Loading...
HomeMy WebLinkAbout20200990 Ver 1_FINAL JD Waters Impact Plan-1red_20200819Strickland, Bev From: Daniel Zurlo <dzurlo@wkdickson.com> Sent: Wednesday, August 19, 2020 8:01 AM To: Roden Reynolds, Bryan K CIV (US); Johnson, Alan Subject: [External] RE: SAW-2020-01360_PNG Prospect Church (Notice of Incomplete Pre - Construction Notification) Attachments: 8.17.20_FINAL PNG Prospect Church Road -Jurisdictional Waters Impact Plan-1 red.pdf lummr, External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to ort.s am nc. ov Hi Bryan and Alan, I am in the field this week. I'll submit the updated PCN this evening. Please the responses to your comments in red. 1. Complete the Aquatic Resources Upload Spreadsheet (see attached excel spreadsheet) for all aquatic resources located within the proposed project area. See the attached. 2. In the PCN, Section C(4)(i) you state "All stream crossing impacts will be temporary (86 linear feet) and crossing areas will be stabilized." Please note temporary impacts will be restored to pre-existing conditions after the completion of construction. Based on construction drawings included, you are proposing both temporary and permanent stream impacts. The temporary stream impacts (i.e. 86 linear feet) are associated with open trench cutting techniques to place the new utility line. In addition, you are proposing permanent stream bank stabilization techniques such as embedded coir fiber matting and embedded rip rap. Therefore, please update the PCN, specifically, the table in Section D(3) to include the permanent stream impacts associated with bank stabilization. It is not the applicant's intention to use any rip rap or any other artificial material when stabilizing the proposed stream crossings. Banks will be stabilized with natural techniques such as coir fabric matting and seeding. The note on sheet 14 of the attached, updated plans describing the stream stabilization techniques has been updated to clearly state this. Because no rip rap or artificial stabilization techniques are proposed, none of the proposed impacts will result in permanent stream impacts. Please advise if this interpretation is incorrect. In the PCN Section D(3), the temporary stream impacts are associated with open trenching for the utility and not bank stabilization. Therefore, revise the table appropriately. PCN has been updated accordingly and resubmitted electronically, however open trenching is not an option in the impact type drop down box, so I chose excavation. Dan Zurlo Staff Scientist WK Dickson & Co., Inc. 1213 W. Morehead Street, #300 Charlotte, NC 28208 Office: 704-227-3416 Mobile: 717-460-3466 Email: dzurlo@wkdickson.com www.wkdickson.com Connect with us: Facebook I Twitter I LinkedIn From: Roden Reynolds, Bryan K CIV (US) <Bryan.K.Roden Reynolds@usace.army.mil> Sent: Thursday, August 13, 2020 3:14 PM To: Daniel Zurlo <dzurlo@wkdickson.com> Cc: Johnson, Alan <alan.johnson@ncdenr.gov> Subject: SAW-2020-01360_PNG Prospect Church (Notice of Incomplete Pre -Construction Notification) Importance: High Mr. Zurlo, On July 31, 2020, we received the Pre -Construction Notification you submitted on behalf of PNG on a property located in Stanly County, North Carolina. I have completed my initial review of the report and I have determined that it is incomplete. The following information is necessary before I will issue a determination: 1. Complete the Aquatic Resources Upload Spreadsheet (see attached excel spreadsheet) for all aquatic resources located within the proposed project area. 2. In the PCN, Section C(4)(i) you state "All stream crossing impacts will be temporary (86 linear feet) and crossing areas will be stabilized." Please note temporary impacts will be restored to pre-existing conditions after the completion of construction. Based on construction drawings included, you are proposing both temporary and permanent stream impacts. The temporary stream impacts (i.e. 86 linear feet) are associated with open trench cutting techniques to place the new utility line. In addition, you are proposing permanent stream bank stabilization techniques such as embedded coir fiber matting and embedded rip rap. Therefore, please update the PCN, specifically, the table in Section D(3) to include the permanent stream