Loading...
HomeMy WebLinkAboutNC0004987_Permit (Issuance docs)_20200901July 6, 2020 MEMORANDUM To: Clinton Cook, Regional Engineer NC DEQ / DWR / Public Water Supply Section Mooresville Regional Office From: Sergei Chernikov, Environmental Engineer III, Industrial NPDES Permitting Unit, Division of Water Resources (sergei.chernikov@ncdenr.gov) Subject: Review of the discharge locations for the following Draft NPDES Major Modification: NC0004987 Marshall Steam Station Catawba County Please indicate below by August 12, 2020 your agency's position or viewpoint on the facility listed above. We cannot issue the permit without your concurrence. Please return this form at your earliest convenience. RESPONSE: This agency has reviewed the draft permit and determined that the proposed discharge will not be sufficiently close to any existing or known proposed public water supply intake so as to create an adverse effect on water quality. We concur with the issuance of this permit provided the facility is operated and maintained properly, the stated effluent limits are met prior to discharge, and the discharge does not contravene the designated water quality standards. Concurs with issuance of the above permit, are met * * I have no appreciable expertise in implementation of the Clean Water Act requirements and have minimal understanding of the information provided. As a result, I have no basis for opposing the permit. Opposes the issuance of the above permit, based on reasons stated below, or attached: t/ Signed o , Date: August 14.2020 cc: file The Mooresville Tribune Advertising Affidavit PO Box 968 Hickory, NC 28603 NCDENR DIVISION OF WATER RESOURCES ATTN: ACCOUNTS PAYABLE 1611 MAIL SERVICE CENTER RALEIGH, NC 27699-1611 Account Number 3657135 Date July 12, 2020 Date Category Description Ad Number Ad Size 07/12/2020 Legal Notices PUBLIC NOTICE N.C. DEPARTMENT OF ENVIRONMENTAL 0000660392 2 x 33 L THIS IS NOT A BILL. Publisher of The Mooresville Tribune Iredell County Before the undersigned, a Notary Public of Iredell County, North Carolina, duty commissioned, qualified, and authorized by law to administer oaths, in said County and State; that he/she is authorized to make this affidavit and sworn statement; that the notice or other legal advertisement, a copy of which is attached hereto, was published in the The Mooresville Tribune on the following dates: 07/12/2020 and that the said newspaper in which such notice, or legal advertisement was published, was a newspaper meeting all the requirements and qualifications of Section 1-597 of the General Statutes of North Carolina. Assistant Bookkeeper Newspaper reference: 0000660392 /Swwom to and subscribed before me, this _ f q day of _"mil, , 2020 Notary Public r Notary public _ lrea'ell County My Commission expires: hl. 24 3:7 JW2 2 PLEASE PAY FROM INVOICE. THANK YOU �'rrtt m1w'•\`\� PUBLIC NOTICE N.C. DEPARTMENT OF ENVIRONMENTAL QUALITY INTENT TO ISSUE NPDES WASTEWATER DISCHARGE PERMIT #NCOftMM Public comment or objection to the draft permit modification is invited. All comments received by August 12, 2020 will be considered in the final determination regarding permit issuance and permit provisions. PERMIT APPLICATION Duke Energy Progress, LLC, 526 South Church St., Charlotte, N.C., has ap- plied for modification of its NPDES wastewater permit (NC0004987) for Marshall Steam Station, 8320 E. NC Highway 150, Terrell, Catawba Coun- ty. The facility discharges treated industrial wastewater, groundwater, and stormwater to the Catawba River in the Catawba River basin. Some of the parameters are water quality limited. This discharge may affect fu- ture allocations in this portion of the Catawba River basin. The location of Outfall is: Latitude: 35036'21"; Longitude: 80057'35". The draft wastewater permit modification and related documents are available online at: https://goo.ol/3WtzME Printed copies of the draft per- mit and related documents may be reviewed at the department's Mooresville Regional Office. To make an appointment to review the docu- ments, please call 704-663-1699. Public comment on the draft permit modification should be mailed to: Wastewater Permitting, 1617 Mail Service Center, Raleigh, N.C., 27699- 1617. Public comments may also be submitted by email to: p ubliccomments@ncdenr.g ov. Please be sure to include "Marshall" in the email's subject line. Publish: July 12, 2020. Advertising Affidavit Observer News Enterprise 309 N College Ave Newton, NC 28658 NCDENR Wren Thedford 1617 Mail Service Center Raleigh, NC 27699-1617 Date Description Charge 07/09/20 Intent to issue wastewater permit $88.00 #NC0004987; Duke Energy at Marshall Steam Station North Carolina Catawba County Balance $88.00 Philip Rogers, BEING DULY SWORN SAYS: that he is the Composing Manager for the OBSERVER NEWS ENTERPRISE, a newspaper published at Newton, North Carolina. It is a newspaper of general circulation in Catawba County and surrounding counties. The Notice of Intent to Issue Wastewater Permit #NC0004987; Duke Energy for Marshall Steam Station, was published in said newspaper and not a supplement thereof and is a true copy of the Notice as it was published in the regular and entire edition, beginning on July 9, 2020, and that said OBSERVER NEWS ENTERPRISE was regularly distributed to the subscribers during said period. Sworn to and subscribed before me this the 1 try y of July, 2020. Composing Mana er: ;t•' NOTARY PUBLIC: My Commission Expires:.2 PUBLIC NOTICE N.C. DEPART- MENT OF ENVI- RONMENTAL QUALITY IN- TENT TO ISSUE NPDES WASTE- WATER DIS- CHARGE PER- MIT #NC0004987 Public comment or objection to the draft permit modi- fication is invited. All comments re- ceived by August 12. 2020 will be considered in the final determina- tion regarding Permit issuance and permit provi- sions. PERMIT APPLI- CATION Duke Energy Progress, LLC, 526 South Church St., Char- lotte, N.C., has applied for modifi- cation of its NPDES wastewa- ter permit (NC0004987) for Marshall Steam Station, 8320 E. NC Highway 150, Terrell, Catawba County. The fa- cility discharges treated industrial wastewater, groundwater, and stormwater to the Catawba River in the Catawba Riv- er basin. Some of the parameters are water quality limited. This dis- charge may affect future allocations in this portion of the Catawba Riv- er basin. The lo- cation of Outfall is: Latitude: 35036'21"; Longi- tude: 80057'35". [-he draft waste- water permit modification and related docu- ments are availa- ble online at: https://900.gl/3Wt zMF. Printed cop- ies of the draft permit and relat- ed documents may be reviewed at the depart- ment's Moores- ville Regional Of- fice. To make an appointment to review the docu- ments, please call 704-663- 1699. Public comment on the draft per- mit modification should be mailed to: Wastewater Permitting, 1617 Mail Service Cen- ter, Raleigh, N.C., 27699-1617. Public comments may also be sub- mitted by email to: publiccom- ments@ncdenr.g ov. Please be sure to include "Marshall" in the email's subject line. Publish: July 9, 2020 ROY COOPER Governor MICHAEL S. REGAN. Secretary S. DANIEL SMITH Director Mr. Paul Draovitch, Senior Vice President Environmental, Health and Safety Duke Energy Carolinas, LLC Mail Code EC13K P.O. Box 1006 Charlotte, North Carolina 28201-1006 Dear Mr. Draovitch: NORTH CAROLINA Environmental Quality July 6, 2020 Subject: Draft NPDES Major Modification Permit NC0004987 Marshall Steam Station Catawba County Facility Class I The Division has received your request to increase flow limit to 3.0 MGD for the dewatering phase (Outfall 002) due to the need to incorporate wastewater from the remediation project. The request has been granted. Enclosed with this letter is the modified permit. Please review this permit carefully to ensure thorough understanding of the conditions and requirements it contains. The draft permit modification contains the following significant changes from your current permit: • The flow limit for Outfall 002 (dewatering phase) was increased to 3.0 MGD. Please provide any comments you have regarding the draft permit to this office by August 12, 2020. At this time, the Division is also publishing a notice in the newspapers of general circulation in Catawba County, inviting public comment on the Draft Modification. Following the 30- day comment period, we will review all pertinent comments received and take appropriate action on the permit modification. North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617 ��� 919.707.9000 If you have any questions about the NPDES permit process, please contact me at the following e-mail address: sergei.chernikov&ncdenr.g(_)y, or telephone number: 919-707-3606. Sincerely, Sergei Chernikov, Ph.D. Environmental Engineer III Industrial NPDES Permitting Unit cc: Central Files NPDES Files EPA Region IV (e-copy) Mooresville Regional Office/Water Quality (e-copy) Mooresville Regional Office/PWS (e-copy) WSS/Aquatic Toxicology Unit (e-copy) PERMIT No. NC0004987 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES Draft PERMIT TO DISCHARGE WASTEWATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provisions of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Duke Energy Carolinas, LLC is hereby authorized to discharge wastewater from a facility located at Marshall Steam Station At the intersection of NC Highway 150 and NCSR 1841 Terrell Catawba County to receiving waters designated as the Catawba River (Lake Norman) in the Catawba River Basin in accordance with effluent limitations, monitoring requirements, and other applicable conditions set forth in Parts I, II, and III hereof. This modification shall become effective This permit modification and authorization to discharge shall expire at midnight on September 30, 2021. Signed this day D. Daniel Smith, Director Division of Water Resources By Authority of the Environmental Management Commission Page 1 of 22 PERMIT No. NC0004987 SUPPLEMENT TO PERMIT COVER SHEET All previous NPDES Permits issued to this facility, whether for operation or discharge are hereby revoked, and as of this issuance, any previously issued permit bearing this number is no longer effective. Therefore, the exclusive authority to operate and discharge from this facility arises under the permit conditions, requirements, terms, and provisions included herein. Duke Energy Carolinas, LLC is hereby authorized to: Continue to discharge: • Outfall 001: once -through cooling water and intake screen backwash • Outfall 002: treated wastewater (consisting of metal cleaning wastes, coal pile runoff, ash transport water, storm water, low volume wastes, landfill leachate, and FGD wet scrubber wastewater) from the ash settling basin. • Outfall 005. Upon completion of construction, discharge from the new lined retention basin. Basin will accept wastes from holding basin (coal pile runoffl, ash transport water, various sumps, stormwater runoff, FGD wastewater, and various low volume wastes such as boiler blowdown, oily waste treatment, wastes/backwash from the water treatment processes, plant area wash down water, equipment heat exchanger water, landfill leachate, and ash transport water. Upon completion of construction all waste streams previously discharged to the ash basin, will be re-routed to the new retention basin. During the transition period, wastewater from the ash pond can also be discharged (Outfall 002). • Outfalls 002A and 00213: yard sump overflows. • Outfall 007: the emergency spillway of the Ash Pond. The spillway is designed for a flood greater than 100-year event. Sampling of this spillway is waived due to unsafe conditions associated with sampling during an overflow event. • Internal outfall 