Loading...
HomeMy WebLinkAbout20201141 Ver 1_401 Application_20200904DWR mrlslon of Water Resources Pre -Construction Notification (PCN) Form April 11, 2020 Ver 3.1 Initial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* C Yes r No Change only if needed. BIMS # Assigned 20201141 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Reviewing Office * Mooresville Regional Office - (704) 663-1699 Information for Initial Review 1a. Name of project: Irvine Creek Greenway 1a. Who is the Primary Contact?* Ian Eckardt 1b. Primary Contact Email:* ieckardt@Wldlandseng.com Date Submitted 9/4/2020 Nearest Body of Water Irvine Creek Basin Catawba Water Classification C Site Coordinates Latitude: 35.159060 A. Processing Information County (or Counties) where the project is located: Mecklenburg Is this a NCDMS Project r Yes r No Longitude: -80.706780 Is this project a public transportation project?* r Yes r No 1a. Type(s) of approval sought from the Corps: W Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Version#* 1 What amout is owed?* r $240.00 r $570.00 Select Project Reviewer* Alan Johnson:eads\adjohnson1 1c. Primary Contact Phone:* (704)332-7754 V 1b. What type(s) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: 13 - Bank Stabilization NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: W 401 Water Quality Certification - Regular r Non-404 Jurisdictional General Permit r Individual Permit le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: F- 401 Water Quality Certification - E)press r Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? r Yes r No B. Applicant Information 1d. Who is applying for the permit? r Owner W Applicant (other than owner) le. Is there an Agent/Consultant for this project?* r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: See attached Property Owner/Parcel Information Sheet. Included as part of the JD submittial package. 2b. Deed book and page no.: See attached Property Owner/Parcel Information Sheet. Included as part of the JD submittial package 2c. Responsible party: Mecklenburg County Asset and Facility Management (POC: Brian Bennett) 2d.Address Street Address 3205 Freedom Drive, Suite 6000 Address Line 2 City Charlotte Fbstal / Zip Code 28208 2e. Telephone Number: (980)314-2539 2g. Email Address:* Brian.Bennett@mecklenburgcountync.gov State / RWnce / Rion NC Country us 2f. Fax Number: r Yes r No r Yes r No 3. Applicant Information (if different from owner) 3a. Name: Brian Bennett, Project Manager 3b. Business Name: Mecklenburg County Asset and Facility Management 3c.Address Street Address 3205 Freedom Drive, Suite 6000 Address Line 2 city Charlotte Fbstal / Zip Code 28208 3d. Telephone Number: (980)314-2539 3f. Email Address:* Brian.Bennett@mecklenburgcountync.gov 4. Agent/Consultant (if applicable) 4a. Name: Ian Eckardt 4b. Business Name: Wildlands Engineering, Inc. 4c.Address Street Address 1430 South Mint Street, Suite 104 Address Line 2 city Charlotte Postal / Zip Cade 28203 4d. Telephone Number: (704)332-7754 4f. Email Address:* ieckardt@Wldlandseng.com State / Rovince / Rion NC Country us 3e. Fax Number: State / Province / Fegion NC Country us 4e. Fax Number: Agent Authorization Letter* LOA- ePCN Upload.pdf 621.33KB C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (d appropriate) 1c. Nearest municipality/ town: Matthews 2. Project Identification 2a. Property Identification Number: See attached Property Owner/Parcel Information Sheet 2c. Project Address 2b. Property size: 25 acres (assessment area) Street Address See attached Property Owner/Parcel Information Sheet included as part of the JD submittal package. Address tine 2 See attached Property Owner/Parcel Information Sheet included as part of the JD submittal package. Oty Slate/ Fnwince/ I3gion See attached Property Owner/Parcel Information Sheet included as part of the JD See attached Property Owner/Parcel Information Sheet included as part of the JD submittal package. submittal package. Postal / Zip Code Country See attached Property Owner/Parcel Information Sheet included as part of the JD See attached Property Owner/Parcel Information Sheet included as part of the JD submittal package. submittal package. 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Irvins Creek 3b. Water Resources Classification of nearest receiving water:* C 3c. What river basin(s) is your project located in?