impacts associated with bank stabilization 3. In the PCN Section D(3), the temporary stream impacts are associated with open trenching for the utility and not bank stabilization. Therefore, revise the table appropriately. Please provide the information requested above in ONE consolidated response within 30-days of the date of this correspondence. If you do not respond within 30-days, the request will be administratively canceled. Please contact me via telephone or e-mail if you have any questions. Thanks, Bryan Roden -Reynolds, PWS Regulatory Project Manager U.S. Army Corps of Engineers Wilmington District Charlotte Regulatory Field Office 8430 University Executive Park Drive Charlotte, NC 28262 Office: (704)510-1440 o. Zaw 0OUO �JU OZw ¢O11 ZOp WW� nm< p xw ❑mom Oa0o 1N_0 E-o dz w00 ZZU 0Om wYJ =U¢ ~O= w O 0 ,Z< OWW z ooz O w C7 xr wE¢ ¢3z °�� 0 w3¢ x x¢3 xao Q2 �O< z=w OZV ZZo w .2x Y U F U po0 z = Y � ooI MOW oo= E0, Mao OU. WK JURISDICTIONAL WATERS OF THE U.S. — IMPACT PLAN �DICKSON rcommunityinfrastructure FOR consultants PNG PROSPECT CHURCH (AIRPORT) ROAD REPLACEMENT 1 213 W.MOREHEAD SUITE STREET 300 CHARLOTTE, NC 28208 STANLY COUNTY, NC (t) 704-334-5348 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 P OF 2" 11 SDR MDPE NAT RAL GA INE O BE I TALLED BY a =678 LF OF AWG #2 HMWPE CABL O ENCH OR DRY BORE (OR OTHER O BE INSTALLED BY OP N-TRENCH A PR ED N DOT T ENCHLESS METHOD) p � o AN /0 ROVED N A % DOT H DD7o Z O K CIR O \ U a RE PA K CIR AREA - HEET 9 Q O LLI Z W Z J R EET 4 A T 8 A RLOCATION OF O (n 0 J 3 H AREA 6-SHEET PROP.CONSTRUCTION M Q W O LO EA 5 -SHEET 6 LAYDOWN YARD CL JCS Cc R. 1418) K Oy�� = J } Q ~ (S R. 15 4) Q CL U = o 5 RE 1 - SHEET 11 Q O EA 1 - SH ET PROP.=15,212 LF TURAL GAS PIPELINE F 8" 11.5 SDR B SE IN TALLE Y p f- U O OPEN OR RY BORE O U Z W -TRENCH w O ?� APPROVED CDOT TREK (OR LESS METHO ❑ 5� Q\ Y J Z HVRC RO N al 9 2= v A A 11 - SHEE 2 C,gRT '4CR E U Z Z LLI Z LU Q S R.1 L'r N� 1—N isRFzR g o o PROP. =490 LF O 8" 11.5 D NATU L o=y W � OLLJ� � GAS PIPELINE T BE INS D BY Q m OPEN-TRENC O RY € P R ETH ) a Z J Q m m ILL _ m a 0 0 c E m m Pp o a LEGEND Riw NCDOT RIGHT-OF-WAY w Q w H rj RR RAN — RR R/W CSXT RIGHT-OF-WAY J z H PL PL PL EXISTING PROPERTY LINE O U Z_ wo PROPOSED LIMIT OF DISTURBANCE — GAS GAS GAS— PROPOSED NATURAL GAS PIPELINE - OPEN -TRENCH w § a GASH GASH GASH PROPOSED NATURAL GAS PIPELINE - TRENCHLESS cn Ir tY J - — — — — — — — - PROPOSED PERMANENT EASEMENT - N - d d p PROPOSED TEMPORARY EASEMENT I PROPOSED 15'STREAM/WETLAND BUFFER LOD LIMIT OF DISTURBANCE IL D ILPROPOSED PROJ. MGR.: — G c c EXISTING NATURAL GAS PIPELINE 0 750' 1500' 3000' WGB EXISTING RAILROAD w - EXISTING EDGE OF PAVED ROAD SCALE: 1" - 1500' w tr DESIGN BY: GLT DRAWN BY: EXISTING ROAD CENTERLINE ? EXISTING STORM DRAIN O GILT PROJ. DATE: n 13w13'°, 13AA 134A'lW EXISTING JURISDICTIONAL WETLAND -METt—%ETLbJETL'[NETL'WEYL= 2 — — — EXISTING JURISDICTIONAL STREAM CENTERLINE�+ 19- Piedmont 0 ? DULY 2020 NUMBER: DRAWING ----TB----TB----TB— EXISTING JURISDICTIONAL STREAM TOP OF BANK a - - BB - - - - BB - - - - BB— EXISTING JURISDICTIONAL STREAM BOTTOM OF BANK oe oe oe EXISTING OVERHEAD ELECTRIC V Natural Gas ¢ 1 OF 15 NO.: WKD PROJ. FM � EXISTING FORCE MAIN Know what's below. BEFORE YOU o a --- ss ---- ss ---- ss EXISTING SANITARY SEWER EXISTING TREE LINE all before you dig —4 CALL 1-800-632-4949 N.C. ONE —CALL CENTER ,T 5 THE LAW[ J Q z LL 20190195.00.CL o� Zaw p 0V0 �JU pZW ao¢ zoo 0 UO = W p U6] � w Ozw m .o -oN w00 Z °om T =oQ ems= �3w -00 Z< 0w ozoz owo Q N w¢a ¢�Z o�g >00 0 Oz w�¢ 2 tFn¢3 EDUZW ¢Em Wa <M ZoZ -3� OZV ZZO w Og= YUF U p00 Y � Q 3FZ ©o¢ NO 00= ¢Ff aW0 U0LL Q RIW M APPROX. EXTENT OF EX. -- / GH 30' OVERHEAD UTILITY / EASEMENT (TYP.) ¢_ G w R PE(SR.15241 I W OE,- R 5 -mcgo 6PG,121 PER-- / O u'D / /O_' PROP i — f —��/, F,n / . 