HomeMy WebLinkAboutNCC203892_ESC Approval Submitted (5)_20200909ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Director
NORTH CAROLINA
Environmental Quality
August 29, 2020
LETTER OF APPROVAL WITH MODIFICATIONS
LGI Homes - NC, LLC
ATTN: Keith Sears, Regional Const. Mngr.
1450 Lake Robbins Drive, Suite 430
Spring, TX 77380-3258
RE: Project Name: Lot Clearing Plan for Lot 115 at Avery Pond Subdivision, Phase III D
Acres Approved: 0.29
Project ID: HARNE-2021- 021
County: Harnett, City: Hector's Creek, Address: Lahinch Drive
River Basin: Cape Fear
Stream Classification: HQW
Submitted By: Lee R. Hines, Jr., PE
Date Received by LQS: July 30, 2020
Plan Type: New
Dear Mr. Sears:
This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of
Approval with Modifications. A list of the modifications and reservations is attached. This plan approval
shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken,
as is required by Title 15A NCAC 4B .0129. Should the plan not perform adequately, a revised plan will be
required (G.S. 113A-54.1)(b).
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice
of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction
Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of
any land disturbing activity on the above -named project. The NOI form may be accessed at deq.nc.gov/NCGOI.
Please direct questions about the NOI form to Annette Lucas at Annette.lucaskncdenr.gov or Paul Clark at
Paul.clarkkncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you
within three business days. A $100 fee will be charged annually until allotice of Termination is issued. This
fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file
at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure
compliance with the approved plan, including the use of equipment and technology owned and operated by
D_ E Q�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Fayetteville Regional Office 1 225 Green Street, Suite 7141 Fayetteville, North Carolina 28301
NORT1 CAROLING
DgmwbmtoiEnviro,taia,ar� /`� 910.433.3300
Letter of Approval with Modifications
LGI Homes - NC, LLC
August 29, 2020
Page 2 of 3
the Department, (e.g., survey equipment, vehicles, unmanned aerial vehicles, etc.). Unless this office hears
otherwise from you, this correspondence serves as your authorization for DEMLR to utilize equipment and /
or technology on your property for inspection purposes.
Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job
site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, it is determined that
the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require
revisions to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change
in the information included on the form. This permit allows for a land -disturbance, as called for on the
application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit
and would require a revised plan and additional application fee. In addition, it would be helpful if you notify
this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction
conference.
Your cooperation is appreciated.
Sincerely,
61" t -�
Jodi Pace, EI
Regional Engineering Associate
DEMLR
Enclosures: Certificate of Approval
Modifications Required for Approval
NPDES NCGO1 Fact Sheet
cc: Lee R. Hines, Jr., PE (electronic copy)
Landon Chandler, Senior Planner (electronic copy)
DEMLR - Fayetteville Regional Office File
Letter of Approval with Modifications
LGI Homes - NC, LLC
August 29, 2020
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: LOT CLEARING PLAN FOR LOT 115 AT AVERY POND SUBDIVISION, PHASE III D
Project ID: HARNE-2021-021
County: Harnett
Provide two full size copies each of revised plan sheets, showing all the Modifications required for
approval, prior to beginning any land -disturbing activity. Per G.S. 113A-57(4), 15A NCAC
04B.0118 & G.S. 113A-54(d)(4)