001/001A. Yard sump (wastewater from the yard sump 2, the yard sump 3, the fly ash silo yard sump, and stormwater) discharging to the retention basin. • Internal Outfall 003: non -contact cooling water from the induced draft fan control house to the intake for cooling water pumps. • Internal Outfall 006: treated FGD wet scrubber wastewater to the new lined retention basin. • Internal Outfall 010 from Holding Basin: coal pile runoff, and stormwater to the retention basin. From a facility located at Duke Energy's Marshall Steam Station at the intersection of NC Highway 150 and NCSR 1841 in Terrell, Catawba County; 2. Discharge from said treatment works at the locations specified on the attached map into the Catawba River (Lake Norman) which is classified WS-IV and B CA waters in the Catawba River Basin. Page 2 of 22 PERMIT No. NC0004987 PART I A. (1.) Effluent Limitations and Monitoring Requirements (Outfall 001) [ 15A NCAC 02B .0400 et seq., 02B .0500 et seq.] During the period beginning on the effective date of this permit and lasting until expiration, the Permittee is authorized to discharge from Outfall 001 (once -through cooling water). Such discharges shall be limited and monitored2 by the Permittee as specified below: EFFLUENT DISCHARGE LIMITATIONS MONITORING REQUIREMENTS Monthly Daily Measurement Sample Sample CHARACTERISTICS Average Maximum Frequency a Location Pump logs or Flow, MGD Monitor & Report Daily similar Effluent Daily readings Grab Temperature 33.3 oC Effluent November 1 - June 30 Daily Effluent Temperature Jul 1 - October 31 34.4 oC Grab Free Available Chlorine 1 0.L 2 m g� 0.5 m L g� Dail y Grab Effluent NOTES: 1 Once -through cooling water shall not be chlorinated. Should the facility wish to chlorinate once -through cooling water, Division permission shall be obtained prior to commencement of chlorination. The monitoring requirement and effluent limitations only apply if chlorination is commenced. 2 The permittee shall submit Discharge Monitoring Reports electronically using NC DWR's eDMR application system. Please See Special Condition A. (30.). There shall be no discharge of floating solids or visible foam in other than trace amounts. Based upon studies conducted by the permittee and submitted to the Division, it has been determined pursuant to Section 3.16(a) of the Clean Water Act that the thermal component of the discharge assures the protection and propagation of a balanced, indigenous population of shellfish, fish and wildlife in the receiving water. Page 3 of 22 PERMIT No. NC0004987 A. (2.) Effluent Limitations and Monitoring Requirements (Outfall 002 - normal operation / decanting) [ 15A NCAC 02B .0400 et seq., 02B .0500 et seq.] During the period beginning on the effective date of this permit and lasting until expiration, the Permittee is authorized to discharge from Outfall 002 (ash settling basin discharge - decanting the free water above the settled ash layer that does not involve mechanical disturbance of the ash). Such discharges shall be limited and monitored4 by the Permittee as specified below: EFFLUENT CHARACTERISTICS DISCHARGE LIMITATIONS MONITORING REQUIREMENTS Monthly Daily Averagre Maximum Measurement Sample Fre uenc Type Sample Location' Flow, MGD Oil and Grease Total Suspended Solids2 Monitor & Report 9.0 mg/L 12.0 mg/L 20.0 mg/L 50.0 mg/L Weekly Monthly Monthly Weekly Pump logs or similar readings Grab Grab Grab Effluent Effluent Effluent Total Arsenic Effluent Total Copper 1.0 mg/L3 1.0 mg/L3 Weekly Grab Effluent Total Iron 1.0 mg/L3 1.0 mg/L3 Weekly Grab Effluent Total Mercury6 Weekly Grab Effluent Total Selenium Weekly Grab Effluent Turbiditys, NTU Monthly Grab Effluent Effluent Nitrate/nitrite as N, mg/L Quarterly Grab Bromide, mg/L Monthly Monthly Grab Grab Effluent Total Hardness, mg/L Effluent Total Nitrogen NO2+NO3+TKN , m L Monitor & Report Monitor & Report See Part I, Section A. (18.) Quarterly Quarterly Monthly Grab Grab Grab Effluent _ Effluent Total Phosphorus, mg/L Chronic Toxicity Effluent Effluent pH7 Between 6.0 and 9.0 Standard Monthly Grab Units NOTES: 1 Effluent sampling shall be conducted at the discharge from the ash settling basin prior to mixing with any other waste stream(s). 2 The facility shall continuously monitor TSS concentration when the decanting process commences and the decanting pump shall be shut off automatically when one half of the Daily Maximum limit (15 minutes average) is exceeded. Pumping will be allowed to continue if interruption might result in a dam failure or damage. The continuous TSS monitoring only required when the pumps are employed for decanting. 3 The limits for total copper and total iron only apply when chemical metal cleaning wastewaters are being discharged. 4 The permittee shall submit Discharge Monitoring Reports electronically using NC DWR's eDMR application system. Please See Special Condition A. (30.). 5 The discharge from this facility shall not cause turbidity in the receiving stream to exceed 50 NTU. If the instream turbidity exceeds 50 NTU due to natural background conditions, the discharge cannot cause turbidity to increase in the receiving stream. Therefore, if the effluent measurement exceeds 50 NTU, the Permittee shall sample upstream and downstream turbidity in the receiving waterbody, within 24 hours, to demonstrate the Page 4 of 22 PERMIT No. NC0004987 existing turbidity level in the receiving waterbody was not increased. All data shall be reported on the DMRs. (See 15A NCAC 2B .0211 (21)). NTU - Nephelometric Turbidity Unit. 6 The facility shall use EPA method 1631E. 7 The facility shall continuously monitor pH when the decanting process commences and the decanting pump shall be shut off automatically when 15 minutes running average pH falls below 6.1 standard units or rises above 8.9 standard units. Pumping will be allowed to continue if interruption might result in a dam failure or damage. The continuous pH monitoring only required when the pumps are employed for decanting. When the facility commences the ash pond/ponds decanting, the facility shall treat the wastewater discharged from the ash pond/ponds using physical -chemical treatment, if necessary, to assure state Water Quality Standards are not contravened in the receiving stream. Duke Energy shall notify DWR NPDES Permitting and DWR Mooresville Regional Office, in writing, within seven calendar days of installing additional physical -chemical treatment at this Outfall. There shall be no discharge of floating solids or visible foam in other than trace amounts. The facility is allowed to drawdown the wastewater in the ash pond to no less than three feet above the ash. The rate for lowering the liquid level in a coal ash pond shall not exceed one (1) foot per day unless a higher rate is supported to the satisfaction of DEMLR and in accordance with NCAC, Title 15A, Subchapter 2K. The facility shall use a floating pump station with free water skimmed from the basin surface using an adjustable weir. By November 1, 2018 there shall be no discharge of pollutants in fly ash transport water. This requirement only applies to fly ash transport water generated after November 1, 2018. In accordance with the N.C.G.S. § 130A-309.210, by December 31, 2019, the facility shall convert to the disposal of dry bottom ash, as defined in the Coal Ash Management Act ("CAMA"). This requirement only applies to bottom ash transport water generated after 12/31/2019 or a new date as HB630 may be amended. By November 1, 2021 there shall be no discharge of pollutants in bottom ash transport water. This requirement only applies to bottom ash transport water generated after November 1, 2021. Beginning on November 1, 2021, the permittee will comply with the Steam Electric Effluent Limitations Guidelines for bottom ash wastewater (40 C.F.R. 423) in effect on December 1, 2020. The limits and conditions in Section A. (3.) of the permit apply when water in the ash settling basin is lowered below the three feet trigger mark. The facility shall notify DWR Complex NPDES Permitting Unit and DWR Mooresville Regional Office, in writing, seven calendar days prior to the commencement of the decanting. Page 5 of 22 PERMIT No. NC0004987 A. (3.) Effluent Limitations and Monitoring Requirements (Outfall 002 - dewatering phase) [15A NCAC 02B .0400 et seq., 02B .0500 et seq.] During the period beginning on the commencement date of the dewatering operation and lasting until expiration, the Permittee is authorized to discharge from Outfall 002 Ash Settling Basin Discharge (Dewatering - removing the interstitial water). Such discharges shall be limited and monitored4 by the Permittee asspecified below: EFFLUENT CHARACTERISTICS DISCHARGE LIMITATIONS MONITORING REQUIREMENTS Monthly —Average Daily Maximum Measurement Frequency Sample Type Sample Location' Flow 3.0 MGD 12.0 mg/L Weekly Pump logs or similar readings Effluent Oil and Grease 9.0 mg/L Monthly Grab Effluent Total Suspended SolidS2 20.0 mg/L 50.0 mg/L Monthly Grab Effluent Total Arsenic 139.1 µg/L 695.4 µg/L Weekly Grab Effluent Total Copper 1.0 mg/L3 1.0 mg/L3 Weekly Grab Effluent Total Iron 1.0 mg/L3 1.0 mg/L3 Weekly Grab Effluent Total Mercury6 Weekly Grab Effluent Total Selenium Weekly Grab Effluent Turbidity5, NTU Monthly Grab Effluent Nitrate/nitrite as N, mg/L Quarterly Grab Effluent Bromide, mg/L Monitor & Report Monthly Grab Effluent Total Hardness, mg/L Monthly Grab Effluent Total Nitrogen NO2+NO3+TKN , m L Quarterly Quarterly Grab Grab Effluent Effluent Total Phosphorus, mg/L Monitor & Report Chronic Toxicity See Part I, Section A. (18.) Monthly Grab Effluent pH7 Between 6.0 and 9.0 Standard Units Monthly Grab Effluent NOTES: 1 Effluent sampling shall be conducted at the discharge from the ash settling basin prior to mixing with any other waste stream(s). 2 The facility shall continuously monitor TSS concentration when the dewatering process commences and the dewatering pump shall be shut off automatically when one half of the Daily Maximum limit (15 minutes average) is exceeded. Pumping will be allowed to continue if interruption might result in a dam failure or damage. The continuous TSS monitoring only required when the pumps are employed for dewatering. 3 The limits for total copper and total iron only apply when chemical metal cleaning wastewaters are being discharged. 4 The permittee shall submit Discharge Monitoring Reports electronically using NC DWR's eDMR application system. Please See Special Condition A. (30.). 