8" 11.5 SDR MDPE NATURAL / i F GAS PIPELINE TO BE INSTALLED BY / f� W N O OPEN -TRENCH, MIN. 36" DEEP�Q (AOP. LIMIT OFIS URBANCE , �' � / — O -G �� C6 N / / —_ _U ROP. PERMANENT — — _ — 561 Z GAS ��� EASEMENT (TYP.) _ aso _ Q /� //�/ LU PROP. TEMPORARY 0 GAS EASEMENT(TYP.)LD d \' 7 H SOD c�� 0 JJ / < W 6� / / / LU / 0 u A U \ EX. JURISDICTIONAL STREAM - rr ° UT1 LITTLE LONG CREEK Z Z PROP. 15' O STREAM BUFFER U O O Z E AREA 1 IMPACT TABLE IMPACT TYPE & VALUE UNIT SITE # PERMANENT 0 LF STREAM PERMANENT 0 AC WETLAND TEMPORARY 0 LF STREAM TEMPORARY 0 AC WETLAND IL — N — o W w 0 15, 30' 60' w NOTE: SEE SHEET 1 FOR °C H KEY MAP & LEGEND O SCALE: 1 " = 30' Z r 4�11-,� Piedmont z Know what's below. ero Natural Gas W Call before you dig "; [sETM w,r6i Ir IL DWDIKCKSON 213 W. MOREHEAD STRE SUITE 300 CHARLOTTE, INC 28208 (t) 704-334-5348 WWW.WKDICKSON.COM N Q o O (D Z H o Cc 0C)< z 0 0- w (D tr Q CC if Q o Z U 2 (1- 5 N Z_ OU[C ccz¢ 2 2 H M Z Z Q U 0 wg0g � �a IL W W_ H W O�aa Cc CL m Q IL r Z Q IL w Ir 6j ¢ ui g J Z U Z W � o PROJ. MGR.: WGB DESIGN BY: GILT DRAWN BY: GILT PROJ. DATE: JULY 2020 DRAWING NUMBER: 2OF15 WKD PROJ. NO.: 20190195.00.CL m om Zaw p0o pJU ,zw Qom zo~ 0 2- 5m< p xw p�m wM o �No w ozw o zo. w00 �, oZom W x V_Q �px Oi� W3w =oN O. oww z czz owo w¢a ¢3Z ono w=¢ 0 3< xa❑ C7Zw Qo2E ?�w 32P oz(D O U- Zzp w o�= Y�r U p�0 Y V zQ �= 15 oo, "o mo= o ¢F, MW6 oWM INV. IN: 510.31' `/ // \ \ \- Sig — — /// INV. OUT: 510.12' , / �� PROP. PERMANENT INV. IN: 511.68' % // EASEMENT (TYP.) Q �, I cP PROP. TEMPORARY EASEMENT (TYP.) o s INV. OUT: 511.2TIf APPROX. LOCATION OF P OP�/ S1 I II —see— �� TEMPORARY PUMP -AROUND (TYP.) I• \ /� I W I I �� 1 N SEE DETAILS ON SHEET 14 13 - � ()�`' PROP. 8" 11.5 SDR MDPE NATURAL GAS PIPELINE TO BE INSTALLED BY, / OPEN -TRENCH, MIN. 36" DEEP a 110\m Z b �a cQ 1 �o c- I l v U q O I EX. JURISDICTIONAL �u O ai d� I lZ T LITTLE LONG CREEK o 1 PROP. LIMIT OF f, DISTURBANCE s'a AREA 2 IMPACT TABLE IMPACT TYPE & VALUE UNIT SITE # PERMANENT 0 LF STREAM PERMANENT 0 AC WETLAND TEMPORARY STREAM; S1 21 LF TEMPORARY 0 AC WETLAND s, A \ OO NOTE: SEE SHEET 1 FOR KEY MAP & LEGEND 8�1 Know what's below. Call before you dig Q � PROP.15'STREAM BUFFER N k 0 15' 30' 60' SCALE: 1" = 30' r6l' Piedmont Natural Gas �D CKSON 213 W. MOREHEAD STRE SUITE 300 CHARLOTTE, NC 28208 (t) 704-334-5348 WWW.WKDICKSON.COM rn O z o Cc J OUQ� Z O d w O Ir aO<� CC U Z_ Cc z Q Cc 2 H M J Z U p Z Q Ld Wgog �Q d L L I W_ H W 0 < m Cc IL IL 2 J Q 0 a Z Q IL w Cc w Q w g J H z U Z W O Q � o PROJ. MGR.: WGB DESIGN BY: GILT DRAWN BY: GILT PROJ. DATE: JULY 2020 DRAWING NUMBER: 3 OF 15 WKD PROJ. NO.: 20190195.00.CL m om Zaw o OVo �JU ozw Qom zoo 0 om> UU=w 'mom v,ao � w ozw u .o zo. w00 �, ozom W =VQ Oi� w3Q �o� 0Wz o�m z mzz ¢wo WE< ¢�:Z 6�3 w�E 0 W3< ml, wz o C7 ¢o< Q2E zow 32P oz(D U-O zzo w o�= Y�r U ES,O § Y!z< 15 ooE FAO UO= EFL M� oom R/vr Q------------ g I' OE ----------- ---- — --- -- — — N --------- _� ^ _ —` a � IT7— _ _ 3 _ ---- ---- EX. DROP INLET , RIM: 545.32' � INV. 18" RCP IN: 542.77' O � m U z V o z E AIRPORT ROAI�E------------_ _ \ (S.R.1524) /\----- _�_ ------- (NCDOT, 60' R/W \ �— PERM.B.21,PG.001) ^ — _ — __ ----- APPROX. EXTENT OF EX. C' 30' OVERHEAD UTILITY --INV. OUT: 532.86' —_ —_ - EASEMENT (TYP.)— PROP. 8" 11.5 SDR MDPE NATURAL — GAS PIPELINE TO BE INSTALLED -- \ BY OPEN -TRENCH, MIN. 36" DEEP \ s Ot — \ �c) I \17- \, I GAS W GAP _j tA, IN Ir fl0_1v 0, 9 w II I 1'1 W sz sw \ sww PROP. PERMANENTS I 1, 401 Z EASEMENT (TYP., PROP. LIMIT OF j APPROX. LOCATION OF PROP. I II DISTURBANCE \, 0 rTEMPORARY PUMP -AROUND (TYP.) O \` ` �,, \ 1 PROP. TEMPORARY \ U v (SEE DETAILS ON SHEET 13 - 14) Q Fo EASEMENT (TYP.) Z �� ������� � / �A� �/» O "SO `r % ) \ \ / / � /� Ab7PROP.15STREAMBUFFER ' Z EX. JURISDICTIONAL STREAM - z UT2 LITTLELONG CREEK O o INV. OUT:540.33' ,FI i \ AREA 3 IMPACT TABLE IMPACT TYPE & VALUE UNIT SITE # PERMANENT 0 LF STREAM PERMANENT 0 AC WETLAND TEMPORARY STREAM; S2 26 LF TEMPORARY WETLAND 0 AC pt w —N— w Q � w 0 \ 15' 30' 60' NOTE: SEE SHEET 1 FOR Cc KEY MAP & LEGEND O SCALE: 1 " = 30' Z } 81 Piedmont z .�� Know what's below. INatural Gas W 4. Call before you dig`E TMuw"""' m IL �D CKSON 213 W. MOREHEAD STRE SUITE 300 CHARLOTTE, INC 28208 (t) 704-334-5348 WWW.WKDICKSON.COM o oLO co H O Z J OUQ� O �wOZ Ir QOQ� U 2CLCC 5LO Z_ OU Cc z < [C 2 2� M �] Z Z Q Ld U p Wgog �Q dwwF- 0pmda w Cc IL m J Q w g U' CM Z Q IL w m ui ¢ ui g J Z H U Z Wj PROJ. MGR.: WGB DESIGN BY: GILT DRAWN BY: GILT PROJ. DATE: JULY 2020 DRAWING NUMBER: 4 OF 15 WKD PROJ. NO.: 20190195.00.CL 00 Zw Ma 0JU ❑Zw ao¢ zoo Z:j UOxw p0m ­0 �No w Ozw m .o � C) ZO, Z ,Om W =UQ Oi� Iw =ON ¢OWz oww oz'Z ¢w(D w¢a ¢3z ono >o¢ 0 w�¢ x Sap Ozw a Q om Z=Z 3 OzV Zzo Ogw= YF 000, Y � Q 3FZ ©o¢ No 0ZW ¢F .W0 U0¢ I I I AIRPORT