Loading...
HomeMy WebLinkAboutNCC203957_NOI Application_20200910Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 9/8/2020 8:43:41 AM (NCG01 NOI Submission) Approve by Clark, Paul 9/10/2020 10:26:14 AM (Review- Construction NOI 31041) • Gwinn, Matt reassigned the task to Clark, Paul 9/9/2020 11:41 AM . The task was assigned to Gwinn, Matt by round robin distribution 9/8/2020 8:43 AM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: September 10, 2020 5:00 PM 9/8/2020 8:43 AM Submit by Selkane, Aziza 9/10/2020 11:25:57 AM (Payment Verification for NCC203957) * Eastwood Construction LLC • Selkane, Aziza assigned the task to Selkane, Aziza 9/10/2020 11:25 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: October 22, 2020 5:00 PM 9/10/2020 10:26 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting r No an NOI that was r Yes rejected before? Previous Rejected 30915 NOI No. Prior Reviewer Paul Clark Name 1a. Project Name * Park View Estates 1 b. Specific Lot This field any be used to list specifc lot numbers. Numbers Lots 1 and 3 2. County* Cabarrus 3. Highway or Street 4210 Falls Lake Drive SW Address * Street narre only is acceptable if no address number assigned yet 4. City or Township* Concord 5. State * NC 6. Zip Code * 28205 7. Latitude * Enter the latitude in decimal degrees 35.3552 8. Longitude* Enter the longitude in decimal degrees (M. ST be negative) -80.5848 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 10/05/2020 Estimated Construction Project Start Cate 10. Date to End* 04/30/2021 Estimated Construction Project End Cute 11. SIC (Primary)* Residential, Single Family Houses (SFE) (1521) Standard Industrial Classification for Developrrent 12. Acres to be 0.38 disturbed* (including off -site borrow and waste areas) 13. Total site area 0.38 (acres) * 14. Post- 0.13 construction (Estirrated) impervious area (acres) * NCC Project NCC-CABAR-2020-Park View Estates Tracking ID Assignedautonatically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Rocky River Wate rbody* %rre of waterbody into which stornwater runoff will discharge 15b. Waterbody 13-17 Index No.* NCWaterbody Index Nurrber Stormwater rJ No discharges will flow r- Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ Fbrnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Pesponsible Entity Name * Eastwood Construction, LLC It pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. Note: The organization name must match the business entity name registered with the NC Secretary of State. You can verify the registration here. 2. First Name * Marc If Corporation, enter Faegistered Agent First %rre 3. Last Name* Battiste It Corporation, enter Pbegistered Agent Last %rre 3b. Title VP of Construction 4. Permitee E-mail mbattiste@eastwoodhomes.com Address* 5. Permittee 704.399.4663 Telephone No.* 6. Permittee Mailing Street Address Address* 2857 Westport Road Address Line 2 City Charlotte Fbstal / Zip Code 28208-3647 Check box if the street address the same as mailing address 7. Permittee Street Address* V Yes Street Address 2857 Westport Road Address Line 2 city Charlotte Fbstal / Zip Code 28208-3647 8. Type of Non -Government Ownership * State / Frovince / Fbgion NC Country us State / Frovince / Region NC Country us C. Site Contact Information Part C. Roject Site Contact Information .............................................................................................................................................................................................................................................................................................................................................................................................. 1. Primary Site Joshua Contact - First Name * 2. Primary Site Peak Contact - Last Name * 3. Title Homebuilding Manager 4. Site Contact E- jpeak@eastwoodhomes.com mail Address* 5. Site Contact 704.779.2106 Telephone No.* 6. Organization Eastwood Construction, LLC Name 7. Site Contact Street Address Mailing Address* 2857 Westport Road Address Line 2 city Charlotte Fbstal / Zip Code 28208-3647 8. Consultant Name (Optional) First and Last narre 9. Consultant E-mail This person will be copied on all correspondence. 10. Consultant Telephone No. State / Frovince / Pegion NC Country us D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 08/19/2020 Approved * 2. E&SC Plan Project CABAR-2021-008 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Mooresville (MRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan Letter of Approval PA with permit card. pdf 1.05MB Approval letter or Mist be RDF format Grading Permit 6. Site Location Map Helpful for linear project review (Optional) Parkview Plan with site map.pdf 1.28MB Mast be RDF format. Rease do not upload entire set of E&SCplans. 7. Notes (Optional) Rovide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies for linear projects if necessary. 8. NOI Certification NOI CERT FORM PARKVIEW ESTATES.pdf 453KB Form Wst be RDFfornat This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature wel , Wi1 ' Type Name * Marc Battiste Title VP of Construction Organization Legally Responsible Entity Eastwood Construction, LLC Date * 09/08/2020 F. Tracking and COC Info NOI Tracking No. 31041 NC Reference No. NCG01-2020-3957 Uses 'count_nurrber' variable (increrrented by SP) Certificate of NCC203957 Coverage (COC) Uses 'count_nurrber' variable (increrrented by SP) No.* Count Number 3957 Sequential nurrber for subrrittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.) Initial Invoice No. NCC203957-2020 Invoice Due Date 10/10/2020 Initial Fee $ 100.00 Invoice Status OPEN