5 The discharge from this facility shall not cause turbidity in the receiving stream to exceed 50 NTU. If the instream turbidity exceeds 50 NTU due to natural background conditions, the discharge cannot cause turbidity to increase in the receiving stream. Therefore, if the effluent measurement exceeds 50 NTU, the Permittee shall sample upstream and downstream turbidity in the receiving waterbody, within 24 hours, to demonstrate the existing turbidity level in the receiving waterbody was not increased. All data shall be reported on the DMRs. (See 15A NCAC 213 .0211 (21)). Page 6 of 22 PERMIT No. NC0004987 NTU - Nephelometric Turbidity Unit. 6 The facility shall use EPA method 1631E. 7 The facility shall continuously monitor pH when the dewatering process commences and the dewatering pump shall be shut off automatically when 15 minutes running average pH falls below 6.1 standard units or rises above 8.9 standard units. Pumping will be allowed to continue if interruption might result in a dam failure or damage. The continuous pH monitoring only required when the pumps are employed for dewatering. When the facility commences the ash pond/ponds dewatering, the facility shall treat the wastewater discharged from the ash pond/ponds using physical -chemical treatment, if necessary, to assure state Water Quality Standards are not contravened in the receiving stream. Duke Energy shall notify DWR NPDES Permitting and DWR Mooresville Regional Office, in writing, within seven calendar days of installing additional physical -chemical treatment at this Outfall. There shall be no discharge of floating solids or visible foam in other than trace amounts. The rate for lowering the liquid level in a coal ash pond shall not exceed one (1) foot per day unless a higher rate is supported to the satisfaction of DEMLR and in accordance with NCAC, Title 15A, Subchapter 2K. By November 1, 2018 there shall be no discharge of pollutants in fly ash transport water. This requirement only applies to fly ash transport water generated after November 1, 2018. In accordance with the N.C.G.S. § 130A-309.210, by December 31, 2019, the facility shall convert to the disposal of dry bottom ash, as defined in the Coal Ash Management Act ("CAMA"). This requirement only applies to bottom ash transport water generated after 12/31/2019 or a new date as HB630 may be amended. By November 1, 2021 there shall be no discharge of pollutants in bottom ash transport water. This requirement only applies to bottom ash transport water generated after November 1, 2021. Beginning on November 1, 2021, the permittee will comply with the Steam Electric Effluent Limitations Guidelines for bottom ash wastewater (40 C.F.R. 423) in effect on December 1, 2020. The facility shall notify DWR Complex NPDES Permitting Unit and DWR Mooresville Regional Office, in writing, seven calendar days prior to the commencement of the dewatering. Page 7 of 22 PERMIT No. NC0004987 A. (4.) Effluent Limitations and Monitoring Requirements (Outfal1002A) [ 15A NCAC 02B .0400 et seq., 02B .0500 et seq.] During the period beginning on the effective date of this permit and lasting until expiration, the Permittee is authorized to discharge from Outfall 002A (yard sump # 1 overflows). Such discharges shall be limited and monitored2 by the Permittee as s ecified below: EFFLUENT DISCHARGE LIMITATIONS MONITORING REQUIREMENTS Monthly Daily Measurement Sample Sample CHARACTERISTICS Avera a Maximum Frequency Type Location' Flow, MGD Per discharge Estimate Effluent event pH Between 6.0 and 9.0 Standard Per discharge Grab Effluent Units event 30.0 mg/L 100.0 mg/L Per discharge Total Suspended Solids Grab Effluent event Oil and Grease 15.0 mg/L 20.0 mg/L I Per dischargeGrab Effluent event Total Iron, mg/L Per discharge Grab Effluent event NOTES: 1 Effluent samples shall be collected at a point upstream of the discharge to the Catawba River. 2 The permittee shall submit Discharge Monitoring Reports electronically using NC DWR's eDMR application system. Please See Special Condition A. (30.). There shall be no discharge of floating solids or visible foam in other than trace amounts. All flows shall be reported on monthly DMRs. Should no flow occur during a given month, the words "No Flow" shall be clearly written on the front of the DMR. All samples shall be of a representative discharge. Page 8 of 22 PERMIT No. NC0004987 A. (5.) Effluent Limitations and Monitoring Requirements (Outfall 002B) [ 15A NCAC 02B .0400 et seq., 02B .0500 et seq.] During the period beginning on the effective date of this permit and lasting until expiration, the Permittee is authorized to discharge from Outfall 002B (yard sump #2 overflows). Such discharges shall be limited and monitored2 by the Permittee as specified below: DISCHARGE LIMITATIONS MONITORING REQUIREMENTS EFFLUENT CHARACTERISTICS Monthly Daily Measurement Sample Sample Avera a Maximum Frequency Type Location' Flow, MGD Per discharge Estimate Effluent event _ pH Between 6.0 and 9.0 Standard Per discharge Grab Effluent Units 30.0 mg/L 100.0 mg/L event Total Suspended Solids Per discharge Grab Effluent event _ Oil and Grease 15.0 mg/L 20.0 mg/L Per discharge Grab Effluent event Total Iron, mg/L Per discharge Grab Effluent event NoTEs• 1 Effluent samples shall be collected at a point upstream of the discharge to the Catawba River. 2 The permittee shall submit Discharge Monitoring Reports electronically using NC DWR's eDMR application system. Please See Special Condition A. (30.). There shall be no discharge of floating solids or visible foam in other than trace amounts. All flows shall be reported on monthly DMRs. Should no flow occur during a given month, the words "No Flow" shall be clearly written on the front of the DMR. All samples shall be of a representative discharge. Page 9 of 22 PERMIT No. NC0004987 A. (6.) Effluent Limitations and Monitoring Requirements (Internal Outfall 003) [15A NCAC 02B .0400 et seq., 02B .0500 et seq.] During the period beginning on the effective date of this permit and lasting until expiration, the Permittee is authorized to discharge from Internal Outfall 003 (non - contact cooling water from the induced draft fan control house). Such discharges shall be limited and monitored2 by the Permittee as specified below: EFFLUENT DISCHARGE LIMITATIONS MONITORING REQUIREMENTS Monthly Daily Measurement Sample Sample CHARACTERISTICS Averse Maximum Fre uenc Type Location Flow, MGD Semi-annually Estimate Effluent Temperature, oC Semi-annually Grab Effluent Total Residual Semi-annually Grab Effluent Chlorine', µ L 0.2 m g/L 0.5 m g/L Free Available Semi-annually Grab Effluent Chlorine' Between 6.0 and 9.0 Standard Semi-annually Grab Effluent pH Units NoTEs- 1 Monitoring requirements apply only if chlorine is added to the cooling water. Neither free available chlorine nor total residual chlorine may be discharged from any unit for more than two hours in any one day and not more than one unit in any plant may discharge free available chlorine or total residual chlorine at any one time. 2 The permittee shall submit Discharge Monitoring Reports electronically using NC DWR's eDMR application system. Please See Special Condition A. (30.). There shall be no discharge of floating solids or visible foam in other than trace amounts. Limitations shall be met at the discharge point. Page 10 of 22 PERMIT No. NC0004987 A. (7.) Effluent Limitations and Monitoring Requirements (Internal Outfall 006) [15A NCAC 02B .0400 et seq., 02B .0500 et seq.] During the period beginning on the effective date of this permit and lasting until expiration, the Permittee is authorized to discharge from Internal Outfall 006 (treated FGD wet scrubber wastewater to retention basin). Such discharges shall be limited and monitored2 by the Permittee as specified below: EFFLUENT DISCHARGE LIMITATIONS MONITORING REQUIREMENTS Monthly Daily Measurement Sample Sample CHARACTERISTICS Avera a Maximum Fre uency Type Location' Pump logs or Flow, MGD Monitor & Report Monthly similar Effluent readings Grab Effluent Total Arsenic 8.0 µg/L4 11.0 µg/L4 Quarterly 356.0 ng/L4 788.0 ng/L4 Quarterly Grab Total Mercury3, ,ng/L Effluent Total Selenium 12.0 pg/L4 23.0 pg/L4 Quarterly Grab Effluent Nitrate/nitrite as N 4.4 mg/L4 17.0 mg/L4 Quarterly Grab Effluent pH Between 6.0 and 9.0 Standard Quarterly Grab Effluent Units NOTES: 1 Sample Location: E - Effluent samples shall be collected prior to the commingling with other waste streams. 2 The permittee shall submit Discharge Monitoring Reports electronically using NC DWR's eDMR application system. Please See Special Condition A. (30.). 3 The facility shall use EPA method 1631E. 4 Beginning on November 1, 2021, the permittee shall comply with the Steam Electric Effluent Limitations Guidelines for FGD wastewater (40 C.F.R. 423) in effect on December 1, 2020. All flows shall be reported on monthly DMRs. Should no flow occur during a given month, the words "No Flow" shall be clearly written on the front of the DMR. All samples shall be of a representative discharge. Page 11 of 22 PERMIT No. NC0004987 A. (8.) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS (Outfall 005) [15A NCAC 02B .0400 et seq., 02B .0500 et seq.] During the period beginning upon commencement of operations and lasting until expiration, the Permittee is authorized to discharge from Outfall 005 - Retention Basin discharge. Such discharges shall be limited and monitored' by the Permittee as specified below: EFFLUENT CHARACTERISTICS DISCHARGE LIMITATIONS MONITORING REQmRzmENTs Monthly Average Daily Maximum Measurement Sample Sample Fre uenc 2 e Location Flow, MGD Weekly Instantaneous or Estimate Effluent pH Between 6.0 and 9.0 standard units Monthly Grab Effluent TSS 30.0 mgjL 50.0 m L Monthly Grab Effluent Oil and Grease 15.0 m L 20.0 m L Monthly Grab Effluent Fluoride, m L Monthly Grab Effluent Total Mercu 2, n L Monthly Grab Effluent Total Silver, µ L Monthly Grab Effluent Total Iron3 1.0 m L 1.0 m L Monthly Grab Effluent Total Zinc, µ L Monthly Grab Effluent Total Arsenic,µ L Month' Grab Effluent Total Cadmium, L Monthly Grab Effluent Total Chromium, µ L Monthly Grab Effluent Total Co era 68.8 µ L 76.8 µ L Monthly Grab Effluent Total Lead, µ L Monthly Grab Effluent Total Nickel, µ L Monthly Grab Effluent Total Selenium, µ L Month' Grab Effluent Total Nitrogen NO2 + NO3 + TKN , m L Quarterly Grab Effluent Total Phosphorus, m L Quarterly Grab I Effluent Sulfates, m L Monthly Grab Effluent Chlorides, m L Monthly Grab Effluent Bromide, m L Monthly Grab Effluent TDS, m L Monthly Grab Effluent Total Hardness, m L Monthly Grab Effluent Temperature, OC Monthly Grab Effluent Conductivity, pmhocm Monthly Grab Effluent Chronic Toxicit 4 Monthly Grab Effluent Notes: 1. The permittee shall submit Discharge Monitoring Reports electronically using NC DWR's eDMR application system. Please See Special Condition A. (30.). 2. The facility shall use EPA method 1631E. 3. The limits for total copper and total iron only apply when chemical metal cleaning wastewaters are being discharged. 4. Whole Effluent Toxicity shall be monitored by chronic toxicity (Ceriodaphnia) P/F at 23.0%, see Special Condition A. (18.). The facility shall submit EPA Form 2C for Outfall 005 no later than 180 days from the commencement of the discharge. The facility shall notify DWR/NPDES Complex Permitting, in writing, 30 days prior to the commencement of the discharge from this outfall. There shall be no discharge of floating solids or visible foam in other than trace amounts. Page 12 of 22 PERMIT NO. NC0004987 A. (9.) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS (Outfall 007) [15A NCAC 02B .0400 et seq., 02B .0500 et seq.] During the period beginning on the effective date of this permit and lasting until expiration, the Permittee is authorized to discharge from outfall 007 - Emergency spillway of the ash basin. Such discharges shall be limited and monitored' by the Permittee as specified below: EFFLUENT CHARACTERISTICS DISCHARGE LIMITATIONS MONITORING REQUIREMENTS Monthly Average Daily MaximumL Measurement Fre uenc Sample Type Sample Location Flow, MGD Waived 1 Estimate I Effluent H Waived Grab Effluent TSS Waived Grab Effluent Oil and Grease Waived Grab Effluent The emergency spillway is designed for a flood greater than 100-year event in Catawba County. Sampling of this spillway is waived due to unsafe conditions associated with sampling during an overflow event. Monitoring is required for any other rain event that might trigger a discharge. A. (10.) