Loading...
HomeMy WebLinkAbout20140762 Ver 5_R-2915 B stormwater question__RobertP_20200904 Wanucha, Dave From:Patterson, Robert D Sent:Friday, September 4, 2020 11:42 AM To:Wanucha, Dave; Hining, Kevin J; Beckwith, Loretta A CIV USARMY CESAW (USA) Subject:RE: R-2915 B stormwater question__RobertP Kevin – This sounds reasonable to me also. Thanks. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Wanucha, Dave Sent: Friday, September 4, 2020 10:48 AM To: Hining, Kevin J <kjhining@ncdot.gov>; Beckwith, Loretta A CIV USARMY CESAW (USA) <Loretta.A.Beckwith@usace.army.mil> Cc: Patterson, Robert D <robert.patterson@ncdenr.gov> Subject: RE: R-2915 B stormwater question Hi Kevin, Your proposal sounds reasonable to me and unless the Corps has some issues. The New River is HQW, so the length of treatment may be an issue. In the meantime, I’ll forward your email to our unit’s stormwater engineer for closer scrutiny. This definitely falls within Robert’s wheelhouse. He may have some additional comments or suggestions. Stay tuned. Thanks for the update and have a good holiday weekend. Dave W. Robert, Please take a look at Kevin’s email and attachment when you get the chance. Let me know if you need additional info or want to review on site. I attached a clip of the original plansheet for comparisons. Division of Water Resources 401 & Buffer Transportation Permitting NC Department of Envirionmental Quality 336-776-9703 office 1 336-403-5655 mobile Dave.Wanucha@ncdenr.gov NC DEQ Winston Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston Salem, NC 27106 Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Hining, Kevin J <kjhining@ncdot.gov> Sent: Friday, September 4, 2020 10:00 AM To: Beckwith, Loretta A CIV USARMY CESAW (USA) <Loretta.A.Beckwith@usace.army.mil>; Wanucha, Dave <dave.wanucha@ncdenr.gov> Subject: R-2915 B stormwater question Hey Lori and Dave, We have discovered an issue that is affecting the north abutment of our bridge over the South Fork New River, on HWY 221 in Ashe County, R-2915 (near the end of the B section at Station 244 Rt. The approach on the northeast corner of the bridge is starting to sink a little. We believe the issue is due in part to overflow during high rain events at one of the drop inlets/stormwater boxes. On the plan, there are two boxes on the northeast side of the road that are connected to each other and a longer pipe system. The primary issue is believed to be associated with the box closest to the bridge. All water that enters this box is supposed to travel north in a pipe, away from the river, join water that flows in from the adjacent box, travel further down the pipe system, and then is discharged down a slope drain onto a rip rap pad into a lateral base ditch. The water then travels back south to the SF New River. Since the terrain moves uphill fairly steeply as you move away from the river, the drainage system is low gradient (only 1%). To get it any steeper would have required excessive excavation. As a result of the low slope, the stormwater in the pipe system appears to be backing up during high rain events. The overflow during those events leaks out of the box closest to the bridge and is going around the bridge approach. This is believed to be a reason for the bridge approach sinking. As an alternative, I’m seeking your approval for an alteration to this system. The existing pipe system will stay in place and water entering the box furthest from the bridge will function as proposed during normal rain events. However, we would install a pipe into the first box that will allow the majority of water that enters it to travel directly from the box to the ditch below, and then into the SF New River. I’ve attached the plans, which show this alteration in red. I’ve also pointed out the existing system, which will remain in place. My assumption is that during high rain events some of the water that enters the second box will flow backwards towards the first box and leave the system. Given the low gradient of the system, I think this is likely during those higher events. However, even though some of the water will now be discharged a little closer to the river, it should still have 125-150’ of travel once it hits the lateral base ditch prior to entering the river, which should help pre-treat stormwater runoff prior to it entering the river. I’m hoping this alteration is seen as a minor change, and that we can get your approval to move forward. However, if you need additional information, or a formal permit modification, just let me know. Thanks again and hope you both have a great, long weekend! Kevin 2 Kevin Hining Division 11 Environmental Officer North Carolina Department of Transportation 828-386-7202 cell kjhining@ncdot.gov 801 Statesville Rd. PO Box 250 North Wilkesboro, NC 28659 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. _____________________________________________________________ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 3