From: Dishmon, Joyce Martin <Joyce.Dishmon@duke-energy.com>
Sent: Wednesday, September 2, 2020 4:40 PM
To: Gwinn, Matt
Subject: [External] RE: Dan River Minor Mod
Attachments: Renewal Update Request.pdf
®' T External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
reDort.spam(@nc.Rov
Matt,
I have attached an electronic copy of the renewal update submitted in August. The hardcopy was received 8/6/20 in the
mail service center. Thank you for forwarding the draft minor modification. I will respond with any comments this
week. Tyler Pearson is scheduled to visit the site on 9/9/20.
Regards,
Joyce Dishmon
Permitting and Compliance, Carolinas
Office: 336-623-0238
Cell: 336-394-5524
Email: joyce.dishmon@duke-energy.com
From: Gwinn, Matt <matt.gwinn@ncdenr.gov>
Sent: Wednesday, September 2, 2020 2:31 PM
To: Dishmon, Joyce Martin <Joyce.Dish mon@duke-energy.com>
Cc: Lucas, Annette <annette.lucas@ncdenr.gov>
Subject: [EXTERNAL] Dan River Minor Mod
Hi Joyce,
I hope you're doing well. I apologize for the confusion, the inspection Tyler requested is mainly for the permit minor
modification. I think the Regional Office would like to go ahead and conduct a full inspection as the permit renewal for
Dan River will be coming up soon. Our goal is to issue the permit minor modification prior to the expiration of your
existing permit at the end of September. There is not a draft of the renewed permit yet, but I can provide you with a
draft of the permit minor modification. The draft permit modification is still awaiting comments from the Regional
Office. If you have any comments on the minor modification please let me know in time to incorporate them into the
minor modification before it will need to be issued.
Here is part of the draft approval letter which notes the changes made in the minor modification:
This modification includes the following changes from your current permit:
• Modifications to the permit in Part 11 on page on 9 of 18, to designate the sampling location for SW002;
• Modifications to the permit in Part II on page 10 of 18, to include Outfall SWO02 in the analytical
monitoring requirements listed in Table 5;
• Modifications to the permit in Part II on page 10 of 18 to designate the sampling location for SW010;
• Modifications to the permit in Part II on pages 6-10 of 18 to update verbiage that referred to
construction/demolition activities that have now been completed; and
• Revisions to the permit cover page to reflect the latest amendment date.
On the topic of the permit renewal. I had requested some information for the permit renewal including a summary of
monitoring data, and I wanted to check on the status of that information. In our earlier emails on August 181" you had
said you would provide the information by Thursday of that week. I just wanted to make sure you hadn't already sent it
and that it was lost somewhere along the way.
Matt Gwinn
Stormwater Program Environmental Technician II
Division of Energy, Mineral and Land Resources
North Carolina Department of Environmental Quality
Office: (919) 707-3648
Email: matt,gwinna-ncdenr.gov
Web site: deg.nc.gov/SW
Physical Address: 512 North Salisbury Street, Office 640L, Raleigh, NC 27604
Mailing Address: 1612 Mail Service Center, Raleigh, NC 27699-1612
D,
nOPp+im�i{ of lnY,ronrnraiial {{�sliYy
Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed
to third parties
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety of staff and the public. Many employees are working remotely or are
on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
appointments only. We appreciate your patience as we continue to serve the public during this challenging time.