Loading...
HomeMy WebLinkAbout20200914 Ver 1_More Information Received_20200826Staff Review Does this application have all the attachments needed to accept it into the review process?* r Yes r No ID#* Version* 1 20200914 Is this project a public transportation project?* r Yes r No Reviewer List:* Sue Homewood:eads\slhomewood Select Reviewing Office:* Winston-Salem Regional Office - (336) 776-9800 Does this project require a request for payment to be sent?* r Yes r No Project Submittal Form Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type:* r New Project C New Project w Existing ID r Pre -Application Submittal (-- More Information Response r Other Agency Comments C Stream or Buffer Appeal r Re-issuance\Renewal Request (- For the Record Only (Courtesy Copy) Is this supplemental information that needs to be sent to the Corps?* 6- Yes C No New Project - Please check the new project type if you are trying to submit a new project that needs an official approval decision. Pre -Application Submittal - Please check the pre -application submittal if you just want feedback on your submittal and do not have the expectation that your submittal will be considered a complete application requiring a formal decision. More Information Response - Please check this type if you are responding to a request for information from staff and you have and ID# and version for this response. Other Agency Comments - Please check this if you are submitting comments on an existing project. Re-issuance\Renewal Request — Please check this if you are submitting for a re-issuance\renewal prior to expiration date for the corresponding 401/404. If submitting after the expiration date or if modification needed use New Project with Existing ID option. Project Contact Information Name: Derek Goddard Who is subnitting the information? Email Address: derek@brec.biz Project Information Existing ID #: 20200914 20170001(no dashes) Existing Version: I Project Name: Dollar General NC 135 and Harrington Hwy, Eden, Rockingham County Is this a public transportation project? C Yes (' No Is the project located within a NC DCM Area of Environmental Concern (AEC)? C Yes C No (-- Unknown County (ies) Rockingham Please upload all files that need to be submited. click the upload button or drag and drop files here to attach document 19-580 DG Eden Geotech Report.pdf 2.33MB DG_EDEN.pdf 18.68MB Only pdf or krm files are accepted. Describe the attachments or comments: I have uploaded a revised set of plans that clarifies that SW is routed through the sand filter and added the additional information requested. The soils report for this site has also been uploaded. Please note that in the executive summary under item 1, it was noted that groundwater was not encountered (page 1). Please let us know if you need anything else. Sign and Submit P By checking the box and signing box below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the online form." Signature: Submittal Date: Is filled in automatically. GEOTECHNICAL ENGINEERING REPORT Proposed Dollar General Store 1815 & 1829 NC Highway 135 & 2401 Harrington Highway Eden, Rockingham County, North Carolina CVET Project No. 19-580 April 1, 2020 PREPARED FOR: Teramore Development, LLC P.O. Box 6460 Thomasville, Georgia 31758 PREPARED BY: CATAWBA VALLEY ENGINEERING AND TESTING, P.C. HICKORY, NORTH CAROLINA �i GEOTECHNICAL • CONSTRUCTION MATERIALS • ENVIRONMENTAL CATAWBA VALLEY ENGINEERING & TESTING PO Box 747 Hickory, NC 28603 161 Lenoir Rhyne Blvd. SE Hickory, NC 28602 828 578 9972 0 www.cvet.net NC Firm No. C-3833 SC Firm No. 5201 Geotechnical Engineering Environmental Services CMT/Speci a I Inspections April 1, 2020 Ms. Danielle Stewart Teramore Development, LLC P.O. Box 6460 Thomasville, Georgia31758 dstewart@teramore.net Re: Geotechnical Engineering Report Proposed Dollar General Store 1815 & 1829 NC Highway 135 and 2401 Harrington Highway Eden, Rockingham County, North Carolina CVET Project No.: 19-575 Dear Ms. Stewart: Catawba Valley Engineering and Testing (CVET) is pleased to submit to you our Geotechnical Engineering Report for the proposed Dollar General Store located at 1815 & 1829 NC Highway 135 and 2401 Harrington Highway in Eden, North Carolina. This study was authorized by Teramore Development, LLC on December 13, 2019. This report presents the findings of our subsurface exploration and provides geotechnical recommendations for design and construction of the project. CVET appreciates the opportunity to provide our geotechnical engineering services for this project. If you have any questions regarding the contents of this report, or if we can provide additional services for the project such as construction materials testing, please do not hesitate to contact us. Sincerely, CATAWBA VALLEY ENGINEERING AND TESTING, P.C. ire r James H. Carter Senior Geologist 4y�15CAP 1LlhJ h+�tl SEAL s = 041419 aa1 4/1/2020 Did M. LeGrand, Jr., P.E. Principal Engineer NC 041419 Project Name: Proposed Dollar General Store Location: Eden, Rockingham County, North Carolina Date: April 1, 2020 Project No. 19-580 TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY.....................................................................................1 2.0 PURPOSE AND SCOPE OF WORK......................................................................2 3.0 PROJECT INFORMATION..................................................................................3 4.0 EXPLORATION PROCEDURES...........................................................................3 4.1 Field Exploration...........................................................................................3 4.2 Laboratory Testing........................................................................................4 5.0 SUBSURFACE CONDITIONS..............................................................................4 5.1 Site Geology.................................................................................................4 5.2 Soils.............................................................................................................4 5.3 Bedrock........................................................................................................5 5.4 Groundwater................................................................................................5 6.0 RECOMMENDATIONS FOR DESIGN AND CONSTRUCTION..................................6 6.1 Site Preparation............................................................................................6 6.2 Earthwork....................................................................................................6 6.3 Groundwater Control.....................................................................................7 6.4 Foundations.................................................................................................8 6.5 Floor Slabs...................................................................................................8 6.6 Pavements...................................................................................................9 6.7 Construction Materials Testing and Special Inspections.................................10 7.0 LIMITATIONS................................................................................................11 APPENDIX A — PROJECT FIGURES ............................................................................. iii APPENDIX B — BORING LOGS....................................................................................v APPENDIX C — LABORATORY TEST DATA..................................................................vi Project Name: Proposed Dollar General Store Location: Eden, Rockingham County, North Carolina Date: April 1, 2020 Project No. 19-580 1.0 EXECUTIVE SUMMARY The following items represent a short summary of (1) the findings of our subsurface exploration, (2) our conclusions, and (3) our recommendations for design and construction of the proposed Dollar General Store located at 1815 & 1829 NC Highway 135 and 2401 Harrington Highway in Eden, North Carolina. 1. The area being evaluated generally consists of 4 to 12 inches of topsoil underlain by existing residual soils. Residual soils consisting primarily of dry to moist, silty sand (SM), clayey sand (SC), sandy silt (ML) and sandy clay (CL) were encountered in all nine (9) test borings underlying the surficial topsoil. SPT N-values from the residual soils ranges from 22 to 50+ bpf indicating loose to medium dense non -cohesive soil consistencies and 11 to 50+ bpf indicating stiff to very hard cohesive soil consistencies. Partially weathered rock (PWR) was encountered in every soil test boring with the exception of boring B-6. See table below for depths of the encountered PWR and auger refusal conditions. Groundwater was not encountered during this exploration. 2. We offer the following design and construction recommendations for the proposed Dollar General Store located at 1815 & 1829 NC Highway 135 and 2401 Harrington Highway in Eden, North Carolina: • Site preparation should consist of removing the residential dwelling and associated out buildings, removing the topsoil layer, relocation of any affected utilities, if applicable, and removing all other soft or unsuitable material from the proposed building envelope and associated pavement areas. Site preparation operations should extend a minimum of 10 feet beyond the planned limits of the facilities and a minimum of 5 feet beyond the planned limits of the pavement areas. • Based on the cut/fill depths anticipated for this site, we anticipate some rock removal will be required for foundation and utility installation. PWR was encountered at depths ranging from 2.0 to 7.0 feet below existing site grades. Unweathered bedrock (Auger refusal conditions) were encountered at depths ranging from 6.3 to 14.1 feet below existing site grades. • Any required fill soils should be compacted to at least 98 percent of the maximum dry density obtained in accordance with ASTM Specification D-698, Standard Proctor Method, with a moisture content within +/- 3% of the optimum moisture content (OMC). We recommend the on -site geotechnical engineer evaluate the suitability of the proposed fill soils prior to use as structural fill. 1 Project Name: Proposed Dollar General Store Location: Eden, Rockingham County, North Carolina Date: April 1, 2020 Project No. 19-580 • Groundwater was not encountered during this exploration, however; groundwater tends to run along the interface between residual soils and partially weathered rock and also in seams of partially weathered rock and unweathered bedrock, therefore based upon the depths of the anticipated excavations groundwater may be present. • We recommend supporting the proposed building on shallow foundations bearing on approved residual soils, newly compacted structural fill, or approved existing fill soil. Shallow foundations for buildings should be designed for an allowable net bearing pressure of up to 3,000 pounds per square foot. We recommend minimum foundation widths and embedment depths of 16 and 24 inches, respectively, for building foundations. • As a result of the encountered site conditions we recommend a modulus of subgrade reaction (ks) of up to 100 pounds per cubic inch (pci) for slabs supported by properly prepared soil subgrade. This executive summary should be used in conjunction with the entire contents of the report, in order to gain a complete understanding of all conclusions and recommendations contained within the report. If conditions revealed during construction vary from those described in this report, the on -site geotechnical engineer shall contact the engineer of said report to discuss potential options to address the varying site conditions. 