ROAD I �, _ \ PER M.B. 2 I . PG 001) PROP. LIMIT OF INV. OUT: 544.40' DISTURBANCE - �_ APPROX. EXTENT OF EX. - Z l, _ _ — — — — — OE_ 30' OVERHEAD UTILITY — — — — — — EASEMENT (TYP.) w . " . PROP8115 SDR MDPE NATURAL' p 5- GAS PIPELINE TO BE INSTALLED BY OPEN -TRENCH, MIN. 36" DEEP \GAS \ \ s 546 � GS �— \ S s yv — — \AS SQ Su u2 4 GAS. GASH—� _ _W S �s s, h W \ \ ET N — w sJ so /alb o — -� \ \ \ I I ) I W \ s \ \ \ \ 0 \ PROP. TEMPORARY U \ \ sw� �, \a EASEMENT (TYP.) I a E t a PROP. PERMANENT \ EASEMENT (TYP.) I I I ` W z \ 001 \\ \ \ \ WE —m �T _� — EX. NON -JURISDICTIONAL DITCH \ \\ O EX. J \RISDICTIONAL WETLAND \ 1 PROP. 1T WETLANDBUFFER Q i W U \ \ \ z O a \ U O 0 z E AREA 4 IMPACT TABLE IMPACT TYPE & VALUE UNIT SITE # PERMANENT 0 LF STREAM PERMANENT 0 AC WETLAND TEMPORARY 0 LF STREAM TEMPORARY 0 AC WETLAND LL — N — o W 0 15' 30' 60' '- NOTE: SEE SHEET 1 FOR °C 1-- KEY MAP & LEGEND O SCALE: 1" = 30' Z r 8�1© Piedmont z Natural Gas z Know what's below. �•, W Call before you dig "-,,, w, cr IL DWDIKCKSON 213 W. MOREHEAD STRE SUITE 300 CHARLOTTE, NC 28208 (t) 704-334-5348 WWW.WKDICKSON.COM o O co z H o 0C)< Z 0 d W O tr o Q if QCc: Z U Z_ 2f1= CUCz< OU[C 2 2 H M Z U 0 Z QLd Wgog �Q I- CL W W(Q W CC_ Oda m Cc CL IL J Q Z Q IL W rr 6j ¢ Iii g J Z H U Z W § � o PROJ. MGR.: WGB DESIGN BY: GILT DRAWN BY: GLT PROJ. DATE: JULY 2020 DRAWING NUMBER: 5OF15 WKD PROJ. NO.: 20190195.00.CL o. Zaw 0OUO OJU p z w 'on zo 0 �ma oU=w m po¢ yao ,-o w ozw �-p o. woz °zom w Y =tea OY� n,w zza o.w z ooa pzz o.0 E wa ¢3:Z p HLD wD¢ 0 w1z ¢ H F H Q Ozw C7z ¢E� Qo2 °w -3D ozd Z U-o zp Ogw = co) U p�0 Y � Q oo¢ " o �o= ¢ 1 H awo Om, a a a z z K PROP. 8" 11.5 SDR MDPE NATURAL z GAS PIPELINE TO BE INSTALLED BY 5 HORIZONTAL DIRECTIONAL DRILL w 15" RCP INV. OUT: 555.44' m, 15" RCP INV. IN: 555.84' R/W OE _ _ OE - GAS GAS VJ o /p PROP. 15' WETLAND r BUFFER ¢ � I o I¢ a a PROP. LIMIT OF DISTURBANCE a` \ z U o o z 0 E R/W (S.R.152 (NCDOT, 60' id R/W OE I\. AS _GAS EX. JURISDICTIONAL WETLAND / 1 PROP. PERMANENT EASEMENT (TYP.) h h EX. JURISDICTIONAL STREAM - MOUNTAIN CREEK AREA 5 IMPACT TABLE IMPACT TYPE & VALUE UNIT SITE # PERMANENT 0 LF STREAM PERMANENT 0 AC WETLAND TEMPORARY 0 LF STREAM TEMPORARY 0 AC WETLAND APPROX. EXTENT OF EX. 30' OVERHEAD UTILITY EASEMENT (TYP.) 15" RCP INV. IN: 558.04' 15" RCP INV. OUT: 557.60' - fn w fn -R/W O E \ OE S O� U S _ GAS ��CAS �Cz Q LU sss DATA PLOT 5-2 I z0 DATA PLOT 5-1 i 10 o O � U LU cc O \\ \ (r r sss z Sss d \ O \ U O —N— o I � Q w 0 30' 60' 120' w NOTE: SEE SHEET 1 FOR °C KEY MAP & LEGEND O ' 81 Know what's below. Call before you dig SCALE: 1" = 60' z } Piedmont z + Natural GayLLI 22 — Ir �D CKSON 213 W. MOREHEAD STRE SUITE 300 CHARLOTTE, NC 28208 (t)704-334-5348 WWW.WKDICKSON.COM 0 � O fr � o z J OUQ� Z O fL W cr (O rr Q O Q m U 2fL57 Z_ z Q O Cc O 2 H m J z 0U0Z QLu W(Log c/)a 2 IL LU IL < LU 0 m J Q fZ 2 LO z Q a W Ir iii Q iii g J z Z W cr Ir fi i PROJ. MGR.: WGB DESIGN BY: GILT DRAWN BY: GILT PROJ. DATE: JULY 2020 DRAWING NUMBER: 6 OF 15 WKD PROJ. NO.: 20190195.00. C L m ow Zaw o OVO 0DJV ,zw Qom zoo 2,:5 5m< oow ,�m ,ao INm ~ 'W OZW z ❑ zo. WOO �, oZom WYJ xVQ Iox Oi� W w3Q nw<n ¢o❑ zw< oww z oo< ozz owo W¢a ¢3z 6�3 W o Q 0 3< ml, wz o (7 ¢o< Q2E Z°w 32P oz8 V-O ZZm Ogw = Y� 0�r V 0 z ! Y- 15 ooFc " o OOx ¢Fr Yawo 0 oWW Q AIRPORT ROAD (S. R. 1524) (NCDOT, 60' R/W PER M.B. 21, PG. 001) G G G G Z — — — — — — — — 577 — — — — — — — W— — — — — — — — 576------ INV. OUT: 573.33': z g / — 575 3 EX. JURISDICTIONAL WETLAND I'Y _ 578 . G G — — _ _ 577 - — — — _ _ _ { 576 ti r PROP. 15' WETLAND BUFFER i I I ~ \ \ PROP. 8" 11.5 SDR MDPE APPROX. EXTENT OF EX. y^h 30' OVERHEAD UTILITY \ NATURAL GAS PIPELINE TO �. BE INSTALLED BY / EASEMENT (TYP.) 1 1 \r OPEN -TRENCH, MIN. 36" DEEP o E \ — AS GAS / / G%S� GAS G SQ / \ LOD �` LOD �y LOD LOC \ / / s GAS GAS \ \ C o PROP. LIMIT OF / ` Q DISTURBANCE �O LO -=2� LOD a PROP. PERMANENT / \ EASEMENT (TYP.) \ PROP. TEMPORARY EASEMENT (TYP.) 0 Z 0 AREA 6 IMPACT TABLE IMPACT TYPE & VALUE UNIT SITE # PERMANENT 0 LF STREAM PERMANENT 0 AC WETLAND TEMPORARY 0 LF STREAM TEMPORARY 0 AC WETLAND —N— 0 10, 20' 40' NOTE: SEE SHEET 1 FOR KEY MAP & LEGEND SCALE: 1" = 20' 81 ,� Piedmont Know whaYs below. YouI N a t u ra I G a s Call before you digTMe �D CKSON �213W. MOREHEAD STRE SUITE 300 