* Catawba 3d. Please provide the 12-digit HUC in which the project is located. 030501030104 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The project area is located within a wooded floodplain corridor along Irvins Creek in southeastern Mecklenburg County. Land use in the immediately project area includes forest, utilities easements (sewer / electrical), and recreational. Recreational land use includes Idlewild Road Park located at the the eastern end of the project corridor and ball fields associated with Crown Point Elementary School at the west end of the corridor. Land use surrounding the project area includes forest, residential, recreational, and institutional. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Irvins Creek Greenway USGS Map.pdf 315.75KB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Irvins Creek Greenway Soils Map.pdf 951.96KB 4f. List the total estimated acreage of all existing wetlands on the property: 0.634 AC 4g. List the total estimated linear feet of all existing streams on the property: 6,707 LF 4h. Explain the purpose of the proposed project:* The project proposes to build a new greenway facility for approximately one mile alongside Irvins Creek. The greenway will provide a linear trail for recreation, fitness, and community connection. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The project proposes to build a new greenway facility for approximately one mile alongside Irvins Creek. The project will improve accessibility between Sam Newell Road, Crown Point Elementary School and Idlewild Road Park. The greenway will begin where Irvins Creek crosses Idlewild Road and continues north and west to an existing recreation field west of Sam Newell Road. The trail will be a 12-foot wide asphalt path with sections of boardwalk or pedestrian bridges to cross existing streams. Additional project elements will include new landscaping, overlook points, improvements to an existing parking facility, storm water controls, and stream bank stabilization of approximately 114 linear feet (LF) on Irvins Creek. Excavators and skid steers may be used during grading activities. Proposed greenway crossings of streams will involve the construction of raised boardwalk and a prefabricated bridge. Boardwalk sections will be supported by driven timber piers. The bridge crossing will span top of bank to top of bank of Irvins Creek. Steel pilings will be driven in beyond top of bank to support bridge approaches. The installation of riprap for bank stabilization will be limited to approximately 114 LF and includes the area immediately at the proposed bridge and a section of unstable left bank immediately upstream. 4j. Please upload project drawings for the proposed project. Irvins Creek Greenway CD 8-08-20 Reduced.pdf 22.98MB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No G Unknown Comments: Preliminary JD Application is included with this submittal. 5b. If the Corps made a jurisdictional determination, what type of determination was made? r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Ian Eckardt Agency/Consultant Company: Wildlands Engineering, Inc. Other: Sd1. Jurisdictional determination upload Irvins—Creek _Greenway_PJDpacket. pdf Irvins—Creek _G reenway_PJD_F ig u res. pdf 6. Future Project Plans 6a. Is this a phased project?* r Yes f No 3.12MB 4.54MB 7b. If yes, explain. Irvins Creek Greenway is part of an overall Mecklenburg County greenway system that has numerous epsting sections as well as planned future sections. Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands W Streams -tributaries r Buffers r Open Waters r Pond Construction 3. Stream Impacts 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact* 3d. S. name* Type * 3f. Type of 3gSwidth * 3h. Impact ❑ �e;Stream Jurisdiction* length* S1 Construction Access Tem orar P Y Other Ur1 Intermittent Both 6 11 Average (feet) (lin�rfeet) $2 Construction Access Temporary Other Ur2 Intermittent Both 1Average(fee) 44earfeet) S3 Bank stabilization at bridge Permanent Bank Stabilization Irvins Creek Perennial Both 40 114 —] Average (feet) (lir�rfeet) 31. Total jurisdictional ditch impact in square feet: 0 31. Total permanent stream impacts: 114 3i. Total stream and ditch impacts: 169 3j. Comments: E. Impact Justification and Mitigation 1. Avoidance and Minimization 31. Total temporary stream impacts: 