2.0 PURPOSE AND SCOPE OF WORK The purpose of the subsurface exploration and geotechnical engineering evaluation was to explore the subsurface conditions at the site, collect representative samples of soil for examination in our laboratory, and provide conclusions and recommendations for the proposed Dollar General Store located at 1815 & 1829 NC Highway 135 and 2401 Harrington Highway in Eden, North Carolina. CVET's scope of work included the following: • Drilling of nine (9) soil test borings at the site; • Collection of representative samples of soil from the soil test borings; • Classification of collected soil samples and laboratory testing as necessary; • Preparation of boring logs, boring location plan, and general subsurface profile; • Evaluation of the encountered subsurface conditions at the site; and • Preparation of this geotechnical report. 2 Project Name: Proposed Dollar General Store Location: Eden, Rockingham County, North Carolina Date: April 1, 2020 Project No. 19-580 3.0 PROJECT INFORMATION This project consists of the evaluation of subsurface conditions for the proposed construction of a new 9,100 square foot building, asphalt paved parking and driveway areas, and associated infrastructure located at 1815 & 1829 NC Highway 135 and 2401 Harrington Highway in Eden, North Carolina. The property is mainly grass covered with a residential home and associated outbuilding on the south east corner of the subject property. Based upon the Rockingham County GIS website, existing site grades slope down gradient from the north to the south from approximately 570 to 560 feet above mean sea level (amsl). At the time of this report, CVET was not provided a proposed finished floor elevation (FFE) for the facility. We anticipate that the FFE will be approximately 562f feet amsl. Cut and fill requirements to achieve anticipated FFE will likely range from 2 to 3 feet. Based upon the anticipated FFE, cut and fill requirements in the parking areas will be of similar magnitude. Access to the new facility will be from the northwest off Harrington Highway. Project information was developed through review of a Site Plan, provided by Teramore Development, LLC. 4.0 EXPLORATION PROCEDURES Exploration procedures for this project included drilling test borings at the site and laboratory testing of representative soil samples at our laboratory in Hickory, North Carolina. 4.1 Field Exploration The subsurface conditions at the site were explored by drilling nine (9) soil test borings (denoted B-1 through B-9) at the locations indicated on Figure 2 — Boring Location Plan in Appendix A. The borings were drilled on January 10 and 13, 2020 and extended to depths ranging from 6.3 to 14.1 feet below existing site grades. The boring locations were selected by and located in the field by CVET using existing site features as a reference. Ground elevations at the boring locations were estimated from the Rockingham County GIS website. Therefore, the boring locations and elevations shown on Figure 2 and 3; plus the boring logs should be considered approximate. Drilling was performed with a Geoprobe 7822DT atv-mounted drill rig using continuous - flight hollow stem augers (HSA). Soil samples were obtained by means of the split -barrel sampling procedures in general accordance with ASTM D1586. A 2-inch O.D., split -barrel sampler was driven into the soil a distance of 18 inches by means of an automatic hammer. The number of blows required to drive the sampler through the final 12-inch interval is termed the Standard Penetration Test (SPT) "N"value and is indicated for each 3 Project Name: Proposed Dollar General Store Location: Eden, Rockingham County, North Carolina Date: April 1, 2020 Project No. 19-580 sample on the boring logs. This value can be used to provide an indication of the in - place relative density of cohesionless soils, but is a less reliable indicator of the consistency of cohesive soils. For cohesive soils, the measurement of unconfined compressive strength Qu is a better indicator of consistency; this value is also listed on the boring logs. Representative portions of each SPT sample were sealed in airtight containers and returned to our laboratory for classification and storage. See the individual soil test boring logs in Appendix B for more details. Note that the soil samples will be discarded after 60 days from this report date, unless otherwise directed by Teramore Development, LLC. 4.2 Laboratory Testing Representative samples of soil obtained during the field exploration were transported to CVET's laboratory in Hickory, North Carolina, where they were examined and classified by a geotechnical engineer. The soil samples were visually classified in general accordance with the Unified Soil Classification System (USCS), per ASTM D2487. 5.0 SUBSURFACE CONDITIONS The subsurface conditions at the site are described in the following paragraphs. 5.1 Site Geology The site is located in the Piedmont Physiographic Province of North Carolina. The name Ilk piedmont"" means ""foot -of -the -mountains" which reflect remnants of an ancient mountain range that has since been extensively weathered, decomposed and eroded to form rolling terrain and hillsides. The bedrock is metamorphic in nature (igneous or sedimentary rocks that have been changed by heat and/or pressure) and typically consists of schist, gneiss and/or granite. Extensive weathering over time has reduced the bedrock in -place to form overburden residual soils that range from clay topsoil to sandy silts and silty sandy that grade with depth back to saprolite and partially - weathered -bedrock. The degree of weathering varies both laterally and vertically. Based on the 1985 North Carolina Geologic Map, the site is underlain by Stoneville Formation. 5.2 Soils A generalized subsurface profile has been prepared for the site - see Figure 3 in Appendix A. Soil boring logs are included in Appendix B. The area being evaluated generally consists of 4 to 12 inches of topsoil underlain by residual soils. The generalized subsurface conditions are described below. 51 Project Name: Proposed Dollar General Store Location: Eden, Rockingham County, North Carolina Date: April 1, 2020 Project No. 19-580 Residual soils consisting primarily of dry to moist, silty sand (SM), clayey sand (SC), sandy silt (ML) and sandy clay (CL) were encountered in all nine (9) test borings underlying the surficial topsoil. SPT N-values from the residual soils ranges from 22 to 50+ bpf indicating loose to medium dense non -cohesive soil consistencies and 11 to 50+ bpf indicating stiff to very hard cohesive soil consistencies. 5.3 Bedrock Partially weathered rock (PWR) was encountered in every soil test boring with the exception of boring B-6. See table below for depths of the encountered PWR and auger refusal conditions. Boring PWR (ft.) Auger Refusal (ft.) B-1 6.0 10.0 B-2 2.5 6.3 B-3 6.0 13.8 B-4 7.0 13.6 B-5 6.5 14.1 B-6 N/A N/A B-7 9.5 9.8 B-8 4.5 8.5 B-9 2.0 6.3 5.4 Groundwater Groundwater was not encountered during this exploration. Note that boreholes are left open for only a short period of time during the drilling operation, so the detection of groundwater during this brief period is difficult. Also note that soil moisture and groundwater conditions vary depending on conditions such as temperature, precipitation and season. Therefore, soil moisture and groundwater location at other times of the year may vary from those observed at the time of this subsurface exploration and as described in this report. The borehole cave-in depths ranged from 4.0 to 13.5 feet below existing site. In this geology, the cave-in depth of a boring is sometimes an indication of the stabilized water level, although the water level may be a few feet below the cave-in depth and therefore cannot be directly observed. If the location of the groundwater elevation is important at this site, we recommend the installation of temporary observation wells. 5 Project Name: Proposed Dollar General Store Location: Eden, Rockingham County, North Carolina Date: April 1, 2020 Project No. 19-580 6.0 RECOMMENDATIONS FOR DESIGN AND CONSTRUCTION The following recommendations are provided for the construction of the proposed Dollar General Store located at 1815 & 1829 NC Highway 135 and 2401 Harrington Highway in Eden, North Carolina. The recommendations stated herein shall not be applied to any other project, or used in conjunction with any other recommendation, and shall be used explicitly for this project. 