CHARLOTTE, NC 28208 (t) 704-334-5348 WWW.WKDICKSON.COM N Q (0 O 00 tr Z H o 00 J 0C)< Ir IZwOZ Q O < 0 U =a�'t Z_ OU P cc Z Q't 2 2 H 7 J Z Ld Q �Z U p g Wgo �Q aWwF­ w 0CQ < cr IL m J Q IL 2 Z W Cc ui ¢ ui 2 J Z U Z w Q O I Er PROJ. MGR.: WGB DESIGN BY: GILT DRAWN BY: GILT PROJ. DATE: JULY 2020 DRAWING NUMBER: 7 OF 15 WKD PROJ. NO.: 20190195.00.CL o. Zaw p0U0 OJU p z w ao1. z oo �ma U=w moo. Nao w Ozw to-❑ zoU woz 11c Dz om w Y x U_¢ � p x OY� =o, zwa o.w pz z H pzz o.0 wka ¢3:Z wDE oo 0 w1a <3 xap C7zw Qo2 °w -3D ozd ZU-o zp w og= . co) U p�0 Y � Q ~C7 00¢ ENO 70x x1 awo 0 °ow a AIRPORT ROAD (S. R. 1524) a (NCDOT, 60' R/W — — — — — --PEf U-13— 21,-PG_ QQ — — — G G G G 582 - — — — — — — G G--� G — — — — — _ 579 - — EX. JURISDICTIONAL STREAM _ UT1 MOUNTAIN CREEK fi c3kzr. RiW OE E a r APPROX. XTENT OF EX. I PROP. 8" 11.5 SDR MDPE NATURAL 30' OVERHEAD UTILITY GAS PIPELINE TO BE INSTALLED Ll /// LL — — EASEMENT (TYP.) — BY OPEN -TRENCH, MIN. 36" DEEP- - —� GAS GAS - ,-GAS GAS — GAS GAS � GAS �— GAS'\ p � PROP.15'STREAM BUFFER ' LOD / PROP. PERMANENT EASEMENT (TYP.) S3 CLOD LOD LO 4 L0 LOD LOD o APPROX. LOCATION OF PROP. , A TEMPORARY PUMP -AROUND (TYP.) PROP. TEMPORARY / PROP. LIMIT (SEE DETAILS ON SHEET 13 - 14) EASEMENT (TYP.) ym DISTURBANCE c a 0 z U A 0 z E a 581 - z — - 58� w 57f w AREA 7 IMPACT TABLE IMPACT TYPE & VALUE UNIT SITE # PERMANENT 0 LF STREAM PERMANENT 0 AC WETLAND TEMPORARY STREAM;S3 21 LF TEMPORARY 0 AC WETLAND a T —N— Ja _ 0 10, 20' 40' NOTE: SEE SHEET 1 FOR KEY MAP & LEGEND SCALE: 1" = 20' 81 Piedmont Imow what's below. N a t y ra I G a s Call before yo dig`,�,'n, �D CKSON �213 W. MOREHEAD STRE SUITE 300 CHARLOTTE, NC 28208 (t)704-334-5348 WWW.WKDICKSON.COM N 0cli O CD O 00 z J 0C)< O dWOZ cr Q O Q o_ U 2 d 5 7 Z_ O z cl:< Ucr 0 2 1- m J z Q_j � UpZ Wgog �a 2 d W W F- CC 0 w 0 < m J ¢ d z a w fr W ¢ W g J z H U z W O ¢ c d � PROJ. MGR.: WGB DESIGN BY: GLT DRAWN BY: GLT PROJ. DATE: JULY 2020 DRAWING NUMBER: 8 OF 15 WKD PROJ. NO.: 20190195.00. C L ow Zaw pOVo 0DJU 'zw Qom zoo WFo om w mom ,ao �No w ozw m .❑ 0 zoN w .�U0 Z 0Om wYJ =VQ 01 � Waw =ON zz< oww z ?OQ ozz O w o N w¢a ¢3z o�g w,¢ 0 W3< ¢'wlm �a� ma' oz w ¢o< Q2E z°w 32P oz(D U-O ZZo w og= Y�r U p'0'0 §=z -15 ooF, " o U'O= Fr o Mwo oo, Q 0 \ AIRPORT ROAD \ (S.R. 1524) N o / ( N CDOT,-60' R/W a3 — / PER M.B. 21, PG. 001) a— a —t_ --------------- 3 OE - --- 582 — — o — z — — _ _ 7 \ O — 581 E - — -- W OF — -_ OE — - 582 — — — — — OF— _'�' \ - — 581 582�� 580 — OE OE APPROX. EXTENT OF EX. / / 30' OVERHEAD UTILITY PRSEMEN (TYP.)P. PEANEEASEMENT (TYP.) — — C'qs �Q EASEMENT (TYP.) d 1 6'0 > Gqs/ C oo W2 o o f— I PROP. 15' WETLAND BUFFER Wl � yv PROP. 8" 11.5 SDR MDPE NATURAL (on a GAS PIPELINE TO BE INSTALLED Q ` r BY OPEN -TRENCH, MIN. 36" DEEP r �X. JURISDICTIONAL WETLAND O0 % / / 00 ` a MEN PROP. TEMPORARY z ' EASEMENT (TYP.) 1 PROP. LIMIT OF / DISTURBANCE G �QQ O qs o Z E O /GAS / _ '147 AREA 8 IMPACT TABLE IMPACT TYPE & VALUE UNIT SITE # PERMANENT 0 LF STREAM PERMANENT WETLAND; W1 0.018 AC TEMPORARY 0 LF STREAM TEMPORARY WETLAND; W2 0.018 AC / 0 10, 00� _0' NOTE: SEE SHEET 1 FOR 42� KEY MAP & LEGEND �3CALE: 1 " = 20' 81 Piedmont q Know A's below. " E u N a t u ra i G a s II before you dig;E,�„ WD CKSON community infrastructure consultants 213 W. MOREHEAD STREE SUITE 300 CHARLOTTE, NC 28208 (t)704-334-5348 WWW.WKDICKSON.COM N O �R Z H o J OUQ� O fLwOZ tr �U QOQ0 2 C L M Z_ OUP cccZQ : O 2 H M J Z Z Q LLi U p Wgog �Q aWwl— w 0 < cr IL m J Q IL g_ 0 00 ZIL Q W fS 6j ¢ iti 2 J Z U Z w cr tL � PROJ. MGR.: WGB DESIGN BY: GLT DRAWN BY: GLT PROJ. DATE: JULY 2020 DRAWING NUMBER: 9 OF 15 WKD PROJ. NO.: 20190195.00.CL om Zaw -=U 0 0DJU ozw aom zoo 2- 5m< p ow o�m ,ao INo w ozw m .o zo. w00 �, Z wYJ o V_Q pox Oi� w 3 w =o, owz oww z oo< ozz ¢wo w¢a ¢3z o F o wm¢ 0 w3< Uj F¢� xa❑ ,zw °2E z°w -32P oz(D U-O ZZo w o�= Y�r U p�0 Y V Q �I- 0o 00Fc Flo moo= ¢F� od0 Q d l d a `\a a \ U� z � t w � ,- J INV. OUT: 577.23' w ¢ i ( ROPO � P�RPOR 1524� ry, IN�S R� RIB �Oj26 pG pp1i • PARM6 .4 RIW i / O --z U� � 1 I o/ N EX. JURISDICTIONAL STREAM - e° E UT2 MOUNTAIN CREEK _ � INV. IN: 5-1 .20UZ ' / L 0 D U30 GAS o Y, CIO � 7 PROP.15'STREAM BUFFER PROP. 8" 11.5 SDR MDPE NATURAL GAS PIPELINE WITH 12" API 5L PSL2 GRADE B (MIN.), 0.188" W.T. (MIN.) STEEL CASING - / TO BE