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS (Internal Outfall 010) [15A NCAC 02B .0400 et seq., 02B .0500 et seq.] During the period beginning upon commencement of operation of the yard sump and lasting until expiration, the Permittee is authorized to discharge from Internal outfall 010 - Coal yard runoff and stormwater. Such discharges shall be limited and monitored' by the Permittee asspecified below: EFFLUENT CHARACTERISTICS DISCHARGE LIMITATIONS MONITORING REQUIREMENTS Monthly Average Daily Maximum Measurement Sample Frequency Type Sample Location Flow, MGD Quarterly Estimate Effluent H Quarterly Grab Effluent TSS Quarterly Grab Effluent Oil and Grease Quarterly Grab Effluent Notes: 1. The permittee shall submit Discharge Monitoring Reports electronically using NC DWR's eDMR application system. Please See Special Condition A. (30.). Page 13 of 22 PERMIT No. NC0004987 A. (11.) ADDITIONAL CONDITIONS AND DEFINITIONS [NCGS 143-215.3 (a) (2) and NCGS 143-215.661 1. EPA methods 200.7 or 200.8 (or the most current versions) shall be used for analyses of all metals except for total mercury (EPA Method 1631E). 2. All effluent samples for all external outfalls shall be taken at the most accessible location after the final treatment but prior to discharge to waters of the U.S. (40 CFR 122.416)). 3. The term low volume waste sources means wastewater from all sources except those for which specific limitations are otherwise established in this part (40 CFR 423.11 (b)). 4. The term chemical metal cleaning waste means any wastewater resulting from cleaning any metal process equipment with chemical compounds, including, but not limited to, boiler tube cleaning (40 CFR 42 3. 11 (c)). 5. The term metal cleaning waste means any wastewater resulting from cleaning [with or without chemical cleaning compounds] any metal process equipment including, but not limited to, boiler tube cleaning, boiler fireside cleaning, and air preheater cleaning (40 CFR 423.11 (d)). 6. For all outfalls where the flow measurement is to be "estimated" the estimate can be done by using calibrated V-notch weir, stop -watch and graduated cylinder, or other method approved by the Division. 7. The term "FGD wet scrubber wastewater" means wastewater resulting from the use of the flue -gas desulfurization wet scrubber. A. (12.) TOXICITY RE -OPENER CONDITION [NCGS 143-215.3 (a) (2) and NCGS 143-215.66] This permit shall be modified, or revoked and reissued to incorporate toxicity limitations and monitoring requirements in the event toxicity testing or other studies conducted on the effluent or receiving stream indicate that detrimental effects may be expected in the receiving stream as a result of this discharge. A. (13.) APPLICABLE STATE LAW (STATE ENFORCEABLE ONLY) [NCGS 143-215.1(b)] This facility shall meet the General Statute requirements under NCGS § 130A-309.200 et seq. This permit may be reopened to include new requirements imposed under these Statutes. A. (14.) POLYCHLORINATED BIPHENYL COMPOUNDS [40 CFR 423] There shall be no discharge of polychlorinated biphenyl compounds such as those commonly used for transformer fluid. A. (15.) BIOCIDE CONDITION [NCGS 143-215.1] The permittee shall not use any biocides except those approved in conjunction with the permit application. The permittee shall notify the Director in writing not later than ninety (90) days prior to instituting use of any additional biocide used in cooling systems which may be toxic to aquatic life other than those previously reported to the Division of Water Resources. Such notification shall include completion of Biocide Worksheet Form 101 and a map locating the discharge point and receiving stream. Completion of Biocide Worksheet Form 101 is not Page 14 of 22 PERMIT No. NC0004987 necessary for those outfalls containing toxicity testing. Division approval is not necessary for the introduction of new biocides into outfalls currently tested for whole effluent toxicity. A. (16.) INTAKE SCREEN BACKWASH [NCGS 143-215.1 (b)] Continued intake screen backwash discharge and overflow from the settling basin are permitted without limitations or monitoring requirements. A. (17.) BEST MANAGEMENT PRACTICES [NCGS 143-215.1 (b)] It has been determined from information submitted that the plans and procedures in place at Marshall Steam Station are equivalent to that of a Best Management Practice (BMP). A. (18.) CHRONIC TOXICITY PASS/FAIL PERMIT LIMIT — OUTFALL 002 AND OUTFALL 005 [15A NCAC 02B .0200 et seq.] The effluent discharge shall at no time exhibit observable inhibition of reproduction or significant mortality to Ceriodaphnia dubia at an effluent concentration of.23.0% for decanting (Outfall 002) and Outfall 005, and 2.6% for dewatering (Outfall 002). The permit holder shall perform at a minimum, monthlu monitoring using test procedures outlined in the "North Carolina Ceriodaphnia Chronic Effluent Bioassay Procedure," Revised December 2010, or subsequent versions or "North Carolina Phase II Chronic Whole Effluent Toxicity Test Procedure" (Revised- December 2010) or subsequent versions. Effluent sampling for this testing must be obtained during representative effluent discharge and shall be performed at the NPDES permitted final effluent discharge below all treatment processes. If the monthly test procedure results in a failure or ChV below the permit limit, then multiple -concentration testing shall be performed at a minimum, in each of the two following months as described in "North Carolina Phase II Chronic Whole Effluent Toxicity Test Procedure" (Revised -December 2010) or subsequent versions. All toxicity testing results required as part of this permit condition will be entered on the Effluent Discharge Monitoring Form (MR-1) for the months in which tests were performed, using the parameter code TGP3B for the pass/fail results and THP3B for the Chronic Value. Additionally, DWR Form AT-3 (original) is to be sent to the following address: Attention: North Carolina Division of Water Resources Water Sciences Section/Aquatic Toxicology Branch 1621 Mail Service Center Raleigh, North Carolina 27699-1621 Completed Aquatic Toxicity Test Forms shall be filed with the Water Sciences Section no later than 30 days after the end of the reporting period for which the report is made. Test data shall be complete, accurate, include all supporting chemical/physical measurements and all concentration/response data, and be certified by laboratory supervisor and ORC or approved designate signature. Total residual chlorine of the effluent toxicity sample must be measured and reported if chlorine is employed for disinfection of the waste stream. Should there be no discharge of flow from the facility during a month in which toxicity monitoring is required, the permittee will complete the information located at the top of the Page 15 of 22 PERMIT No. NC0004987 aquatic toxicity (AT) test form indicating the facility name, permit number, pipe number, county, and the month/year of the report with the notation of "No Flow" in the comment area of the form. The report shall be submitted to the Water Sciences Section at the address cited above. Should the permittee fail to monitor during a month in which toxicity monitoring is required, monitoring will be required during the following month. Assessment of toxicity compliance is based on the toxicity testing month. Should any test data from this monitoring requirement or tests performed by the North Carolina Division of Water Resources indicate potential impacts to the receiving stream, this permit may be re -opened and modified to include alternate monitoring requirements or limits. NOTE: Failure to achieve test conditions as specified in the cited document, such as minimum control organism survival, minimum control organism reproduction, and appropriate environmental controls, shall constitute an invalid test and will require immediate follow-up testing to be completed no later than the last day of the month following the month of the initial monitoring. A. (19.) ASH SETTLING BASIN [NCGS 143-215.1 (b)] Beginning on the effective date of this permit and lasting until expiration, there shall be no discharge of plant wastes to the ash pond unless the permittee provides and maintains at all times a minimum free water volume equivalent to the sum of the maximum 24-hour plant discharges plus all direct rainfall and all runoff flows to the pond resulting from a 10-year, 24- hour rainfall event, when using a runoff coefficient of 1.0. During the term of the permit, the permittee shall remove settled material from the ponds or otherwise enlarge the available storage capacities in order to maintain the required minimum volumes at all times. Annually the permittee shall determine and report to the permit issuing authority: (1) the actual free water volume of the ash pond, (2) physical measurements of the dimensions of the free water volume in sufficient detail to allow validation of the calculated volume, and (3) a certification that the required volume is available with adequate safety factor to include all solids expected to be deposited in the ponds for the following year. Any changes to plant operations affecting such certification shall be reported to the Director within five days of the change. NOTE: In the event that adequate volume has been certified to exist for the term of the permit, periodic certification is not needed. A. (20.) CHEMICAL METAL CLEANING WASTES [40 CFR 4231 It has been demonstrated that under certain conditions it is possible to reduce the concentration of metals in boiler cleaning wastes in the range of 92 to 99+ percent by. treatment in ash ponds. Because of dilution problems, and the existence of boundary interface layers at the extremities of the plume, it is difficult to prove beyond doubt that the quantity of iron and copper discharged will always be less than one milligram per liter times the flow of metal cleaning when treated in this manner. The application of physical/chemical methods of treating wastes has also been demonstrated to be effective in the treatment of metal cleaning wastes. However, the effectiveness of ash pond Page 16 of 22 PERMIT No. NC0004987 treatment should be considered in relation to the small differences in effluent quality realized between the two methods. It has been demonstrated that the presence of ions of copper, iron, nickel, and zinc in the ash pond waters was not measurably increased during the ash pond equivalency demonstration at the Duke Energy's Marshall Steam Station. Therefore, when the following conditions are implemented during metal cleaning procedures, effective treatment for metals can be obtained at this facility: (1) Large ash basin providing potential reaction volumes. (2) Well-defined shallow ash delta near the ash basin influent. (3) Ash pond pH of no less than 6.5 prior to metal cleaning waste addition. (4) Four days retention time in ash pond with effluent virtually stopped. (5) Boiler volume less than 86,000 gallons. (6) Chemicals for cleaning to include only one or more of the following: (a) Copper removal step- sodium bromate, NaBr03i ammonium carbonate, (NH4)2CO3; and ammonium hydroxide, NH40H. (b) Iron removal step -hydrochloric acid, HCl; and ammonium bifluoride, (NH4)BF2 and proprietary inhibitors. (7) Maximum dilution of wastes before entering ash pond 6 to 1. (8) After treatment of metal cleaning wastes, if monitoring of basin effluents as required by the permit reveals discharges outside the limits of the permit, the permittee will re -close the basin discharge, conduct such in -basin sampling as necessary to determine the cause of nonconformance, will take appropriate corrective actions, and will file a report with EPA including all pertinent data. A. (21.) FLOATING MATERIALS [NCGS 143-215.1 (b)] The Permittee shall report all visible discharges of floating materials, such as an oil sheen, to the Director when submitting DMRs. A. (22.) CHEMICAL DISCHARGES [NCGS 143-215.1 (b)] Discharge of any product registered