HomeMy WebLinkAboutNCG140449_Inspection_20200901Compliance Inspection Report
Permit: NCG140449 Effective: 08/01/17 Expiration: 06/30/22 Owner : The Lane Construction Company
SOC: Effective: Expiration: Facility: Temporary Concrete Batch Plant - Lane Constr
County: Rowan 1500 N US Hwy 29
Region: Mooresville
China Grove NC 28023
Contact Person: Christopher Ange Title: Phone: 336-406-9060
Directions to Facility:
185 N to exit 68 left onto Hwy 152, drive 152, drive — 1.1 mi, use right lane to take ramp to 185 N/US 601 merge onto US 29, drive 0.2
mi facility is on the right.
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 09/01/2020 Entry Time 09:35AM Exit Time: 09:45AM
Primary Inspector: Kenny Llywelyn Phone:
Secondary Inspector(s):
Jesse M McDonnell
Reason for Inspection: Follow-up Inspection Type: Compliance Evaluation
Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC
Facility Status: ❑ Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG140449 Owner - Facility: The Lane Construction Company
Inspection Date: 09/01/2020 Inspection Type: Compliance Evaluation Reason for Visit: Follow-up
Inspection Summary:
Lane Construction is complete with concrete operations. However, the site still has equipment stored onsite. There is also
construction debris and bare areas that needs groundcover before it can be considered stablized. It is recommended that the
permit not be rescinded at thie time.
Page 2 of 3
Permit: NCG140449 Owner - Facility: The Lane Construction Company
Inspection Date: 09/01/2020 Inspection Type: Compliance Evaluation Reason for Visit: Follow-up
Page 3 of 3