6.1 Site Preparation Site preparation should consist of removing the residential dwelling and associated out buildings, removing the topsoil layer, relocation of any affected utilities, if applicable, and removing all other soft or unsuitable material from the proposed building envelope and associated pavement areas. Site preparation operations should extend a minimum of 10 feet beyond the planned limits of the facilities and a minimum of 5 feet beyond the planned limits of the pavement areas. Once stripping and rough excavation has been accomplished, the exposed subgrade should be evaluated by proofrolling. Proofrolling consists of driving the appropriate equipment, typically a dump truck with axle weights of 10 or 20 tons for single and double axles respectively, over the subgrade at a walking pace. The proofrolling equipment should first make overlapping passes across the subgrade in one direction, followed by passes in a perpendicular direction. We recommend that the proofrolling be observed by a professional engineer or qualified engineering technician. Based upon the surficial cohesive site soils and their moisture content at the time of proofrolling, we anticipate that some instability of subgrade soils may be observed. 6.2 Earthwork Based upon the Forsyth County GIS website, existing site grades slope down gradient from the north to the south from approximately 570 to 560 feet above mean sea level (amsl). At the time of this report, CVET was not provided a proposed finished floor elevation (FFE) for the facility. We anticipate that the FFE will be approximately 562f feet amsl. Cut and fill requirements to achieve anticipated FFE will likely range from 2 to 3 feet. Based upon the anticipated FFE, cut and fill requirements in the parking areas will be of similar magnitude. Access to the new facility will be from the northwest off Harrington Highway. Based on the cut/fill depths anticipated for this site, we anticipate some rock removal will be required for foundation and utility installation. PWR was encountered at depths ranging from 2.0 to 7.0 feet below existing site grades. Unweathered bedrock (Auger refusal conditions) were encountered at depths ranging from 6.3 to 14.1 feet below existing site grades. Based on the encountered partially weathered rock we anticipate 0 Project Name: Proposed Dollar General Store Location: Eden, Rockingham County, North Carolina Date: April 1, 2020 Project No. 19-580 that it should be possible to excavate the residual soils and the fractured partially weathered rock materials with conventional earthwork equipment. However, the underlying harder bedrock (auger refusal materials or materials with SPT N-values of 50/2" or less) may require ripping. We recommend ripping operations to be performed by a CAT D-8 bulldozer with a single tooth ripper (or equivalent machinery). Rock not able to be removed by ripping will require the use of pneumatic hammers or blasting to excavate. We define un-excavatable rock as material that cannot be removed with a CAT 330 excavator or equivalent (approximately a 75,000 pound machine) utilizing rock teeth. Required fill soils should be compacted to at least 98 percent of the maximum dry density obtained in accordance with ASTM Specification D-698, Standard Proctor Method, with a moisture content within +/- 3% of the optimum moisture content (OMC). Acceptable fill soils should be soil that has less than 5 percent organic content and a liquid limit and plasticity index less than 50 and 20, respectively. Soils with USCS group symbols of SP, SW, SM, SC, and ML are recommended for use as controlled fill, although it is important to note that silty soils are very moisture sensitive and not as strong as sandy soils. Elastic silts (MH) and plastic clays (CH) should not be utilized as structural fill at this site. All fill soils should be placed in horizontal loose lifts and compacted with adequately -sized equipment. Loose lift thicknesses will vary depending on the size of the compaction equipment: we recommend a maximum of 8 inches for large self-propelled compactors, 6 inches for small self-propelled compactors, and 4 inches for remote -controlled compactors and hand -operated equipment (plate tampers, wacker-packers, or jumping jacks). Vibratory smooth -drum rollers are appropriate for cohesion less/coarse-grained soils while sheepsfoot rollers are appropriate for cohesive/fine-grained soils. We recommend that positive site drainage is maintained during earthwork operations to prevent the ponding of water on exposed subgrades. Soil subgrades should be protected from inclement weather (rain especially) by sealing' the subgrades prior to forecasted inclement weather. Sealing' can be performed by rolling with a smooth steel -drum roller without vibration. Ruts should not be created during the sealing' operation. Prior to the placement of additional fill, the sealed' subgrade should be scarified. If earthwork is performed during winter months or after inclement weather, the subgrade soil conditions could potentially be more unstable due to wet soil conditions, which could potentially require stabilization or undercutting. 6.3 Groundwater Control Groundwater was not encountered during this exploration, however; groundwater tends to run along the interface between residual soils and partially weathered rock and also in seams of partially weathered rock and unweathered bedrock, therefore based upon the depths of the anticipated excavations groundwater may be present. Groundwater control is the purposeful drawdown of the groundwater levels to facilitate necessary construction. Project Name: Proposed Dollar General Store Location: Eden, Rockingham County, North Carolina Date: April 1, 2020 Project No. 19-580 Temporary dewatering operations consist of well points and sump pumps, while permanent dewatering operations typically consist of French underdrains which discharge by means of gravity flow into the site storm drainage system. Note that soil moisture and groundwater conditions vary depending on conditions such as temperature, precipitation and season. Therefore soil moisture and groundwater location at other times of the year may vary from those observed at the time of this subsurface exploration and as described in this report. 6.4 Foundations We recommend supporting the proposed building on shallow foundations bearing on approved residual soils, newly compacted structural fill, or approved existing fill soil. Shallow foundations for buildings should be designed for an allowable net bearing pressure of up to 3,000 pounds per square foot. We recommend minimum foundation widths and embedment depths of 16 and 24 inches, respectively, for building foundations. We do not recommend bearing any foundations directly on elastic/plastic soils, especially perimeter foundations which have a greater chance of being subjected to surface water. If such conditions are encountered, we recommend an undercut of the plastic/elastic soil to a depth of at least 24 inches from where encountered at the foundation bearing elevation and replacement with approved fill materials or ABC stone. If fill soils are placed to reach final grades, we recommend a 24-inch buffer of non -plastic fill soils between the bottom of foundations and the elastic/plastic soils. Some localized undercut and replacement of existing fill soils should be anticipated during foundation excavation. As a result of shallow partially weathered rock and bedrock, ripping and the use of pneumatic tools may be necessary within portions of the site depending on foundation bearing elevations. We recommend a minimum of 12-inch buffer of ABC stone is rock is exposed at foundation bearing elevation. A site -specific settlement analysis has not been performed. However, based upon the expected loading and the requirement that the foundations bear on approved existing fill soil, competent residuum, or structural fill soils (to be verified by CVET or another qualified CMT firm), we expect total settlements of structure foundations to not exceed acceptable industry standard tolerances. In general, differential settlements between building components are expected to be on the order of 1/3 to 1/2 of the total settlements. We expect settlements in the building foundations to occur relatively soon after the loads are applied. 6.5 Floor Slabs We recommend that grade slabs be supported on approved residual soils or newly compacted structural fill. Correspondence with Teramore Development, LLC (developer) 0 Project Name: Proposed Dollar General Store Location: Eden, Rockingham County, North Carolina Date: April 1, 2020 Project No. 19-580 indicated that the project architect and developer do not require the use of 4 to 6 inches of free draining material or aggregate base course beneath the concrete slab on grade; therefore CVET has been requested to provide a modulus of subgrade reaction (ks) for slabs supported directly on prepared soil subgrade. As a result of the encountered site conditions we recommend a modulus of subgrade reaction (ks) of up to 100 pounds per cubic inch (pci) for slabs supported by properly prepared soil subgrade. This value is representative of a 1-ft square loaded area and may need to be adjusted depending the size and shape of the loaded area and the method of structural analysis. The floor slab should be isolated from building foundations unless the connection is designed to accommodate anticipated differential settlement between the slab and foundation systems. We consider properly prepared soil subgrade to consist of approved residuum or approved structural fill soils within the top two feet of finished grades compacted to 100% of the standard Proctor method (ASTM D698). Compacted soils should be placed within f3% of the optimum moisture content (OMC) as determined by the standard Proctor method. Please note that site preparation and earthwork operations shall be performed in accordance with our Geotechnical Engineering Report to ensure adequate subgrade soil conditions for direct slab on grade support. The structural engineer of record should be provided to the structural engineer of record for review. Plastic/elastic soils are moisture sensitive and prone to shrink/swell with moisture changes. If plastic/elastic soil is exposed at the floor slab elevation, we recommend an undercut of at least 18 inches of the elastic/plastic soil, and replacement with quality non - plastic fill materials. If fill soils are placed to reach final grades, we recommend an 18- inch buffer of non -plastic fill soils between the bottom of foundations and the elastic/plastic soils. Stabilization can also include the installation of a biaxial geogrid (Mirafi BX1200 or approved equivalent) or a heavy woven geotextile fabric (Mirafi HP 370 or approved equivalent) depending on the exposed subgrade soil conditions. If conditions revealed during slab on grade preparation operations vary from those described in this report, the on -site geotechnical engineer shall contact the engineer of said report to discuss potential options to address the varying site conditions. The use of a vapor retarder should be considered beneath concrete slabs on grade which will be covered with wood, tile, carpet or other moisture -sensitive or impervious coverings, per ACI 302 and/or ACI 360. Construction joints, contraction joints, and isolation joints should be provided in the slab to reduce the impacts of cracking and shrinkage. See ACI 302 for additional details regarding slab joint design. 