55 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The greenway alignment design incorporated the location of delineated streams and wetland in order to avoid these features as much as possible. Proposed stream crossings consist of either a bridge or raised boardwalk. The one bridge crossing will span top of bank to top of bank of Irvins Creek. Steel pilings will be driven in beyond the top of bank to support the bridge. Riprap bank stabilization proposed at the bridge crossing has been minimized to the area immediately at the bridge and a portion of the left bank immediately upstream that is currently unstable. Boardwalk sections will be constructed using driven timber pilings to avoid impacts. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Construction practices will follow guidelines from the NC Erosion and Sediment Control Planning and Design Manual. Boardwalk crossings will be supported by timber piers that will be driven in to avoid discharge. Steel bridge pilings will be installed outside of the top of bank of Irvins Creek to avoid impacts. Mud mats will be used for temporary construction access across streams. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State u 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? t^ Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Mitigation should not be required because project design has avoided impacts to streams and wetlands to the mabmum extent practicable. Wetlands were completely avoided and where stream crossings are necessary bridge or boardwalk is proposed. Riprap bank stabilization is limited to areas immediately at the bridge and a short section of unstable left bank immediately upstream. Proposed stabilization won't result in a loss of waters F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No If no, explain why: The project is located in the Catawba River basin where only the mainstem of the Catawba River has associated NC Riparian Buffer Protection Rules. The project area is on a smaller tributary (Irvins Creek) to the Catawba River with no NC Riparian Buffer Protection Rules. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? r Yes r No Comments: supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? * r Yes r No Comments: This is a Mecklenburg County greenway project which is not subject to NEPA/SEPA requirements. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. A majority of the land within or adjacent to the project area is publicly owned (including Idlewild Road Park). These properties are primarily forested and will serve as buffers immediately adjacent to much of the trail. A majority of private parcels adjacent to the project have already been or are currently being developed for residential purposes. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor WA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. Is another Federal agency involved?* r Yes r No r Unknown 5e. Is this a DOT project located within Division's 1-8? r Yes r No 5f. Will you cut anytrees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r' Yes r No 5h. Does this project involve the construction/installation of a wind turbine(s)?' r Yes r No 51. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r No If yes, please provide details to include type of percussive activity, purpose, duration, and specific location of this activity on the property. Irvins Creek Greenway - Percussive PCN information.pdf 1.01 MB 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Wildlands obtained an official species list (Consultation Code: 04EN1000-2019-TA-0736) from the USFWS IPAC on 9/11/19. A pedstrian survey was conducted between September 30 and October 2, 2019. Results of the survey found areas of potential summer roosting for the Northern long eared bat (NLEB) (Myotis septentrionalis), and areas of suitable habitat for the Schweinitts sunflower (Helianthus schweinitai), the smooth coneflower (Echinacea laevigata), and Michames sumac (Rhus michau)di). No individuals or populations of any of the above referenced species were documented on -site. A letter requesting review and comment was submitted to the USFWS on 11/4/19. The USFWS responded via letter (Log No. 4-2-20-064) indicating the agency had no concern for project -mediated impacts to federally protected species. Copies of correspondence with the USFWS are uploaded with this submittal. Consultation Documentation Upload Irvins Creek Greenway - USFWS Correspondence. pdf 1.77MB 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* National Oceanic and Atmospheric Administration (NOAA) Essential Fish Habitat Mapper Website (https://www. habitat. noaa.gov/application/efhmapper/index html). 