Loading...
HomeMy WebLinkAbout20091262 Ver 2_Acceptance Letter_20100217A NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary February 17, 2010 DWQ EXP # 09-1262v2 Nash County EXPRESS REVIEW ACCEPTANCE LETTER Mr. Mark Strickland 930 Eastern Avenue Nashville, NC 27856 Subject Property: Rocky Mount High School STORMWATER MANAGEMENT PLAN (SMP) On February 16, 2010 the Division of Water Quality DWQ received a request from Mr. Michael Stocks of Stocks Engineering, PA (through Mr. Jeff Harbour of ESI) for acceptance into the Express Review Program regarding the Stormwater Management Plan (SMP) review for the subject project in Nash County. This letter advises you that your project will be accepted into the Express Review Program once the following items are received: a. The application fee of $1500.00 made payable to the North Carolina Division of Water Quality [Stormwater Management Plan (SMP) with three (3) drainage areas]; b. Three (3) complete and collated copies of the Express Review Stormwater Management Plan Application [http://portal.ncdenr.or web/wq/swp/ws/401/express/fortnsl; Three (3) collated copies of all supporting information pertaining to this project including i. Design calculations for the proposed BMPs sized for both on-site and any off-site drainage; ii. Most current BMP Supplement completed for each BMP including Design Summary and Required Items Check List along with all required items (available at http://portal.ncdenr.org/web/wg/ws/su/bmp-manual ; iii. Signed and notarized Operation & Maintenance Agreements for the BMPs, available at the same website in c.ii above. d. Three collated copies of full size plans (with detailed construction information) including, but not limited to, the following: i. Existing conditions map of project area; ii. Proposed site grading plan showing existing and proposed contours, and delineated drainage area to each proposed BMP; iii. Erosion and sediment control plan; iv. Detailed plan and cross sectional views of each BMP showing information such as zones, pool levels, bottom and top elevations of berm, outlet structure-pipe system with topographic contours to receiving stream (outfall), etc (at appropriate scales as listed in the Required Items Checklist); 401 OversightlExpress Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX: 919-733-6893 Internet: http:/lh2o.enr.state.nc.uslncwetlands/ NorthCarohna Nahmilik An Equal Opportunity 1 Affirmative Action Employer Rocky Mount High School - SMP (Nash) Mark Strickland Page 2 of 2 February 17, 2010 V. Construction sequence and planting schedule for the proposed BMPs; e. One (1) data CD of full size plans in TIFF Group 4 format (black and white, not grayscale or color). If the plans are too large to store in TIFF format, they can be stored in PDF. Please note that a pre-application meeting is required prior to the submittal of your completed application. The owner of the project must be present at the pre-application meeting. The clock for this project will not start until receipt of the completed application package and required fee. If the drainage areas exceed what is indicated on the Initial Interest Form and/or the services are different you may be required to remit an additional fee. Thank you for your attention to this matter. If you have any questions or wish to discuss these matters further please do not hesitate to call Joseph Gyamfi or Lia M. Gilleski at 919-733-1786. Sincerely, Cyndi Karoly, Supervisor 401 Oversight/Express Review Program CBK/jg cc: File copy Michael Stocks, Stocks Engineering, 1100 Eastern Ave., P. O. Box 1108, Nashville, NC 27856