6.6 Pavements 0 Project Name: Proposed Dollar General Store Location: Eden, Rockingham County, North Carolina Date: April 1, 2020 Project No. 19-580 Traffic loading conditions for this project have not been provided. Pavement for this project is assumed to consist of light -duty asphalt parking areas (only personal vehicle traffic) and heavy-duty asphalt drives (drive lanes). Based on the subsurface conditions encountered in the test borings, and assuming all pavement areas pass a proofroll as described in section 6.1 of this report, we recommend thicknesses of 2, 0 and 8 inches for surface course, base course and ABC crushed stone, respectively, for light -duty pavement. For heavy-duty pavement, we recommend thicknesses of 3.0 and 8.0 inches for surface course and ABC crushed stone, respectively. We recommend an 8-inch thick Portland cement concrete slab bearing on 6 inches of ABC crushed stone for the approach and slab for any trash dumpster on site. If concrete pavements are desired, we recommend a minimum of 6 inches of concrete overlying 8 inches of ABC crushed stone base. The concrete should be air -entrained and have a minimum of 4,000 psi after 28 days of laboratory curing per ASTM C-31. It should be noted that the design recommendations stated may not satisfy North Carolina Department of Transportation guidelines; therefore, we recommend that any roadways constructed for public use with maintenance provided by the State be designed in accordance with State regulatory requirements. If a proofroll reveals unstable soils, stabilization and/or undercut should be anticipated. We recommend an undercut of at least 18 inches and replacement with quality non - plastic fill materials. Plastic/elastic soils are moisture sensitive and prone to shrink/swell with moisture changes. If fill soils will be placed to reach final grades, we recommend an 18 inch buffer of non -plastic fill soils between the pavement subgrade and the elastic soils. Stabilization could consist of the installation of a biaxial geogrid (Mirafi BX1200 or approved equivalent) or a heavy woven geotextile fabric (Mirafi HP 370 or approved equivalent) depending on the exposed subgrade soil conditions. Pavements should not bear on plastic/elastic soils. Careful control of storm water is one of the best ways to ensure adequate long-term performance of any pavement. The surface of the pavement should be sloped to gutters and/or catch basins to prevent water from ponding and infiltrating through the pavement into the sub -base and subgrade. We recommend compaction testing of the ABC crushed stone base prior to asphalt/concrete placement, and full-time inspection during asphalt/concrete placement. 6.7 Construction Materials Testing and Special Inspections Construction materials testing (CMT) and inspection should be performed at regular intervals throughout the course of the project. CVET is qualified for this work and would be pleased to provide these services during construction. 10 Project Name: Proposed Dollar General Store Location: Eden, Rockingham County, North Carolina Date: April 1, 2020 Project No. 19-580 7.0 LIMITATIONS This report has been prepared for the exclusive use of Teramore Development, LLC, and their agents for specific application to the referenced property, in accordance with generally accepted soils and foundation engineering practices. No warranties, express or implied, are intended or made. The conclusions and recommendations presented in this report are based on the specific test borings and laboratory testing performed as part of our scope of work, and do not reflect variations in subsurface conditions that may exist between test boring locations or in unexplored portions of the site. Note that the soil data presented in this report is for the specific time of this subsurface exploration. While the type of material encountered in the test borings will not likely change significantly over time, the properties of the materials can and will change over time, including soil moisture content, density, consistency, SPT ""N" values, etc. Fluctuations in the groundwater level can have a significant impact on the material properties, as can seasonal changes. Site safety, excavation support related to OSHA requirements, and construction dewatering requirements are the responsibility of others, not CVET. In the event changes are made to the proposed construction plans, design or location of the project as described within this report, the conclusions and recommendations provided in this report shall not be considered valid unless CVET is given the opportunity to review the changes, and either verifies or modifies the conclusions and recommendations contained in this report in writing. 11 Project Name: Proposed Dollar General Store Location: Eden, Rockingham County, North Carolina Date: April 1, 2020 Project No. 19-580 APPENDIX A - PROJECT FIGURES 115A F, C2 4 C H a W zU)Ir 4 Z r Y U U Cam] III y �++ U /�/ LJ_ 00 Z r T o'c c H w J z LLI S W U O 0 M - s z N r- 0) 0) N 0 O - W W 00 U) N W [ Z N L 0 C L W W Y N U - UO=� C c `� L7 m= H �QW V ¢F W u W �I = 0 LO Ol O W CO V N O W CO V N O W CO I- CO CO CO CO Co LO LO LO LO LO V V LO LO LO LO LO LO LO LO LO LO LO LO LO o 0 CToo M � Qo m, � a NIv- NM N7 Nr M 7 7 m -. r r m m M J m CN m i 0 m O W CO V N O W CO V N O W CO I- CO CO CO CO Co LO LO LO LO LO V V LO LO LO LO LO LO LO LO LO LO LO LO LO (11) U01l2Aa13 LO U) Mm W 0 � U C U) Cl) Nll� 0 fdE)'N303 32JOAV2J31\S103PO2JdUNIJ\A3-1N38\S1N3Wf1000\oi�ond\S2J3sn\:O - b£:80 OZ/9Z/Z - lOJ'8V� sn OlS 1NIJ - 3ZIS V - MJ'S AHdV2JEAIV2JIS CVET KEY TO SYMBOLS 308 15th St SE CATAWBA VALLEY Hickory, NC 28702 ENGINEERING 8.TESTIN0 Telephone: 828 578 9972 CLIENT Teramore Development LLC PROJECT NAME Dollar General Eden PROJECT NUMBER 19-580 PROJECT LOCATION NC Highway 135 & Harington Highway LITHOLOGIC SYMBOLS SAMPLER SYMBOLS (Unified Soil Classification System) Split Spoon IN BEDROCK: Bedrock 12 CL: USCS Low Plasticity Clay IM] ML: USCS Silt SC: USCS Clayey Sand SM: USCS Silty Sand TOPSOIL: Topsoil WELL CONSTRUCTION SYMBOLS ABBREVIATIONS LL - LIQUID LIMIT (%) TV - TORVANE PI - PLASTIC INDEX (%) PID - PHOTOIONIZATION DETECTOR W - MOISTURE CONTENT (%) UC -UNCONFINED COMPRESSION DID - DRY DENSITY (PCF) ppm - PARTS PER MILLION NP - NON PLASTIC Water Level at Time -200 - PERCENT PASSING NO. 200 SIEVE Drilling, or as Shown PP - POCKET PENETROMETER (TSF) Water Level at End of 1 Drilling, or as Shown Water Level After 24 - Hours, or as Shown Project Name: Proposed Dollar General Store Location: Eden, Rockingham County, North Carolina Date: April 1, 2020 Project No. 19-580 APPENDIX B - BORING LOGS REFERENCE NOTES FOR BORING LOGS I. Drilling Sampling Symbols SS Split Spoon Sampler ST Shelby Tube Sampler RC Rock Core, NX, BX, AX PM Pressure meter DC Dutch Cone Penetrometer RD Rock Bit Drilling BS Bulk Sample of Cuttings PA Power Auger (no sample) HSA Hollow Stem Auger WS Wash Sample REC Rock Sample Recovery % RQD Rock Quality Designation II. Correlation of Penetration Resistance to Soil Properties Standard penetration (blows/ft) refers to the blows per foot of a 140 lb. hammer falling 30 inches on a 2 inch OD split spoon sampler, as specified in ASTM D 1586. The blow count is commonly referred to as the N-value. L. Non -Cohesive Soils (Silt, Sand, Gravel and Combinations Density Adjective Form Under 4 blows/ft Very Loose 5 to 10 blows/ft Loose 11 to 30 blows/ft Medium Dense 31 to 50 blows/ft Dense Over 51 blows/ft Very Dense Particle Size Identification Boulders 8 inches and larger Cobbles 3 to 8 inches Gravel Coarse 1 to 3 inches Medium 1/2 to 1 inch Fine 1/4 to'/z inch Sand Coarse 2.00 mm to inch Medium 0.42 to 2.0 mm Fine 0.074 to 0.42 mm Silt and Clay 0.0 to 0.074 mm Cohesive Soils (Clay, Silt, and Combinations Blows/ft Consistency Unconfined Comp. Strength Q (tso Degree of Plasticity Plasticity Index Under 2 Very Soft Under 0.25 None to Slight 0-4 3 to 4 Soft 0.25-0.49 Slight 5-7 5 to 8 Medium Stiff 0.50-0.99 Medium 8-22 9 to 15 Stiff 1.00-1.99 High to Very High Over 22 16 to 30 Very Stiff 2.00-3.00 31 to 50 Hard 4.00-8.00 Over 51 Very Hard Over 8.00 III. Water Level Measurement Symbols WL Water Level BCR Before Casing Removal DCI Dry Cave-in WS While Sampling ACR After Casing Removal WCI Wet Cave-in WD While Drilling 0 Est. Groundwater Level 0. Est. Seasonal High GWT The water levels are those levels actually measured in the borehole at the times indicated by the symbol. The measurements are relatively reliable when augering, without adding fluids, in a granular soil. In clay and plastic silts, the accurate determination of water levels may require several days for the water level to stabilize. In such cases, additional methods of measurement are generally applied. BORING NUMBER 131 CVET `V 308 15th St SE PAGE 1 OF 1 CATAW13A VALLEY Hickory, NC 28702 ENGINEERING &TESTING Telephone: 828 578 9972 CLIENT Teramore Development LLC PROJECT NAME Dollar General Eden PROJECT NUMBER 19-580 PROJECT LOCATION NC Highway 135 & Harington Highway DATE STARTED 1/10/20 COMPLETED 1/10/20 GROUND ELEVATION 562 ft MSL HOLE SIZE 2.25 inches DRILLING CONTRACTOR CVET GROUND WATER LEVELS: DRILLING METHOD 2.25 Hollow Stem Auger AT TIME OF DRILLING --- Cave at 6.0 ft. LOGGED BY TV CHECKED BY JC AT END OF DRILLING --- NOTES AFTER DRILLING --- W o ASPTNVALUE A C) Of } w w 20 40 60 80 = ~^ d O MATERIAL DESCRIPTION W J d' ^ > 0 0 Q 0- W Z Z a PL . 