Loading...
HomeMy WebLinkAbout20200970 Ver 1_USACE More Info Requested_20200911Strickland, Bev From: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil> Sent: Friday, September 11, 2020 11:12 AM To: Michael Brame Cc: Homewood, Sue; Brian Shugart Subject: [External] RE: Request for Additional Information - Cadence s/d, North Church Street, Greensboro, Guilford County; SAW-2019-01893 Attachments: Pages from 20200901 RFAI Response.pdf Follow Up Flag: Follow up Flag Status: Completed External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Hi Michael, and thanks for the additional information. We consider items 1, 3, 4, and 5 resolved from our 8/4/2020 request for additional information. However, it appears that there was some confusion regarding item 2 in our letter. As such, I have attached a figure to show the general location referenced in this item and I will restate the question below: 2) The proposed road crossing is presented as necessary to access uplands for upland residential development. The need for such access is not disputed, however you have not demonstrated avoidance and minimization to the maximum extent practicable as required by NWP General Conditions 23(a) and (b). For example, it appears that the proposed road crossing could be shifted to the north, such that the northern fill slope would be placed just south of Wetland WA31-40 and the associated large meander in Stream SA, resulting in significantly reduced wetland impacts and likely similar or only slightly increased stream impacts. It appears that the road and lot design could be shifted to accommodate such a change in road alignment to still allow for a similar scale residential development. Please re -design accordingly, or provide documentation that such avoidance and minimization measures are not practicable (i.e. available and capable of being done after taking into consideration cost, existing technology, and logistics in light of overall project purposes); Also, if the above can be resolved, at the currently proposed crossing location at least 1 at -grade floodplain culvert pipe is needed to maintain a hydrological connection throughout the wetland (per NWP 29 Regional Conditions 3.6.1-3.6.3) due to the relatively wide geomorphic floodplain containing riparian wetlands. The Corps recommends that this floodplain culvert pipe be aligned with the existing overflow channel/braid on the eastern side of the proposed crossing. If item 2 above can be resolved, please provide an updated plan/profile sheet accordingly. Please submit the requested information above (via e-mail is fine) within 30 days of receipt of this Notification, and let me know if you have any questions. Sincerely, Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David. E.Bailey2@usace.army.miI We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: http://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey. From: Michael Brame <mbrame@pilotenviro.com> Sent: Tuesday, September 1, 2020 7:07 AM To: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>; Homewood, Sue <sue.homewood@ncdenr.gov> Subject: [Non-DoD Source] RE: Request for Additional Information - Cadence s/d, North Church Street, Greensboro, Guilford County; SAW-2019-01893 Good Morning David and Sue, We were able to meet the September 1, 2020 deadline. I was not sure I was going to make it. Please find attached the applicants response to your e-mail requests for additional information for the referenced project. Please let me know if you need additional information in order to process the PCN. Thank -you. Sincerely, Michael T. Brame 336.708-4620 (c) 336.310.4527 (o) PO Box 128 Kernersville, NC 27285 www.pilotenviro.com mbrame(@Dilotenviro.com From: Michael Brame Sent: Monday, August 31, 2020 8:10 PM To: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil> Subject: Re: Request for Additional Information - Cadence s/d, North Church Street, Greensboro, Guilford County; SAW- 2019-01893 Please extend the deadline to Tuesday, September 2. Thank you. Sent from my iPhone On Aug 19, 2020, at 8:34 AM, Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil> wrote: Thanks Michael. I will extend our response deadline to September 1, 2020. -Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: Blockedhttp://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey. From: Michael Brame <mbrame@pilotenviro.com> Sent: Tuesday, August 18, 2020 3:25 PM To: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>; Homewood, Sue <sue.homewood@ncdenr.gov> Cc: Brian Shugart <brian@shugarthomes.net> Subject: [Non-DoD Source] RE: Request for Additional Information - Cadence s/d, North Church Street, Greensboro, Guilford County; SAW-2019-01893 Good Afternoon David and Sue, We are working to address the concerns. We hope to have a response within two weeks. Sincerely, <image003.png> Michael T. Brame 336.708-4620 (c) 336.310.4527 (o) PO Box 128 Kernersville, NC 27285 www.pilotenviro.com mbrame@pilotenviro.com From: Bailey, David E CIV USARMY CESAW (USA)<David.E.Bailey2@usace.army.mil> Sent: Tuesday, August 4, 2020 2:43 PM To: Michael Brame <mbrame@pilotenviro.com>; Brian Shugart <brian@shugarthomes.net> Cc: Homewood, Sue <sue.homewood@ncdenr.gov> Subject: RE: Request for Additional Information - Cadence s/d, North Church Street, Greensboro, Guilford County; SAW-2019-01893 Hi Michael. One other item I neglected to include in my earlier email today: 5) Given recent USFWS concerns regarding suitable Schweinitz's sunflower and small whorled pogonia habitat, please complete a pedestrian survey for these species within the Corps ESA action area. In this case, the Corps