HomeMy WebLinkAboutNCG080833_Rescission_20200908McCoy, Suzanne
From: McCoy, Suzanne
Sent: Tuesday, September 8, 2020 10:20 AM
To: joseph.williams3@nscorp.com; Motsinger, Adam
Subject: NCG080833_Rescission
Attachments: NCG080833_Rescission_20200908.pdf
Good morning.
Attached please find a copy of the Rescission letter being sent, per the request received March 20, 2020.
Suzanne McCoy
Stormwater Program Administrative Specialist
Division of Energy, Mineral and Land Resources
North Carolina Department of Environmental Quality
Physical: 512 N. Salisbury Street, Office 640K, Raleigh, NC 27604
Mailing: 1612 Mail Service Center, Raleigh, NC 27699-1612
Email: Suzanne. m000V�ncdenr.goy
Phone: 919-707-3640
Website: http://deg.nc.gov/about/divisions/energy-mineral-land-resources/stormwater
ISp,}.�einir��i no F aa.rwmrn dal q�iahky
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Before printing this email, please consider your budget and the environment.
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or
are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your
requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging
time.
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Director
Norfolk Southern Railway Company
1200 Peachtree St NE Box 13
Augusta GA 30909
NORTH CAROLINA
Environmental Quality
September 8, 2020
Subject: Rescission of NPDES Stormwater Permit
Kannapolis DTL Fuel Site
Certificate of Coverage: NCG080833
Cabarrus County
The Division of Energy, Mineral and Land Resources received your request to rescind coverage
under NPDES Stormwater Permit NCGO80833 for the above named facility.
Coverage of NCG080833 has been rescinded effective immediately.
If you have questions about this matter, please contact the Stormwater staff in our Mooresville
regional office 704-663-1699.
Sincerely,
For
Brian Wrenn
Director
ioseph.williams3@nscorp.com
adam.motsinger@nscorp.com
-D E Q�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612
NORTH WOLINA _
n_P_M_,.'� /� 919.707.9200
Compliance Inspection Report
Permit: NCGO80833 Effective: 11/01/18 Expiration: 05/31/21 Owner: Norfolk Southern Railway Company
SOC: Effective: Expiration: Facility: Kannapolis DTL Fuel Site
County: Cabarrus 306 N Main St
Region: Mooresville
Kannapolis NC 28081
Contact Person: Gilbert O Turner Title: Phone: 704-378-3841
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 09/01/2020 Entry Time 10:05AM
Primary Inspector: Kenny Llywelyn
Secondary Inspector(s):
Certification:
Phone:
Exit Time: 10:20AM
Phone:
Jesse M McDonnell
Reason for Inspection: Follow-up Inspection Type: Compliance Evaluation
Permit Inspection Type: Transportation wNehicle Maintenance/Petroleum Bulk/Oil Water Separator Stormwater Discharge COC
Facility Status: Compliant ❑ Not Compliant
Question Areas:
■ Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG080833 Owner - Facility: Norfolk Southern Railway Company
Inspection Date: 09/01/2020 Inspection Type : Compliance Evaluation Reason for Visit: Follow-up
Permit and Outfalls
# Is a copy of the Permit and the Certificate of Coverage available at the site?
# Were all outfalls observed during the inspection?
# If the facility has representative outfall status, is it properly documented by the Division?
# Has the facility evaluated all illicit (non stormwater) discharges?
Comment: This site is inactive and no personnel was onsite at the time of the inspection.
Page 3 of 3