'L pv <J d� 0� m0> v" } 20 40 60 80 (� 2Z 0 UZ < W 0 T- ElFINES CONTENT (%) El 0.0 20 40 60 80 TOPSOIL (12") (CL) RESIDUAL: Sandy CLAY, Brown, Grey, Dark Brown, Dry to Moist, Stiff SS 100 25-6 O 2.5 SZ 100 5 4025 (SM) RESIDUAL: Silty SAND with Small Rock Fragments, Dark 5.0 Brown, Dry, Dense >> (SM) PARTIALLY WEATHERED BEDROCK: Silty SAND with Rock SS 100 50/5" Fragments, Grey, Dry 3 7.5 >> SS 100 50/4" 4 10.0 Refusal at 10.0 feet. SS 50/0" Bottom of borehole at 10.0 feet. 5 BORING NUMBER B2 CVET `V 308 15th St SE PAGE 1 OF 1 CATAW13A VALLEY Hickory, NC 28702 ENGINEERING &TESTING Telephone: 828 578 9972 CLIENT Teramore Development LLC PROJECT NAME Dollar General Eden PROJECT NUMBER 19-580 PROJECT LOCATION NC Highway 135 & Harington Highway DATE STARTED 1/10/20 COMPLETED 1/10/20 GROUND ELEVATION 563 ft MSL HOLE SIZE 2.25 inches DRILLING CONTRACTOR CVET GROUND WATER LEVELS: DRILLING METHOD 2.25 Hollow Stem Auger AT TIME OF DRILLING --- Cave at 4.0 ft. LOGGED BY TV CHECKED BY JC AT END OF DRILLING --- NOTES AFTER DRILLING --- W o ASPTNVALUE A = C) Of } [aw 0- 20 40 60 80 PL . 'L ~^ d O MATERIAL DESCRIPTION W J Of > 0 � � 0 Q W Z Z a pv <J d� 0- m0> v" } 20 40 60 80 (� 2Z 0 UZ < W 0 T- El FINES CONTENT (%) El TOPSOIL (6") (SM) RESIDUAL: Silty Fine SAND, Grey, Dry (SM) PARTIALLY WEATHERED BEDROCK: Silty SAND with Rock Fragments, Grey, Dry 2.5 Refusal at 6.3 feet. Bottom of borehole at 6.3 feet. SS 100 13-35- » 1 50/1 " SS 100 31-50/3" >>Ak 2 SS 100 50/3" » 3 BORING NUMBER B3 CVET `V 308 15th St SE PAGE 1 OF 1 CATAW13A VALLEY Hickory, NC 28702 ENGINEERING &TESTING Telephone: 828 578 9972 CLIENT Teramore Development LLC PROJECT NAME Dollar General Eden PROJECT NUMBER 19-580 PROJECT LOCATION NC Highway 135 & Harington Highway DATE STARTED 1/10/20 COMPLETED 1/10/20 GROUND ELEVATION 560 ft MSL HOLE SIZE 2.25 inches DRILLING CONTRACTOR CVET GROUND WATER LEVELS: DRILLING METHOD 2.25 Hollow Stem Auger AT TIME OF DRILLING --- Cave at 13.5 ft. LOGGED BY TV CHECKED BY JC AT END OF DRILLING --- NOTES AFTER DRILLING --- W o ASPTNVALUE A = C) Of } ^ w w 0- 20 40 60 80 PL . 'L ~^ d O MATERIAL DESCRIPTION W J d' > 0 0 Q W Z Z a pv <J d� 0- m0> v" } 20 40 60 80 (� 2Z 0 UZ < W 0 T- El FINES CONTENT (%) El TOPSOIL (4") (SC) RESIDUAL: Clayey SAND with Small Rock Fragments, Dark Brown, Dry, Dense 2.5 5.0 SS 100 10 21 (33) SZ 100 12 23 (44) (ML) PARTIALLY WEATHERED BEDROCK: Sandy SILT with Small SS 100 35-50/1" Rock Fragments, Dark Brown, Dry 3 7.5 SS 1 100 1 50/4" 4 E111111 (SM) PARTIALLY WEATHERED BEDROCK: Silty Fine SAND with 12.5M Rock Fragments, Grey, Dry SS 100 50/3" Refusal at 13.8 feet. 5 Bottom of borehole at 13.8 feet. BORING NUMBER B4 CVET `V 308 15th St SE PAGE 1 OF 1 CATAW13A VALLEY Hickory, NC 28702 ENGINEERING &TESTING Telephone: 828 578 9972 CLIENT Teramore Development LLC PROJECT NAME Dollar General Eden PROJECT NUMBER 19-580 PROJECT LOCATION NC Highway 135 & Harington Highway DATE STARTED 1/13/20 COMPLETED 1/13/20 GROUND ELEVATION 560 ft MSL HOLE SIZE 2.25 inches DRILLING CONTRACTOR CVET GROUND WATER LEVELS: DRILLING METHOD 2.25 Hollow Stem Auger AT TIME OF DRILLING --- Cave at 13.5 ft. LOGGED BY TV CHECKED BY JC AT END OF DRILLING --- NOTES AFTER DRILLING --- W o ASPTNVALUE A = C) Of } ^ w w 0- 20 40 60 80 PL . 'L ~^ d O MATERIAL DESCRIPTION W J d' > 0 0 Q W Z Z a pv <J d� 0- m0> v" } 20 40 60 80 (� 2Z 0 UZ < W 0 T- El FINES CONTENT (%) El TOPSOIL (10") - (SM) RESIDUAL: Silty Fine SAND with Sandy SILT, Brown, Dark Brown, Dry, Dense _1 SS 100 11 25 (50 ) 2.5 _ SS 2 94 14-16-19 (35) 5.0 _ SS 100 19 50 (89 ) (SM) PARTIALLY WEATHERED BEDROCK: Silty Fine SAND with Rock Fragments, Grey, Dry 7.5 » SS 100 50/3" _ 4 10.0 12.5 Refusal at 13.6 feet. Bottom of borehole at 13.6 feet. SS 5 100 50/1" BORING NUMBER B5 CVET `V 308 15th St SE PAGE 1 OF 1 CATAW13A VALLEY Hickory, NC 28702 ENGINEERING &TESTING Telephone: 828 578 9972 CLIENT Teramore Development LLC PROJECT NAME Dollar General Eden PROJECT NUMBER 19-580 PROJECT LOCATION NC Highway 135 & Harington Highway DATE STARTED 1/10/20 COMPLETED 1/10/20 GROUND ELEVATION 562 ft MSL HOLE SIZE 2.25 inches DRILLING CONTRACTOR CVET GROUND WATER LEVELS: DRILLING METHOD 2.25 Hollow Stem Auger AT TIME OF DRILLING --- Cave at 13.4 ft. LOGGED BY TV CHECKED BY JC AT END OF DRILLING --- NOTES AFTER DRILLING --- W o ASPTNVALUE A C) Of } w w 20 40 60 80 = ~^ d O MATERIAL DESCRIPTION W J d' ^ > 0 0 Q 0- W Z Z a PL . 'L pv <J d� 0� m0> v" } 20 40 60 80 (� 2Z 0 UZ < W 0 T- ElFINES CONTENT (%) El 0.0 20 40 60 80 : TOPSOIL (6") (SC) RESIDUAL: Claye SAND with Small Rock Fragments, Dark Brown, Dry, Medium Dense to Dense SS 100 8 22 3 O 2.5 SZ 100 12 17 32 O 5.0 » SS 3 100 45-50/3" (SM) PARTIALLY WEATHERED BEDROCKL Silty Fine SAND with Rock Fragments, Brown, Dark Brown, Dry 7.5 SS 4 100 45-50/4" 10.0 >> 12.5 SS 100 35-50/1'. 5 Refusal at 14.1 feet. Bottom of borehole at 14.1 feet. BORING NUMBER B6 CVET `V 308 15th St SE PAGE 1 OF 1 CATAW13A VALLEY Hickory, NC 28702 ENGINEERING &TESTING Telephone: 828 578 9972 CLIENT Teramore Development LLC PROJECT NAME Dollar General Eden PROJECT NUMBER 19-580 PROJECT LOCATION NC Highway 135 & Harington Highway DATE STARTED 1/13/20 COMPLETED 1/13/20 GROUND ELEVATION 560 ft MSL HOLE SIZE 2.25 inches DRILLING CONTRACTOR CVET GROUND WATER LEVELS: DRILLING METHOD 2.25 Hollow Stem Auger AT TIME OF DRILLING --- Cave at 5.0 ft. LOGGED BY TV CHECKED BY JC AT END OF DRILLING --- NOTES AFTER DRILLING --- W o ASPTNVALUE A C) Of } w w 20 40 60 80 = ~^ d O MATERIAL DESCRIPTION W J d' ^ > 0 0 Q 0- W Z Z a PL . 'L pv <J d� 0� m0> v" } 20 40 60 80 (� 2Z 0 UZ < W 0 Tf ElFINES CONTENT (%) El 0.0 20 40 60 80 : TOPSOIL (4") (SM) RESIDUAL: Silty Fine SAND with Rock Fragments and Clay Inclusions, Yellow -Brown, Grey, Dry, Dense to Very Dense SS 100 11 50 72 O 2.5 SZ 100 23 14 39 O 5.0 (ML) RESIDUAL: Sandy SILT with Small Rock Fragments, Light Yellow, Brown, Tan, Dry, Dense to Very Dense S3S 100 14 24 45 O 7.5 S4 100 14-24-47 10.0 Bottom of borehole at 10.0 feet. BORING NUMBER B7 CVET `V 308 15th St SE PAGE 1 OF 1 CATAW13A VALLEY Hickory, NC 28702 ENGINEERING &TESTING Telephone: 828 578 9972 CLIENT Teramore Development LLC PROJECT NAME Dollar General Eden PROJECT NUMBER 19-580 PROJECT LOCATION NC Highway 135 & Harington Highway DATE STARTED 1/13/20 COMPLETED 1/13/20 GROUND ELEVATION 560 ft MSL HOLE SIZE 2.25 inches DRILLING CONTRACTOR CVET GROUND WATER LEVELS: DRILLING METHOD 2.25 Hollow Stem Auger AT TIME OF DRILLING --- Cave at 5.0 ft. LOGGED BY TV CHECKED BY JC AT END OF DRILLING --- NOTES AFTER DRILLING --- W o ASPTNVALUE A = C) Of } ^ w w 0- 20 40 60 80 PL . 'L ~^ d O MATERIAL DESCRIPTION W J d' > 0 0 Q W Z Z a pv <J d� 0- m0> v" } 20 40 60 80 (� 2Z 0 UZ < W 0 T- El FINES CONTENT (%) El 2.5 5.0 7.5 J TOPSOIL (6") (CL) RESIDUAL: Sandy CLAY with Rock Fragments and Fine Roots, Brown, Grey, Moist, Stiff (ML) RESIDUAL: Sandy SILT with Rock Fragments, Brown, Dark Brown, Dry, Very Dense ML) PARTIALLY WEATHERED BEDROCK: Sandy SILT with Rock -ragments, Brown, Dark Brown, Dry Refusal at 9.8 feet. Bottom of borehole at 9.8 feet. SS 100 4 27 O SS 2 94 13-33-39 (72) S3S 100 24 83 38 O SS 4 100 24-33- 50/4" BORING NUMBER B8 CVET `V 308 15th St SE PAGE 1 OF 1 CATAW13A VALLEY Hickory, NC 28702 ENGINEERING &TESTING Telephone: 828 578 9972 CLIENT Teramore Development LLC PROJECT NAME Dollar General Eden PROJECT NUMBER 19-580 PROJECT LOCATION NC Highway 135 & Harington Highway DATE STARTED 1/13/20 COMPLETED 1/13/20 GROUND ELEVATION 560 ft MSL HOLE SIZE 2.25 inches DRILLING CONTRACTOR CVET GROUND WATER LEVELS: DRILLING METHOD 2.25 Hollow Stem Auger AT TIME OF DRILLING --- Cave at 5.0 ft. LOGGED BY TV CHECKED BY JC AT END OF DRILLING --- NOTES AFTER DRILLING --- W o ASPTNVALUE A = C) Of } ^ w w 0- 20 40 60 80 PL . 'L ~^ d O MATERIAL DESCRIPTION W J d' > 0 0 Q W Z Z a pv <J d� 0- m0> v" } 20 40 60 80 (� 2Z 0 UZ < W 0 T- El FINES CONTENT (%) El 0.0 20 40 60 80 - _ 2.5 : TOPSOIL (4") » »Ak » (ML) RESIDUAL: Sandy SILT with Fine Root and Rock Fragments, Brown, Dark Brown, Grey, Dry to Moist, Stiff SS 100 11-7 8 ( ) 5.0 SS 2 100 4-13-50/5" (SM) PARTIALLY WEATHERED BEDROCKL Silty SAND with Rock Fragments, Grey, Dry - 7.5 SS 3 100 33-50/3" SS 100 50/4" Refusal at 8.8 feet. Bottom of borehole at 8.8 feet. 4 BORING NUMBER B9 CVET `V 308 15th St SE PAGE 1 OF 1 CATAW13A VALLEY Hickory, NC 28702 ENGINEERING &TESTING Telephone: 828 578 9972 CLIENT Teramore Development LLC PROJECT NAME Dollar General Eden PROJECT NUMBER 19-580 PROJECT LOCATION NC Highway 135 & Harington Highway DATE STARTED 1/13/20 COMPLETED 1/13/20 GROUND ELEVATION 568 ft MSL HOLE SIZE 2.25 inches DRILLING CONTRACTOR CVET GROUND WATER LEVELS: DRILLING METHOD 2.25 Hollow Stem Auger AT TIME OF DRILLING --- Cave at 4.4 ft. LOGGED BY TV CHECKED BY JC AT END OF DRILLING --- NOTES AFTER DRILLING --- W o ASPTNVALUE A = C) Of } [aw 0- 20 40 60 80 PL . 'L ~^ d O MATERIAL DESCRIPTION W J Of > 0 � � 0 Q W Z Z a pv <J d� 0- m0> v" } 20 40 60 80 (� 2Z 0 UZ < W 0 T- El FINES CONTENT (%) El TOPSOIL (6") (SM) RESIDUAL: Silty SAND, Brown, Grey, Yellow, Dry (ML) PARTIALLY WEATHERED BEDROCK: Sandy SILT with Rock Fragments, Brown, Dark Brown, Dry 2.5 (SM) RESIDUAL: Silty SAND with Rock Fragments, Brown, Dry Refusal at 6.3 feet. Bottom of borehole at 6.3 feet. S1 S 100 8-22-50/5" » Ak SS 100 26-50/4" >>Ak 2 SS 100 50/4" >>AL 3 Project Name: Proposed Dollar General Store Location: Eden, Rockingham County, North Carolina Date: April 1, 2020 Project No. 19-580 APPENDIX C - LABORATORY TEST DATA PERCENT COARSER d N N O o O N O M O V O N (O O L- O 00 O 0) O o (0 O V J M M O O o O M 00 �c Z N (n If w LL V) 00 Zt w o I o x cn �U�0 U � N al I —I OC ElM /� C o 1 O O CG V O T C M M � LL p �+ O LU 07 /1 V/ Z o a N V w w w ca 06 w O 0 Z U V a (� () O O O W E U) � N N aca c > w x N N o W N N L (D n O_ C Z - 0 IY1 IY1 W 0- �� _ Ll LU � \ # LL1 c_ N a) d V1 O �O O U C U) O G Q W � O O O > a3 f+ tDf 00 0 o CG CG 0 O m 00 O O o Lo 0 0 V o O o O O O C N N � U U bENld 1N�Cb�d0 L d L d ElU u T U PERCENT COARSER d N N N O o O N O M O O N (O O O r 00 O O o O (0 O V J A M M O O O tn Z N N If w LL tn tn N O t w o I o x cn a � o U o U U �+ L °7 o Q � o�CG y W O 0 LL N p Ct w m Z�LU N U w LU ca 0< u Z `� ~ N ai Z 0 U ai m UU�uu � .L N� V O in c V 5 C _ C o0o LU U)000 N N N N aca c > LU z \ N N _ c o o W N N Z_ (7 o ~ M ~ Z Mtn `� Z oa) CG CG CG W IL U _ LL LU > \ # w c_ (D N a) d N O\ M O\ O\ U E m O O O a j C O W � O a3 f+ r, 0 00 O O O E O O O 4+ 0 o CG CG CG 0 O m 00 O O o Lo 0 0 o O o O O O C N N � U U bENld 1NECbEd U L d L d O O O u T A LIQUID AND PLASTIC LIMITS TEST REPORT 60 Dashed line indicates the approximate upper limit boundary for natural soils SOIL DATA NATURAL SYMBOL SOURCE SAMPLE