ESA action area would be contained within a 100 foot radius of the footprint of proposed impacts to waters of the US, including the currently proposed footprint and any revised footprint if project plans are changed per item # 2 in my earlier email. Following the survey, please provide the survey report to the Corps (copy also the USFWS) for review. Of course, if you do not believe that any suitable habitat exists in the Action area for these species, please provide a justification so that the corps could evaluate the potential for a No Effect determination. Please direct any questions regarding the Corps ESA action area to me. Please direct any questions regarding appropriate survey techniques and information to include in a survey report to John Ellis with the USFWS. Please let me know if you have any questions. -Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: BlockedBlockedhttp://corpsmapu.usace.army.miI/cm apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey. From: Bailey, David E CIV USARMY CESAW (USA) Sent: Tuesday, August 4, 2020 2:31 PM To: Michael Brame <mbrame@pilotenviro.com>; Brian Shugart <brian@shugarthomes.net> Cc: Homewood, Sue <sue.homewood@ncdenr.gov> Subject: Request for Additional Information - Cadence s/d, North Church Street, Greensboro, Guilford County; SAW-2019-01893 on Thank you for your PCN and attached information, dated 7/27/2020, for the above referenced project. I have reviewed the information and need clarification before proceeding with verifying the use of Nationwide Permit (NWP) 29 (BlockedBlockedhttp://saw- reg.usace.army.mil/NWP2017/2017NWP29.pdf). Please submit the requested information below (via e- mail is fine) within 30 days of receipt of this Notification, otherwise we may deny verification of the use of the Nationwide Permit or consider your application withdrawn and close the file: 1) The Corps issued a Preliminary Jurisdictional Determination (PJD) for this project on 5/21/2020. In comparing the PJD map with the project plans (Sheets 1 and 2) it is clear that the location/meanders of Stream SA are shown in slightly different locations. On the PJD map, Stream SA closely aligns to the stream channel location shown in QL2 LiDAR data, while the stream location on Sheets 1 and 2 appears to miss several meanders, including meanders within the proposed Cadence Drive stream crossing. Update the stream location on Sheets 1 and 2 according to stream location data from the PJD map and update the proposed stream impacts on the plans/PCN accordingly, or confirm field conditions in this location and provide photographs showing that the stream location at the proposed crossing matches the Sheet 1 and 2 locations; 2) The proposed road crossing is presented as necessary to access uplands for upland residential development. The need for such access is not disputed, however you have not demonstrated avoidance and minimization to the maximum extent practicable as required by NWP General Conditions 23(a) and (b). For example, it appears that the proposed road crossing could be shifted to the north, such that the northern fill slope would be placed just south of Wetland WA31-40 and the associated large meander in Stream SA, resulting in significantly reduced wetland impacts and likely similar or reduced impacts to streams. It appears that the road and lot design could be shifted to accommodate such a change in road alignment to still allow for a similar scale residential development. Please re -design accordingly, or provide documentation that such avoidance and minimization measures are not practicable (i.e. available and capable of being done after taking into consideration cost, existing technology, and logistics in light of overall project purposes); 3) The rip rap pad proposed in Stream SA is considerably longer than typical for similar road crossings, nearly as long as the culvert itself. Please provide justification for a rip rap pad of this length, noting that we may consider a rip rap pad of this length as more than minimal and view these impacts as a loss of aquatic function; 4) Please provide across -section view of the rip rap pad to demonstrate how the feature will comply with NWP 29 Regional Condition 3.6.4 (see attached picture as an example). Please let me know if you have any questions. Sincerely, Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: BlockedBlockedhttp://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey. EXISTING WATERFALL FEATURE FJ I/ -N / /s)11 ri Area referenced as road crossing location to further avoid and minimize impacts per item \ II\ I\\\\ \ I I the Corps' 8/4/2020 request for \\\\1\ll \�\I\ll l additional information.N. II _ I \ / I f \ I 7 � it / ^— \\ \\ / d i ^ � � 1\ \• �\ \\�� , � \_ ICI Q 1 %/ I I IIII \ \ / � �— ITRAGT IS IN AN "AREA OF MINIMAL FLOOD HAZARD, ZONE X" PER FEMA MAP FIRM MAP 3-7I0186-100J, EFF. DATE: 6/18/200-7. AND FEMA MAP FIRM MAP 3-710-78-7900J, EFF. DATE: 6/10/200-7. PROPOSED GADENGE DRIVE STREAM GROSSING OF CALL NC ONE CAFE IS BEFORE YOU DIG STOP DIAL 811 or 800-632-4949 AVOID UNTY DALIAGEI SEE GADENGE DRIVE PLAN AND PROFILE VIEWS FOR LOCATIONS OF WETLANDS, FLOOD ZONES, AND BUFFERS, SEAL c - 10727 FNGI N y�O� x'-) (4L 2 20 AUGUST 26, 2020 OVERALL PLAN GADENGE DRIVE STREAM GROSSING GADENGE SUBDIVISION 5680 CHURCH STREET CENTER GROVE TWP., OUILFORD CO. NORTH CAROLINA SCALE: "=500' DATE: JULY 6, 2020 O 150 300 600 HUGH CREED ASSOCIATES, INC., P.A. CONSULTING ENGINEERS & LAND SURVEYORS P.O. BOX 9623 PHONE: (336) 275-9826 1306 W. WENOMR AVE. OR (336) 275-8084 GREENSBORO, N.C. 27408 FIRM LICENSE #C-0551 E-MAIL: HCAOHUGHCREEDASSOCIATES.COM