HomeMy WebLinkAboutNCG190010_Email re Renewal_20200908McCoy, Suzanne
From: McCoy, Suzanne
Sent: Tuesday, September 8, 2020 3:16 PM
To: LP3@parkerboats.net; eric@parkerboats.net
Cc: Georgoulias, Bethany
Subject: NCG190010_Parker Offshore LLC Stormwater
Attachments: NCG190010_Renewal Application_20200908.pdf
Good afternoon.
We received the attached Renewal Application.
Please note this form is for Individual Permits, your facility is covered under a General Permit, your Certificate of
Coverage number is NCG190010. Below is a hyperlink to the portion of our website for Marinas and Shipbuilding
httos://dea.nc.2ov/about/divisions/ener2v-mineral-land-resources/nodes-stormwater-2os#nc2l90000:-marinas-and
shipbuilding,-administratively-extended,-effective-6-1-2020,-expires-9-30-2020 for your reference.
We apologize for any confusion that may have been caused the renewal notification letter sent August 7, 2020.
Nothing needs to be done for this renewal except update outfall information and use the new electronic submittal form
for Data Monitoring Reports.
Please do not hesitate to contact me with any questions.
Suzanne McCoy
Stormwater Program Administrative Specialist
Division of Energy, Mineral and Land Resources
North Carolina Department of Environmental Quality
Physical: 512 N. Salisbury Street, Office 640K, Raleigh, NC 27604
Mailing: 1612 Mail Service Center, Raleigh, NC 27699-1612
Email: Suzanne. mccoy�ncdenr.goy
Phone: 919-707-3640
Website: http://deg.nc.gov/about/divisions/energy-mineral-land-resources/stormwater
D, E QR & - '-�
ovp�r�,w o��nri����� quarry
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Before printing this email, please consider your budget and the environment.
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or
are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your
requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging
time.
Permit Coverage
Renewal Aaalication Form
National Pollutant Discharge Elimination System NPDES Permit Number
Environmental
Stormwater Individual Permit NCS 190010
Quality
Please provide your permit number in box in the upper right hand corner, complete the information in the space provided
below and return the completed renewal form along with the required supplemental information to the address indicated.
Owner Information
* Address to which permit correspondence will be mailed
Owner / Organization Name:
PARKER OFFSHORE LLC
Owner Contact:
LINWOOD PARKER
Mailing Address:
PO BOX 2129 2570 HWY 101 BEAUFORT NC 28516
PO BOX 2129 2570 HWY 101 BEAUFORT NC 28516
Phone Number:
252728-5621
Fax Number:
252728-1772
E-mail address:
LP3@PARKERBOATS.NET
Facility Information
Facility Name:
PARKER OFFSHORE LLC
Facility Physical Address:
2570 HWY 101 BEAUFORT NC 28516
Facility Contact:
ERIC DENTON
Mailing Address:
PO BOX 2129 2570 HWY 101 BEAUFORT NC 28516
Phone Number:
252728-5621
Fax Number:
252 728-1772
E-mail address:
ERIC@PARKERBOATS.NET
Permit Information
Permit Contact:
ERIC DENTON
Mailing Address:
PO BOX 2129 2570 HWY 101 BEAUFORT NC 28516
Phone Number:
252728-5621
Fax Number:
252 728-1772
E-mail address:
Discharge Information
Receiving Stream:
EASTMAN CREEK
Stream Class:
SA:HOW
Basin:
WHITE OAK
Sub -Basin:
Number of Outfalls:
3
RECEIVED
SEP 0 8 2020
DENR-LAND QUALITY
STORMWATER PERMITTING
Facility/Activity Changes Please describe below any changes to your facility or activities since issuance of your permit. Attached a
separate sheet if necessary.
No changes to facility operations or activities
CERTIFICATION
I certify. that I am fa ' ' r with the ' formation contained in the application and that to the best of my knowledge and belief
such information ' true, co nd accurate.
