HomeMy WebLinkAboutNC0023868_Pretreatment Audit Report_20200909 (2)+ NORTH CAROLINA DIVISION OF WATER RESOURCES
PRETREATMENT AUDIT REPORT
Water Resources
ENVIRONMENTAL QUALITY
Background Information [Complete prior to audit; review Program Info Database Sheet(s)]
1. Control Authority (POTW) Name: City of Burlington
2. Control Authority Representative(s): Kristy King
3. Tide(s): Industrial Pretreatment Specialist
4. Address of POTW:
Mailing P.O. Box 1358
City Burlington Zip Code 27216
Phone Number 336-222-5132 Fax Number 336-570-6175 E-Mail kHdng(a,burlingtonnc.gov
5. Audit Date 08/26/2020
6. Last Inspection Date: 07/02/2019 Inspection Type: ® PCI ❑ Audit
7. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s) ? ® Yes ❑ No
If No, Explain.
8. In the last year has the POTW experienced any NPDES or Sludge Permit compliance problems? ❑ Yes ® No
If Yes, Explain.
9. Is POTW under an Order That Includes Pretreatment Conditions? ❑ Yes ® No
Order Type and Number: Are Milestone Dates Being Met? ❑ Yes ❑ No ® NA
Parameters Covered Under Order
ICIS Coding
Main Program Permit Number
INIC101012 13 Is I7 I6 I
MM/DD/YY
I08 I26I20
10.
....................................................................................................................................................................................................................................................................................................
Current Number of Significant Industrial Users (SIUs)?
12
11.
....................................................................................................................................................................................................................................................................................................
Number of SIUs with No IUP, or with an Expired IUP?
0
12.
....................................................................................................................................................................................................................................................................................................
Number of SIUs Not Inspected by POTW in Last Calendar Year?
0
13.
....................................................................................................................................................................................................................................................................................................
Number of SIUs Not Sampled by POTW in Last Calendar Year?
0
14.
....................................................................................................................................................................................................................................................................................................
Number of SIUs in SNC for Limits Violations During Either of Last 2 Semi -Annual Periods?
1
15.
....................................................................................................................................................................................................................................................................................................
Number of SIUs in SNC for Reporting During Either of Last 2 Semi -Annual Periods?
0
16.
....................................................................................................................................................................................................................................................................................................
Number of SIUs in SNC with Pretreatment Schedule?
0
17.
....................................................................................................................................................................................................................................................................................................
Number of SIUs on Schedules?
0
18.
Current Number of Categorical Industrial Users (CIUs)?
2
19.
Number of CIUs in SNC?
0
NC DWR Pretreatment Audit Form Revised: December 2016
Page 1
20. PRETREATMENT PROGRAM ELEMENTS REVIEW- Review POTW files, verify POTW has copy of each Program Element
in their File, complete with all supporting documents and PERCS Approval Letter, and dates consistent with Program Info:
Program Element
Last Submittal
Date In file?
Last Approval
Date In file
Date Next Due,
If Applicable
Headworks Analysis (HWA)
03/17/2020
® Yes ❑ No
Not
Completed
❑ Yes ® No
Industrial Waste Survey (IWS)
08/02/2016
® Yes ❑ No
09/19/2016
® Yes ❑ No
07/02/2021
Sewer Use Ordinance (SUO)
01/31/2013
® Yes ❑ No
03/01/2013
® Yes ❑ No
Enforcement Response Plan (ERP)
11/04/2019
® Yes ❑ No
02/05/2020
® Yes ❑ No
Long Term Monitoring Plan (LTMP)
11/18/2005
® Yes ❑ No
01/27/2006
® Yes ❑ No
Legal Authority (Sewer Use Ordinance-SUO)
21. Do you have any towns and/or areas from which you receive wastewater which are not in your annexed jurisdiction?
® Yes ❑ No If yes, Please list these towns and/or areas. Elon, Gibsonville, Swepsonville, Town of Haw River, Village of
Alamance
22. If yes to #21, Do you have current Interjurisdictional Agreements (IJAs) or other Contracts? ® Yes ❑ No ❑ NA
A copy, if not already submitted, should be sent to Division.