INSTALLED BY DRY BORE o 0 ` I ' O APPROX. EXTENT OF EX. 30' OVERHEAD UTILITY EASEMENT (TYP.) — fY. /i 584 . �D CKSON C community infrastructure consultants G ------ 213 W. MOREHEAD STEEE G _ 1 5g3 SUITE 300 ` CHARLOTTE, INC 28208 / y ,� � SBY � / � i � � 583 ' —\ 63 82 Sal INV. OUT:577.58',I I or Sao, Z E PROP. PERMANENT �;� INV. OUT: 576.70' EASEMENT (TYP.) i � \ PROP. TEMPORARY yeti ( I y1 EASEMENT (TYP.) LODLOb� \ GAS GAS I � I AREA 9 IMPACT TABLE IMPACT TYPE & VALUE UNIT SITE # PERMANENT 0 LF STREAM PERMANENT 0 AC WETLAND TEMPORARY 0 LF STREAM TEMPORARY 0 AC WETLAND GAS - � I\ L fn LL L. Q \�_J fn \ \ _ U \I z LU L� — Z o z _---0 I / 40� I 40� — 1 � doh o / PROP. 8" 11.5 SDR MDPE NATURAL j O L GAS PIPELINE TO BE INSTALLED n= I I \ BY OPEN -TRENCH, MIN. 36" DEEP I I _ — _ Z �Q I I PROP. LIMIT OF \ I I 0 ow DISTURBANCE r \ EX. NON -JURISDICTIONAL fn DI CHANNEL - REFER TO Z < III DATAFORM SCP1 \ O \Sao \ , 58 \ I O w LU �S9 o \ /? `n¢ 581— W -_0 25' 0' 100' w NOTE: SEE SHEET 1 FOR KEY MAP & LEGEND 8 1 , P i Krim what's below. Call before you dig �� _ 49 _ 4-c.RNETME .cF,� r6i ' V 1 7 Ir 1-- 0 1 " 50' Z rmbnt ViLurdl z Gas (t) 704-334-5348 WWW.WKDICKSON.COM Q r 0 m H O Cc Z 0C)< 0 Ir 0-w(7Z Q CC cr Q CD Z U 211=)M Z_ O cc z¢ U[C 2 2 H M Z Z Q LLi U 0 Wgog �Q d W W H 00 W < Cc IL m J Q IL 2 0 rn Z Q IL III Cc W Q LLI g J H Z U Z W d /PROJ. MGR.: WGB \ DESIGN BY: GILT DRAWN BY: GILT PROJ. DATE: JULY 2020 DRAWING NUMBER: 10 OF 15 WKD PROJ. NO.: 20190195.00.CL I O. Zaw -�pOvo �JV pzw Qom Zoe WW2 5m� VD=w m, -W �a0 = � w ozw . .0 .oN w0-0. z °om wYJ =VQ ~p= Oi� I3w Mop' ,Z< 0WW z o0Q OZZ ¢w0 m w¢a m3z 0 �9 w,Q O WIZ Oa �7Zw ¢0< Qom F z O W oz� V-O ZZp w Og= Y�r U p00 Y V1Q =Z 602 ,moo 0o= ¢F� ow. oo, a CARTER ACRES ROAD ` 582 (� R. 1524) G G G G G —71\1 0T, 60' R/W _ — —M.B_ 21� PG. OUTF- 1�i FM - _ - FM= = _ —F-M- 581 = 1 = — -FM- FM - FM - - FM - - saz - - --FM- � _ - FM - -580- — — — — — — — — — — — saf — — — — — - a- _ 580 F_ 57=. 57857 � T� d d� — — — — — — — — — — — — — — — — 578 3— - — — — — — 577 _ _ - — z ---574 \ —------------- 576�1F _ — — — — — —_ - — — 573 575 - � ~ — w — - 574-- — — — — s7z \ INV. OUT: 570.05' ' — — — — - 573 - — — — 5� / �___� APPROX. EXTENT OF EX. INV. OUT: 571.06' w PROP. 8" 11.5 SDR MDPE - OE \ 1 30' OVERHEAD UTILITY \ NATURAL GAS PIPELINE TO v \ 1 `� \\' EASEMENT (TYP.) — \ BE INSTALLED BY OPEN -TRENCH, MIN. 36" DEEP Y �\ `h° 1 PROP. TEMPORARY �� ) AZi EASEMENT TYP. J / I ( ) PROP. LIMIT OF V Q 1 o 1.' \ r I I� �l DATA PLOT 10 DISTURBANCE CDl� 0 O LOD -� OD I [" LOD LOD LOD— 1 W NJ GAS —� GAS GAS p U (10� a 0W3�� I 0 APPROX. LOCATION OF PROP. TEMPORARY J o I I PUMP -AROUND (TYP.) (SEE a I DETAILS ON SHEET 13 - 14) EX. JURISDICTIONAL STREAM - d UT3 MOUNTAIN CREEK �!am z \ z a m AREA 10 IMPACT TABLE o IMPACT TYPE & VALUE UNIT SITE # z PERMANENT 0 LF E STREAM a PERMANENT WETLAND; W3 0.0138 AC g TEMPORARY STREAM; S4 21 LF Q w TEMPORARY LL 1NFTI Alvin. 1Nd 0.0141 AC ZL�C A GAS GAS GAS GAS 'z \ O \ �—(10-1—(10 PROP. PERMANENT p 1 � EASEMENT (TYP.) Q S4 yy4 � DATA PLOT 10-2O tr Cc Z O co \ O fr E I� PROP. 15' WETLAND BUFFER 0( Z OU EX. JURISDICTIONAL WETLAND pc O LL \7 o Lq \ a 0\ 10, 20' 40' W \�\ NOTE: SEE SHEET 1 FOR - °C KEY MAP & LEGEND O SCALE: 1" - 20' Z m 81 Oiedmont Know what's below. a N a t u ra I Gas W- Call before you dig m.c. RflfE TM� war ^ m IL �D CKSON 213 W. MOREHEAD STRE SUITE 300 CHARLOTTE, NC 28208 (t) 704-334-5348 WWW.WKDICKSON.COM Qco O m � r H 0 cc:I-� Z J Ir 7 US co < Q O Q m Z U CL cM V 0z<Ln 2 �WZcl) OO 2 2 H ' Z U p Z Q Ld Ug�g c/)< Q cQ Omd¢ LU m cc: IL d J Q 0 0 a W W Q g LU J H Z H U Z w 0 Q d Cc � PROJ. MGR.: WGB DESIGN BY: GILT DRAWN BY: GILT PROJ. DATE: JULY 2020 DRAWING NUMBER: 11 OF 15 WKD PROJ. NO.: 20190195.00.CL m om Zaw p OVo pJU pzw ao� zoo wFo Oo=w mm p �,ao �No w ozw .o z w00 z ` 0) Z 0Om wYJ mo< I Oi� W3w mo. 0Wz 0 .n z oo< oZz owo w¢a m�:Z o�g w,¢ 0 wFz w3a wz o (7 Q2E ¢o< zow oz8 U-O ZZp w og= YUF U p�0 Y V z=Z F o alp OO= F H aW0 oo" Q PROP. 15' WETLAND BUFFER — — \ APPROX. EXTENT OF EX. / __PROP, 30' OVERHEAD UTILITY s PROP. LIMIT OF \ S9s EASEMENT (TYP.) / \ 87 DISTURBANCE \ _ — a _ \ PROP. 8" 11.5 SDR MDPE NATURAL \ \ GAS PIPELINE TO BE INSTALLED m \ PROP. TEMPORARY EASEMENT (TYP.) BY OPEN -TRENCH, MIN. 36" DEEP 0 �59° W6 L0� LOD\ LOD LOD - ¢\ s90 