HomeMy WebLinkAbout20201188 Ver 1_PJD SAW-2019-02188_20200911WILMINGTON DISTRICT
Action Id. SAW-2019-02188 County: Carteret U.S.G.S. Quad: NC- Newport
NOTIFICATION OF JURISDICTIONAL DETERNIINATION
Property Owner/Applicant: Stephen Stroud
5121 Kingdom Way, Suite #200
Raleigh, NC, 27607
Agent: Paul Farley-LMG
3805 Wrightsville Avenue
Wilmington, NC, 28403
Size (acres) 76
Nearest Waterway Bogue Sound
USGS HUC 03020106
Nearest Town Newport
River Basin Pamlico
Coordinates Latitude:34.704735
Longitude:-76.992372
Location description: The project area is located south of Highway 24,76 acres, Carteret County, North Carolina.
Parcel ]]Ds: 630503246341000 & 630501158200000.
Indicate Which of the Following Apply:
A. Preliminary Determination
There are waters, including wetlands, on the above described project area, that may be subject to Section 404 of the
Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). The
waters have been delineated, and the delineation has been verified by the Corps to be sufficiently accurate and reliable.
Therefore this preliminary jurisdiction determination may be used in the permit evaluation process, including determining
compensatory mitigation. For purposes of computation of impacts, compensatory mitigation requirements, and other
resource protection measures, a permit decision made on the basis of a preliminary JD will treat all waters and wetlands
that would be affected in any way by the permitted activity on the site as if they are jurisdictional waters of the U.S. This
preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process
(Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting
the Corps district for further instruction.
_ There are wetlands on the above described property, that may be subject to Section 404 of the Clean Water Act
(CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). However, since the
waters, including wetlands, have not been properly delineated, this preliminary jurisdiction determination may not be
used in the permit evaluation process. Without a verified wetland delineation, this preliminary determination is merely an
effective presumption of CWA/RHA jurisdiction overall of the waters, including wetlands, at the project area, which is
not sufficiently accurate and reliable to support an enforceable permit decision. We recommend that you have the
waters of the U.S. on your property delineated. As the Corps may not be able to accomplish this wetland delineation in a
timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps.
B. Approved Determination
_ There are Navigable Waters of the United States within the above described property subject to the permit requirements of Section 10
of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is
a change in law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of
this notification.
X There are waters of the U.S., including wetlands, on the above described project area subject to the permit requirements of Section
404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this
determination may be relied upon for a period not to exceed five years from the date of this notification.
_ We recommend you have the waters of the U.S. on your property delineated. As the Corps may not be able to accomplish this
wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps.
_ The waters of the U.S., including wetlands, on your project area have been delineated and the delineation has been verified by the
Corps. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the
Page 1 of 2
#FOLDER DA NUMBER#
Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which,
provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years.
_ The waters of the U.S., including wetlands, have been delineated and surveyed and are accurately depicted on the plat signed by the
Corps Regulatory Official identified below on . Unless there is a change in the law or our published regulations, this
determination may be relied upon for a period not to exceed five years from the date of this notification.
_ There are no waters of the U.S., to include wetlands, present on the above described project area which are subject to the permit
requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations,
this determination may be relied upon for a period not to exceed five years from the date of this notification.
X The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You
should contact the Division of Coastal Management in Morehead City, NC, at (252) 808-2808 to determine their requirements.
Placement of dredged or fill material within waters of the US, including wetlands, without a Department of the Army permit
may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). Placement of dredged or fill material,
construction or placement of structures, or work within navigable waters of the United States without a Department of the
Army permit may constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act (33 USC § 401 and/or 403). If
you have any questions regarding this determination and/or the Corps regulatory program, please contact Thomas Charles at
910-251-4101 or Thomas.p.charles(a)usace.army.mil.
D. Basis For Determination: The Project area exhibits wetland criteria as described in the 1987 Corps Wetland
Delineation Manual and appropriate Regional Supplement. This determination is based on information submitted by
LMG and a desk office review by Thomas Charles (1/28/2020). Please see attached AJD form.
D. Remarks: This determination is only for the proiect area depicted in solid red proiect area on the attached Stroud
Track, Figure 7 Wetland Delineation Sketch dated 10/2019.
E. Attention USDA Program Participants
This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site
identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of
1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified
wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work.
F. Appeals Information for Approved Jurisdiction Determinations (as indicated in Section B. above)
If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will
fmd a Notification of Appeal Process (NAP) fact sheet and Request for Appeal (RFA) form. If you request to appeal this determination you
must submit a completed RFA form to the following address:
US Army Corps of Engineers
South Atlantic Division
Attn: Jason Steele, Review Officer
60 Forsyth Street SW, Room 1OM15
Atlanta, Georgia 30303-8801
In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for
appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP.
Should you decide to submit an RFA form, it must be received at the above address by N/A
It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this
correspondence.
Corps Regulatory Official:
Digitally signed14A1OMA5.P.1288547196CHARLES.THOMAS.P.1288547196 Date:2028477 OS'o
Date: 1/28/2020 Expiration Date: 1/28/2024.
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete our Customer Satisfaction Survey, located online at
http://corpsmapu.usace.army.mil/cm_apex/f?p=136*0.