23. If yes to #21, Have you had any trouble working with these towns or districts? ❑ Yes ® No ❑ NA
If yes, Explain.
24. Date of Last SUO Adoption by Local Council 11/19/2013
25. Have you had any problems interpreting or enforcing any part of the SUO? ❑ Yes ® No
If yes, Explain.
Enforcement (Enforcement Response Plan-ERP)
26. Did you send a copy of the ERP to your industries? ® Yes ❑ No
If no, POTW must send copy within 30 days. A copy is sent every 5 years with Permit Application.
27. Have you had any problems interpreting or enforcing any part of the ERP (i.e. any adjudication, improper enforcement, etc?
❑ Yes ® No If yes, Explain.
28. List Industries under a Schedule or Order and Type of Schedule or Order
N/A
Resources
29. Please Rate the Following: S=Satisfactory M=Marginal U=Unsatisfactory
Rating
Explanation, if Unsatisfactory
Personnel Available for Maintaining
POTW's Pretreatment Program
®S ❑M ❑U
Access to POTW Vehicles for
Sampling, Inspections, and
®S ❑M ❑U
Emergencies
Access to Operable Sampling
15 portable samplers; WWTPs also have their own
Equipment
®S Elm Flu
Availability of Funds if Needed for
Funds available from surcharges, penalties, and a portion of the
Additional Sampling and/or Analysis
®S ❑M ❑U
water/sewer bills.
Reference Materials
®S ❑M ❑U
Staff Training (i.e. Annual and
NCPC Grades 1-3; NCPC Annual Conference; PAR and
Regional Workshops, Etc.)
®S ❑M ❑U
Headworks workshops
NC DWR Pretreatment Audit Form Revised: December 2016 Page 2
Computer Equipment (Hardware and
Software) ®S ❑M ❑U
30. Does the POTW have an adequate data management system to run the pretreatment program? ® Yes ❑ No
Explain Yes or No. Excel and Hach WIMS
31. How does the POTW recover the cost of the Pretreatment Program from their industries? Explain.
Sampling charges, permit renewal fees, and surcharges
Public Perception/ Participation
32. Are there any local issues affecting the pretreatment program (e.g.. odor, plant closing, new or proposed plants)?
® Yes ❑ No If yes, Explain. Lemco has stopped dyeing and finishing operations and no longer discharges to the POTW.
Carolina Dye and Finishing closed in January 2020.
33. Has any one from the public ever requested to review pretreatment program files? ® Yes ❑ No
If yes, Explain procedure. If no, how would the request be addressed? Formal requests must be made through city hall;
hardcopies are provided with a copy fee depending on the number of page
34. Has any industry ever requested that certain information remain confidential from the public? ® Yes ❑ No If yes, Explain
procedure for determining whether information qualified for confidential status, as well as procedure for keeping files confidential
from public. If no how would the request be addressed? Trade secrets are usually kept confidential. The confidentiality
request is reviewed by the Water Resources Director and City attorney as well as the Industry attorneys.
35. In addition to annual inspection, does the POTW periodically meet with industries to discuss pretreatment? ® Yes ❑ No
36. Is the public notified about changes in the SUO or Local Limits? ® Yes ❑ No
37. Were all industries in SNC published in the last notice? ® Yes ❑ No
Permitting (Industrial Waste Survey-IWS)
38. How does the POTW become aware of new or changed Users? Mr. Patterson of the Technical Review Committee is
made waware of new sewer connections. This information is passed on to Pretreatment staff.
39. Once the POTW becomes aware of new or changed Users, how does the POTW determine which industries have the
reasonable potential to adversely impact the WWTP and therefore require a new permit or a permit revision? (Who is an
SIU?) Water discharge, process type, waste type, chemical inventory
40. Does the POTW receive waste from any groundwater remediation projects (petroleum, CERCLA) or landfill leachate?
®Yes ❑No If Yes, how many are there? 2 Landfill leachate programs.