DEPTH WATER PLASTIC LIQUID PLASTICITY USCS NO. CONTENT LIMIT LIMIT INDEX • Test Borings 4092 B11-2.5' 2L1 24 45 21 CL � Test Borings 4093 B3 3.5-5' 10.2 22 37 15 SC � Test Borings 4094 BS 1-2.5' 15.6 25 39 14 SC ♦ Test Borings 4095 B7 1-2.5' 18.0 21 37 16 CL ♦ Test Borings 4096 B9 1-2.5' 26.3 26 37 11 SM Tested By: CLP Checked By: CR SURVEY: BLUE RIDGE GEOMATICS, PA 1520 MEADOWVIEW DRIVE WILKESBORO, NC 28697 LICENSE: C-3576 CITY/TOWN: EDEN, NC EDEN, NC STORE #21637 VICINITY MAP (NTS) ENGINEER: BREC, PA 1520 MEADOWVIEW DRIVE WILKESBORO, NC 28697 LICENSE: C-3448 NORTH CAROLINA COUNTY MAP (ROCKINGHAM COUNTY) C000 C001 C002 C003 C100 C200 C201 C202 C203 C300 C301 C302 C303 C400 G100 C900 C901 C902 C903 C904 C905 SHEETINDEX COVER SHEET NPDES NCG01 EXISTING CONDITIONS DEMOLITION PLAN SITE PLAN GRADING PLAN DRAINAGE AREAS WATERS OF THE US USGS MAP PHASE 1 ESC PLAN PHASE 2 ESC PLAN PHASE 3 ESC PLAN FINAL ESC PLAN UTILITY PLAN LANDSCAPE PLAN DETAILS DETAILS DETAILS DETAILS DETAILS DETAILS SITE COORDINATES: LATITUDE = 36.476457' N LONGITUDE _-79.794872° W ���1111111/// 0Q SS/ <i F 'REVIEW 035736 = ��vGs;•�NGINE��''G� �, ///II1110 \`\\ 08/24/2020 BREC: .,q NICBELSK-3448; z �'•. CARD W ti z � U W z CIA � z w w � � w OII­__ J COVER SHEET PREPARED FOR: TERAMORE DE' PO BOX 6460 THOMASVILLE, JELOPMENT, LLC GA 31758 DATE: REVISIONS: SHEET SIZE: 24"x36" DATE: 06/15/2020 PROJECT NUMBER: 3160632019 DRAWN BY: J.EDWARDS APPROVED BY: J.CHURCH SCALE: NTS (H) (N) SHEET: C000 © COPYRIGHT 2020 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE. GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. Temporary and Permanent Groundcover* STABILIZATION TIMEFRAMES (Effective Aug. 3, 2011) SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS Perimeter dikes, swales, ditches, slopes 7 days None -OWN" High Quality Water (HQW) Zones 7 days None Slopes steeper than 3:1 7 days If slopes are 10' or less in length and are not steeper than 2:1, 14 days are allowed. Slopes 3:1 flatter 14 days 7 days for than 50' in length. or slopes greater All other areas with slopes flatter than 4:1 14 days None, except for perimeters and HQW Zones. *-For Falls Lake watershed, in disturbed areas where grading activities are incomplete, provide temporary groundcover no later than seven (7) days for slopes steeper than 3:1; ten (10) days for slopes equal to or flatter than 3:1; fourteen (14) days for areas with no slope. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or without reinforcement matting temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retainingwalls POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. NORTH CAROLINA Environmental Quality EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number of waste containers on site to manage the quantity of waste produced. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. 8. Dispose waste off -site at an approved disposal facility. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER A o 1ssrrR, 0 oR srnPlF 0 s°Es rvsrs `' 0 arR,°F O A FENCEL5N rvarirvc oEvicEElie°xzaA irvi SECTION A -A cii%nL tocnriory °srERnrirvE°w EiEL° uoaEzcry PLAN cuEaar niaRxEouw rnRs� ­ onrau oEvcE. BELOW GRADE WASHOUT STRUCTURE - ,o miNB °�EI..IUTRo o° 0 0 0 0 o 0 0 O e °R cu NOTING OEvicE PLAN ABOVE GRADE ,u nvc. oM�L 'LASTIC L soi�sERM ry �P°E 9 SECTION E-n rEry R°aAUs P, iI AL Eoc11- UETERM «E° IN 11CLI srraIE2 THE CONCRETEMSICUT STRUCTURES l�s5xlapMiN.1 MirviMuu,z irvcrvEs of FREE -N. CIII .01i .Rv E. rceo wrtry sicrvncE WASHOUT STRUCTURE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Inspect Frequency Inspection records must include [40 CFR 122.41]: (during normal business hours (1) Rain Daily Daily rainfall amounts. gauge If no daily rain gauge observations are made during maintained in weekend or holiday periods, and no individual -day rainfall good working information is available, record the cumulative rain order measurement for those un-attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC At least once 1. Identification of the measures inspected, Measures per 7 calendar 2. Date and time of the inspection, days and within 3. Name of the perscn performing the inspection, 24 hours of a 4. Indication of whether the measures were operating rain event > 1.0 properly, inch in 24 5. Description of maintenance needs for the measure, hours 6. Corrective actions taken, and 7. Date of actions taken. (3) At least once 1. Identification of the discharge outfalls inspected, Stormwater per 7 calendar 2. Date and time of the inspection, discharge days and within 3. Name of the perscn performing the inspection, outfalls 24 hours of a 4. Evidence of indicators of stormwater pollution such as (SDOs) rain event > 1.0 oil sheen, floating or suspended solids or discoloration, inch in 24 S. Indication of visible sediment leaving the site, hours 6. Actions taken to correct/prevent sedimentation, and 7. Date of actions taken. (4) Perimeter At least once If visible sedimentation is found outside site limits, then a of site per 7 calendar record of the following shall be made: days and within 1. Actions taken to clean up or stabilize the sediment that 24 hours of a has left the site limits, rain event > 1.0 2. Date of actions taken, and inch in 24 3. An explanation as to the actions taken to control future hours releases. (5) Streams At least once If the stream or wetland has increased visible or wetlands per 7 calendar sedimentation or a stream has visible increased turbidity onsite or days and within from the construction activity, then a record of the offsite (where 24 hours of a following shall be made: accessible) rain event > 1.0 1. Evidence and actions taken to reduce sediment inch in 24 contributions, and hours 2. Records of the required reports to the appropriate Division Regional Office per Part III, Section C, Item (2)(a) of this permit of this permit. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. ;..4rr f1, ►,, NORTH CAROLINA Environmental Quality PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be documented in the manner described: Item to Document Documentation Requirements (a) Each E&SC Measure has been installed Initial and date each E&SC Measure on a copy and does not significantly deviate from the of the approved E&SC Plan or complete, date locations, dimensions and relative and sign an inspection report that lists each elevations shown on the approved E&SC E&SC Measure shown on the approved E&SC Plan. Plan. This documentation is required upon the initial installation of the E&SC Measures or if the E&SC Measures are modified after initial installation. (b) A phase of grading has been Initial and date a copy of the approved E&SC completed. Plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and Initial and date a copy of the approved E&SC installed in accordance with the Plan or complete, date and sign an inspection approved E&SC Plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report requirements for all E&SC Measures have been performed. (e) Corrective actions have been Initial and date a copy of the approved E&SC taken to E&SC Measures. Plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available for agency inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This general permit as well as the certificate of coverage, after it is received. (b) Records of inspections made during the previous 30 days. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. (c) All data used to complete the Notice of Intent and older inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] EFFECTIVE: 03/01/19 PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that must be reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (a) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (b) Anticipated bypasses and unanticipated bypasses. (c) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300. Occurrence Reporting Timeframes After Discovery) and Other Requirements (a) Visible • Within 24 hours, an oral or electronic notification. sediment • Within 7 calendardays, a report that contains a description of the deposition in a sediment and actions taken to address the cause of the deposition. stream or wetland Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303� )d) listlistas impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and • Within 24 hours, an oral or electronic notification. The release of notification shall include information about the date, time, nature, hazardous volume and location of the spill or release. substances per Item 1(b)-(c) above (c) Anticipated a A report at least ten days before the date of the bypass, if bypasses [40 CFR possible. The report shall include an evaluation of the anticipated 122,41(m)(3)] quality and effect of the bypass. (d) Unanticipated • Within 24 hours, an oral or electronic notification. bypasses [40 CFR • Within 7 calendardays, a report that includes an evaluation of 122.41(m)(3)] the quality and effect of the bypass. (e) Noncompliance • Within 24 hours, an oral or electronic notification. with the • Within 7 calendardays, a report that contains a description of the conditions of this noncompliance, and its causes; the period of noncompliance, permit that may including exact dates and times, and if the noncompliance has not endanger health or been corrected, the anticipated time noncompliance is expected to the continue; and steps taken or planned to reduce, eliminate, and environmeri prevent reoccurrence of the noncompliance. [40 CFR 122.41(1)(6). CFR 122.41(I)(7)] • Division staff may waive the requirement for a written report on a case -by -case basis. NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 03/01/19I NPDES CONSTRUCTION GENERAL PERMIT - NCG 010000 ENTIRE PERMIT CAN BE FOUND AT: https://files.nc.gov/ncdeq/Energy%20Mineral%20and%20Land%20Resources/Stormwater/NCG010000_Fi nal_Permit_2019_04_0l .pdf EROSION CONTROL CONTACT ROBERT CALDWELL - (704) 614-1763 PROJECT MANAGER \�i�1111111//// �p� FEssio REVIEW 035736 = Sj •........