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* The North Carolina Historic Preservation Office (SHPO)'s online HPOWEB Map Service was reviewed and indicated no historic resources within a half mile of the project area. No architectural structures or archaeological artifacts were observed or noted during pedestrian surveys of the site between September 30 and October 2, 2019. A letter requesting review and comment was submitted to SHPO on 11/4/19. No response from received from SHPO. The letter to SHPO is uploaded below. 7c. Historic or Prehistoric Information Upload Irvins Creek-SHPO Letter 11.4.19.pdf 1.22MB 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* r Yes r No 8b. If yes, explain how project meets FEMA requirements: A "No -Rise" flood model certification is being conducted and will be submitted with an application for an Individual Floodplain Development Permit (FDP) to Charlotte -Mecklenburg Storm Water Services. 8c. What source(s) did you use to make the floodplain determination?* Mecklenburg County NC Flood Insurance Rate Map (FIRM) Panels 4581 (Map Number 3710458100K) and Panel 4591 (Map Number 3710459100K). Both have an effective date of February 19, 2014. Miscellaneous Comments PCN Impact Maps are attached. Miscellaneous attachments not previously requested. Irvins Creek Figure PCN Impacts Maps.pdf Signature 2.42MB R By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: C. Brian Bennett Signature Date 9/4/2020 AGENT AUTHORIZATION FORM The undersigned landowner(s) identified below hereby authorize Wildlands Engineering, Inc. to act as the agent in obtaining a preliminary Jurisdictional Determination (pJD) and/or necessary permits/certification (401/404) for Irvins Creek Greenway-ldlewild Road to Lakewood Circle on the identified property in Mecklenburg County, NC. As part of the authorization the landowner authorizes access to Wildlands Engineering, Inc., the North Carolina Department of Environmental Quality, and the US Army Corps of Engineers personnel for the evaluation of the property as it relates to the project including stream and wetland determinations and delineations. Parcel ID #1: Street Address: Listed Owner: Responsible Party: Phone Number: Signature: Date: 19306204 3335 SAM NEWELL RD MATTHEWS NC 28105 CHARLOTTE MECKLENBURG BOARD OF EDUCATION 701E2NDST Charlotte, NC 28204 Name & Title AGENT AUTHORIZATION FORM The undersigned landowner(s) identified below hereby authorize Wildlands Engineering, Inc. to act as the agent in obtaining a preliminary Jurisdictional Determination (p1D) and/or necessary permits/certification (401/404) for Irvins Creek Greenway-ldlewild Road to Lakewood Circle on the identified property in Mecklenburg County, NC. As part of the authorization the landowner authorizes access to Wildlands Engineering, Inc., the North Carolina Department of Environmental Quality, and the US Army Corps of Engineers personnel for the evaluation of the property as it relates to the project including stream and wetland determinations and delineations. Parcel ID #2: 19325103 Street Address: 3120 SAM NEWELL RD MATTHEWS NC 28105 Listed Owner: KOREAN SEVENTH DAY ADVENTIST CHURCH (INC CAROLINA CONFERENCE ASSOC) PO BOAC 44270 Charlotte NC 28215 Responsible Party: PLA 64101-A te- v n- vergr&33L)re •— Name&Titlee/` Phone Number: ?Q (' 3 ` - ✓-ao d Signature: Date: AGENT AUTHORIZATION FORM The undersigned landowner(s) identified below hereby authorize Wildlands Engineering, Inc. to act as the agent in obtaining a preliminary Jurisdictional Determination (pJD) and/or necessary permits/certification (401/404) for Irvins_Creek Greenway-Idlewild Road to Lakewood Circle on the identified property in Mecklenburg County, NC. As part of the authorization the landowner authorizes access to Wildlands Engineering, Inc., the North Carolina Department of Environmental Quality, and the US Army Corps of Engineers personnel for the evaluation of the property as it relates to the project including stream and wetland determinations and delineations. Parcel ID #3: 19315105 