September 14, 2020
SUBJECT: Compliance Inspection Report
Sutton Steam Electric Plant
NPDES WW Permit No. NC0001422
New Hanover County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of the Sutton Steam Electric
Plant on 9/11/2020. This inspection was conducted to verify that the facility is operating in compliance
with the conditions and limitations specified in NPDES WW Permit No. NC0001422. The findings and
comments noted during this inspection are provided in the enclosed copy of the inspection report
entitled "Compliance Inspection Report".
There were no significant issues or findings noted during the inspection and therefore, a response to this
inspection report is not required.
If you should have any questions, please do not hesitate to contact Steve West with the Water Quality
Regional Operations Section in the Wilmington Regional Office at 910-796-7215 or via email at
steve.west@ncdenr.gov.
Sincerely,
DocuSigned by:
E
ev�((a Sa 6"�
E3ABA14AC7DC434...
Morella Sanchez -King, Regional Supervisor
Water Quality Regional Operations Section
Wilmington Regional Office
Division of Water Resources, NCDEQ
ATTACHMENTS
Cc: WQS Wilmington Regional Office
NPDES Compliance/Enforcement Unit
NorthCemLnaDepartnientofEnvironmentslQusiity 19iuisionofWater Resoames
W41mingtoa Regona:0ffice Wilmington, North Caro.in923405
910-796-7215
DocuSign Envelope ID: 65A95394-4A64-4054-B6DC-2D0250ABB8B4
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 u 3 I NC0001422 I11 121 20/09/11 I17 18I � I 19 I s I 201
6
211IIIII 111111III II III III1 I I IIIII IIIIIIIII II J
Inspection
Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved -------------------
67
I 72 I ni I 71 I 74 79 I I I I I I I80
701a I 711 L
L—I L -1 I I
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES Dermit Number)
08:45AM 20/09/11
20/07/01
Sutton Steam Electric Plant
801 Sutton Steam Plant Rd
Exit Time/Date
Permit Expiration Date
Wilmington NC 284018357
11:30AM 20/09/11
22/09/30
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Joshua Gene Schieffer/ORC/910-341-4780/
Kent Tyndall//910-341-4775 /9103414790
Roland G Rivenbark/ORC/910-341-4774/
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
James Corriher,801 Sutton Seam Plant Rd Wilmington NC 28401//910-341-4750/
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit 0 Flow Measurement Operations & Maintenar 0 Self -Monitoring Progran
Facility Site Review N Effluent/Receiving Wate Storm Water
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Bria @§ySignedby: DWR/WIRO WQ/910-796-7341/
�L_.'I'1CS9/14/2020
1
L�2.
EF61AOA14A2445...
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
d by: 9/14/2020
Morelia Sanchez -King DWR/WIRO WQ/910-796-7218/F�"sm4v� 6"
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. E3ABA14AC7DC434...
Page#
DocuSign Envelope ID: 65A95394-4A64-4054-B6DC-2D0250ABB8B4
NPDES yr/mo/day Inspection Type (Cont.)
NC0001422 I11 12I 20/09/11 117 18 i c i
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Routine compliance evaluation inspection with the assistance of Kent Tyndall, Glen Rivenbark, and
Josh Schieffer. Staff answered all questions presented and provided access to all areas of the site
where inspection was requested.
Work in the coal ash areas continues. Excavation of both coal ash ponds and the LOLA area is
complete. The "84" pond has been filled. Remaining waters in the "71" pond and the LOLA excavation
remain idle as the facility evaluates the final dewatering procedure for these two areas. The excavatior
landfill capping process is nearly complete. Stormwater basins for landfill stormwater outfalls 010 and
011 are in place. The on -site Evoqua treatment facility continues to treat and discharge landfill
leachate, groundwaters and stormwaters at outfall 001. The treatment performance of this system
appears to be excellent according to recently -submitted data. All measured parameters are well below
permit limits. A review of effluent data submitted since the last site inspection (8/18) revealed no permi
limit exceedances for the permitted outfalls.
Page#
DocuSign Envelope ID: 65A95394-4A64-4054-B6DC-2D0250ABB8B4
Permit: NC0001422 Owner -Facility: Sutton Steam Electric Plant
Inspection Date: 09/11/2020 Inspection Type: Compliance Evaluation
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment: Sutton Lake dikes were reinforced with concrete and rip rap after Hurricane Florence.
Permit
Yes
No
NA
NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
❑
❑
❑
application?
Is the facility as described in the permit?
0
❑
❑
❑
# Are there any special conditions for the permit?
0
❑
❑
❑
Is access to the plant site restricted to the general public?
0
❑
❑
❑
Is the inspector granted access to all areas for inspection?
0
❑
❑
❑
Comment: Permit modification effective 7/1/20 eliminates several outfalls no lonaer used in addition to
various internal outfalls. Outfall 001 includes treated wastewater associated with the coal
ash landfill leachate, groundwater and stormwater. Outfall 008 includes station cooling
waters, internal stormwaters, and LOLA excavation waters. Facility is prepared to submit
required SPPP certification per permit condition A(19)(1)(e) by 9/30/20. The 008 copper limi
(effective 10/1/22) 'Water Effect Ratio" studv continues
Effluent Pipe
Is right of way to the outfall properly maintained?
Are the receiving water free of foam other than trace amounts and other debris?
If effluent (diffuser pipes are required) are they operating properly?
Comment: Each outfall was visibly observed with no visible foaming or discoloration
Flow Measurement - Effluent
# Is flow meter used for reporting?
Is flow meter calibrated annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
Yes
No
NA
NE
•
❑
❑
❑
•
❑
❑
❑
❑
❑
■
❑
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
❑ ❑ ❑ ■
❑ ❑ ❑ ■
Comment: Flows for 001 from the wastewater treatment facility are measured by an Evogua flow meter
which is routinely calibrated. Flows for the 008 outfall are based on power station pumping
capacity.
Effluent Sampling
Is composite sampling flow proportional?
Yes No NA NE
❑ ❑ ■ ❑
Page# 3
DocuSign Envelope ID: 65A95394-4A64-4054-B6DC-2D0250ABB8B4
Permit: NC0001422 Owner -Facility: Sutton Steam Electric Plant
Inspection Date: 09/11/2020 Inspection Type: Compliance Evaluation
Effluent Sampling
Yes
No
NA
NE
Is sample collected below all treatment units?
0
❑
❑
❑
Is proper volume collected?
❑
❑
❑
Is the tubing clean?
❑
❑
0
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
❑
❑
0
❑
Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
0
❑
❑
❑
representative)?
Comment: All reauired effluent samples are collected by arab method at reDresentative locations for
each outfall.
Upstream / Downstream Sampling Yes No NA NE
Is the facility sampling performed as required by the permit (frequency, sampling type, an( 0 ❑ ❑ ❑
sampling location)?
Comment: Facility participates in the Lower Cape Fear River Basin Association testing program. In
addition, facility also collects its own in -stream samples at the locations described in the
Dermit. (This data is included in the "comments" section of submitted a-DMRs)
Page# 4