•• ' Q� /N C CHI \\.. ////llllllti�`\ 08/24/2020 BREC: .,q p0Pq NCBELSK-34481. •. TH CARD ��• W ti Z � U W z CN � z w w � C) w O� J r-� NPDES NCGO1 PREPARED FOR: TERAMORE DE' PO BOX 6460 THOMASVILLE, JELOPMENT, LLC GA 31758 DATE: REVISIONS: SHEET SIZE: 24" x36" DATE: 06/15/2020 PROJECT NUMBER: 3160632019 DRAWN BY: J.EDWARDS APPROVED BY. J.CHURCH SCALE: NTS (H) (N) SHEET: C001 © COPYRIGHT 2020 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE. F \ \ "x*� REBAR SET REBAR e ,,II �'` \ \\ \ \\ \\ \\ \\ \ - SET N.C. GRID-NAD 83 (2011) N 1 \ \ \ \ N=993,536.98' \ \ \ \ \ \ % \ \ \ \ Q, 00 4 \ POLE Y 's \ \ \ \ \ UTILITY POLE C.0I I I11o2 \\�\r• �� \ \ \ \ \ \ \ \ \ \ \ \ Pf --- Sao \ /: P \ SAT. DISH^ --- WESTSIDE STORAGE, LLC a' \ ]TILITY I \ \~ \ \ \ x \ e \ \ D.B. 945, PG. 2303 OLE SAT. DISH LOTS 21 thru 24 P.B. 03, PG. 53 REBAR SEIi TAX PARCEL #133468 N.C.GRIDN D83(2011 'A .�\\ \ \\ ��\\ SHEDUTILITY \\— E 1,7=8.64 / // Mr./`Y \\V` r \ \ \\\ \\ \POLE \ \N SIVER MANHOLE / / / / �I '�' I 'V ''V�.. �It.. _' 1 \` \ \ IN \ \ \ \ CONC. I I \ I I RIM=565.94'IN� { \ \ N 19 I \ I \\YV OUT6660 4' / / / / \ I\ +• I �! \ I \ \ \ \ \ \ \ \ \ \ ��� \\ sm V I N / / / / / 1 ! �\ •�• I) \ \ v \ s6s \ EXISTING HOUSE c WELL GAS \\ MTR..` c SHED \ \\1 / > \\ / \ vN TELE / \IPED \\I \\\ \ \ Gk \\ 2F\ \\ ` AN F° TLI\Y OUT INV. 15"RCP RA =563.39' o �o 16CONC. o N 1 Fo / I \ I \ / 'C ��i 1 I 1 �• �� �• W \ II I I\ \ \ `` \`\ \\\ \ \ I \ WiR. m W / / 'Y \ 'Y ' I \ \ \\ \ CONC. \ \ m ZR _X INV. 15 RCP\/ " k \ \ \ \ \ EXISTING yI\ N .p �\ \ Y \\ / LEGEND — — PROPERTY LINE -too EXISTING CONTOURS 10o PROPOSED CONTOURS BUILDING SETBACK — — — — — — — — — LANDSCAPE BUFFER 2" PIPE FOUND N.C. GRID-NAD 83 (2011) N=993,284.25' E=1,766,463.03' / \ \ 7� \ y I I �� I f _ \ / I'1 �. I I'. I \ \ \ \ \\ \\ GGNG \ �`2\\ \y \ �\AI �w w• �w• /`�.\ �.�✓\ �I w• I +I w• '�I \ \ \` \\ \ \\ I \-----�/ N \� ` / /p j/i °I I I� w•/ w• \ .•\ :r w:'� / /ii w• ♦ I w• w•`I \ \ \ \\ \\\ = 1 \ / / / �N I `\\ PGLY v 2 OA I I 11 \ \ \\ / ` \ \ CLEAN- "_ -C-, t/ \ o I ' r"!L '/r '/r 'Y �• / I I W •• \ I —� ^ \ I / OUT o f/ "o S \ \ �GNG. / / \\\\ \ N \/ 1 /� �Y/ �l✓ �Y 1 .Y �Y\ \ \ \ UTIA�CO ITY \ \\ t \\ /W �Y {Y �Y �Y .Y r. i/r r. :1 \ \ \ POLE\ \\\ \\\ MTR. WETLIND t`� \ % \ \ \ \ \\ \ / o.5 / 'RREA �. Z �1 \ WI �. \ \ \ A \ \ \\ \ I _�/ \, *0.27 AWES cp,�N.\\ RAP I �Y I �1'/ \ \ \ �A \\ \\ \\ \ COMPUTEDPOINT 1 562 GPS TP Ps 4 SEWER MANHOLE / +• I \ \ \ I 1\ \; \ e / e / / N / / Ps/\/' /55 P RIM=556.57' r, I \ \ I I I \A I \\ \\ / / / / / /i -/VTR. \ ri \ \ \ \\ \;c�\ \ \ \\ \\ \° \I\ \\� °\\IW\rN �N�. I S�s . A �w.•\�\. w�• �. ��r. \ �. �w.• \�II . �w.•\ �7�. I /h�I ''• I'I ` \I \ \ II I I I II INV IN=551 / MTR.' J/'\VOK=551.31V OUT / FZP� /5s UTILITY / POLE5P 3VVTR. 8IPA MR. eo C� FIRE NGQ`HYD. PG+4q,yF� ��,•� \\ I I 1 \ /�/ � ���.�� // ��� / / / GPs GPs /ss P CSC/ j / / / IPA \ \ \ \ o -C\ S ��►SSF\/7 FF�F\6 pG 406 \ \ �\ \ l 1 ��i� ` R'L 2� / / p o I / 1 Ps /GPs/ss /ssR�Po / 1 \ �• G /Ss // � \ Fo \ \ \ \ \ / / N G IPA / \ \ \ \ t�UY\ ' ­'I''Y \ ♦ �� S / /\ \ / /� / '� /GPs s /ss e % / / / GUY INV. " RCP %N 'ANCHOR m'' vN \ \ \ ss / .� / �/ / !� S ss/ :`CLEAN - OUT / / \ \ \ \•��\ / /' / UTILITY UTI/\ N / / / / �N\/ GP G\1 °A ss UNIT NP "POLE\ '1 \/�/ '� °/ I NN .� / / j \S ss'\ UTILITY I - �/ / ANHOLE TELE POLE / \ 1/ M = 556.48' �as� i PED. NN N \ WTR. \ U\IT1T \ / / / / I / INV IN=550.98' I a vLv. �Q ' N e PO J /" I NINV OUT=550.78' / / /GP�/ ` \ a I / // \ 4 / SEWER MANHOLE RIM = 561.49' INV IN=553.09' \ / a �'\ a GQ INV OUT=552.99 CATCH BASIN \ \a R ' e / �� N d WTR. / I / s/ WTR. RIM=560.5T a s /' VLV MTR. INV N=556.64' �J6 INV OUT=556.22 / P �� v \ / / 21 / >, / / j / es 14- I.,\ 20 WTR. UTILITY a \ / P ��VN01 / VLV. vN /GOrQ1/ I G4'� POLE � y ,--�/ e GR / � 9� MAG NAIL SET P ��"E' / " N.C. GRID-NAD 83 (2011) N66 �� / N=993,160.01' / A E=1,766,162.4j-drluT POL� I // SEWER MANHOLE \ RIM=560.31' \ 1.5" PIPE INV IN=550.46' \ FOUND INV OUT=550.36 \ COORDINATE WITH NCDOT AND/OR LOCAL TRANSPORTATION \ AUTHORITY AND FOLLOW TRAFFIC MANAGEMENT PLAN FOR IV/ \ ALL WORK WITHIN AND ADJACENT TO PUBLIC RIGHT OF WAY. IN P EX. OVERHEAD ELECTRIC SS EX. SANITARY SEWER W EX. WATER FO EX. FIBER OPTICS GAS EX. NATURAL GAS — STREAM CENTERLINE WETLAND GENERAL NOTES SITE VICINITY MAP (NTS) 1. CONTRACTOR IS TO VERIFY ALL UTILITY LOCATIONS PRIOR TO BEGINNING WORK. 2. ALL WORK IS TO BE IN ACCORDANCE WITH ALL STATE AND LOCAL REGULATIONS. 3. ALL PERMITS ARE TO BE OBTAINED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. 4. CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL PERMIT CONDITIONS. 5. EXISTING UTILITIES ON SITE SHALL BE RELOCATED AS REQUIRED. CONTRACTOR SHALL PAY ALL COSTS ASSOCIATED WITH RELOCATION. 6. CONTRACTORS ARE TO FULLY ACQUAINT THEMSELVES WITH ALL UTILITIES WITHIN THE CITY AND STATE ROW AND WITHIN THE PROPERTY BOUNDARIES WHICH WILL REQUIRE RELOCATION. ALL COSTS ASSOCIATED WITH RELOCATION SHALL BE INCLUDED IN THE BASE BID. 7. ALL WORK PERFORMED WITHIN NCDOT ROW SHALL BE PER NCDOT SPECS AND SHALL BE INSPECTED FOR COMPLIANCE BY STATE INSPECTORS AT THEIR DISCRETION. 11 \\\1111111/// \\'CH CARO pQ' REVIEW 035736 = %vGs;•�'�GINE���G �. 08/24/2020 C p0 .60 NCBELS#C-3448? 0. ''•. CARD o. �"###seeNllN• W ti z � U W z CN � z w w � � w O� J r-- EXISTING CONDITIONS PREPARED FOR: TERAMORE DEVELOPMENT, LLC PO BOX 6460 THOMASVILLE, GA 31758 DATE: REVISIONS: SHEET SIZE: 24"x36" DATE: 06/15/2020 PROJECT NUMBER: 3160632019 DRAWN BY: J.EDWARDS APPROVED BY: J.CHURCH SCALE: 1" = 20' (H) (M 20 10 0 20 40 SHEET: C002 © COPYRIGHT 2020 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE 1520 MEADOWVIEW DRIVE WILKESBORO, NC 28697 336.844.4088 http://brec.biz \ H CARD'%'� . of o y .'L9 REVIEW 035736 = S C. uro 08/24/2020 .•'�� BREC: Pq. ���'-. p0 NICBELSK-3448i �'•. CARO )LITION PLAN �ELOPMENT, SHEET SIZE: 24"x36" DATE: 06/15/2020 PROJECT NUMBER: 3160632019 DRAWN BY: J.EDWARDS APPROVED BY: J.CHURCH SCALE: 1" = 20' (H) (N) SHEET: C003 © COPYRIGHT 2020 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE. / / / / / e REBAR SET N.C. GRID-NAD 83 (2011) ` N=993,536.98' E=1,766,028.32' 0 10' x 70' SIGHT N TRIANGLE ACCESS EASEMENT O 0 24" STOP BAR - WHITE PER NCDOT STDS. 1205 1 NCDOT PAVING SEE DET. 1/C901 k1 �3S 10' x 70' SIGHT TRIANGLE 2 2 0 o 0 w cp \ -0 ••1 •1 1 �1 F j ' �r r. r. r:• RETAINING WALL - 1 TO BE DESIGNED BY OTHERS. SAFETY FENCE ALONG EXTENTS SEE DET. 6/C901 , \ INN p2iaooe 81REBAR SET / so. 6' WOOD FENCE SEE DET. 6/C901 2/ 12' x 18' DUMPSTER NID ENCLOSURE / \ SEE DET. 4/C901 6, d A d . e ':f d .. f 'd' a a -4 ..d d I . • d ' y d' a ° a. a \ 6.14' DELIVERY RAMP SEE DET. 2/C901 DOLLAR GENERAL 9,100 SQ. FT. 7,302 SQ.FT. RETAIL SPACE F.F.E. = 567.75 HANDICAP RAMP & SIGNAGE SEE DET. 3-5/C900 4 - BOLLARDS SEE DET. 9/C900 4" DOUBLE YELLOW LINES d PAVEMENT MARKINGS \\ PER NCDOT STDS. 1205 I 6 \ ;. d' \ \ \ IN \14 ` \ A \, / \ HEAVY DUTY �o ASPHALT SEE \ A ��A RETAINING WALL - 2 TO BE "' DET. 1/C900 \ \ \ DESIGNED BY OTHERS. �' "' j R25 \ \ 15 \ \o� a SAFETY FENCE ALONG \ :p `� EXTENTS SEE DET. 7/C901 \ \ \ r �� r��.• /r� �'� j \ \\ \ \\ �� �\35\ STANDARD \ \ .\ ;� W \ \ \ \ DUTY ASPHAL \ \ \r. r. `�r. �•. j r r. r►\ � r. r r r. •\ \ \ \ \ \ \ SEE DE 9 03 \ r• r• r• r• r• r• r• '1 \ \ r• r• �, \ r• r• r• r• � WETLAND AREA C • r. ` r• ` .�. 0.27 ACRES r• r• �. �, / / SAND FILTER �/* a 3.5' d \ a \ 4" DOUBLE YELLOW LINES PAVEMENT MARKINGIN PER NCDOT STDS. 1205 10' x 70' SIGHT TRIANGLE ❑A SIGN LEGEND LEGEND — — PROPERTY LINE ❑A STOP loo EXISTING CONTOURS R1-1 goo PROPOSED CONTOURS 30"X30" BUILDING SETBACK — — — — — — — — — LANDSCAPE BUFFER P EX. OVERHEAD ELECTRIC SS EX. SANITARY SEWER W EX. WATER FO EX. FIBER OPTICS GAS EX. NATURAL GAS STREAM CENTERLINE WETLAND NCDOT PAVING \ \ \ \ \ STANDARD DUTY ASPHALT HEAVY DUTY ASPHALT WESTSIDE STORAGE, LLC D.B. 945, PG. 2303 LOTS 21 thru 24 - P.B. 03, PG. 53 TAX PARCEL#133468 2" PIPE FOUND N.C. GRID-NAD 83 (2011) N=993,284.25' E=1,766,463.03' 10' x 70' SIGHT TRIANGLE NCDOT PAVING SEE DET. 1/C901 / f� 24" STOP BAR -WHITE PER NCDOT STDS. 1205 / SURFACES SHOULD BE CLEAN, DRY AND METAL SURFACES FREE YELLOW CURBING AND BOLLARDS - OF HEAVY RUST. 2 COATS PARKING LOT SHERWIN WILLIAMS - KEM 4000 ACRYLIC ALKYD ENAMEL SAFETY YELLOW B55Y300 SURFACES SHOULD BE CLEAN, STRIPING - PARKING LOT DRY. TOP COAT SHERWIN WILLIAMS PROMAR TRAFFIC MARKING PAINT YELLOW TM5495 \ 1.5" PIPE \ SURFACES SHOULD BE CLEAN, FOUND \ COORDINATE WITH NCDOT AND/OR LOCAL TRANSPORTATION DRY. TOP COAT SHERWIN \ /' \ AUTHORITY AND FOLLOW TRAFFIC MANAGEMENT PLAN FOR HANDICAP STRIPING - PARKING LOT WILLIAMS - PROMAR TRAFFIC IV \ ALL WORK WITHIN AND ADJACENT TO PUBLIC RIGHT OF WAY. MARKING PAINT "H.C." BLUE © COPYRIGHT 2020 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE. SITE VICINITY MAP (NTS) GENERAL NOTES 1. CONTRACTOR IS TO VERIFY ALL UTILITY LOCATIONS PRIOR TO BEGINNING WORK. 2. ALL WORK IS TO BE IN ACCORDANCE WITH ALL STATE AND LOCAL REGULATIONS. 3. ALL PERMITS ARE TO BE OBTAINED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. 4. CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL PERMIT CONDITIONS. 5. EXISTING UTILITIES ON SITE SHALL BE RELOCATED AS REQUIRED. CONTRACTOR SHALL PAY ALL COSTS ASSOCIATED WITH RELOCATION. 6. CONTRACTORS ARE TO FULLY ACQUAINT THEMSELVES WITH ALL UTILITIES WITHIN THE CITY AND STATE ROW AND WITHIN THE PROPERTY BOUNDARIES WHICH WILL REQUIRE RELOCATION. ALL COSTS ASSOCIATED WITH RELOCATION SHALL BE INCLUDED IN THE BASE BID. 7. ALL WORK PERFORMED WITHIN NCDOT ROW SHALL BE PER NCDOT SPECS AND SHALL BE INSPECTED FOR COMPLIANCE BY STATE INSPECTORS AT THEIR DISCRETION. PARKING AND PAVEMENT NOTES 1. ALL SIGNS, PAVEMENT MARKINGS, AND OTHER TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE MANUAL ON UNIFORM TRAFFIC DEVICES, 2012 EDITION AS AMENDED. 2. ALL PAVEMENT MARKINGS SHALL BE THERMOPLASTIC WHITE ON ASPHALT IN NCDOT ROW. 3. ALL DIMENSIONS ARE TO FACE -OF -CURB UNLESS INDICATED OTHERWISE. 4. ALL CURB RADII ARE 5' UNLESS OTHERWISE INDICATED. 5. CONTRACTOR SHALL FURNISH AND INSTALL PAVEMENT MARKINGS AS SHOWN ON THE PLANS. 6. CONTRACTOR SHALL COORDINATE THE INSTALLATION OF ALL SIGNS, PAVEMENT MARKINGS, AND OTHER TRAFFIC CONTROL DEVICES WITH OTHER CONTRACTORS ON SITE. 7. JOINTS OR SCORE MARKS ARE TO BE SHARP AND CLEAN WITHOUT SHOWING EDGES OF JOINTING TOOLS. 8. CONTRACTOR SHALL SAW -CUT TIE-INS AT EXISTING CURBS AS NECESSARY TO INSURE SMOOTH TRANSITIONS. CONTRACTOR SHALL SAW -CUT AND TRANSITION TO MEET EXISTING PAVEMENT AS NECESSARY AND AS DIRECTED BY INSPECTOR TO INSURE POSITIVE DRAINAGE (TYPICAL AT ALL INTERSECTIONS). 9. CONTRACTOR SHALL COMPLY WITH ALL PERTINENT PROVISIONS OF THE "MANUAL OF ACCIDENT PREVENTION IN CONSTRUCTION" ISSUED BY AGC OF AMERICA, INC. AND THE HEALTH AND SAFETY REGULATIONS FOR CONSTRUCTION ISSUED BY THE US DEPARTMENT OF LABOR. 