Signature Date �"� /Ze
Ct vivo a ��Ceti Tti
Print or type name of person signing above Title
DEMLR -Stormwater Program
Please return this completed application form Dept. of Environmental Quality
and requested supplemental information to: 1612 Mail Service Center
Raleigh, North Carolina 27699-1612
STORMWATER POLLUTION PREVENTION PLAN
DEVELOPMENT AND IMPLEMENTATION
CERTIFICATION
North Carolina Division of Energy, Mineral, and Land Resources — Stormwater Program
Facility Name:
Permit Number:
Location Address
PARKER OFFSHORE LLC
NCS190010
2570 HWY 101 BEAUFORT NC
County: CARTERET
"I certify, under penalty of law, that the Stormwater Pollution Prevention Plan (SPPP) document and all
attachments were developed and implemented under my direction or supervision in accordance with a system
designed to assure that qualified personnel properly gather and evaluate the information required by the SPPP.
Based on my inquiry of the person or persons who manage the system, or those persons directly responsible
for gathering the information, the information gathered is, to the best of my knowledge and belief, true,
accurate and complete."
And
"I certify that the SPPP has been developed, signed and retained at the named facility location, and the SPPP
has been fully implemented at this facility location in accordance with the terms and conditions of the
stormwater discharge permit."
And
"I am aware that there are significant penalties for falsifying information, including the possibility of fines and
imprisonment for knowing violations."
Sign (according to permit signatory requirements) and return this Certification. DO NOT
SEND STORMWATER POLLUTION PREVENTION PLAN WITH THIS CERTIFICATION.
Signature /T!�
Print or type name of person signing above
Date
Wr
Title
SPPP Certification 10/13
i
.,r,.
� •
+.i
} ��
�.�.
i
err
�
�
4 �
tT'
,,
ti�""
,�:
N
x �
�.,
� :�
�'••
_�
.,..�
�
—�
.�
„d-.�
4 "'
�,
�
y
;'r;
`"'
��"`.
�
"'°"
ww (
;y
8 -
/rh 7
�AM`
7wt
d
�
-�
iF
y�
�
wow
_b
s.ae
.-tea.. M
�
erw
�`
iij
Vi f
�'.,
,��.
r+�
�
� ,
i
Y
`4a
3
1
�{
y�
�
n -'
J
�r
�"
4%
v
�
�y�
�
�.
�i
.�.
u
(�
l_...�.......,�.
//F
1
r
i,
;,
.�
;:
'
� .:
i i
�
y
�
�
�
_.
s
'
i
{ �
�
�
'
I A
e
k •r
i �
i
Y
! r .. _.
!.
STORMWATER POLLUTION PREVENTION PLAN
DEVELOPMENT AND IMPLEMENTATION
CERTIFICATION
North Carolina Division of Energy, Mineral, and Land Resources — Stormwater Program
Facility Name: PARKER OFFSHORE LLC
Permit Number: NCS190010
Location Address: 2570 HWY 101 BEAUFORT NC
County: CARTERET
"I certify, under penalty of law, that the Stormwater Pollution Prevention Plan (SPPP) document and all
attachments were developed and implemented under my direction or supervision in accordance with a system
designed to assure that qualified personnel properly gather and evaluate the information required by the SPPP.
Based on my inquiry of the person or persons who manage the system, or those persons directly responsible
for gathering the information, the information gathered is, to the best of my knowledge and belief, true,
accurate and complete."
And
"I certify that the SPPP has been developed, signed and retained at the named facility location, and the SPPP
has been fully implemented at this facility location in accordance with the terms and conditions of the
stormwater discharge permit."
And
"I am aware that there are significant penalties for falsifying information, including the possibility of fines and
imprisonment for knowing violations."
Sign (according to permit signatory requirements) and return this Certification. DO NOT
SEND STORMWATER POLLUTION PREVENTION PLAN WITH THIS CERTIFICATION.
Signature �� e , _ Date
Print or type name of person signing above Title
SPPP Certification 10/13
SUPPLEMENTAL INFORMATION REQUIRED FOR RENEWAL OF INDIVIDUAL
NPDES STORMWATER PERMIT
Two copies of each of the following shall accompany this submittal in order for the application
to be considered complete:
(Do not submit the site Stormwater Pollution Prevention Plan)
Initials
E D 1. A current Site Map from the Stormwater Pollution Prevention Plan. The location of
industrial activities (including storage of materials, disposal areas, process areas and
loading and unloading areas), drainage structures, drainage areas for each outfall,
building locations and impervious surfaces should be clearly noted.
E D 2 A summary of Analytical Monitoring results during the term of the existing permit
(if your permit required analytical sampling). Do not submit individual lab reports.
The summary can consist of a table including such items as outfall number,
parameters sampled, lab results, date sampled, and storm event data.
