Loading...
HomeMy WebLinkAbout310317_Compliance Evaluation Inspection_202008260 Division of Water Resources Facility Number 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: 0 7Routine Hance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: -a io—ate Arrival Time: Q °O g1ti, Departure Time: ((° ° qrv� County: (D,)d iO Region: w I 120 Farm Name: \� Noe f-j —1� &1 Jy rArt-rn a Owner Email: Owner Name: V L7 E151 Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: R 0\-\ j Certified Operator: V0A 2 r\ -1-� OYA Back-up Operator: Location of Farm: Design Current Swine Capacity Pop. Wean to Finish Wean to Feeder Feeder to Finish ?44r9 a Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Other Title: Integrator: Phone: Certification Number: Certification Number: Latitude: Design Current Wet Poultry Capacity Pop. Layer Non -Layer Design Current Dry Pnnitry Canneity Pon. Layers Non -Layers Pullets Turkeys Turkey Poults Other Longitude: Design Current Cattle Capacity Pop. y Cow y Calf y Heifer Cow Beef Stocker Beef Feeder Beef Brood Cow Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? [:]Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes YNo ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes To ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412015 Continued Facility Number: - Date of inspection: -a6 -aoa o Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes E!(No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes F%_,Yf'�o ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes VNo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes Into ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes E2�No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes EPINo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes U/No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes 2/No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes �No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): (341 S C: a C, SR ��Vj 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes D?(No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes [�No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes GTo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes rNo ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes EDINIp, ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes [;4o ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. 2rYes ❑ No ❑ NA ❑ NE [°Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey NA NE 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes [ ❑ ❑ 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes�/No ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facility Number: -j 1 - '3 (+ I jDate of Inspection: g- 26-a0P_0 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes �❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes YNo❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes dNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No EY A ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes M/No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ER/No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA KrNE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes 19'No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes E4o ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes Fg--No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). fNew 1, C)G"'�a�� W��le �Wa3 SIi 1) ►. �ie c fp )w� Ls am Z h-J S S e$} 30 � S V\CA 1 Gve r kv? 0'.1 K � aNAr, O eclu of Mo x� �a,�+� Na ve r C%w «.-+i c h Reviewer/Inspector Name: 15 tt rzr?- i Phone: 9 18) W- I M Reviewer/Inspector Signature: Date: Page 3 of 3 21412015