#FOLDER DA NUMBER#
NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND
REQUEST FOR APPEAL
pplicant: Stephen Stroud
I File Number: SAW-2019-02188
Date: 1/28/2020
Attached
is: Stroud Track Fi re 8 Ra anos Reference ma Dated 11/2019
See Section below
INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission)
A
PROFFERED PERMIT (Standard Permit or Letter of permission)
B
PERMIT DENIAL
C
APPROVED JURISDICTIONAL DETERMINATION
D
PRELIMINARY JURISDICTIONAL DETERMINATION
E
SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision.
Additional information maybe found at http://www.usace.army.miUMissions/CivilWorks/RegulatoryProgramandPermits.aspx or
Corps regulations at 33 CFR Part 331.
A: INITIAL PROFFERED PERMIT: You may accept or object to the permit.
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature
on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the
permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit.
• OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the
permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your
objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal
the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the
permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit
having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer
will send you a proffered permit for your reconsideration, as indicated in Section B below.
B: PROFFERED PERMIT: You may accept or appeal the permit
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature
on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the
permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit.
• APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you
may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form
and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of
this notice.
C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative
Appeal Process by completing Section II of this form and sending the form to the division engineer. This form
must be received by the division engineer within 60 days of the date of this notice.
D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or
provide new information.
• ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of
this notice means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD.
• APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative
Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by
the division engineer within 60 days of the date of this notice.
#FOLDER DA NUMBER#
E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps
regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved
JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new
information for further consideration by the Corps to reevaluate the JD.
SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT
REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your
objections to an initial proffered permit in clear concise statements. You may attach additional information to
this form to clarify where your reasons or objections are addressed in the administrative record.)
ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps
memorandum for the record of the appeal conference or meeting, and any supplemental information that the
review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps
may add new information or analyses to the record. However, you may provide additional information to clarify
the location of information that is already in the administrative record.
POINT OF CONTACT FOR QUESTIONS OR INFORMATION:
If you have questions regarding this decision and/or the
If you only have questions regarding the appeal process you may
appeal process you may contact:
also contact:
District Engineer, Wilmington Regulatory Division,
Mr. Jason Steele, Administrative Appeal Review Officer
Attn: Thomas Charles
CESAD-PDO
69 Darlington Avenue
U.S. Army Corps of Engineers, South Atlantic Division
Wilmington, NC 28403
60 Forsyth Street, Room 10M15
Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government
consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day
notice of any site investigation, and will have the opportunity to participate in all site investigations.
Date:
Telephone number:
Signature of appellant or agent.
For appeals on Initial Proffered Permits send this form to:
District Engineer, Wilmington Regulatory Division, Attn: Thomas Charles, 69 Darlington Avenue, Wilmington,
North Carolina 28403
For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to:
Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele,
Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
Jurisdictional Determination Request
F. JURISDICTIONAL DETERMINATION (JD) TYPE (Select One)
❑ I am requesting that the Corps provide a preliminary JD for the property identified herein.
A Preliminary Jurisdictional Determination (PJD) provides an indication that there may
be "waters of the United States" or "navigable waters of the United States"on a property.
PJDs are sufficient as the basis for permit decisions. For the purposes of permitting, all
waters and wetlands on the property will be treated as if they are jurisdictional "waters of
the United States". PJDs cannot be appealed (33 C.F.R. 331.2); however, a PJD is
"preliminary" in the sense that an approved JD can be requested at any time. PJDs do
not expire.
❑ I am requesting that the Corps provide an approved JD for the property identified herein.
An Approved Jurisdictional Determination (AJD) is a determination that
jurisdictional "waters of the United States" or "navigable waters of the United
States" are either present or absent on a site. An approved JD identifies the limits of
waters on a site determined to be jurisdictional under the Clean Water Act and/or
Rivers and Harbors Act. Approved JDs are sufficient as the basis for permit
decisions. AJDs are appealable (33 C.F.R. 331.2). The results of the AJD will be
posted on the Corps website. A landowner, permit applicant, or other "affected
party" (33 C.F.R. 331.2) who receives an AJD may rely upon the AJD for five years
(subject to certain limited exceptions explained in Regulatory Guidance Letter 05-
02).
❑ I am unclear as to which JD I would like to request and require additional information
to inform my decision.
G. ALL REQUESTS
❑ Map of Property or Project Area. This Map must clearly depict the boundaries of the
review area.
❑ Size of Property or Review Area acres.
❑ The property boundary (or review area boundary) is clearly physically marked on the site.
Version: May 2017 Page 4
Stroud Tract, Ron Cullipher\Maps IN U "I oU aUU UUU
Boundaries are approximate and not meant to be absolute. Feet
Map Source: 2016 NC One Map A Scale applies to 11X17" print.
Stroud Tract
Carteret County, NC tLMGFigure 7
LAND YTANACTEMENTGROUP Wetland Delineation
October 2019 I7AVEYl company Sketch
3805 Wrightsville Avenue
LMG19.357 Wilmington, NC 28403
(910) 452-0001
Stroud Tract, Ron Cullipher\Maps IN U "I oU aUU UUU
Boundaries are approximate and not meant to be absolute. Feet
Map Source: 2016 NC One Map A Scale applies to 11X17" print.
Stroud Tract
Carteret County, NC tLMGFigure 7
LAND YTANACTEMENTGROUP Wetland Delineation
October 2019 I7AVEYl company Sketch
3805 Wrightsville Avenue
LMG19.357 Wilmington, NC 28403
(910) 452-0001