Loading...
HomeMy WebLinkAboutNCC203876_NOI Application_20200904Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 9/1/2020 10:23:47 AM (NCG01 NOI Submission) Approve by Garcia, Lauren V 9/3/2020 8:51:40 AM (Review- Construction NOI 30776) • The task was assigned to Garcia, Lauren V by round robin distribution 9/1/2020 10:23 AM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: September 3, 2020 5:00 PM 9/1/2020 10:23 AM Submit by Selkane, Aziza 9/4/2020 12:44:46 PM (Payment Verification for NCC203876) * LKC Engineering PLLC • Selkane, Aziza assigned the task to Selkane, Aziza 9/4/2020 12:43 PM The task was assigned to DEMLR NCG01 Payment Team. The due date is: October 15, 2020 5:00 PM 9/3/2020 8:52 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting IT No an NOI that was r Yes rejected before? 1a. Project Name * Fidelity Bank 1 b. Specific Lot This field nay be used to list specifc lot nunbers. Numbers 2. County* Moore 3. Highway or Street Old US HWY 1 & Bell Ave Address* Street narre only is acceptable if no address number assigned yet 4. City or Township* Southern Pines 5. State * NC 6. Zip Code * 28388 7. Latitude* Enter the latitude in decinal degrees 35.1667 8. Longitude* Enter the longitude in decir al degrees (M.JST be negative) -79.4035 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 10/01/2020 Estinated Construction Project Start Date 10. Date to End* 09/01/2021 Estinated Construction Project End Date 11. SIC (Primary)* Commercial (1542) Standard Industrial Classification for Developrrent 12. Acres to be 1.00 disturbed* (including off -site borrow and waste areas) 13. Total site area 1.02 (acres) * 14. Post- 0.68 construction (Estirrated) impervious area (acres) * NCC Project NCC-MOORE-2020-Fidelity Bank Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Aberdeen Creek Waterbody* Ibrre of w aterbody into w hich storrrw ater runoff w ill discharge 15b. Waterbody 14-2-11-(1) Index No.* NCWaterbody Index Number Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project F Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ Fternittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Pesponsible Entity Name * The Fidelity Bank It pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. Note: The organization name must match the business entity name registered with the NC Secretary of State. You can verify the registration here. 2. First Name * Jim IF Corporation, enter Faegistered Agent First %rre 3. Last Name* Byrd It Corporation, enter Pbegistered Agent Last %rre 3b. Title Area Executive 4. Permitee E-mail Jim.Byrd@fidelitybankingnc.com Address* 5. Permittee 910-745-4325 Telephone No.* 6. Permittee Mailing Street Address Address* PO Box Address Line 2 City State / Rovince / Plegion Fuquay Varina NC Fbstal / Zip Code Country 27603 Wake Check box if the V Yes street address the same as mailing address 7. Permittee Street Street Address Address* PO Box Address Line 2 City State / Frovince / Region Fuquay Varina NC Fbstal / Zip Code Country 27603 Wake 8. Type of Non -Government Ownership C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Jim Contact - First Name * 2. Primary Site Byrd Contact - Last Name * 3. Title 4. Site Contact E- Jim.Byrd@fidelitybanknc.com mail Address* 5. Site Contact 910-420-5303 Telephone No. 6. Organization Name 7. Site Contact Street Address Mailing Address* PO box Address Line 2 city Fuquay Varina Postal / Zip Code 27603 8. Consultant Name (Optional) LKC Engineering PLLC First and Last nacre 9. Consultant E-mail jackson@lkcengineering.com This person will be copied on all correspondence. 10. Consultant Telephone No. State / Rovince / Region NC Country Wake D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 12/31/2019 Approved * 2. E&SC Plan Project ZP-14-19 Number/ID * Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by* r Local Program 4. Local Program* Town of Southern Pines Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan EC Approval.pdf 346.27KB Approval letter or ZP-14-19 Approval Letter.pdf 43.37KB Grading Permit Mist be FDFfon-rat 6. Site Location Map Helpful for linear project review (Optional) Mast be FCFfornat. Rease do not upload entire set of E&SCplans. 7. Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies for linear projects if necessary. 8. NOI Certification a-NOI signed.pdf 1.24MB Form Mist be RDFfornat This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.66 (1) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Atide; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Atcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Atide or rules of the Commission implementing this Atcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit. I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * 17 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature 0 ram' jfc� Type Name* Jim Byrd Title Area Executive Organization Legally Iesponsible Entity The Fidelity Bank Date * 09/01 /2020 F. Tracking and COC Info NOI Tracking No. 30776 NC Reference No. NCG01-2020-3876 Uses 'count_nurrber' variable (increrrented by SP) Certificate of NCC203876 Coverage (COC) Uses 'count_nurrber' variable (increrrented by SP) No.* Count Number 3876 Sequential nurrber for subrrittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.) Initial Invoice No. NCC203876-2020 Invoice Due Date 10/3/2020 Initial Fee $ 100.00 Invoice Status OPEN