Loading...
HomeMy WebLinkAboutNCC203877_ESC Approval Submitted_20200904ROY COOPERe'�y, Governor '9� MICHAEL S. REGAN Secretary BRIAN WRENN •�'""� Director NORTH CAROLINA Env&vnmaMm! Q"aW August 18, 2020 LETTER OF APPROVAL WITH MODIFICATIONS E & S Development, LLC ATTN: Travis Sharpe, Member/Manager 15 Scotland St. Ocean Isle Beach, NC 28469 RE: Project Name: Haw Village Acres Approved: 4.58 Project ID: ALAMA-2018-012 County: Alamance City: Thompson Address: Haw Village Dr. River Basin: Cape Fear Stream Classification: WS-V ; NSW - Jordan Lake Watershed Submitted By: Bateman Civil Survey Company Date Received by LQS: August 14, 2020 Plan Type: Revised Dear Mr. Sharpe, This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval with Modifications. A list of the modifications and reservations is attached. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. Should the plan not perform adequately, a revised plan will be required (G.S. 113A-54.1)(b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (N01) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: D �JS North Cardha Department of Envlranmermal Qua ft I Division of Energy, MRneral and land Resouroes •/ Winston-Sakm Regional Office 1 450 Hanes M 11 Road State 3001 Wlrmton-Salem. North Carobm 2nQ3 ` "s"'�v336.T76.9800 Letter of Approval with Modifications E & S Development, LLC August 18, 2020 Page 2 of 3 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S.113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely Z char3hentz, El Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NPDES NCG01 Fact Sheet cc: Bateman Civil Survey Company ATTN: Lauren Granger 2524 Reliance Ave. Apex, NC 27539 WSRO file Letter of Approval with Modifications E & S Development, LLC August 18, 2020 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Haw Village Project ID: ALAMA-2018-012 County: Alamance Modifications pursuant to applicable North Carolina General Statutes and/or Regulations: The following modifications were included with the April 1, 2020 approval and still apply to the project: 1. Be advised that any homebuilder other than the financially responsible party would be required to obtain an independent plan approval, as part of this common plan of development. [GS 113A-54.1, NCGO100001 2. Additional measures maybe required -The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] 3. Be advised that this approval is based in part on the accuracy of the information provided in the application, including the deed. An updated copy of the deed must be provided to this office upon modification of the deed provided with the application and referenced on the Financial Responsibility/Ownership Form. [GS 113A-54.1(a)] Additional Comments: 1. This review was conducted following receipt of a Financial Responsibility/Ownership Form which changed the Financially Responsible Party to E & S Development, LLC. Be advised, the new Financially Responsible Party must follow the previously approved plan in order to remain in compliance with applicable regulations. Alternatively, a revised plan may be submitted to this office and implemented upon approval. 2. Be advised the 7/14-day soil stabilization requirements apply to any section of the project where land -disturbing activities have temporarily or permanently ceased and shall supersede any less stringent stabilization requirement on the plans. [G.S. 143- 215.11 Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities � v n pool rt 0 o w o, CDlot s� poll CL eZ