under the Federal Insecticide, Fungicide, and Rodenticide Act to any waste stream which may ultimately be released to lakes, rivers, streams or other waters of the United States is prohibited unless specifically authorized elsewhere in this permit. Discharge of chlorine from the use of chlorine gas, sodium hypochlorite, or other similar chlorination compounds for disinfection in plant potable and service water systems and in sewage treatment is authorized. Use of restricted use pesticides for lake management purposes by applicators licensed by the N.C. Pesticide Board is allowed. A. (23.) PRIORITY POLLUTANT ANALYSIS - OUTFALL 002 [NCGS 143-215.1 (b)] The Permittee shall conduct a priority pollutant analysis (in accordance with 40 CFR Part 136) once per permit cycle at outfall 002 and submit the results with the application for permit renewal. A. (24.) WAIVERS [NCGS 143-215.1 (b)] Page 17 of 22 PERMIT No. NC0004987 Nothing contained in this permit shall be construed as a waiver by permittee or any right to a hearing it may have pursuant to State or Federal laws or regulations. A. (25.) STRUCTURAL INTEGRITY INSPECTIONS OF ASH POND DAM [15A NCAC 02K.0208] The facility shall meet the dam design and dam safety requirements per 15A NCAC 2K. A. (26.) CLEAN WATER ACT SECTION 316(a) THERMAL VARIANCE [40 CFR 125, Subpart H] The thermal variance granted under Section 316(a) terminates on expiration of this NPDES permit. Should the permittee wish a continuation of its 316(a) thermal variance beyond the term of this permit, reapplication for such continuation shall be submitted in accordance with 40 CFR Part 125, Subpart H and Section 122.21(m)(6) not later than 180 days prior to permit expiration. Reapplication shall include a basis for continuation such as a) plant operating conditions and load factors are unchanged and are expected to remain so for the term of the reissued permit; b) there are no changes to plant discharges or other discharges in the plant site area which could interact with the thermal discharges; and c) there are no changes to the biotic community of the receiving water body which would impact the previous variance determination. The next 316(a) studies shall be performed in accordance with the Division of Water Resources approved plan. The temperature analysis and the balanced and indigenous study plan shall conform to the specifications outlined in 40 CFR 125 Subpart H, the EPA's Draft 316(a) Guidance Manual, dated 1977, and the Region 4 letter to NCDENR, dated June 3, 2010. EPA shall be provided an opportunity to review the plan prior to the commencement of the study. Copies of all the study plans, study results, and any other applicable materials should be submitted to: 1) Electronic Version Only (pdf and CD) Division of Water Resources WQ Permitting Section - NPDES 1617 Mail Service Center Raleigh, NC 27699-1617 2) Electronic Version (pdf and CD) and Hard Copy Division of Water Resources Water Sciences Section 1621 Mail Service Center Raleigh, NC 27699-1621 A. (27.) CLEAN WATER ACT SECTION 316 (B) 140 CFR 125.95] The permittee shall comply with the Cooling Water Intake Structure Rule per 40 CFR 125.95. The permittee shall submit all the materials required by the Rule with the next renewal application. Page 18 of 22 PERMIT No. NC0004987 A. (28.) FISH TISSUE MONITORING NEAR ASH POND DISCHARGE - OUTFALL 002 [NCGS 143-215.3 (a) (2)] The facility shall conduct fish tissue monitoring annually and submit the results with the NPDES permit renewal application. The objective of the monitoring is to evaluate potential uptake of pollutants by fish tissue near the Ash Pond discharge. The parameters analyzed in fish tissue shall be arsenic, selenium, and mercury. The monitoring shall be conducted in accordance with the Sampling Plan approved by the Division. The plan should be submitted to the Division within 180 days from the effective date of the permit. Upon approval, the plan becomes an enforceable part of the permit. Copies of all the study plans, study results, and any other applicable materials should be submitted to: 1) Electronic Version Only (pdf and CD) Division of Water Resources WQ Permitting Section - NPDES 1617 Mail Service Center Raleigh, NC 27699-1617 2) Electronic Version (pdf and CD) and Hard Copy Division of Water Resources Water Sciences Section 1621 Mail Service Center Raleigh, NC 27699-1621 A. (29.) INSTREAM MONITORING 115A NCAC 02B.0500 ET SEQ.] The facility shall conduct monthly instream monitoring (approximately one mile upstream and approximately one mile downstream of the ash pond discharge) for total arsenic, total selenium, total mercury, total chromium, dissolved lead, dissolved cadmium, dissolved copper, dissolved zinc, total bromide, total hardness (as CaCO3), turbidity, and total dissolved solids (TDS). The monitoring results shall be reported on the facility's Discharge Monitoring Reports and included with the NPDES permit renewal application. This condition becomes effective on June 1 2018. A. (30.) ELECTRONIC REPORTING OF DISCHARGE MONITORING REPORTS [G. S. 143-215.1(b)] Federal regulations require electronic submittal of all discharge monitoring reports (DMRs) and program reports. The final NPDES Electronic Reporting Rule was adopted and became effective on December 21, 2015. NOTE: This special condition supplements or supersedes the following sections within Part II of this permit (Standard Conditions for NPDES Permits): • Section B. (11.) Signatory Requirements • Section D. (2.) Reporting • Section D. (6.) Records Retention • Section E. (5.) Monitoring Reports Page 19 of 22 PERMIT No. NC0004987 1. ReRortigg Requirements fSupersedes Section D. 2. and Section E. 5. a The permittee shall report discharge monitoring data electronically using the NC DWR's Electronic Discharge Monitoring Report (eDMR) internet application. Monitoring results obtained during the previous month(s) shall be summarized for each month and submitted electronically using eDMR. The eDMR system allows permitted facilities to enter monitoring data and submit DMRs electronically using the internet. Until such time that the state's eDMR application is compliant with EPA's Cross -Media Electronic Reporting Regulation (CROMERR), permittees will be required to submit all discharge monitoring data to the state electronically using eDMR and will be required to complete the eDMR submission by printing, signing, and submitting one signed original and a copy of the computer printed eDMR to the following address: NC DEQ / Division of Water Resources / Water Quality Permitting Section ATTENTION: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 If a permittee is unable to use the eDMR system due to a.demonstrated hardship or due to the facility being physically located in an area where less than 10 percent of the households have broadband access, then a temporary waiver from the NPDES electronic reporting requirements may be granted and discharge monitoring data may be submitted on paper DMR forms (MR 1, 1. 1, 2, 3) or alternative forms approved by the Director. Duplicate signed copies shall be submitted to the mailing address above. See "How to Request a Waiver from Electronic Reporting" section below. Regardless of the submission method, the first DMR is due on the last day of the month following the issuance of the permit or in the case of a new facility, on the last day of the month following the commencement of discharge. Starting on December 21, 2020, the permittee must electronically report the following compliance monitoring data and reports, when applicable: • Sewer Overflow/Bypass Event Reports; • Pretreatment Program Annual Reports; and • Clean Water Act (CWA) Section 316(b) Annual Reports. The permittee may seek an electronic reporting waiver from the Division (see "How to Request a Waiver from Electronic Reporting" section below). 2. Electronic Submissions In accordance with 40 CFR 122.41(1)(9), the permittee must identify the initial recipient at the time of each electronic submission. The permittee should use the EPA's website resources to identify the initial recipient for the electronic submission. Initial recipient of electronic NPDES information from NPDES-regulated facilities means the entity (EPA or the state authorized by EPA to implement the NPDES program) that is the designated entity for receiving electronic NPDES data [see 40 CFR 127.2(b)]. EPA plans to establish a website that will also link to the appropriate electronic reporting tool for each type of electronic submission and for each state. Instructions on how to access and use the appropriate electronic reporting tool will be available as well. Information on EPA's NPDES Electronic Reporting Rule is found at: Page 20 of 22 PERMIT No. NC0004987 https:/ lwww.federalrepister.pov/documents/20l5/ 10/22/2015-24954/national-pollutant- discharge-elimination-system-npdes-electronic-reporting-rule Electronic submissions must start by the dates listed in the "Reporting Requirements" section above. 3. How to Request a Waiver from Electronic Reporting The permittee may seek a temporary electronic reporting waiver from the Division. To obtain an electronic reporting waiver, a permittee must first submit an electronic reporting waiver request to the Division. Requests for temporary electronic reporting waivers must be submitted in writing to the Division for written approval at least sixty (60) days prior to the date the facility would be required under this permit to begin submitting monitoring data and reports. The duration of a temporary waiver shall not exceed 5 years and shall thereupon expire. At such time, monitoring data and reports shall be submitted electronically to the Division unless the permittee re -applies for and is granted a new temporary electronic reporting waiver by the Division. Approved electronic reporting waivers are not transferrable. Only permittees with an approved reporting waiver request may submit monitoring data and reports on paper to the Division for the period that the approved reporting waiver request is effective. Information on eDMR and the application for a temporary electronic reporting waiver are found on the following web page: http://deg.nc.gov/about/divisionslwater-resources/­edmr 4. Sianatory Requirements [Supplements Section B. (11.1 ibl and Supersedes Section B. 11.(djj All eDMRs submitted to the permit issuing authority shall be signed by a person described in Part II, Section B. (11.)(a) or by a duly authorized representative of that person as described in Part II, Section B. (11.)