Loading...
HomeMy WebLinkAbout20170239 Ver 2_U-3109 Site 2_20200910 (3) Wanucha, Dave From:Parker, Jerry A Sent:Friday, September 4, 2020 11:24 AM To:Wanucha, Dave Cc:David.E.Bailey2@usace.army.mil; 'dmoore@rkk.com'; Howell, John; Harper, Aaron A; Hayes, John R; Eason, Patty P Subject:U-3109 Site 2 Attachments:U-3109 Site 2 Permit Drawing.pdf; U-3109B Site 2 pics; Sample Pre-formed Scour Hole.pdf Dave, This email is being sent to document the conclusions of the onsite meeting at Permit Site 2 on project U-3109 on September 3, 2020. The meeting was scheduled due to NCDOT’s concern about removing vegetation along the fairly vertical banks of Mill Creek (see pictures) in order to install riprap on both sides of the banks at the outlet end of pipes per the permit drawing (see attached). Due to the apparent stability of the banks which was aided immensely by the existing dense vegetation, NCDOT was reluctant to remove the vegetation in order to replace with riprap. At the meeting, it was decided that instead of replacing the vegetation with riprap, that NCDOT would retain the existing dissipator pad on the north side of the creek and install a pre-formed scour hole at the outlet end of the pipe on the southern side of the creek. A sample drawing of a pre-formed scour hole has been attached. The southside pre-formed scour hole would be installed more than 50 feet from the top of bank which would allow for sheet flow through a vegetated buffer down to the creek. Impacts to the adjacent jurisdictional stream would actually be lessened due to this proposed change. Please let me know if you have any questions or if there is anything you would like to add prior to NCDOT commencing the work. Thanks. Jerry Jerry Parker Environmental Supervisor Division 7 North Carolina Department of Transportation 336 256 2063 office jparker@ncdot.gov 1 1584 Yanceyville St. P.O. Box 14996 Greensboro, NC. 27415-4996 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 2