Loading...
HomeMy WebLinkAboutNC0023868_Pretreatment Audit Report_20200909 (3)ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Mr. Robert C. Patterson, Jr., P.E. Water Resources Director City of Burlington P.O. Box 1358 Burlington, North Carolina 27216 NORTH CAROLINA Environmental Quality September 9, 2020 SUBJECT: Pretreatment Audit Inspection (PAI) City of Burlington NPDES# NC0023876/South WWTP & NC0023868/East WWTP Alamance County Dear Mr. Patterson: On August 26, 2020 a Pretreatment Audit Inspection (PAI) was performed by Jim Gonsiewski of the Winston-Salem Regional office. Ms. Kristy King, industrial pretreatment specialist for the City of Burlington, was present. The purpose of this inspection was to determine the effectiveness of the pretreatment program, which included: a detailed file review, review of the POTW plant performance, sampling, and compliance judgement program, and adherence to the enforcement response plan (ERP). Additionally, an inspection of the Indulor facility was conducted in conjunction with an inspection by the City of Burlington. Background The City has twelve (12) Significant Industrial Users (SIUs), two (2) of which are categorical. Both treatment plants are permitted for 12 MGD. Two SIUs have been dropped from the program. Lemco changed processes and no longer discharges to the POTW. Carolina Dye and Finishing closed in January 2020. Pretreatment Program Element Review The Headworks Analysis (HWA) renewal was submitted on March 17, 2020. No approval has been received by the POTW. The last Industrial Waste Survey (IWS) was submitted on August 2, 2016. The IWS was approved on September 19, 2016. The next IWS is due on July 2, 2021. The Sewer Use Ordinance (SUO) was approved on March 1, 2013. E Q�� North Carolina Department of Environmental Quality I Division of Water Resources _ Winston-Salem Regional Office 1 450 West Hanes Mill Road, Suite 300 1 Winston-Salem, North Carolina 27105 NORTH CAROLINA D'p—enn f Qom 336.776.9800 The Enforcement Response Plan (ERP) was approved on February 5, 2020. LTMP File Review The Long Term Monitoring Plan (LTMP) was approved on January 27, 2006 and is being conducted at the proper locations and frequencies. Industrial User Permit (IUP) File Review A review of the file for Alamance Foods (40067) revealed that the monitoring data was well organized and compliant. A review of the file for Carolina Hosiery (90055) revealed that the monitoring data was well organized and compliant. A review of the file for Kayser -Roth (90052) revealed that the monitoring data was well organized and compliant. The slug control plan for Alamance Foods (40067) was in good order. The slug control plan for Carolina Hosiery (40055) was in good order. The slug control plan for Kayser -Roth (#0052) was in good order. Action Items No other action items were noted. The pretreatment program is considered satisfactory. Ms. King maintains an excellent program. If you have any questions please contact Jim Gonsiewski or me at (336) 776-9800. Sincerely, Lon T. Snider Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ — WSRO cc: PERCS Unit — Mike Montebello (Electronic Copy) Kristy King — City of Burlington (Electronic Copy) WSRO Electronic Files Laserfiche Files