Please list each site and how it is permitted, if applicable. local permits
41. Does the POTW accept waste by (mark if applicable) ® Truck ❑Dedicated Pipe ❑ NA
42. If the POTW accepts trucked waste, what controls are placed on this waste? (example. designated point, samples drawn,
manifests required) Designate discharge site. Origination report required, samples taken, visual inspection
performed. Septage is only accepted at the East Plant.
43. How does the POTW allocate its loading to industries? Mark all that apply
❑ Uniform Limits ® Historical Industry Need ❑ By Surcharge ® Categorical Limits ❑ Other
Explain Other:
44. Review POTW's copies of current allocation tables for each WWTP. Are there any over allocations? ❑ Yes ® No
If yes, what parameters are over allocated?
45. If yes to #44, What is being done to address the over allocations? (short-term IUPs, HWA to be revised, pollutant study, etc.)
N/A
46. Does the POTW keep pollutant loading in reserve for future growth / safety? ® Yes ❑ No
If yes, what percentage of each parameter 25%
47. Has the POTW experienced any difficulty in allocation? (for example: adjudication by an industry) ❑ Yes ® No
NC DWR Pretreatment Audit Form Revised: December 2016 Page 3
If yes, Explain.
48. How does the POTW decide on which pollutants to limit in the permits? Monitor for? (for example: were only those pollutants
listed on the application limited; categorical parameters; NPDES Pollutants of Concern)
Type of process, chemicals used, NPDES limits, and categorical limits
49. How does the POTW decide what the monitoring frequency should be for the various pollutants in industry permits? Explain.
All SIUs are sampled quarterly. The POTW samples in the 1st and 3rd quarters, and the SIUs sample in the 2nd and 4th
quarters.
Permit Compliance
50. Does the POTW currently have or during the past year had any permits under adjudication? ❑ Yes ® No
If yes, which industries? What was (will be) the outcome of the adjudication?
51. Demonstrate how the POTW judges compliance. This should include compliance judgment on all violations of limits, reporting
requirements, and permit conditions, as well as for SNC. Use compliance judgment worksheets, violations are highlighted in
an Excel spreadsheet. Pace Analytical entails SIU sample results to the City, therefore reports are received as soon as
results are recorded.
52. Does the POTW use the Division's model inspection form or equivalent? ® Yes ❑ No
If no, does the POTW form include all Division data? ❑ Yes ❑ No
53. Were all SIUs evaluated for the need of a slug/spill control plan during their most recent inspections? ® Yes ❑ No
If no, Explain.
54. What criteria are used to determine if a slug/spill control plan is needed?
All SIUs are required to have a slug/spill control plan. Chemical storage/consumption and bulk wet chemicals stored would
be assessed.
55. What criteria does the POTW use to determine if a submitted slug/spill control plan is adequate?
Look for up-to-date contact information and postings at the job site.
56. How does the POTW decide where the sample point for an SIU should be located?
Most accessible point according to the plant diagram. Sample only locations where categorical.
57. Has the POTW established a procedure to ensure that representative samples will be taken by the POTW or SIU each time?
(example: correct location; proper programming of sampler; clean equipment; swirling the sample bucket uniformly)
POTW: ® Yes ❑ No SIU: ® Yes ❑ No If yes, Explain. Sample points are clearly marked. Pace Analytical
and Meritech performs SIU sampling and understands correct sampling procedures.
58. Who performs sample analysis for the POTW for Metals POTW and Meritech
Conventional Parameters POTW
Organics Meritech
59. Explain the Chain of Custody Procedure used for both in house and commercial lab samples.
Chain of custody forms are used and maintained for both in house and commercial samples
Long/Short Term Monitoring Plan (L/STMP) and Headworks Analysis (HWA)
60a.
60b.
60c.
60d.
60e.
60f.
Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ® YES ❑ NO
Are Correct Detection Levels being used for all LTMP/STMP Monitoring? ® YES ❑ NO
Is LTMP/STMP Data Maintained in Table or Equivalent? ® YES ❑ NO Is Table Adequate? ® YES ❑ NO
All LTMP/STMP effluent data on Discharge Monitoring Report (DMR)? ® YES ❑ NO Division Inspector, verify yourself!