E D 3. A summary of the Visual Monitoring results. Do not submit individual monitoring
reports. The summary can consist of a table including such items as outfall number,
parameters surveyed, observations, and date monitoring conducted.
E D 4. A summary of the Best Management Practices utilized at the permitted facility.
Summary should consist of a short narrative description of each BMP's in place at
the facility. If the implementation of any BMP's is planned, please include
information on these BMP's.
E D 5. A short narrative describing any significant changes in industrial activities at the
permitted facility. Significant changes could include the addition or deletion of
work processes, changes in material handling practices, changes in material storage
practices, and/or changes in the raw materials used by the facility.
E D 6. Certification of the development and implementation of a Stormwater Pollution
Prevention Plan for the permitted facility (Sign and return attached form).
If the final year analytical monitoring of the existing permit term has not been completed
prior to filing the renewal submittal, then the last years monitoring results should be submitted
within 30 days of receipt of the laboratory reports. (i.e. do not withhold renewal submittal
waiting on lab results)
PARKER MARINE ENT. 2570 HWY 101 BEAUFORT, NC 28516
N'S1 DEGS 'E 1426.16
PARKER MARINE ENT. 2570 HWY 101 BEAUFORT, NC 28516
N'SIDEGSS'E 1426.16
PARKER OFFSHORE LLC
SUMMARY OF ANALYTICAL MONITORING RESULTS
PERMIT NUMBER NCS190010
Due to the sloping topography of the property the stormwater does not flow to the outfall
collection locations immediately but gradually rises to the point where discharge at the outfall
collection location occurs. Unless the event is very rapid with significant amounts of rainfall no
flow exists at the outfall collection locations therefore there were several no flow reports
submitted. The event that was significant enough to gather samples is listed below.
Outfall
No.
Date
Sample
Collected;
molddh•r
Total
Rainfall,
inches
00530
00400
00556
01119
01104
01094
01114
Total
Suspended
Solids, mg.Z
p13;
Standard units
Oil &
Grease,
mga
Copper-'O,
mg.L
:aluminum=.
mg:Z
Zinc=-3,
mgZ
Lead!-1,
mgZ
Benchmark'
-
-
100
Within 6.0 —
9.0
15
0.005
0.75
0.095
0.220
Outfall #1
4-7-16
1.2"
< 3 mgil
6.89
5 mg.-7-
<.005 mg•'L
<.75 mg;Z
.033 mgZ
<.01 mg;L
Outfall #2
4-7-16
1.2"
5.1 mg.Z
7.00
<5 mg,-1
<.005 m l
<.75 mg.-1
.029 mg.1.
<.01 mg:L
Outfall #3
4-7-16
11"
3.5 mgrl
7.26
<5 mg;Z
<.005 mg.,,L
<.75 mg,1.
.022 mg,,-1
<.01 mg:L
(All, I i
1131
'rll
fjjjj 9'?
1 ?frxi p("1011
r, r
IJ I (f
1K P-, 'IM Olet"If4ji
J)ffr fc, -pe-
Is !"A f j(-
JS), H rj! :r� JJOI
c I tA n !A1 B F 9 1A C 2 1 c-) 0 0 T 0
kiwwr WOVULOWWO ur2n 12
C+PHOIA ITC
PARKER OFFSHORE LLC
SUMMARY OF ANALYTICAL MONITORING RESULTS
PERMIT NUMBER NCS190010
Due to the sloping topography of the property the stormwater does not flow to the outfall
collection locations immediately but gradually rises to the point where discharge at the outfall
collection location occurs. Unless the event is very rapid with significant amounts of rainfall no
flow exists at the outfall collection locations therefore there were several no flow reports
submitted. The event that was significant enough to gather samples is listed below.
Outfall
No.
Date
Sample
Collected;
moAdIvr
00530
00400
00556
01119
01104
01094
01114
Total
Rainfall,
inches
Total
Suspended
Solids, mg!Z
pH,
Standard units
Oil &
Grease,
mg.Z
Copper'O'
mg:Z
:1,luminum=.
mg:Z
Zinc=•3.
m911-
Lead=-3,
mgiL
Benchmarkl
-
-
100
Within 6.0 —
9.0
15
0.005
0.75
0.095
0.220
Outfall #1
4-7-16
1.2'
< 3 mg.L
6.89
5 mg'L
<.005 •L
<.15 mgrZ
.033 mg7.
