HomeMy WebLinkAbout820352_Plan of Action_20200908II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRm/24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: A
2. Structure ID: B
3. Structure ID:
4. Structure ID:
5. Structure ID:
6. Structure ID:
n.lines1 +2+3+4+5+6=
line m =
1129.0 Ib PAN
line m =
1343.E Ib PAN
line m =
Ib PAN
line m =
Ib PAN
line m =
Ib PAN
line m =
Ib PAN
2472.7 Ib PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR-
2 PAN balance
(Ib/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs,)
column r x s
u. application window'
10744
Pi
millet
48-50
207.00
10039.5
Apr -Aug
10744
P2
millet
33.70
96-00
3235.2
Apr -Aug
10744
1A
millet
3.66
75-00
274.5
Apr -Aug
10744
1 B
millet
1.711
154.001
263.3lApr-Aug
10744
2A
millet
4.39
121.00
531.2
Apr -Aug
10744
2B
millet
2.531
170.001
430.1
Apr -Aug
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) _
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) _
14773.8 Ib. PAN
2472.7 Ib. PAN
PoA (30 Day) 2/21 /00
x. Crop's remaining PAN balance (line v from section III) _
y. Overall PAN balance (w - x) _
14773.8 lb. PAN
-12301 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based
on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the
PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted
facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility.
NARRATIVE:
Irrigation onto existing spray fields will continue as weather and field conditions permit.
PoA (30 Day) 2/21 /00
PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 82-352
County: Sampson
Facility Name: JD Teachey Sow Farm
Certified Operator Name: Phillip Strickland Operator Number:
1003249
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID
Spillway(Y or N):
Level(inches):
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
A B
N Y
17 28
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 9/8/2020
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
JD Teachey Sow Farm Phone:
Facility Owner/Manager (print)
Date:
Facility Owner/Manager (signature)
910-284-0244
9/8/2020
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): FB--
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 28.01 inches
b. designed 25 yr./24 hr. storm &structural freeboard 30.0 inches
c. line b - line a (inches in red zone) = 2.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 159900 1ft2
e. line c/12 x line d x 7.48 gallons/W 199342 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 211483 W
h. current herd # 1 2000 certified herd #1 2000
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 6/25/2020
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
211483 ft'
W
111930 W
403188 gallons
2.23 Ibs/1000 gal.
1343.E lbs. PAN
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
E
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e, line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
17. inches
19.01 inches
2.0 inches
1624751ft 2
2202552 gallons
180 days
g. volume of waste produced according to structural design 21 1997
h. current herd # E 20001 certified herd #F' 20001
actual waste produced current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 6/25/2020
M. ((lines e + k)/1 000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
211997 ft'
01ft 3
94777 1 ft 3
382445 gallons
1.931lbs/1000 gal.
1129.0 lbs. PAN
PoA (30 Day) 2/21 /00