If NO to any above, list violations
Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP? ❑ YES ® NO
If yes, which ones? Eliminated: Added:
61. Do you complete your own headworks analysis (HWA) ? ® Yes ❑ No
If no, who completes your HWA? Phone ( ) --
62. Do you have plans to revise your HWA in the near future? ❑ Yes ® No
If yes, what is the reason for the revision? (mark all that apply) ❑Increased average flow
❑NPDES limits change
NC DWR Pretreatment Audit Form Revised: December 2016 Page 4
❑More LTMP data available ❑Resolve over allocation ❑5 year expiration ❑Other
Explain. Awaiting NPDES permit renewal and HWA approval
63. In general, what is the most limiting criteria of your HWA? ❑Inhibition ® Pass Through ❑Sludge Quality
64. Do you see any way to increase your loading in the future (Example: obtaining more land for sludge disposal)? ® Yes ❑ No
Explain. The City has plenty of land available for land application and also composts a portion of their biosolids.
Summary
65. Do you plan any significant changes to the pretreatment program or changes to the WWTP that may affect pretreatment?
No
NC DWR Pretreatment Audit Form Revised: December 2016 Page 5
INDUSTRIAL USER PERMIT (IUP) FILE REVIEW (3 IUP FILE REVIEWS AND 1 IU INSPECTION)
66. User Name
1. Alamance Foods 2. Carolina Hosiery
3. Kayser -Roth
67. IUP Number
0067
0055
0052
68. Does File Contain Current Permit?
® Yes ❑ No
® Yes ❑ No
® Yes ❑ No
69. Permit Expiration Date
12/31/21
12/31/21
06/30/21
70. Categorical Standard Applied (I.E. 40 CFR, Etc.) Or N/A
----
----
----
71. Does File Contain Permit Application Completed Within One Year Prior
® Yes ❑ No
® Yes ❑ No
® Yes ElNo
to Permit Issue Date?
72. Does File Contain Inspection Completed Within Last Calendar Year?
® Yes ❑ No
® Yes ❑ No
® Yes ❑ No
73. a. Does File Contain Slug/Spill Control Plan?
a. ®Yes ❑No
a. ®Yes ❑No
a. ®Yes ❑No
b. If No, is One Needed? (See Inspection Form from POTW)
b. ❑Yes ❑No
b. ❑Yes ❑No
b. ❑Yes ❑No
74. For 40 CFR 413 and 433 TTO Certification, Does File Contain a Toxic
❑Yes❑No®N/A
❑Yes❑No®N/A
❑Yes❑NoON/A
Organic Management Plan (TOMP)?
75. a. Does File Contain Original Permit Review Letter from Division?
a. ®Yes ❑No
a. ®Yes ❑No
a. ®Yes ❑No
b. All Issues Resolved?
b.❑Yes❑No®N/A
b.❑Yes❑No®N/A
b.❑Yes❑No®N/A
76. During Most Recent Semi -Annual Period, Did POTW Complete its
® Yes ❑ No
® Yes ❑ No
® Yes ❑ No
Sampling as Required by IUP, including Flow?
77. Does File Contain POTW Sampling Chain -Of -Custody Forms?
® Yes ❑ No
® Yes ❑ No
® Yes ❑ No
78. During Most Recent Semi -Annual Period, Did SIU Complete its
®Yes❑No❑N/A
®Yes❑No❑N/A
®Yes❑No❑N/A
Sampling as Required by IUP, including Flow?
79. During Most Recent Semi -Annual Period, Did SIU submit all reports on
®Yes❑No❑N/A
®Yes❑No❑N/A
®Yes❑No❑N/A
time?
80a. For categorical IUs with Combined Wastestream Formula (CWF), does
❑Yes❑No®N/A
❑Yes❑No®N/A
❑Yes❑No®N/A
file include process/dilution flows as Required by IUP?
80b. For categorical IUs with Production based limits, does file include
❑Yes❑No®N/A
❑Yes❑No®N/A
❑Yes❑No®N/A
production rates and/or flows as Required by IUP?