(b). A person, and not a position, must be delegated signatory authority for eDMR reporting purposes. For eDMR submissions, the person signing and submitting the DMR must obtain an eDMR user account and login credentials to access the eDMR system. For more information on North Carolina's eDMR system, registering for eDMR and obtaining an eDMR user account, please visit the following web page: http: LIdeg.nc.gov/about/­divisions/`­water-resources/edmr Certification. Any person submitting an electronic DMR using the state's eDMR system shall make the following certification [40 CFR 122.22]. NO OTHER STATEMENTS OF CERTIFICATION WILL BE ACCEPTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. " Page 21 of 22 PERMIT No. NC0004987 5. Records Retention [Supplements Section D. {6.1] The permittee shall retain records of all Discharge Monitoring Reports, including eDMR submissions. These records or copies shall be maintained for a period of at least 3 years from the date of the report. This period may be extended by request of the Director at any time [40 CFR 122.41]. A. (31.) COMPLIANCE BOUNDARY [15A NCAC 02L.0107] The compliance boundary for the disposal system shall be specified in accordance with 15A NCAC 02L .0107(a) or (b) dependent upon the date permitted. An exceedance of groundwater standards at or beyond the compliance boundary is subject to remediation action according to 15A NCAC 02L .0106(c), (d), or (e) as well as enforcement actions in accordance with North Carolina General Statute 143-215.6A through 143-215.6C. Page 22 of 22 Marshall Steam Station 2014 Freshwater RPA - 95% Probabilityl95% Confidence Outfall 002 Dewatering 1 NC0004987 MAXIMUM DATA POINTS = 58 Qw = 3 MGD Qw (MGD) = 3.00 WWTP/WTP Class: 1Q10S (cfs) = 49.15 IWC @ 1Q10S = 8.64% 7Q10S (cfs) = 60.00 1WC @ 7Q10S = 7.19% 7Q10W (cfs) = 60.00 IWC @ 7Q10W = 7.19% 30Q2 (cfs) = 60.00 IWC @ 30Q2 = 7.19% Avg. Stream Flow, QA (cfs) = 60.00 IWC @ QA = 7.19% Receiving Stream: Lake Norman Stream Class: WS-IV PARAMETER STANDARDS & CRITERIA (2) TYPE REASONABLE POTENTIAL RESULTS F RECOMMENDED ACTION (1) NC WQS / Applied '/2 FAY / j Max Pred Chronic Standard Acute 11 # Det. Cw Allowable Cw Acute: NO WQS Arsenic C 50 FW(7Q10s) ug/L 1 1 3,560.0 add limit Vote: n 5 9 Default C.V. Chronic: 695.4 — — Limited data set > All_owa_ble C_w_ Arsenic C 10 ffH/WS(Qavg) ug/L .1-value(s) _ 1 1 3,560.0 Chronic: 139.1 _ _ _ _ _ _ _ _ _ _ _ — — Note: n < 9 Default C.V. 1 value(s) > Allowable Cw Cadmium NC 2 FW(7Q10s) 15 ug/L 1 0 0.5 Acute: 173.E no limit Note: n 5 9 Default C.V. -Chronic: 27.8 — — —------- Limited data set No oaluc = Allowable Cw Chlorides (AL) NC 230 FW(7Q lOs) mg/L Acute: NO WQS 8 1 1rDeautC.V. no limit _ _ _ _ _ _ _ _ Note: n <_ 9 Chronic: 3,199 — — Limited data set NO value =• Allowable Cw Chromium NC 50 FW(7Q10s) 1022 uglL Acute: 11,828.7 1 0 0.5 no limit Note: n < 9 Default C.V. Chronic: 695.4 — — — Limited data set No value > Allowable Ca Copper (AL) NC 7 FW(7QlOs) 7.3 ug/L Acute: 84.5 1 1 2.0 no limit _ _ _ _ _ Note: n<9 Default C.V. Chronic: 97.4 ------- Limited data set No value > Allowable Cw Fluoride NC 1800 FW(7Q10s) ug/L 1 1 2.8 Acute: NO WQSno limit Note: n 5 9 Default C.V. Chronic: 25,034.8 — — Limited data set No value> Allowable c to Lead NC 25 FW(7Q10s) 33.8 ug/L 1 0 0.5 Acute: 391.2 no limit Note: n<9 Default C.V. Chronic: 347.7 ----- Limited data set No value > Allowable Cw Mercury NC 12 FW(7Q10s) 0.5 ng/L Acute: NO WQS 1 1 2.0 no limit _ _ _ _ _ _ Note: n <_ 9 Default C.V. Chronic: 166.9 — — — --- — Limited data set No value => Allowable Cw Molybdenum NC 160 WS(7Q10s) ug/L Acute: NO WQS 1 1 854.0 no limit Note: n < 9 Default C.V. Chronic: 2,225.3 Limited data set No value > Allowable Cw Page 1 of 2 9 4987-RPA - dewatering 1-2020, rpa 6/17/2020 Marshall Steam Station 2014 Freshwater RPA - 95% Probability/95% Confidence Outfall 002 Dewatering 1 NC0004987 MAXIMUM DATA POINTS = 58 Qw = 3 MGD Nickel NC 25 WS(7Q10s) 261 ug/L 1 1 14.8 ll)cfaultC. Acute: 3,020.8 no limit Note: n 5 9 - . Chronic: 347.7 --------- Limited data set No value > Allowable Cw Selenium NC 5 FW(7Q10s) 56 ug/L 1 1 3.2 Acute: 648.1 no limit Note: n<9 Default C.V. Chronic: 69.5 --------- Limited data sei No value > Allowablc C A Zinc (AL) NC 50 FW(7Q10s) 67 ug/L 1 1 50.0 Acute; 775.5 no limit Note: n<9 Default C.V. Chronic: 695.4 --------- Limited data set No value > Allowable Cw Page 2 of 2 4987-RPA - dewatering 1-2020, rpa g 6/17/2020 REASONABLE POTENTIAL ANALYSIS 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 Arsenic - FW Standard use -PASTE SPEGAL Values" then -COPY" 2 Arsenic - HHMS Standards . Maximum data pomts = 58 Date Data BDL=112DL Results Date Data BDL=112DL Results 3560 3560 Std Dev. N/A 1 1/0/1900 0 3560 3560 Std Dev. Mean 3560.0000 2 Mean C.V. 0.0000 3 C.V. n 1 4 n 5 Mult Factor = 1.00 6 Mult Factor = Max. Value 3560.0 ug/L 7 Max. Value Max. Pred Cw 3560.0 ug/L 8 Max. Pred Cw 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 Automatically copies Arsenic data from FW Standard entries 3560.0000 0.0000 1 1.00 3560.0 ug/L 3560.0 ug/L -1- 4987-RPA - dewatering 1-2020, data 6/17/2020 REASONABLE POTENTIAL ANALYSIS 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 Cadmium X ""-."'°" $Am . Mie data: d'.7 Date Data BDL=112DL Results _ < 1 0.5 Std Dev. N/A Mean 0.5000 C.V. 0.0000 n 1 Mult Factor = 1.00 Max. Value 0.5 ug/L Max. Pred Cw 0.5 ug/L 5 00.TA67Et;PR Chlorides (AL) tr1 .. .2 014X Atmdftm dMPC w Date Data BDL=1/2DL Results 1 288 288 Std Dev. N/A 2 Mean 288.0 3 C.V. 0.0000 4 n 1 5 6 Mult Factor = 1.0 7 Max. Value 288.0 8 Max. Pred Cw 288.0 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 -2- 4987-RPA - dewatering 1-2020, data 6/17/2020 REASONABLE POTENTIAL ANALYSIS $ Use "PASTE SPECIAL 9 Use "PASTE SF Chromium Values" then "COPY' Copper (AL) Values" then ", Maximum data Maxlmumt points = 58 points - 6 Date Data BDL=1/2DL Results Date Data BDL=1/2DL Results 1 < 1 0.5 Std Dev. N/A 1 1.99 1.99 Std Dev. N/A 2 Mean 0.5000 2 Mean 1.9900 3 C.V. 0.0000 3 C.V. 0.0000 4 n 1 4 n 1 5 5 6 Mult Factor = 1.00 6 Mult Factor = 1.00 mg/L 7 Max. Value 0.5 ug/L 7 Max. Value 2.0 mg/L 8 Max. Pred Cw 0.5 ug/L 8 Max. Pred Cw 2.0 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 25 25 26 26 27 27 28 28 29 29 30 30 31 31 32 32 33 33 34 34 35 35 36 36 37 37 38 38 39 39 40 40 41 41 42 42 43 43 44 44 45 45 46 46 47 47 48 48 49 49 50 50 51 51 52 52 53 53 54 54 55 55 56 56 57 57 58 58 4987-RPA - dewatering 1-2020, data -3- 6/17/2020 REASONABLE POTENTIAL ANALYSIS 11 12 - Uss'T%SrfE " 46ie a Fluoride Yaiueil" tl�erl "CUPY" Lead .:. - _gip'" -. Maximum dfh POW@ - 5B pdjr�ls w7 Date Data BDL=1/2DL Results Date Data BDL=1/2DL Results _ 1 2.78 2.78 Std Dev. WA 1 < 1 0.5 Std Dev. NIA 2 Mean 2.7800 2 Mean 0.5000 3 C.V. 0.0000 3 C.V. 0.0000 4 n 1 4 n 1 5 5 6 Mult Factor = 1.00 6 Mult Factor = 1.00 ug/L 7 Max. Value 2.8 ug/L 7 Max. Value 0.5 ug/L 8 Max. Pred Cw 2.8 ug/L 8 Max. Pred Cw 0.5 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 25 25 26 26 27 27 28 28 29 29 30 30 31 31 32 32 33 33 34 34 35 35 36 36 37 37 38 38 39 39 40 40 41 41 42 42 43 43 44 44 45 45 46 46 47 47 48 48 49 49 50 50 51 51 52 52 53 53 54 54 55 55 56 56 57 57 58 58 4987-RPA - dewatering 1-2020, data -4- 6/17/2020 REASONABLE POTENTIAL ANALYSIS IECIAL ;opy" 13 Mercury. Use"PASTE SPECIAL values" then "COPY" 14 Use"PASTE St Molybdenum Values' Men', . Maximum c fala Maximum data Palrth = 6 8 points = 58 Date Data BDL=112DL Results Date Data BDL=112DL Results 1 1.97 1.97 Std Dev. N/A 1 854 854 Std Dev. N±A 2 Mean 1.9700 2 Mean 854.0000 3 C.V. 0.0000 3 C.V. 0.0000 4 n 1 4 n 1 5 5 6 Mult Factor = 1.00 6 Mult Factor = 1.00 ug/L 7 Max. Value 2.0 ng/L 7 Max. Value 854.0 ug/L 8 Max. Pred Cw 2.0 ng/L 8 Max. Pred Cw 854.0 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 25 25 26 26 27 27 28 28 29 29 30 30 31 31 32 32 33 33 34 34 35 35 36 36 37 37 38 38 39 39 40 40 41 41 42 42 43 43 44 44 45 45 46 46 47 47 48 48 49 49 50 50 51 51 52 52 53 53 54 54 55 55 56 56 57 57 58 58 4987-RPA - dewatering 1-2020, data -5- 6117/2020 REASONABLE POTENTIAL ANALYSIS -. 15 16 Pu" us&'PASTE SPECIAL values" "COPY" Nickel then Selenium Maximum dau points = 58 Date Data BDL=1/2DL Results Date Data BDL=1/2DL Results 1 14.8 14.8 Std Dev. N/A 1 3.15 3.15 Std Dev. 2 Mean 14.8000 2 Mean 3 C.V. 0.0000 3 C.V. 4 n 1 4 n 5 5 6 Mult Factor = 1.00 6 Mult Factor = ug/L 7 Max. Value 14.8 ug/L 7 Max. Value ug/L 8 Max. Pred Cw 14.8 ug/L 8 Max. Pred Cw 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 25 25 26 26 27 27 28 28 29 29 30 30 31 31 32 32 33 33 34 34 35 35 36 36 37 37 38 38 39 39 40 40 41 41 42 42 43 43 44 44 45 45 46 46 47 47 48 48 49 49 50 50 51 51 52 52 53 53 54 54 55 55 56 56 57 57 58 58 4987-RPA - dewatering 1-2020, data -6- 6/17/2020 REASONABLE POTENTIAL ANALYSIS Lise "PASTE SPEC 0 Values" then -COP, . Maximum data points = 59 M/A 3.1500 0.0000 1 1.00 3.2 ug/L 3.2 ug/L 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 ilea "PASTE 3PECl Zinc (AL) Values" then "COF . Maximum data paints = 58 Date Data BDL=1/2DL Results . 50 50 Std Dev. N/A Mean 50.0000 C.V. 0.0000 n 1 Mult Factor = Max. Value Max. Pred Cw 1.00 50.0 ug/L 50.0 ug/L -7- 4987-RPA - dewatering 1-2020, data 6/17/2020 -Marshall Steam Station NC0004987 Qw (MGD) = 3.00 1Q10S (cfs) = 49.15 7Q10S (cfs) = 60.00 7Q10W (cfs)= 60.00 30Q2 (cfs) = 60.00 Avg. Stream Flow, QA (cfs) = 60.00 Receiving Stream: Lake Norman REASONABLE POTENTIAL ANALYSIS 2094 Generic RPA - 95% Probability/95% Confidence MAXIMUM DATA POINTS = 58 WWTP/WTP Class: IWC @ 1Q10S = 8.643123% IWC @ 7Q lOS = 7.192575% IWC @ 7Q10W = 7.192575% IWC @ 30Q2 = 7.192575% IWC @ QA = 7.192575% Stream Class: WS-IV Outfall 002 Dewatering 2 Qw=3 MGD PARAMETER TYPE (1) STANDARDS & CRITERIA (2) � W 1 REASONABLE POTENTIAL RESULTS RECOMMENDED ACTION NC WQS / Applied '/z FAV / Max Pred Chronic Standard Acute n # Det. Cw Allowable Cw Acute: NO WQSno Sulfate NC 250 WS(7Q10s) mg/L 1 1 149.0 limit Note: n 5 9 Default C.V. Chronic: 3,475.81 Limited data set No value > Allowable ('w Acute: NO WQS Aluminum NC 87 FW(7Q10s) µg/L 1 1 jDe7 no limit - Note: n < 9 _ _ _ _ _ _ _ _ Chronic: 1,209.58 Limited data set No value > Allowable Cw Acute: NO WQS Barium NC 1 WS(7Q10s) mg/L 1 1 0.5 no limit_ Note: n 5 9 Default C.V. ___ Chronic: 13.90 _ Limited data set No value > Allox aF,, I Acute: NO WQS Boron NC ? WS(7Q10s) mg/L 1 1 6.3 no limit Note: n 5 9 Default C.V. Chronic: 97.32 — Limited data set No value > Allowable Cw Acute: NO WQS Iron NC 1 FW(7Q10s) mg/L 1 1FDfa no limit Note: n < 9 C.V. __ _ _ ___ Chronic: 13.90 — Limited data set No value > Allowable C= Acute: NO WQS Manganese NC 200 WS(7Q 1 Os) µg/L 1 1 1250.0 no limit Note: n59 Default C.V. _ _ _ _ _ _ _ _ _ Cbronic: 2,780.65 Limited data set No value > Allowable CN, Acute: NO WQS Antimony NC 5.6 WS(7Q10s) µg/L 1 0 0.5 no limit Note:n<9 Default C.V. _ _ Chronic: —--77.86-- --------------------------- Limited data set No value > Allowable Cw Acute: NO WQS Thallium NC 0.24 WS(7Q10s) µg/L 1 1 0.8 no limit Note: n59 Default C.V. _ _ Ch_ronic: ---- 3.34 -- --------------------------- Limited data set No value > Allowable ( Acute: NO WQS Vanadium NC 24 FW(7QIOs) µ 1 1 1.7 no limitglL Note: n 59 Default C.V. __ _ _____ _ _ _ Chronic: 333.68 _ Limited data set No value :> Allowable Cw Acute: 0 0 N/A Chronic: — — --- — — — — — — ----- — ----- — — Page 1 of 2 4987-RPA dewaterring 2-2020, rpa 6117/2020 Marshall Steam Station NC0004987 REASONABLE 2014 Generic RPA POTENTIAL - 95% Probability195% ANALYSIS Confidence Outfall 002 Dewatering 2 Qw = 3 MGD Acute: 0 0 N/A Chronic:---------- --------------------------- Acute: 0 0 N/A __: __ Chronic---------- --------------------------- Acute: 0 0 N/A Chronic: — — — --- — — — — ----- — ----- ----- Acute: 0 0 N/A Chronic: --- — — — --- — — — — — — — — --- --- Acute: 0 0 N/A Chronic:---------- --------------------------- Acute: 0 0 N/A _ _ _ Chronic: -------------------------------------- Acute: 0 0 N/A _ _ _ _ Chronic:---------- --------------------------- Acute: 0 0 N/A Chronic:---------- --------------------------- Acute: 0 0 N/A _ _ _ Chronic:---------- --------------------------- Acute: 0 0 N/A _ _ _ Chronic:---------- --------------------------- Acute: 0 0 N/A Chronic: --- — --- — — — — — — — --- — — — --- Acute: I-T 0 0 N/A Chronic:------------------- ---- Page 2 of 2 4987-RPA dewateMng 2-2020, rpa 9 6/17/2020 REASONABLE POTENTIAL ANALYSIS Sulfate Yait�ed'then "COPY" Aluminum �railus"OW-9 Maximum data pubAm 4 points = SB pa6rta+ i Date Data BDL=1/2DL Results Date Data BDL=1/2DL Results _ 1 149 149 Std Dev. N/A 1 810 810 Std Dev. N/A 2 Mean 149.0000 2 Mean 810.0000 3 C.V. 0.0000 3 C.V. 0.0000 4 n 1 4 n 1 5 5 6 Mult Factor = 1.0000 6 Mult Factor = 1.0000 7 Max. Value 149.0 mg/L 7 Max. Value 810.0 8 Max. Pred Cw 149.0 mg/L 8 Max. Pred Cw 810.0 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 25 25 26 26 27 27 28 28 29 29 30 30 31 31 32 32 33 33 34 34 35 35 36 36 37 37 38 38 39 39 40 40 41 41 42 42 43 43 44 44 45 45 46 46 47 47 48 48 49 49 50 50 51 51 52 52 53 53 54 54 55 55 56 56 57 57 58 58 4987-RPA dewaterring 2-2020, data 1 6/17/2020 REASONABLE POTENTIAL ANALYSIS :opr Sato pg/L pg/L 4987-RPA dewaterring 2-2020, data - 2 - 6/17/2020 REASONABLE POTENTIAL ANALYSIS Barium Vdlu9a" then "COPY" Boron Vaiue!" then "� Maximum data Maxtmum i points - 58 points - 5 Date Data BDL=1/2DL Results Date Data BDL=112DL Results 1 0.493 0.498 Std Dev. N/A 1 6.27 6.27 Std Dev. NIA 2 Mean 0,4980 2 Mean 6.2700 3 C.V. 0.0000 3 C.V. 0.0000 4 n 1 4 n 1 5 5 6 Mult Factor = 1.0000 6 Mult Factor = 1.0000 7 Max. Value 0.5 mg/L 7 Max. Value 6.3 8 Max. Pred Cw 0.5 mg/L 8 Max. Pred Cw 6.3 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 25 25 26 26 27 27 28 28 29 29 30 30 31 31 32 32 33 33 34 34 35 35 36 36 37 37 38 38 39 39 40 40 41 41 42 42 43 43 44 q4 45 45 46 46 47 47 48 48 49 49 50 50 51 51 52 52 53 53 54 54 55 55 56 56 57 57 58 58 4987-RPA dewaterring 2-2020, data -3- 6/17/2020 REASONABLE POTENTIAL ANALYSIS .