Loading...
HomeMy WebLinkAbout20170239 Ver 2_U-3109 Site 2_20200910 Wanucha, Dave From:Patterson, Robert D Sent:Friday, September 4, 2020 11:51 AM To:Wanucha, Dave; Parker, Jerry A Cc:David.E.Bailey2@usace.army.mil; 'dmoore@rkk.com'; Howell, John; Harper, Aaron A; Hayes, John R; Eason, Patty P Subject:RE: U-3109 Site 2 I’m fine with the proposed change also. Thanks. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Wanucha, Dave Sent: Friday, September 4, 2020 11:43 AM To: Parker, Jerry A <jparker@ncdot.gov>; Patterson, Robert D <robert.patterson@ncdenr.gov> Cc: David.E.Bailey2@usace.army.mil; 'dmoore@rkk.com' <dmoore@rkk.com>; Howell, John <jhowell@ncdot.gov>; Harper, Aaron A <aaharper@ncdot.gov>; Hayes, John R <jrhayes3@ncdot.gov>; Eason, Patty P <peason@ncdot.gov> Subject: RE: U-3109 Site 2 Hi Jerry, Thanks for the follow-up. I’m forwarding this information to our unit’s Stormwater Engineer for his review and input. Robert may see something that I am not. I do not foresee any hiccups, but stay tuned. Thanks. Robert, Please review the info when you get a chance and let me know of any concerns. Thanks. Dave W. Division of Water Resources 401 & Buffer Transportation Permitting NC Department of Envirionmental Quality 336-776-9703 office 336-403-5655 mobile Dave.Wanucha@ncdenr.gov NC DEQ Winston Salem Regional Office 450 West Hanes Mill Road, Suite 300 1 Winston Salem, NC 27106 Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Parker, Jerry A <jparker@ncdot.gov> Sent: Friday, September 4, 2020 11:24 AM To: Wanucha, Dave <dave.wanucha@ncdenr.gov> Cc: David.E.Bailey2@usace.army.mil; 'dmoore@rkk.com' <dmoore@rkk.com>; Howell, John <jhowell@ncdot.gov>; Harper, Aaron A <aaharper@ncdot.gov>; Hayes, John R <jrhayes3@ncdot.gov>; Eason, Patty P <peason@ncdot.gov> Subject: U-3109 Site 2 Dave, This email is being sent to document the conclusions of the onsite meeting at Permit Site 2 on project U-3109 on September 3, 2020. The meeting was scheduled due to NCDOT’s concern about removing vegetation along the fairly vertical banks of Mill Creek (see pictures) in order to install riprap on both sides of the banks at the outlet end of pipes per the permit drawing (see attached). Due to the apparent stability of the banks which was aided immensely by the existing dense vegetation, NCDOT was reluctant to remove the vegetation in order to replace with riprap. At the meeting, it was decided that instead of replacing the vegetation with riprap, that NCDOT would retain the existing dissipator pad on the north side of the creek and install a pre-formed scour hole at the outlet end of the pipe on the southern side of the creek. A sample drawing of a pre-formed scour hole has been attached. The southside pre-formed scour hole would be installed more than 50 feet from the top of bank which would allow for sheet flow through a vegetated buffer down to the creek. Impacts to the adjacent jurisdictional stream would actually be lessened due to this proposed change. Please let me know if you have any questions or if there is anything you would like to add prior to NCDOT commencing the work. Thanks. Jerry Jerry Parker Environmental Supervisor Division 7 North Carolina Department of Transportation 2 336 256 2063 office jparker@ncdot.gov 1584 Yanceyville St. P.O. Box 14996 Greensboro, NC. 27415-4996 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 3