81. During Most Recent Semi -Annual Period, Did POTW Identify All
®Yes ❑ No
❑ Yes El No
El Yes El No
Limits Non -Compliance from Both POTW and SIU Sampling?
None
None
82. During Most Recent Semi -Annual Period, Did POTW Identify All
❑Yes❑NoON/A
❑Yes❑No®N/A
❑Yes❑No®N/A
Reporting -Non -Compliance from SIU Sampling?
83. a. Was POTW Notified by SIU (Within 24 Hours) of All Self-
a.®Yes❑No❑N/A
a.❑Yes❑No®N/A
a.❑Yes❑No®N/A
Monitoring Violations?
b. Did Industry Resample and submit results to POTW within 30 Days?
v.®Yes❑No❑N/A
b.❑Yes❑No®N/A
b.❑Yes❑No®N/A
c. If applicable, did POTW resample and obtain results within 30 days of
c'®Yes❑No❑N/A
becoming aware of SIU limit violations in the POTW's sampling of SIU?
c.❑Yes❑No®N/A
c.❑Yes❑No®N/A
84. During Most Recent Semi -Annual Period, Was SIU in SNC?
❑
Yes
®
No
❑
Yes
®
No
❑
Yes
®
No
85. During Most Recent Semi -Annual Period, Was Enforcement Taken as
❑Yes❑NoON/A
❑Yes❑NoON/A
❑Yes❑No®N/A
Specified in POTW's ERP (NOVs, Penalties, timing, etc.)?
86. Does File Contain Penalty Assessment Notices?
❑Yes❑NoON/A
❑Yes❑No®N/A
❑Yes❑No®N/A
87. Does File Contain Proof Of Penalty Collection?
❑Yes❑No®N/A
❑Yes❑No®N/A
❑Yes❑No®N/A
88. a. Does File Contain Any Current Enforcement Orders?
a.❑Yes❑No®N/A
a.❑Yes❑No®N/A
a.❑Yes❑No®N/A
b. Is SIU in Compliance with Order?
b.❑Yes❑No®N/A
b.❑Yes❑No®N/A
b.❑Yes❑No®N/A
89. Did POTW Representative Have Difficulty in Obtaining Any Requested
❑ Yes ®No
❑ Yes ®
ElYes ® No
Information For You?
IF
!o�
FILE REVIEW COMMENTS:
The files are very well organized.
NC DWR Pretreatment Audit Form Revised: December 2016 Page 6
INDUSTRY INSPECTION ICIS CODING:
Main Program Permit Number MM/DD/YY
N I C I 0 10 1 2 13 18 17 16 108 126 120 I
1. Industry Inspected: Indulor
2. Industry Address: 932 E Elm St, Graham, NC
3. Type of Industry/Product: Categorical 414.111; Emulsion (water -based) polymers
4. Industry Contact: Jonas Schafer Title: Plant Manager Phone: 336-578-9660 Fax: _
5. Does the POTW Use the Division Model Inspection Form or Equivalent? ® Yes ❑ No
6. Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly?
Comments:
A. Initial Interview ® Yes ❑ No
B. Plant Tour ® Yes ❑ No
C. Pretreatment Tour ® Yes ❑ No
D. Sampling Review ® Yes ❑ No
E. Exit Interview ® Yes ❑ No
Industrial Inspection Comments:
Avery clean, well run facility. Manufactures bases for water based printing inks and overprint varnishes. Began production in
February 2017. Extensive training program for all employees. 27 employees at the facility. One shift (M-F 8:00 — 5:00).
Occasional overtime depending on work requirements.
Audit SUMMARY AND COMMENTS:
Audit Comments: No problems noted.
Requirements: None noted
Recommendations: None noted.
NOD: ❑ Yes ® No
NOV: ❑ Yes ® No
QNCR: ❑ Yes ® No
POTW Rating:
Satisfactory ® Marginal ❑ Unsatisfactory ❑
Audit COMPLETED BY: Jim Gonsiewski DATE: 09/09/2020
PERCS, and Winston-Salem Regional Office
NC DWR Pretreatment Audit Form Revised: December 2016 Page 7