LOD ''592-----\\ LOD \ \ g 400 -� GAS GA GAS---' GAS \ 1 \ �+^ S a� 401 Q015°- \ - G7�7 00 _ _ _ _ _ —�jI' �T-1 589 --_ —1r IL_ —_ ... II-L Ir IL ' JC\ J W5 '� r E E E WET` — 5ae — < ' �. F /. D W cn —I z EX. JURISDICTIONAL WETLAND N i / > / 1 0 o U I c) I / o PROP. PERMANENT EASEMENT (TYP.) > DATA PLOT 11;1 0 / O Q� / 0 r / oW[ A o DATA PLOT 11-2 z f0 � C \ 0 0 Z E AREA 11 IMPACT TABLE IMPACT TYPE & VALUE UNIT SITE # PERMANENT 0 LF STREAM PERMANENT WETLAND; W5 0.016 AC TEMPORARY 0 LF STREAM TEMPORARY WETLAND; W6 0.015 AC S8v LL 1 o w Uj I✓ \ W 0 20' 40' 80' W NOTE: SEE SHEET 1 FOR OC F- KEY MAP & LEGEND SCALE: -V = 40' G) 0 Z 81 ,� Pied orb Know below. u oioi Nat rah \ as what's Call before you dig „_ ETM��^cr i - W IL �D CKSON 213 W. MOREHEAD STRE SUITE 300 CHARLOTTE, INC 28208 (t) 704-334-5348 WWW.WKDICKSON.COM LO Q W O H F U) z J _j <Ir�(0 Q Ir M UQO Zaco v = oUCz< W Z M OO 22l- Z U 0 Z Q Ug2g �Er Q m p ad¢ it Il IL J Q z IL W W Q g W J Z U z W d t7 PROJ. MGR.: WGB DESIGN BY: GILT DRAWN BY: GILT PROJ. DATE: JULY 2020 DRAWING NUMBER: 12 OF 15 WKD PROJ. NO.: 20190195.00.CL om Zaw o OVO 0DJU ,zw ao� zo~ 2- 5m< Uoow ,�m wM o �No w ozw o zo. w00 �, oZom wYJ =VQ ~�N OY� w3¢ =oN O. oww z Do< mzz Owo w¢a ¢3z 6�2 wnI 0 wFz w�a ml, oa (7zw ¢o< Qo2i z°W -3 2P oz8 U-O ZZm w o�= Y�r U p,O,0 Y V Q �=Z ~ C7 000 o mo o= F H Ya wo L)o' 0 BYPASS PUMP. CONTRACTOR SHALL BE RESPONSIBLE FOR SELECTING PUMP ADEQUATE DISCHARGE HOSE ENOUGH TO HANDLE THE BYPASS FLOW GENERATED BY ENERGY DISSIPATION 11 THE DAMMING OF THE STREAM X X PUMP PROPOSED I SILT FENCE PIPELINE (TYP.) OUTLET (TYP.) SILT FENCE (TYP.) DEWATERING DEVICE WATTLE (TYP.) GENERAL NOTES: —SUCTION HOSE FLOATING INTAKE COFFER DAM (TYP.) 1. CONTRACTOR SHALL ENSURE TO ANCHOR ALL PUMPS AND PIPES SECURELY. 2. CONTRACTOR SHALL UTILIZE NCDEQ EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL AND NCDOT BEST MANAGEMENT PRACTICES FOR CONSTRUCTION AND MAINTENANCE OF STREAM CROSSING. 3. CONTRACTOR SHALL PERFORM CROSSING WHEN PRECIPITATION HAS NOT OCCURRED IN THE PAST 48 HOURS AND WHEN PRECIPITATION IS NOT FORECASTED WITHIN STREAM CROSSING CONSTRUCTION WINDOW. 4. ALL DISTURBED STREAM BANKS SHALL BE STABILIZED WITH COIR FIBER EROSION CONTROL MATTING (OR APPROVED EQUIVALENT). DO NOT INSTALL EROSION CONTROL MATTING WITHIN THE TYPICAL HIGH WATER FLOW LINE OF THE STREAM. CONSTRUCTION SEQUENCE 0 1. SET UP BYPASS PUMP AND TEMPORARY PIPING. PLACE OUTLET OF TEMPORARY PIPE TO MINIMIZE EROSION AT DISCHARGE SITE OR PROVIDE TEMPORARY ENERGY DISSIPATION MEASURES. FIRMLY ANCHOR PUMP AND PIPING. 0 2. CONSTRUCT OUTLET PROTECTION IF NEEDED. 3. CONSTRUCT SAND BAG COFFER DAM UPSTREAM OF WORK AREA TO IMPOUND WATER FOR BYPASS PUMP INTAKE. USE A FLOATING INTAKE FOR PUMPS WHERE POSSIBLE. 4. CONSTRUCT AN SAND BAG COFFER DAM DOWNSTREAM TO ISOLATE WORK AREA. 5. CHECK OPERATION OF PUMP AND PIPING SYSTEM o 6. EXCAVATE AND SAVE THE EXISTING STREAM SURFACE COBBLE FOR USE IN FINAL STABILIZATION. IF NO STREAM COBBLE IS PRESENT, EXCAVATE AS TYPICAL AND REFER TO NOTE 8A FOR CHANNEL FLOW LINE STABILIZATION. a 7. INSTALL PROPOSED PIPELINE AS SHOWN ON PLANS. 8. BACKFILL TRENCH WITH NATIVE SOIL AND COMPACT TO PNG SPECIFICATIONS. UPON BACKFILLING OF TRENCH, REPLACE EXCAVATED STREAM COBBLE TO RESTORE STREAM FLOW LINE TO ITS ORIGINAL CONDITION AND PROVIDE SURFACE STABILIZATION. 0 9. STABILIZE ALL OTHER DISTURBED AREAS AS DETAILED IN GENERAL NOTE 4 ON THIS SHEET, AND IN THE CHANNEL CROSSING POST -CONSTRUCTION STABILIZATION DETAIL ON THIS SHEET. CONTRACTOR SHALL ADHERE TO ALL 401/404 PERMIT GUIDELINES FOR RE-ESTABLISHING VEGETATION WITHIN STREAM BANKS. ' 10. UPON COMPLETION OF CONSTRUCTION, REMOVE SAND BAG COFFER DAM, BYPASS PUMP, AND TEMPORARY PIPE. jw MAINTENANCE 'E 1. ROUTINELY INSPECT BYPASS PUMP AND TEMPORARY PIPING TO ENSURE PROPER OPERATION. a 2. INSPECT SAND BAG COFFER DAM FOR LEAKS AND REPAIR ANY DAMAGE. 3. INSPECT DISCHARGE POINT FOR EROSION. 