°p,r Iron vemee' then -COPY" Manganese mu . Maxlmmn data a points = ss Date Data BD! =1/2DL Results Date Data BDL=1/2DL Results 1 8.55 8.55 Std Dev. N/A 1 1250 1250 Std Dev. 2 Mean 8.5500 2 Mean 3 C.V. 0.0000 3 C.V. 4 n 1 4 n 5 5 6 Mult Factor = 1.0000 6 Mult Factor = mg/L 7 Max. Value 8.6 mg/L 7 Max. Value mg/L 8 Max. Pred Cw 8.6 mg/L 8 Max. Pred Cw 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 25 25 26 26 27 27 28 28 29 29 30 30 31 31 32 32 33 33 34 34 35 35 36 36 37 37 38 38 39 39 40 40 41 41 42 42 43 43 44 44 45 45 46 46 47 47 48 48 49 49 50 50 51 51 52 52 53 53 54 54 55 55 56 56 57 57 58 58 4987-RPA dewaterring 2-2020, data 4- 6/17/2020 REASONABLE POTENTIAL ANALYSIS -j-p— "FrIV Antimony ..tAeartnma �tr pohttes:8& _ Date Data BDL=112DL Results 'A 1 < 1 0.5 Std Dev. 1250.0000 2 Mean 0.0000 3 C.V. 1 4 n 5 1.0000 6 Mult Factor = 1250.0 Ng/L 7 Max. Value 1250.0 Ng/L 8 Max. Pred Cw 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 valime eta Thallium Muimum data pokfts_= 58 Date Data BDL=1/2DL WA 1 0.828 0.828 0.5000 2 0.0000 3 1 4 5 1.0000 6 0.5 Ng/L 7 0.5 pg/L 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 -5- 4987-RPA dewaterring 2-2020, data 6/17/2020 REASONABLE POTENTIAL ANALYSIS y"O'e lhe" -copy- Vanadium Madmum data points a 50 Results Date Data BDL=112DL Results Std Dev. N/A 1 1.73 1.73 Std Dev. Mean 0.8280 2 Mean C.V. 0.0000 3 C.V. n 1 4 n 5 Mult Factor = 1.0000 6 Mult Factor = Max. Value 0.8 ug/L 7 Max. Value Max. Pred Cw 0.8 Ng/L 8 Max. Pred Cw 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 IIRaolkum.data ppints a a 1.7300 0.0000 1 1.00 1.7 Ng/L 1.7 Ng/L 0 Date Data BDL=112DL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 -6- 4987-RPA dewaterring 2-2020, data 6/17/2020 REASONABLE POTENTIAL ANALYSIS VwaupR 1Mn-IaGF"►r 0 varufe" am"Co N=bngm dam dm gym•-m gnu- 5.9 Results _ Date Data BDL=112DL Results Date Data Std Dev. NO DATA 1 Std Dev. NO DATA 1 Mean NO DATA 2 Mean NO DATA 2 C.V. NO DATA 3 C.V. NO DATA 3 n 0 4 n 0 4 5 5 Mult Factor = N/A 6 Mult Factor = N/A 6 Max. Value N/A 7 Max. Value N/A 7 Max. Pred Cw N/A 8 Max. Pred Cw N/A 8 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 25 25 26 26 27 27 28 28 29 29 30 30 31 31 32 32 33 33 34 34 35 35 36 36 37 37 38 38 39 39 40 40 41 41 42 42 43 43 44 44 45 45 46 46 47 47 48 48 49 49 50 50 51 51 52 52 53 53 54 54 55 55 56 56 57 57 58 58 4987-RPA dewaterring 2-2020, data -7- 6/17/2020 REASONABLE POTENTIAL ANALYSIS 0 v*1v "@m*CCF . Ml�clnwrA'defs pOtgts:atl� BDL=1/2DL Results Std Dev. NO DATA Mean NO DATA C.V. NO DATA n 0 Mult Factor = N/A Max. Value N/A Max. Pred Cw N/A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 Date Data 0 viduw am Wm Maimum do Pam a'as BDL=112DL Results Std Dev. NO DATA Mean NO DATA C.V. NO DATA n 0 Mult Factor = N/A Max. Value N/A Max. Pred Cw N/A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 Date Da 4987-RPA dewatemng 2-2020, data -8- 6/17/2020 REASONABLE POTENTIAL ANALYSIS U vefpw "" ICOF Fpt"%tas to BDL=1/20L Results Std Dev. NO DATA Mean NO DATA C.V. NO DATA in 0 Mult Factor = N/A Max. Value N/A Max. Pred Cw N/A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 Date Data O Values" then .'COF . Maximum data points = 58 BDL=1/2DL Results Std Dev. NO DATA Mean NO DATA C.V. NO DATA n 0 Mult Factor = NIA Max. Value N/A Max. Pred Cw N/A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 Date -9- 4987-RPA dewaterring 2-2020, data 6/17/2020 REASONABLE POTENTIAL ANALYSIS 0 VON"* msa s" IltuNnuFn,� pOhlht+�SE Data BDL=1/2DL Results Std Dev. NO DATA Mean NO DATA C.V. NO DATA n 0 Mult Factor = N/A Max. Value N/A Max. Pred Cw N/A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 Date Data 0 -- —, wr MpdmUm *w P�IRti=5lI- BDL=1/2DL Results Std Dev. NO DATA Mean NO DATA C.V. NO DATA n 0 Mult Factor = N/A Max. Value N/A Max. Pred Cw N/A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 -10- 4987-RPA dewaterring 2-2020, data 6/1712020 REASONABLE POTENTIAL ANALYSIS 4987-RPA dewaterring 2-2020, data 11 - 6/17/2020 REASONABLE POTENTIAL ANALYSIS 0 v*i�^ ' mot. Date Data BDL=1/2DL Results 1 Std Dev. NO DATA 1 2 Mean NO DATA 2 3 C.V. NO DATA 3 4 n 0 4 5 5 6 Mu It Factor = N/A 6 7 Max. Value N/A 7 8 Max. Pred Cw N/A 8 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 25 25 26 26 27 27 28 28 29 29 30 30 31 31 32 32 33 33 34 34 35 35 36 36 37 37 38 38 39 39 40 40 41 41 42 42 43 43 44 44 45 45 46 46 47 47 48 48 49 49 50 50 51 51 52 52 53 53 54 54 55 55 56 56 57 57 58 58 0 vahmwdm"l .t,� Date Data BDL=1/2DL Results Std Dev. NO DATA Mean NO DATA C.V. NO DATA n 0 Mult Factor = N/A Max. Value N/A Max. Pred Cw N/A -12- 4987-RPA dewaterring 2-2020, data 6/17/2020 REASONABLE POTENTIAL ANALYSIS Values" a' then iota 0 Maximum data I points = 58 Date Data BDL=112DL Results 1 Std Dev. NO DATA 2 Mean NO DATA 3 C.V. NO DATA 4 n 0 5 6 Mult Factor = N/A 7 Max. Value N/A 8 Max. Pred Cw N/A 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 -13- 4987-RPA dewaterring 2-2020, data 6/17/2020 DEQ/DWR FACT SHEET FOR NPDES PERMIT DEVELOPMENT/Major Modification NPDES No. NC0004987 Facility Information Applicant/FacilityName: Duke Energy — Marshall Steam Station Applicant Address: Water Management, Duke Energy, P.O. Box 1006, Charlotte, NC 28201 Facility Address: 8320 E. NC Highway 150, Terrell, NC 28682 Permitted Flow Not Limited Type of Waste: 99.9% Industrial, 0.1% Domestic Facili/Permit Status: Major Modification County: Catawba Miscellaneous Receiving Stream: Lake Norman Regional Office: Mooresville Stream Classification: WS-IV & B CA USGS Topo Quad: Lake Norman North 303(d) Listed?: No Permit Writer: Ser ei Chernikov, Ph.D. Subbasin: 03-08-32 Date: June 8, 2020 Drainage Area mil : NA 4 Summer 7 10 cfs Release 60 cfs Winter 7Q10 cfs : NA 1Q10 cfs): IWC %): 23 SUMMARY This permit is being modified to increase flow limit for Dewatering Phase from 1.0 MGD to 3.0 MGD for Outfall 002. Decanting of the ash basin is currently in progress. In the second half of 2020 the decanting phase of the ash basin closure project will move into dewatering. The input from rainfall run-off and dewatering activities will account for approximately 2 million gallons per day (MGD) to Outfall 002. A pilot study for the groundwater remediation system associated with the Corrective Action Plan (CAP) Update, submitted to NCDEQ on December 31, 2019, plans to begin in the first half of 2021 with the full system being implemented shortly after. The full-scale remediation project will be extracting and discharging an estimated 1 MGD of groundwater to Outfall 002. Infiltration wells are also included in the remediation system, for which water will be pumped from Lake Norman, treated, then allowed to infiltrate into groundwater to increase remediation system effectiveness. The infiltration wells will increase aquifer productivity and flush out constituents from the unsaturated zone. Groundwater will then be pumped from the aquifer through the extraction wells and sent to a Waste Water Treatment System (WWTS) prior to discharging from Outfall 002. Therefore, the maximum daily discharge from Outfall 002 is projected to be 3 MGD during the future ash basin closure activities. A new WWTS is being built to treat wastewater generated from the dewatering activities. It will consist of a high rate clarifier followed by filtration when needed. Ahead of the clarification, the wastewater will be chemically treated to assist in metal precipitation and settleability. These chemicals may include, organo-sulfide, hydrogen peroxide, sodium hydroxide, a coagulant and a polymer for a flocculent Sodium Bisulfite may be used to ensure there is no excess of oxidant leaving the treatment system. There will be a final pH adjustment step in which sulfuric acid or sodium hydroxide is used to ensure the pH is within the limits. The sludge generated by the clarifier and filter backwash is planned to be sent back into the ash basin for removal by the excavation contractor. A new Reasonable Potential Analysis was conducted for Outfall 002 based on the 3.0 MGD flow limit. The Analysis indicated that the Arsenic limits shall be reduced. Hence, the new Arsenic limits have been incorporated into the permit. All the remaining terms and conditions of the permit remain unchanged. PROPOSED SCHEDULE Draft Permit to Public Notice: June 30, 2020 (est.) Permit Scheduled to Issue: August 31, 2020 (est.) STATE CONTACT If you have any questions on any of the above information or on the attached permit, please contact Sergei Chernikov at (919) 707-3606 or sergei.chernikov@ncdenr.gov. NPDES Permit NC 0004987 Page 2 L� DUKE rc ENERGY June 8, 2020 Ms. Julie Grzyb North Carolina Division of Water Resources 1617 Mail Service Center Raleigh, NC 27699-1617 Subject: NPDES Wastewater Permit Modification Request Duke Energy Carolinas, LLC. Marshall Steam Electric Plant NPDES Permit #: NC0004987 Catawba County Dear Ms, Grzyb: Marshall Stearn Station 8320 East NC Hwy 150 Terrell, NC 28682 828.478.7700 With reference to the April 29, 2020 permit modification request, additional information is available for the planned installation of a new wastewater treatment system for Outfall 002. The narrative attachment of the modification request has been updated to reflect this information. This update is attached, If you have questions, please contact Robert Wylie at (704) 562-8258 or Robert.Wylie@duke-energy.com. Sincerely, r i Rick Roper General Manager III Marshall Steam Station cc: Wes Bell (electronic filing) Attachment: Update to April 29, 2020 Permit Modification Request Attachment Marshall Steam Station Ash Basin Closure and Remediation Activities Rage 1 of 2 Ash Basin Closure and Remediation Activities Decanting of the ash basin is currently in progress. In the second half of 2020 the decanting phase of the ash basin closure project will move into dewatering. The input from rainfall run-off and dewatering activities will account for approximately 2 million gallons per day (MGD) to Outfall 002. A pilot study for the groundwater remediation system associated with the Corrective Action Plan (CAP) Update, submitted to NCDEQ on December 31, 2019, plans to begin in the first half of 2021 with the full system being implemented shortly after. The full-scale remediation project will be extracting and discharging an estimated 1 MGD of groundwater to Outfall 002. Infiltration wells are also included in the remediation system, for which water will be pumped from Lake Norman, treated, then allowed to infiltrate into groundwater to increase