? ❑ ❑ M ❑ Comment: On -site field analyses (pH and temperature) are performed under Lowes' field laboratory certification #5016. Statesville Analytical (Certification #440) has also been contracted to Provide analytical support for all effluent analyses except field. Effluent Sampling Is composite sampling flow proportional? Is sample collected below all treatment units? Is proper volume collected? Is the tubing clean? # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Is the facility sampling performed as required by the permit (frequency, sampling type representative)? Comment: The subject permit requires effluent grab samples. Operations & Maintenance Is the plant generally clean with acceptable housekeeping? Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable Solids, pH, DO, Sludge Judge, and other that are applicable? Yes No NA NE ❑ ❑ ■ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ■ ❑ ❑ ❑ Yes No NA NE ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ Comment: The facility was being properly operated and well maintained. The ORC and staff incorporate a comprehensive process control program with all measurements being properly documented and maintained on -site. Page# 4 Permit: NCO085120 Owner -Facility: Iredell Distribution Center WWTP Inspection Date: 08/18/2020 Inspection Type: Compliance Evaluation Operations & Maintenance Yes No NA NE Bar Screens Yes No NA NE Type of bar screen a.Manual b.Mechanical ❑ Are the bars adequately screening debris? 0 ❑ ❑ ❑ Is the screen free of excessive debris? 0 ❑ ❑ ❑ Is disposal of screening in compliance? 0 ❑ ❑ ❑ Is the unit in good condition? E ❑ ❑ ❑ Comment: Screenings are disposed at the County landfill. Equalization Basins Yes No NA NE Is the basin aerated? 0 ❑ ❑ ❑ Is the basin free of bypass lines or structures to the natural environment? 0 ❑ ❑ ❑ Is the basin free of excessive grease? N ❑ ❑ ❑ Are all pumps present? 0 ❑ ❑ ❑ Are all pumps operable? 0 ❑ ❑ ❑ Are float controls operable? 0 ❑ ❑ ❑ Are audible and visual alarms operable? 0 ❑ ❑ ❑ # Is basin size/volume adequate? 0 ❑ ❑ ❑ Comment: The facility is equipped with three equalization basins: however, only two are currently in service. Aeration Basins Mode of operation Type of aeration system Is the basin free of dead spots? Are surface aerators and mixers operational? Are the diffusers operational? Is the foam the proper color for the treatment process? Does the foam cover less than 25% of the basin's surface? Is the DO level acceptable? Is the DO level acceptable?(1.0 to 3.0 mg/1) Yes No NA NE Ext. Air Diffused ❑ ❑ ❑ ❑ ❑ ■ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Page# 5 Permit: NCO085120 Inspection Date: 08/18/2020 Aeration Basins Owner -Facility: Iredell Distribution Center WWTP Inspection Type: Compliance Evaluation Yes No NA NE Comment: Aqueous lime and sodium bicarbonate are added (as -needed basis) to maintained appropriate alkalinity/pH levels. Secondary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater? 0 ❑ ❑ ❑ Is the site free of excessive buildup of solids in center well of circular clarifier? ❑ ❑ 0 ❑ Are weirs level? 0 ❑ ❑ ❑ Is the site free of weir blockage? 0 ❑ ❑ ❑ Is the site free of evidence of short-circuiting? 0 ❑ ❑ ❑ Is scum removal adequate? 0 ❑ ❑ ❑ Is the site free of excessive floating sludge? 0 ❑ ❑ ❑ Is the drive unit operational? ❑ ❑ 0 ❑ Is the return rate acceptable (low turbulence)? 0 ❑ ❑ ❑ Is the overflow clear of excessive solids/pin floc? 0 ❑ ❑ ❑ Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth) 0 ❑ ❑ ❑ Comment: Flow Measurement - Effluent Yes No NA NE # Is flow meter used for reporting? 0 ❑ ❑ ❑ Is flow meter calibrated annually? 0 ❑ ❑ ❑ Is the flow meter operational? 0 ❑ ❑ ❑ (If units are separated) Does the chart recorder match the flow meter? ❑ ❑ 0 ❑ Comment: The flow meter is calibrated twice per year and was last calibrated on 2/26/2020 by Clearwater. Inc. Disinfection - UV Yes No NA NE Are extra UV bulbs available on site? 0 ❑ ❑ ❑ Are UV bulbs clean? 0 ❑ ❑ ❑ Is UV intensity adequate? 0 ❑ ❑ ❑ Is transmittance at or above designed level? 0 ❑ ❑ ❑ Is there a backup system on site? ❑ ❑ 0 ❑ Is effluent clear and free of solids? 0 ❑ ❑ ❑ Comment: Page# 6 Permit: NC0085120 Inspection Date: 08/18/2020 Pump Station - Effluent Is the pump wet well free of bypass lines or structures? Are all pumps present? Are all pumps operable? Are float controls operable? Is SCADA telemetry available and operational? Is audible and visual alarm available and operational? Comment: Owner -Facility: Iredell Distribution Center WWTP Inspection Type: Compliance Evaluation Effluent Pipe Is right of way to the outfall properly maintained? Are the receiving water free of foam other than trace amounts and other debris? If effluent (diffuser pipes are required) are they operating properly? Yes No NA NE ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑ ❑ ■ ❑ ■ ❑ ❑ ❑ Yes No NA NE ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑ ❑ ■ ❑ Comment: The effluent appeared clear with no floatable solids or foam. The receiving stream did not appear to be negatively impacted. Aerobic Digester Yes No NA NE Is the capacity adequate? 0 ❑ ❑ ❑ Is the mixing adequate? 0 ❑ ❑ ❑ Is the site free of excessive foaming in the tank? 0 ❑ ❑ ❑ # Is the odor acceptable? 0 ❑ ❑ ❑ # Is tankage available for properly waste sludge? 0 ❑ ❑ ❑ Comment: Wastewater solids are removed from the aerated sludge holding tank by Myers Septic Tank Service and disposed at the North Wilkesboro WWTP. Standby Power Is automatically activated standby power available? Is the generator tested by interrupting primary power source? Is the generator tested under load? Was generator tested & operational during the inspection? Do the generator(s) have adequate capacity to operate the entire wastewater site? Is there an emergency agreement with a fuel vendor for extended run on back-up power? Is the generator fuel level monitored? Yes No NA NE ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ Comment: The backup generator is automatically tested once per week under load. The on -site maintenance staff services the generator. Page# 7