4. ENSURE FLOW IS ADEQUATELY DIVERTED THROUGH PIPE. Piedmont a w Know what's below. Natural Gas N gone _ _ Call before you dig �D CKSON 213 W. MOREHEAD STRE SUITE 300 CHARLOTTE, NC 28208 (t) 704-334-5348 WWW.WKDICKSON.COM J Q Q p Z CO O U Q Z fr Ir n �a O<rr QCc: cr Q Z U IL Z_ �WZZ OO 2 H a U J Z �Up? Q_j Ug2 III EL Er Q CL W LU p�acc�cj m it G ILQQ z Cc � ui g ui J Q Z U Z w 3: O Q PROJ. MGR.: WGB DESIGN BY: GILT DRAWN BY: GILT PROJ. DATE: JULY 2020 DRAWING NUMBER: 13 OF 15 WKD PROJ. NO.: 20190195.00.CL om Zaw o OVo 0DJU Z w Qom zo~ 2- 5m< p ow o�m wM o � w ozw m .o zo. w00 �, oZom wYJ xVQ ~�N OY� w3Q n w �wv 0 O. oww z ?OQ mzz O w o w¢a ¢3z 6�2 wnI 0 wFz w�Q xa❑ (7Zw ¢o< Q2E zmw, -3 2E oz8 U-U 0 zzm wm o�= U YUF oc0 Y Q �=z 15 oo, " o lox ¢F, mwo 0 L)0, COFFER DAM DETAIL CONSTRUCTION SPECIFICATION 1. REMOVE BRANCHES AND LARGE ROCKS FROM AREA WHERE THE SAND BAGS WILL BE PLACED. 2. LAY OUT THE IMPERVIOUS POLY -FABRIC LINER WITH THE CENTER OF THE LINER LOCATED OVER THE CENTER OF THE SAND BAG DIKE. 3. PLACE THE PLASTIC WRAPPED SANDBAGS TO THE DESIRED HEIGHT. THE DIKES SHALL HAVE A WIDTH SUITABLE TO SUPPORT THE HEIGHT. EACH ROW SHALL BE OFFSET SO THE JOINTS ARE STAGGERED. PACK SANDBAGS TIGHTLY TOGETHER. 4. WRAP IMPERVIOUS POLY -FABRIC LINER AROUND SANDBAG DIKE AND SECURE WITH FINAL LAYER OF SANDBAGS. MAINTENANCE 1. PERIODICALLY INSPECT SANDBAG DIKE FOR DAMAGE AND LEAKS. 2. REMOVE IMPOUNDED TRASH AND SEDIMENT AS NEEDED. KEY IN MATTING PER MANUFACTURERS INSTRUCTIONS COIR FIBER MATTING (400 G/Mz) 9"-12" DIAMETER COIR FIBER ROLL EX.STREAM BANK STABILIZE CHANNEL FLOW LINE WITH ORIGINAL STREAM COBBLE STREAM CROSSING POST -CONSTRUCTION STABILIZATION 8�1© ►� Know what's below. Call before you dig Piedmont Natural Gas �D CKSON 213 W. MOREHEAD STRE SUITE 300 CHARLOTTE, INC 28208 (t) 704-334-5348 WWW.WKDICKSON.COM p J O cr p Z 0 OUQZ CL 0 < Irn_j �a O<rr Q� cr Q Z U IL � L1 Z _ �wzZ 00 2 2 l.d Z 0Up? Q_j Ug2� W d p �Er Q CL W LU 0O a U m I IL Q Q C7 W Cc a � ui g ui J Q = Z U z W O Q M tL cc: p PROJ. MGR.: WGB DESIGN BY: GILT DRAWN BY: GILT PROJ. DATE: JULY 2020 DRAWING NUMBER: 14 OF 15 WKD PROJ. NO.: 20190195.00.CL m o. Zaw o OVO �JU �zw Qom zol 2- 5m< OUxw 'Mm ,ao � w Ozw oz. zo. w00 �, °Zom W xVQ ~ 0 N OY� w3Q �LLW ¢o❑ zz< oW z oo< Do zz owo �r� w¢a ¢�:Z o�0 w=a 0 W3< ¢�Im xa❑ 7Zw ¢0< Q2i z°W -32P oz8 U-O ZZm o wm -= YUF U pco Y Q �=Z ~0 oo. o moo= ¢F� aJ 00,. 0 RIPARIAN SEEDING NOTES THE RIPARIAN SEED MIX SHOULD BE USED IN LIEU OF A TYPICAL PERMANENT SEEDING MIXTURE FOR STABILIZING DISTURBANCES WITHIN ENVIRONMENTALLY SENSITIVE AREAS SUCH AS STREAM BANKS, WETLANDS, AND ALL AREAS WITHIN 15' OF A STREAM BANK OR WETLAND EDGE. RIPARIAN SEEDING RECOMMENDATIONS FOR ALL SEASONS SEEDING MIXTURE ERNST CONSERVATION SEEDS RIPARIAN BUFFER MIX - ERNMX-178 PRE -MIXED SEED 22.1% PANICUM CLANDESTINUM, TIOGA (DEERTONGUE, TIOGA) 20.0% ELYMUS VIRGINICUS, 'MADISON' (VIRGINIA WILDRYE, 'MADISON,) 18.0% ANDROPOGON GERARDII, 'NIAGARA' (BIG BLUESTEM, 'NIAGARA') 18.0% SORGHASTRUM NUTANS, PA ECOTYPE (INDIANGRASS, PA ECOTYPE) 10.0% PANICUM VIRGATUM, 'SHAWNEE' (SWITCHGRASS, 'SHAWNEE') 3.0% RUDBECKIA HIRTA, COASTAL PLAIN NC ECOTYPE (BLACKEYED SUSAN, COASTAL PLAIN NC ECOTYPE) 2.0% ASCLEPIAS INCARNATA, PA ECOTYPE (SWAMP MILKWEED, PA ECOTYPE) 2.0% VERBENA HASTATA, PA ECOTYPE (BLUE VERVAIN, PA ECOTYPE) 1.0% EUPATORIUM PERFOLIATUM, PA ECOTYPE (BONESET, PA ECOTYPE) 1.0% HELENIUM AUTUMNALE, PA ECOTYPE (COMMON SNEEZEWEED, PA ECOTYPE) 0.7% ASTER NOVAE-ANGLIAE, PA ECOTYPE (NEW ENGLAND ASTER, PA ECOTYPE) 0.7% ASTER UMBELLATUS, PA ECOTYPE (FLAT TOPPED WHITE ASTER, PA ECOTYPE) 0.7% ZIZIA AUREA, PA ECOTYPE (GOLDEN ALEXANDERS, PA ECOTYPE) 0.5% MONARDA FISTULOSA, FORT INDIANTOWN GAP -PA ECOTYPE (WILD BERGAMOT, FORT INDIANTOWN GAP -PA ECOTYPE) 0.3% SOLIDAGO RUGOSA, PA ECOTYPE (WRINKLELEAF GOLDENROD, PA ECOTYPE) SEEDING RATE: 20 LB/ACRE OF SEED MIX PLUS AN ADDITIONAL 10 LB/ACRE OF (DRY SITES - GRAIN OATS, JAN 1 - AUG 1; OR GRAIN RYE, AUG 1 - JAN 1; MOIST SITES - GRAIN RYE YEAR-ROUND) SEEDING DATES: MOUNTAINS - YEAR-ROUND PIEDMONT - YEAR-ROUND COASTAL PLAIN - YEAR-ROUND MAINTENANCE RE -FERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, RE -FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. 8�1© ►� Know what's below. Call before you dig Piedmont Natural Gas �D CKSON 213 W. MOREHEAD STRE SUITE 300 CHARLOTTE, NC 28208 (t) 704-334-5348 WWW.WKDICKSON.COM 0 J ¢O z 0 OUQZ LU 00 < oa[n �a O<rr Q� cr Q z U IL Z_ �wzZ OO 2 2 H d z 0Up? Q_j Ug2 W fl Er Q CL WW 0O a curm it g IL Q Q C7 W (c a � W g ui J Q = z U Z W W O M o_ rr o PROJ. MGR.: WGB DESIGN BY: GILT DRAWN BY: GILT PROJ. DATE: JULY 2020 DRAWING NUMBER: 15 OF 15 WKD PROJ. NO.: 20190195.00.CL