remediation system effectiveness. The infiltration wells will increase aquifer productivity and flush out constituents from the unsaturated zone. Groundwater will then be pumped from the aquifer through the extraction wells and sent to a Waste Water Treatment System (WWTS) prior to discharging from Outfall 002. Therefore, the maximum daily discharge from Outfall 002 is projected be 3 MGD during the future ash basin closure activities. An evaluation of projected concentrations determined that only two metal parameters were to be above the calculated allowable limits without treatment. These two parameters were arsenic (from ash basin pore water) and mercury (from CAP wells). Therefore, a WWTS is being implemented to remove these two parameters to concentration levels below the calculated allowable limits. This WWTS will consist of a high rate clarifier followed by filtration when needed. Ahead of the clarification the water will be chemically treated to assist in metal precipitation and settleability. These chemicals may include, organo-sulfide, hydrogen peroxide, sodium hydroxide, a coagulant and a polymer for a flocculant. Sodium Bisulfite may be used to ensure there is no excess of oxidant leaving the treatment system. There will be a final pH adjustment step in which sulfuric acid or sodium hydroxide is used to ensure the pH is within the limits. The sludge generated by the clarifier and filter backwash is planned to be sent back into the ash basin for removal by the excavation contractor. The ash basin closure project will also result in the need to build a larger landfill footprint. The leachate from the larger footprint is planned to be sent to a retention basin which will then pump the leachate to the wastewater Lined Retention Basin that discharge under the NPDES permitted outfall 005. This outfall was permitted based on an estimated flow of 5 MGD. The actual flow has been historically less than 5 MGD. It is estimated that the flow from the additional leachate flow will not change the previously projected long-term average flow or loading of significance. The flow schematic has been updated as follows to reflect the upcoming changes that are requested with this permit modification request. Page 2 of 2 Marshall Steam Station Water Schematic 10 Fan Control House NPDES Permit #NC0004987 > Non -contact Cooling Catawba Counter Water internal - Permit Modification Request 0.2 MGD Intake Screen April 2020 Backwash — -- Outfall001 Once -through Cooling Water --- _ Lake 1093 MGD Norman Ash Sluice Submerged Flight Conveyor Domestic Wastewater � Sanitary POTW — Evap. 1.7 MGD Lake I _ Norman Flue Gas Desulfurization (FGD) Water Supply Groundwater Wastewater Treatment Outfall002 Lake Wet Scrubber Wastewater —_ from Lake Norman Extraction Wells 3.0 MGD Norman System FGD Wastewater Treatment System Internal Outfall GGG L� —(Phys/Chem R 6io) 0.8 MGD — -- —a Heat Exchanger Cooling Water 15 MGD - - Storm Water Air Preheater Water, Precipitator & Boiler Wash Waters, I Misc. Cleaning Wastewaters --- Fly Ash Silo Sump I� Ash Basin Dewatering Misc. Equipment Cooling O.S3 MGD 0.04 MGD Raw Water Stormwater — Treatment c________ i Boiler and Turbine _ ___ Yard Drain Sumps Outfalls O02Aand 002E Room Sumps 1'9 (2 flows to IA) - Yard Sump Overflows -------- ----------- Lake _. MGD (no flow expected) Norman Retention Basin Overflow Coal Pile ------- — Alternate 2.43 ---- - (no flow expected) Route MGD _ �/ ----------------------------- Stormwater HoldingBasin 0.5 MGD -- Retention Basin _ Outfall 00S Lake 5 MGD Norman Landfill Leachate 0.04 MGD — -- J w -j� DUKE `` ENERGY. April 29, 2020 Ms. Julie Grzyb North Carolina Division of Water Resources 1617 Mail Service Center Raleigh, NC 27699-1617 Electronic Mailing Subject: NPDES Wastewater Permit Modification Request Duke Energy Carolinas, LLC. Marshall Steam Station NPDES Permit #: NC0004987 Catawba County Dear Ms. Grzyb, RECEIVED MAY 1 M 2020 KDI_DoWNPHS Marshall Stearn Station 8320 East NC My 150 Terrell, NC 28682 Duke Energy Carolinas, LLC (Duke) requests a modification to the NPDES permit NC0004987 for Outfall 002 in order to support the closure and remediation activities associated with the ash basin. It is projected that the 1 million gallons per day (MGD) daily maximum flow restriction at Outfall 002 during dewatering of the ash basin will need to be increased to 3 MGD. This increase in flow accounts for flows from dewatering, rainfall run-off and extracted groundwater from remediation activities. The details of upcoming closure and remediation activities that warrant the need to increase flow restriction from 1 MGD to 3 MGD for Outfall 002 are attached. In the future the Lined Retention Basin (LRB) (NPDES Outfall 005) will receive flows from a larger landfill footprint, but this is not expected to result in a significant pollutant loading to the LRB. A check in the amount of $1,030 is being mailed separately to your office due changes in processing associated with the coronavirus. If you have questions, please contact Robert Wylie at (704) 562-8258 or Robert.Wylie@duke-energy.com. SirMereiv, . Rick Roper General Manager III Marshall Stearn Station cc: Wes Bell (Electronic Mailing) Attachment: Ash Basin Closure and Remediation Activities 828 478 7700 Attachment Marshall Steam Station Ash Basin Closure and Remediation Activities Page 1 of 2 v Ash Basin Closure and Remediation Activities Decanting of the ash basin is currently in progress. In the second half of 2020 the decanting phase of the ash basin closure project is anticipated to move into dewatering. The input from rainfall run-off and dewatering activities will account for approximately 2 million gallons per day (MGD) to Outfall 002. A pilot study for the groundwater remediation system associated with the Corrective Action Plan (CAP) Update, submitted to NCDEQ on December 31, 2019, plans to begin in the first half of 2021 with the full system being implemented shortly after. The full-scale remediation project will be extracting and discharging an estimated 1 MGD of groundwater to Outfall 002. Infiltration wells are also included in the remediation system, for which water will be pumped from Lake Norman, treated, then allowed to infiltrate into groundwater to increase remediation system effectiveness. The infiltration wells will increase aquifer productivity and flush out constituents from the unsaturated zone. Groundwater will then be pumped from the aquifer through the extraction wells and sent to a waste water treatment system (WWTS) prior to discharging from Outfall 002. Therefore, the maximum daily discharge from outfall 002 is projected to be 3 MGD during the future ash basin closure activities. An evaluation of projected concentrations determined that only two metal parameters were to be above the calculated allowable limits without treatment. These two parameters were arsenic (from ash basin pore water) and mercury (from CAP wells). Therefore, a WWTS is being implemented to remove these two parameters to concentration levels below the calculated allowable limits. The ash basin closure project will also result in the need to build a larger landfill footprint. The leachate from the larger footprint is planned to be sent to a retention basin which will then pump the leachate to the wastewater Lined Retention Basin that discharge under the NPDES permitted outfall 005. This outfall was permitted based on an estimated flow of 5 MGD. The actual flow has been historically less than 5 MGD. It is estimated that the flow from the additional leachate flow will not change the previously projected long-term average flow or loading of significance. The flow schematic has been updated as follows to reflect the upcoming changes that are requested with this permit modification request. Page 2 of 2 ID Fan Control House 1 Non -contact Cooling - Water } - _ :nternal Outfad or= 0.2 MGD Intake Screen Backwash Marshall Steam Station Water Schematic NP©ES Permit #NC0004987 Catawba County Permit Modification Request April 2020 Ii - > Once -through Cooling Water Ash Sluice Submerged Flight Conveyor Evap. 2.7 MGD - %ormar Outfall 001 1093 MGD Lake Norman Domestic Wastewater Sanitary POTW Flue Gas Desulfurization (FGO) Water Supply " Groundwater Wet Scrubber wastewater from Lake Norman Extraction Wells FGD Wastewater Treatment System (Phys/Chem & Bio) Internal Outfall 006 i -- - - — 0.8 MGD Heat Exchanger Cooling Water 1.15 MGD .. Air Preheater Water. Precipitator & Boiler Wash Waters, Misc. Cleaning Wastewaters Fly Ash Silo Sump Misc. Equipment Cooling O.S3 MGD 0.04 t JW Raw Water �`--`� . IV. GG Treatment Stormwater Boiler and Turbine Room Sumps t 1.9 vard Drain Su:nos - -- MGD L (2 flows to l AI Coal Pile r__Alternate 2.43 Route MGD f Stormwater 1Holding Basin 0.5 - MGD `>" Retention Basin Landfill Leachate 0.04 MGD Wastewater Treatment Outfall002 _j Lake System 3.0 MGD Norman storm water ! I ( Ash Basin Dewatering ------- Outfalfs 002A and 002E -' Yard Sump Overflows --------t--------- Lake (no flow expected) Norman Retention Basin Overflow (no flow expected) --------`------------------- Outfall 005 Lake 5 MGD Norman La Sala, Joseph Scott From: Wylie, Robert R Sent: Wednesday, April 29, 2020 1:00 PM To: Grzyb, Julie; Chernikov, Sergei Cc: Bell, Wes; Langley, Shannon; La Sala, Joseph Scott Subject: RE: [External] MARSHALL NPDES PERMIT MODIFICATION NC0004987 Thanks Julie. The check is being sent from another area of the company so the hard copy will have to be sent in separately. From: Grzyb, Julie <julie.grzyb@ncdenr.gov> Sent: Wednesday, April 29, 202012:56 PM To: Wylie, Robert R <Robert.Wylie@duke-energy.com>; Chernikov, Sergei <sergei.chernikov@ncdenr.gov> Cc: Bell, Wes <wes.bell@ncdenr.gov>; Langley, Shannon <Shannon.Langley@duke-energy.com>; La Sala, Joseph Scott <Joseph.LaSala@duke-energy.com> Subject: RE: [External] MARSHALL NPDES PERMIT MODIFICATION NC0004987 *** Exercise caution. This is an EXTERNAL email. DO NOT open attachments or click links from unknown senders or unexpected email. *** Robert, Thanks for the electronic copy. I am forwarding this modification request to Sergei via this email. Please do send the hard copy with the check. Thanks, Julie Julie A Grzyb Supervisor NPDES Complex Permitting NC DEQ / Division of Water Resources / Water Quality Permitting 919 707 3605 office 336 210 8454 cell iul� ie.arzyb@ncdenr_cLov Physical Address: 512 North Salisbury St., Raleigh, NC, 27604 Mailing Address: 1617 Mail Service Center, Raleigh, NC, 27699-1617 Email correspondence to and from tivs address is subject to the North Carolina Public Records Law and rrray be disclosed to third parties From: Wylie, Robert R mailto:Robert.W lie duke-ener .com] Sent: Wednesday, April 29, 202011:58 AM To: Grzyb, Julie <juiie.erzyb ncdenr.gov> Cc: Bell, Wes <wes.bell ncdenr. ov>; Langley, Shannon <Shann_on.Lanpley@duke-energy corn,>; La Sala, Joseph Scott <Jose h.LaSala duke -ever .com> Subject: [External] MARSHALL NPDES PERMIT MODIFICATION NC0004987 CAUTION: , al email Do not click links or open attachments unless you Julie, Attached is a NPDES permit modification request for Marshall Steam Station. This request was determined to be needed after an evaluation was conducted for upcoming activities associated with the ash basin closure and groundwater remediation. If you need a hard copy mailed to you please let me know. A check will be submitted separately, to your office, for the cost to process this request. If you have any questions or need additional information please let me know. Thanks, Robert Wylie Duke Energy Corporation Permitting and Compliance, Carolinas 704 382-4669 (office) 704 562-8258 (cell) Robert.WylieCcDduke-energy.com