<.01mg.1
Outfall #2
4-7-16
1.2"
5.1 mg.1
7.00
<5 mg.1
<.005 mg•L
<.75 mg,-1
.029 melt
<.01 mg.1
Outfall #3
4-7-16
1.2"
3.5 mg'L
7.26
<5 mg:Z
<.005 mg-L
<.75 mg.1
.022 mgZ
<.01 mg.1
PARKER MARINE ENTERPRISES
SUMMARY OF VISUAL MONITORING RESULTS
PERMIT NUMBER NCS190010
January -June 2016
Outfall 1: No visible signs of floating or suspended solids foam or oil sheen. Clarity good clear and no odors.
No deposits or erosion observed.
Outfall 2: Low signs of floating solids (grass clipping) and no suspended solids, foam or oil. Clarity good clear
and no odors. No deposits or erosion observed
Outfall 3: No visible signs of floating or suspended solids foam or oil sheen Clear with no odors. No deposits or
erosion observed.
July -December 2016
Outfall 1: No discharge significant enough to reach outfall collection location
Outfall 2: No discharge significant enough to reach outfall collection location
Outfall 3: No discharge significant enough to reach outfall collection location
Remaining semi-annual periods from January 2017 thru June 2020 there were no significant storm events that
produced a discharge from outfall collection locations.
PARKER MARINE ENTERPRISES
SUMMARY OF VISUAL MONITORING RESULTS
PERMIT NUMBER NCS190010
January -June 2016
Outfall 1: No visible signs of floating or suspended solids foam or oil sheen. Clarity good clear and no odors.
No deposits or erosion observed.
Outfall 2: Low signs of floating solids (grass clipping) and no suspended solids, foam or oil. Clarity good clear
and no odors. No deposits or erosion observed
Outfall 3: No visible signs of floating or suspended solids foam or oil sheen Clear with no odors. No deposits or
erosion observed.
July -December 2016
Outfall 1: No discharge significant enough to reach outfall collection location
Outfall 2: No discharge significant enough to reach outfall collection location
Outfall 3: No discharge significant enough to reach outfall collection location
Remaining semi-annual periods from January 2017 thru June 2020 there were no significant storm events that
produced a discharge from outfall collection locations.
PARKER OFFSHORE LLC
SUMMARY OF BEST MANAGEMENT PRACTICES
PERMIT NUMBER NCS190010
Parker Offshore LLC has in place a Best Management Practices program which includes:
Reduce or eliminate exposure of hazardous materials to the outside environment.
Exchange hazardous materials for non hazardous materials when possible.
Conduct routine checks on hazardous materials areas to prevent possible leaks or spills.
Move all possible materials and equipment indoors or under roof.
Daily checks around dumpster site to keep a clean area that is trash free.
Scheduled checks around entire property for paper, plastics or any other form of trash.
Training for select individuals who handle hazardous materials.
Training for select individuals on spill cleanup and containment.
Instilling a company wide awareness of the negative effects of stormwater pollution.
PARKER OFFSHORE LLC
SUMMARY OF BEST MANAGEMENT PRACTICES
PERMIT NUMBER NCS190010
Parker Offshore LLC has in place a Best Management Practices program which includes:
Reduce or eliminate exposure of hazardous materials to the outside environment.
Exchange hazardous materials for non hazardous materials when possible.
Conduct routine checks on hazardous materials areas to prevent possible leaks or spills.
Move all possible materials and equipment indoors or under roof.
Daily checks around dumpster site to keep a clean area that is trash free.
Scheduled checks around entire property for paper, plastics or any other form of trash.
Training for select individuals who handle hazardous materials.
Training for select individuals on spill cleanup and containment.
Instilling a company wide awareness of the negative effects of stormwater pollution.
PARKER OFFSHORE LLC
SUMMARY OF SIGNIFICANT CHANGES
PERMIT NUMBER NCS190010
There have been no significant changes in work process, material handling
practices or raw materials used by the facility. Material storage practices include
storing all materials possible inside or under cover.
PARKER OFFSHORE LLC
SUMMARY OF SIGNIFICANT CHANGES
PERMIT NUMBER NCS190010
There have been no significant changes in work process, material handling
practices or raw materials used by the facility. Material storage practices include
storing all materials possible inside or under cover.