Street Address: 3108 SAM NEWELL RD, Charlotte, NC 28209_ Listed Owner; TOWN OF MATTHEWS Responsible Party Phone Number; Signature: Date: 232 MATTHEWS STATION ST MATTHEWS,_NC_ 28105____ Z i Name & Title AGENT AUTHORIZATION FORM The undersigned landowner(s) identified below hereby authorize Wildlands Engineering, Inc. to act as the agent in obtaining a preliminary Jurisdictional Determination (pJD) and/or necessary permits/certification (401/404) for Irvins Creek Greenway-Idlewild Road to Lakewood Circle on the identified property in Mecklenburg County, NC. As part of the authorization the landowner authorizes access to Wildlands Engineering, Inc., the North Carolina Department of Environmental Quality, and the US Army Corps of Engineers personnel for the evaluation of the property as it relates to the project including stream and wetland determinations and delineations. Parcel ID #6: 19316104 Street Address: 10512 IDLEWILD RD MATTHEWS NC 28105 Listed Owner: Mecklenburg County c/o Real Estate/ Finance Department 600 E. 4th Street- 11th Floor Charlotte, NC 28202 Responsible Party: Dena R. Diorio, County Manager Name & Title Phone Number: 980.314.2539 Signature: Date: 1 Parcel ID #7: 19316114 Street Address: NA Listed Owner: Mecklenburg County 600 E. 4th Street- 11th Floor Charlotte, NC 28202 Responsible Party: Phone Number: Signature: Date: Parcel ID #8: Street Address: Listed Owner: Responsible Party: Phone Number: Signature: Date: Dena R. Diorio County Manager Name & Title 980.314.2539 19315131 Mecklenburg County 600 E. 4th Street- 11th Floor Charlotte, NC 28202 Dena R. Diorio, County Manager Name & Title 980.314.2539 I,-� Q • �D,,,-D �0�1 --- A �n AM Q Assessment Area• �ti .f: ■ „� Ct44 GMve.),, ark - �0 1 I ■ - `a M r' jP �{ ■ • i r r < < arm sus { Mint Hill USGS 7.5 Minute Topographic Quadrangle USGS Map W I L D LA N D S Irvins Creek Greenway E N G I N E E R I N G 0 500 1,000 Feet Catawba River Basin (03050103) ICI Mecklenburg County, NC QProject Parcels A, / • � �.• . r' 1i� �,' Y .ter `%j i�� .R-. .. t' ! Assessment Area 1� �. Q Project Area ® Existing Wetlands Project Stream - Perennial Project Stream - Intermittent w Non -Project Streams O Upland/Wetland Data Point (DP#) �p .' i. Au Lfs: fry , i ,17 CeB2 -Cecil sandy loam, 2-8%slope � •;..; � t.� ��' �~ r� y�,� - 4•'T l CeD2 -Cecil sandy loam, 8-15%slope r : Nk F - MO - Monacan loam, 0-2% slope a ,411� 1 PaE - Pacolet sandy loam, 10-25% slope7,y� 3. 00 }7: I� lag { Cr 06 tF i ill %Z PAW WILDLANDS ENGINEERING UT2 '�'�✓�3 Irvin A � N'ey ef' Squere n a _ 12 Pa DPI �DP2 0 '-*4 -*0- r' 2019 Aerial Photogra N ki Soils Map Irvins Creek Greenway 0 450 900 Feet Catawba River Basin (03050103) 1 1 1 Mecklenburg County, NC 27. W� 17. Cup, WILDLANDS ENGINEERING W K, 714,114711] I Wetland A Irvins Creek 49G UT1 6 M- 04. Figure 6.0 PCN Impacts Overview Map Irvins Creek Greenway 0 450 900 Feet Catawba River Basin (03050103) 1 1 1 t Mecklenburg County, NC A 1 J = sti wll�d Rd WILDLANDS OA,W ENGINEERING Irvine Creek (5,987 LF) 49�7� pdi wild Rd 0 200 400 Feet I I I S1 - 11 LF Temporary 4 �as+w Wetland A in caw nr_� UT7 (378 LF) l Figure 6.1 PCN Impacts Site Map Irvins Creek Greenway Catawba River Basin (03050103) Mecklenburg County, NC QProject Parcels RMIErAssessment Area Q Project Area ® Existing Wetlands Project Stream - Perennial — Project Stream - Intermittent Non -Project Streams Stream Impacts (S#) WILDLANDS ENGINEERING w i 9 u C' y� .t 7M ' ✓� "Ilk !..- A tip' 8 V. R. t. (5,987 LF) 1 . N UT3 (253 LF) 001 ►'.4t5 L C OVg1: ��- Oy e tt = r 4 uara Lrt Figure 6.2 PCN Impacts Site Map Irvins Creek Greenway 0 200 400 Feet Catawba River Basin (03050103) 1 1 1 Mecklenburg County, NC Irvins Creek Greenway Additional PCN Information G. Supplementary Information Si. Does this project involve (1) blasting, and/or (2) percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? Yes. If yes, please provide details to include type of percussive activity, purpose, duration, and specific location of this activity on the property. The project will not involve blasting but will include short periods of percussive activities. The percussive activities include pile driving timber piers for two boardwalk stream crossings and steel pilings at one proposed bridge crossing. Installation may be completed with a gravity hammer, pneumatic hammer, and/or vibratory hammer. Installation