HomeMy WebLinkAboutNCC203941_ESC Approval Submitted_20200914ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Director
NORTH CAROLINA
Environmental Quatity
September 4, 2020
LETTER OF APPROVAL
The Broadway Group of Alabama, LLC
ATTN: Mr. Robert M. Broadway
P.O. Box 18968
Huntsville, AL 3S804
RE: Project Name: OLD FORT, NC - DOLLAR GENERAL
Acres Approved: 1.50
Project ID: MCDOW-2021-004
County: McDowell
City: Old Fort
Address: 792 Bat Cave Road
River Basin: Catawba
Stream Classification: Moffitt Branch to Catawba River W- Class C, Trout
Submitted By: King Engineering of Concord, RLLP - Mr. Samuel King, Jr., P.E.
Date Received by LQS: September 4, 2020
Plan Type: Express -Commercial
Dear Mr. Broadway,
This office has reviewed the subject erosion and sedimentation control plan and hereby
issues this Letter of Approval. This plan approval shall expire three (3) years following the
date of approval, if no land -disturbing activity has been undertaken, as is required by Title
15A NCAC 413.0129. Should the plan not perform adequately, a revised plan will be required
(G.S. 113A-54.1) (b).
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit fee.
After the fee is received, you will receive the COC via email. You MUST obtain the COC prior
to commencement of any land disturbing activity. The eNOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the eNOI form to Annette Lucas at
Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. If the owner/operator
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
4;��A,���JJJS[ Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
NOiiM CAROLJNA �
oeaartmani of Environmental Quality 828,296A500
Letter of Approval
The Broadway Group of Alabama, LLC
ATTN: Mr. Robert M. Broadway
September 4, 2020
Page 2 of 3
of this project changes in the future, the new responsible party is required to apply for
his/her own COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions
to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land -disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. This permit allows for a land -
disturbance, as called for on the application plan, not to exceed the approved
acres. Exceeding the acreage will be a violation of this permit and would require a revised
plan and additional application fee. You are requested to file an amended form if there is any
change in the information included on the form. In addition, it would be helpful if you notify
this office of the proposed starting date for this project. Please notify us if you plan to have
a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
red Walker, P.E.
Express Engineer
Land Quality Section
Letter of Approval
The Broadway Group of Alabama, LLC
ATTN: Mr. Robert M. Broadway
September 4, 2020
Page 3 of 3
Enclosures: Certificate of Approval
NPDES NCG01 Fact Sheet
ec: Ms. Melissa Ballard (m.ballard@broadwaygroup.net)
Mr. Samuel King, Jr., P.E. (samkingjr(@gmail.com)
Mr. Scott Raines [scott.raines@deweypa.com.)
cc: Regional Office file
aQtQ
4
o'
ML-
.
°low
0
I
ow
�p
M-do
ow
p
c�
a
0.fD