Loading...
HomeMy WebLinkAbout20070128 Ver 2_USACE Correspondence_20100212o1- o? a% v a. DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 REPLY TO ATTENTION OF: February 5, 2010 Regulatory Division Mr. William Perry Plantation Investors, LLC Post Office Box 8000 Pinehurst, North Carolina 28374 Dear Mr. Perry: 100 v^n- VAD 19@90mg, Fee 1 a 2010 WENDS AW STMW TU MANCN We have completed our review of your Department of the Army permit application (Action ID SAW-2007-0049) to discharge fill material into 0.166 acres of Section 404 jurisdictional riparian wetlands to facilitate the construction of a roadway to access the eastern portion of the Mid South Club residential community. The project is located on a 545 acre tract south of Midland Road (NC Highway 2), in Southern Pines, Moore County, North Carolina. Please be advised that the U.S. Army Corps of Engineers (Corps) is prepared to take final action on the application; however, by Federal law we can take no final action until the North Carolina Division of Water Quality (NCDWQ) issues a Section 401 Water Quality Certification (WQC). As of the date of this letter, we have no written indication that NCDWQ has issued a certification for the work. Once NCDWQ has issued or waived the required authorization, you must provide us with a copy. Upon receipt, final action on the Department of the Army permit application will be taken providing there have been no significant changes in the Corps' evaluation policies during that period or any significant project modifications. Conditions of NCDWQ's WQC will become conditions to any final Department of the Army permit. Should their action on the required certification approve a project different from that shown on the current application, a modification to the application will be required. Please notify us when you submit copies of the NCDWQ WQC of any such changes. Substantial changes may require a new permit evaluation process, including issuance of a new public notice. Please be advised that if NCDWQ denies the required WQC, then the federal permit will be denied without prejudice. If you should subsequently obtain the NCDWQ WQC, you should contact this office to determine how to proceed with your permit application. -2- You are cautioned that this is not a final action. Commencement of the work prior to Department of the Army final authorization would constitute a violation of Federal laws and subject you to further enforcement action. In addition, receipt ofNCDWQ's WQC does not obviate the requirement for obtaining a final Department of the Army permit prior to commencing the work. Any questions concerning the application should be directed to Emily Hughes of the Wilmington Regulatory Field Office at (910) 251-4635. Sincerely, Copy Furnished: s. Cyndi Karoly N.C. Department of Environment and Natural Resources 2321 Crabtree Boulevard, Suite 250 Raleigh, North Carolina 27604-2260 William T. Walker, Chief Wilmington Regulatory Field Office