of all timber piers for boardwalks should take approximately one to two days. The steel pilings at the bridge crossing should also take one to two days to install. Attached is a figure of the three locations where percussive activities will occur. Q Project Parcels 4_ _! Assessment Area Project Area 0 Existing Wetlands Project Stream - Perennial Project Stream - Intermittent Non -Project Streams • Percussive Activity - Boardwalk Construction OPercussive Activity - Bridge Construction 5 UT3 °Y Sau�ro t oz!ln cr,� 03 Irvins Creek Lei -��0 UT1 41 2.0 9� 1 Percussive Activity Location Map W I L D LA N D S Irvins Creek Greenway ENGINEERING 0 450 900 Feet Catawba River Basin (03050103) 1 1 1 Mecklenburg County, NC WILDLANDS E N G I N E E R I N G November 4, 2019 Renee Gledhill -Earley State Historic Preservation Office 4617 Mail Service Center Raleigh, NC 27699-4617 Subject: Request for Review and Comment Irvins Creek Greenway— Idlewild Road to Lakewood Circle Charlotte, North Carolina Dear Ms. Gledhill -Earley: On behalf of Mecklenburg County Asset and Facility Management (AFM), Wildlands Engineering, Inc. requests review and comment on any possible issues that might emerge with respect to archaeological or cultural resources associated with the Irvins Creek Greenway — Idlewild Road to Lakewood Circle project in Mecklenburg County, NC. A USGS Topographic Map and an Overview Site Map showing the approximate project area are enclosed. The topographic figure was prepared from the Wilgrove 7.5-Minute USGS Topographic Quadrangle, and the site is located at latitude 35.159, longitude-80.708. The Irvins Creek Greenway project is being developed to build a new greenway facility for approximately 1.0 mile alongside Irvins Creek. The project will improve accessibility between Sam Newell Road, Crown Point Elementary School and Idlewild Road Park. In addition, project elements will include new landscaping, overlook points, a pedestrian bridge crossing, improvements to an existing parking facility, storm water controls, and stream bank stabilization of approximately 300 linear feet (LF) on Irvins Creek. Construction of this project will affect Jurisdictional Waters of the U.S. and require Section 404/401 permitting. Structures within or immediately adjacent to the project area include sewer lines and manholes, powerlines, road culverts, park amenities (walking trails, picnic areas, playground, parking lots, etc.), school building and associated facilities, storm drainage infrastructure, and residential homes. The surrounding land use includes forest, parks, school and residential communities. A portion of the project is located within Mecklenburg County Open Space, which is listed on the NC Natural Heritage Program Managed Lands. No architectural structures or archaeological artifacts were observed or noted during preliminary surveys of the site. We ask that you review the site based on the attached information to determine the presence of any historic properties. We thank you in advance for your timely response and cooperation. Please feel free to contact us with any questions that you may have concerning the extent of site disturbance associated with this project. Sincerely, . ar Kirsten Gimbert, Senior Environmental Scientist kgimbert@wildlandseng.com 704.941.9093 Attachment: Figure 1 Overview Site Map Figure 2 USGS Topographic Site Map Wildlands Engineering, Inc. (P) 704.332.7754 • 1430 South Mint Street, Suite 104 • Charlotte, NC 28203 Parcels Al ■■ . ► s NC Natural Heritage Program Managed Lands 1 � 4` Existing Wetlands Proposed Project Boundary Proposed Greenway Trail '■.�`. �; Existing Streams ''.•� � � �,.p pw age qrA J6, "..1 i0r: :1 b, 7-4 Vd;. g71 r d• - ak LIM dL .. 9EL. -� WILDLANDS ENGINEERING 0 275 550 1,100 Feet I i I i I Figure 1 Overview Site Map Irvins Creek Greenway - Idlewild Road to Lakewood Circle Yadkin River Basin (03040105) Mecklenburg County, NC Proposed Project Boundary ■.� j e l f;a ./ ' ■ 1 a; or • . 446 + r ; • � - " t� �rrr i � ■ � , V AOF It oil r ;1 '• • 50 000' /4:P 3W IV M I - �• ' ■ 7 • * i i� • 1► � ri , + � i � ' r . is 13 Wilgrove USGS 7.5 Minute Topographic Quadrangle r WILDLANDS kip ENGINEERING 0 275 550 1,100 Feet I i I i I Figure 2 USGS Topographic Site Map Irvins Creek Greenway - Idlewild Road to Lakewood Circle Yadkin River Basin (03040105) Mecklenburg County, NC