10. CONTRACTOR SHALL FULLY COMPLY WITH THE REQUIREMENTS OF THE SOILS ENGINEER. 11. ALL EXISTING ON -SITE STRUCTURES SHALL BE REMOVED PER LOCAL CODES AND DISPOSED OF OFF -SITE, INCLUDING ALL ATTACHED UTILITIES AND APPURTENANCES. ANY AND ALL WELLS ON -SITE SHALL BE IDENTIFIED TO THE ENGINEER BEFORE CONSTRUCTION AND CAPPED PER HIS INSTRUCTIONS. 12. ALL AREAS NOT IDENTIFIED AS STANDARD DUTY PAVING SHALL BE CONSTRUCTED AS HEAVY DUTY PAVING (SEE DETAILS FOR STANDARD AND HEAVY DUTY PAVING REQUIREMENTS). 13. ALL SIGNS, WHETHER FREE-STANDING OR ATTACHED REQUIRE SEPARATE APPLICATION FOR EACH INDIVIDUAL SIGN. ALL SIGNS SHALL MEET LOCAL REQUIREMENTS. A SIGN PERMIT IS REQUIRED PRIOR TO INSTALLATION OF ANY SIGN. DOLLAR GENERAL PAVEMENT NOTES: 1. DETAILS ARE DOLLAR GENERAL STANDARD REQUIREMENTS AND MAY INCREASE OR DECREASE WITH VARIOUS SOIL CONDITIONS. A GEO-TECHNICAL INVESTIGATION WITH PAVEMENT DESIGN RECOMMENDATIONS SHALL BE COMPLETED FOR EACH DEVELOPMENT. THE FOLLOWING DETAILS ARE MINIMUM DOLLAR GENERAL REQUIREMENTS. INCREASED RECOMMENDATIONS ARE TO BE USED. 2. THE SUBGRADE MATERIALS SHALL BE PROOF ROLLED AND/OR SCARIFIED AND COMPACTED PRIOR TO PLACEMENT OF BASE MATERIAL. WHERE EXISTING SUBGRADE MATERIALS ARE UNSUITABLE. THEY SHALL BE REMOVED AND REPLACED WITH COMPACTED SELECT MATERIAL IN ACCORDANCE WITH GEO-TECHNICAL RECOMMENDATIONS. 3. HEAVY DUTY CONCRETE PAVEMENT AND STANDARD DUTY CONCRETE PAVEMENT (AS RECOMMENDED BY GEO-TECHNICAL REPORT OR DOLLAR GENERAL MINIMUMS) SHALL BE STEEL REINFORCED. REINFORCEMENT TYPE SHALL BE PRIOR APPROVED BY DOLLAR GENERAL. 4. CONCRETE PAVEMENT PLAN SHALL BE PROVIDED TO DOLLAR GENERAL FOR PRIOR APPROVAL. ALL JOINTS MUST BE SEALED WITH AN APPROVED SEALANT. STEEL REINFORCING SHALL BE USED AT JOINTS. REFER TO ACI 330R \i13t Z\ /- (GUIDE FOR DESIGN AND CONSTRUCTION OF CONCRETE PARKING LOTS) FOR JOINT DESIGN AND LAYOUT. / g 665 1 r• r• r• �,� r• ��\ / / QRo�E 1 60 / G 4g YFgSF �. / A / 1r�fj �`•�` � � . 13964 60406� �� / -flop2252 \ r• Z r• r• r• / -oop \ / v PYLON SIGN / \ 1 i \ Lo STRIPING LEGEND 1�220 MAG NAIL SET / \ 4� 3� E N.C. GRID-NAD 83 (2011) N66 N=993,160.01' / \ ' E=1,766,162.41' / SITE INFORMATION PROPERTY SIZE 1.83± ACRES ON -SITE IMPERVIOUS AREA 0.82± ACRES DISTURBED ACRES 1.73± ACRES ZONE BG PARKING COUNT 38 SPACES 11 CARD'%'� pQ''' Essi <i REVIEW 035736 INE��G�: C . CN`� 08/24/2020 BREC: Pq. NCBELS#C-3448? 0. i •• i %•. TH CARD ,�. W z W SITE PLAN M U C-0 Z N Z � LU W C) O. w 0 W PREPARED FOR: TERAMORE DEVELOPMENT, LLC PO BOX 6460 THOMASVILLE, GA 31758 DATE: REVISIONS: SHEET SIZE: 24"x36" DATE: 06/15/2020 PROJECT NUMBER: 3160632019 DRAWN BY: J.EDWARDS APPROVED BY: J.CHURCH SCALE: 1" = 20' (H) (V) 20 10 0 20 40 SHEET: C100 HWY 135 DRIVEWAY PROFILE STATION \ \\ \\ \\ \\ \ \ \ \ \ \ \ \ \ 18 REBAR \ \\ \ \ \ \\ \ \\ SET \\ \\ \\ \\ \\ \\ \ \ \\ \\ -00N \ \ \ \ \ \ \ sus\ \ \ 0 Zm 6; \\\ \\ \\\ \'o I ` RETAINING WALL 1 TO BE \ \ \ \ 6' OOD FENCE W I / \ SEE DET. 6/C901 DESIGNED BY OTHERS. \ \> \ \\ \\ \ \ I / \`�_ / SAFETY FENCE ALONG � / \ 1s \ \ \ EXTENTS SEE DET. 6/C901 ,j� \ \ �k \ STRUCTURE TABLE STRUCTURE NAME DETAILS RIM = 565.50' CURB INLET - 1 INV OUT = 562.50' RIM = 564.50' CURB INLET - 2 INV IN = 561.38' INV OUT = 561.28' RIM = 567.00' INV IN = 562.20' JUNCTION BOX - 1 INV IN = 562.20' INV OUT = 562.10' RIM = 560.75' OUTLET STRUCTURE INV OUT = 556.50' RIM = 565.50' YARD INLET- 1 INV OUT = 562.50' RIM = 565.50' YARD INLET - 2 INV OUT = 562.50' LEGEND - - PROPERTY LINE loo EXISTING CONTOURS goo PROPOSED CONTOURS - - BUILDING SETBACK - - - - - - - - - LANDSCAPE BUFFER P EX. OVERHEAD ELECTRIC SS EX. SANITARY SEWER W EX. WATER FO EX. FIBER OPTICS GAS EX. NATURAL GAS - STREAM CENTERLINE WETLAND SITE VICINITY MAP (NTS) 11 COORDINATE WITH NCDOT AND/OR LOCAL TRANSPORTATION AUTHORITY AND FOLLOW TRAFFIC MANAGEMENT PLAN FOR ALL WORK WITHIN AND ADJACENT TO PUBLIC RIGHT OF WAY. GENERAL NOTES 1. CONTRACTOR IS TO VERIFY ALL UTILITY LOCATIONS PRIOR TO BEGINNING WORK. I I I JUNCTION BOX - 1 �. \ \ N6�° \ \ \ \ \ 2. ALL WORK IS TO BE IN ACCORDANCE WITH ALL STATE AND LOCAL REGULATIONS. I I I RIM: 567.00\��. \ \ \ \ \ \ \ 3. ALL PERMITS ARE TO BE OBTAINED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. I ` I 15" HDPE INV IN: 562.20 �, . \ 4. CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL PERMIT CONDITIONS. II I 15" HDPE INV IN : 562.201 / \\\� \ Fo ° s�6�ti°�. �\: \ \ s5. EXISTING UTILITIES ON SITE SHALL BE RELOCATED AS REQUIRED. CONTRACTOR SHALL PAY ALL COSTS 15" HDPE INV OUT: 562.10 N �N 6°�0 : , ' \ 6 - 6" PVC ROOF \ ASSOCIATED WITH RELOCATION. _ I SEE DET. 3/C902 / \ R�O� �S \ Ss737 TC \ DRAINS \ 6. CONTRACTORS ARE TO FULLY ACQUAINT THEMSELVES WITH ALL UTILITIES WITHIN THE CITY AND STATE ROW AND I . � 567.30 EC \ \ 566.87 a �; e or W/SPLASHBLOCKS \ < \ \ WITHIN THE PROPERTY BOUNDARIES WHICH WILL REQUIRE RELOCATION. ALL COSTS ASSOCIATED WITH P �F \ .. 567.iQ T(-• SEE DET. 8/C901 \ RELOCATION SHALL BE INCLUDED IN THE BASE BID. WETLAND IMPACT #1 (0.053 ACRES) 567.zo YARD INLET 1 \ 9 50' OF 24" RCP EMBEDDED 20% / \ . . \ _ 7. ALL WORK PERFORMED WITHIN NCDOT ROW SHALL BE PER NCDOT SPECS AND SHALL BE INSPECTED FOR I I I �a Q \ RIM: 565.50 \ \ YARD INLET - 2 I I WITH OUTLET PROTECTION (FILL) I / \\ s . ` , Q 56775E F E. \\ 15" HDPE INV OUT: 562.50 \ \ \ \ RIM: 565.50 COMPLIANCE BY STATE INSPECTORS AT THEIR DISCRETION. I -SEE DET. 5/C902 DOLLAR GENERAL >� \ \ 15" HDPE INV OUT: 562.50 GRADING NOTES 570- I I / I \.° \ 9,100 SQ.FT. \ \ \ ss?s2 SEE DET. 5/C902 1. PROPOSED CONTOURS SHOWN ARE TOP OF FUTURE PAVING/GRAVEL IN AREAS TO RECEIVE PAVEMENT/GRAVEL AND A 7,302 SQ.FT. RETAIL SPACE - TOP OF TOPSOIL IN AREAS TO BE SEEDED AND/OR LANDSCAPED. `� ,�\o .2� •o� \ \ F.F.E. = 567.75 \ �� s . WESTSIDE STORAGE, LLC 2. AREAS OUTSIDE OF THE PARKING LOT PERIMETERS SHOWN TO BE SEEDED AND/OR LANDSCAPED. 567 D.B. 945, PG. 2303 LOTS 21 thru 24 - P.B. 03, PG. 53 3. CONTRACTOR SHALL NOTIFY AND COOPERATE WITH ALL UTILITY COMPANIES OR FIRMS HAVING FACILITIES ON OR TAX PARCEL#133468 ADJACENT TO THE SITE BEFORE DISTURBING, ALTERING, REMOVING, RELOCATING, ADJUSTING, OR CONNECTING TO 99 -N D83(201 56362 \ \\ \ \ " \ A.. SAID FACILITIES. CONTRACTOR SHALL PAY ALL COSTS IN CONNECTION WITH ALTERATION OF OR RELOCATION OF \=3,395 � CURB INLET - 1 / � ... ° . THE FACILITY. - - r / / E=1,76fr078.64' RIM : 565.50 / ssioi TC \\ \\ \\ y^ \ 1 < ' 1 \ \ o \ 4. ALL CATCH BASIN GRATE AND FRAMES ARE TO BE BY US FOUNDRY OR APPROVED EQUAL (U.O.N.) SEE / 15 HDPE INV OUT: 562.50 _ SPECIFICATIONS. SEE DET. 4/C902 OUTLET PROTECTION 5. ALL AREAS NOT COVERED BY BUILDING OR PAVING ARE TO BE GRASSED. (SEE TABLE FOR SIZE) 220�0 \ \ \ Ss S�?s2TC ` 11�� 6. UNUSABLE EXCAVATED MATERIALS AND ALL WASTE RESULTING FROM CLEARING AND GRUBBING SHALL BE SEE DET. 4/C903 \ \ °' aToR ss?s8 0 0 ?o2 DISPOSED TO AN APPROVED OFF SITE LOCATION BY CONTRACTOR. 567.20 TC °. co � \ sm 7. ALL EXCAVATING IS UNCLASSIFIED AND SHALL INCLUDE ALL MATERIALS ENCOUNTERED. a �� \ ° \ epR \ \ �� 8. BEFORE ANY MACHINE WORK IS DONE, CONTRACTOR SHALL STAKE -OUT AND MARK OUT THE ITEMS ESTABLISHED BY > ° ✓ THE SITE PLAN. CONTROL POINTS SHALL BE PRESERVED AT ALL TIMES DURING THE COURSE OF CONSTRUCTION. CAD 567.15 TC e\ 566.65 \ / LACK OF PROPER WORKING POINTS AND GRADE STAKES MAY REQUIRE CESSATION OF OPERATIONS UNTIL SUCH POINTS AND GRADES HAVE BEEN PLACED TO THE OWNERS SATISFACTION. 8,9 / 9. CONTRACTOR IS RESPONSIBLE FOR DETERMINING EARTHWORK QUANTITIES. ENGINEER MAKES NO STATEMENT EITHER IMPLIED OR EXPRESSED REGARDING CUT/FILL QUANTITIES. 10. ALL CORRUGATED METAL PIPE IS TO BE ALUMINIZED OR APPROVED EQUAL WITH RE -ROLLED ENDS. ALL BANDS ARE �' I I / I w I �• \� \ ss?s2Tc \ \ 68a \ TO BE HUGGER TYPE. 566 11. ALL STORM DRAINAGE PIPES SHALL HAVE 12" MINIMUM COVER. �, ✓ II \ / I / ,,�.\� i \ \ / \ \\ \ $ss 36Tci \ \ \ �o 11. ALL GROUND ELEVATIONS ADJACENT TO BUILDING STRUCTURES ARE TO BE A MINIMUM OF 6" BELOW THE FINISHED FLOOR ELEVATION. INV. 15" RCP \ / I ,�, 11 S / \ 12. ALL HDPE IS TO BE ADS N-12 ST IB DUAL WALL WITH WATER TIGHT JOINTS AND DUAL WALL FITTINGS OR APPROVED =563.39' EQUAL. I \ RETAINING WALL - 2 TO BE \ -\A \ \ / a 13. ALL PIPE LENGTHS GIVEN ARE TO THE CENTER OF STRUCTURES. DESIGNED BY OTHERS. I r' / '�''IV' \ 14. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ANY BENCHMARKS SUPPLIED AS PART OF THESE PLANS. SAFETY FENCE ALONG / / r' r' ' \ \ Ss / \ \ / c �`� EXTENTS SEE DET. 7/C901 / \ 1� �iI 566 A sss48 Tc � 2" PIPE FOUND 15. CONTRACTOR RESPONSIBLE FOR IDENTIFYING AND PERMITTING WASTE AND BORROW SITES AS NECESSARY. WASTE INV. 15" RCP \ / I I I / / \�6 2'�2 / () \\ \ OUTLET PROTECTION \ N.C. GRID-NAD 83 (2011) AND BORROW SITES MUST BE NCDEQ APPROVED LOCATIONS. \\ (SEE TABLE FOR SIZE) / �/ N=993,284.25' UT TO DAN RIVER rr l �I �' I \\ CURB INLET - 2 M SEE DET. 4/C903 / \ �co E=1,766,463.03' CLASS: WS-IV I j I I \ RIM: 564.50 c, 7� I I I f \ / II ++� I I \ 15" HDPE INV IN: 561.38 QOUT: �.\ r• r• �.�/ : /* +• 15" HDPE INV OUT : 561.28 \ ) U, / SEE DET. 4/C902 All.00 �o S II II 11\I� r. �`\. r.� r. r. //r. �• r. I r• r• \ \ o"� _ 562- - �+ �.L I \ 1 r• �� �r r• {r r• r �r r• / 62 �� / /' IN WETLAND AREA �• �I \ �\ +' \ �s :� ; SAND FILTER / IMPACT TABLE IMPACT NUMBER TYPE ACRES 50' OF 24" RCP, 20% WETLAND IMPACT #1 EMBEDDED (FILL) 0.053 `' I I I 1 r• r• r• 0.27 ACRES •�-� \ I I I � � . � �� �`�\� �• y � I I +� \ � I ✓ � � ..:SEE DET. 1/C902-.. RAP I:.I......M1. T OUTLET PROTECTION (SEE TABLE FOR SIZE) / 1 \ \ I + I \r SEE DET. 4/C903 \I / �C5 / NA \ \\ \ \ \ r r• r• �r• r• �• r• / I I / �p / 801383, log'6 ��G /' / 1 iIPA \\ \ \ \ �\ 08 I °G 560 48'/Y �•�. / \ ��i 10' EMERGENCY , / / N �.' �s�• '' �' �c/Ty e3� SPILLWAY ELEV. = 561.00 IPA pc 406 SEE DET. 4/C904 CP IPA \ \ \ \ \ \ \ r• \� \ r• - ' INV..Z" RCP / // / �� �j/� "' OUTLET STRUCTURE t53.24''k . ,' / RIM: 560.75 / NA / OUTFACE #1 \\ �� r: ,/ �1-1 18" HDPE INV OUT: 556.50 �' 6' �P �/'� / /i 1-1' SEE DET. 2/C902 IPA\ \ \� \ �/ / / / i / / OUTLET PROTECTION C-o� / r �' (SEE TABLE FOR SIZE) \/ �'�' i �' SEE DET. �� J,J�� // \ � \ HARRINGTON HWY DRIVEWAY PROFILE STATION ' -0 10 0+00 1+00 59 190 CATCH BASIN RIM=560.5T INV IN=556.64' \ �' 58 80 INV OUT=556.22' \ �� / � � / / / / \ .o�No� 561� /_ /�� Q m \ 57 70 /P � \ -3.00%SLOPE - .5%SLOPE 1�220 MAG NAIL SET , / s / / / 0 5 $ 60 � RIPRAP APRON DIMENSIONS NAME DIA (in) La (ft) Da (ft) W1 (ft) W2 (ft) CLASS PIPE - 1 24 10 2.0 6.0 12.7 A PIPE - 5 15 5 1.5 3.8 7.1 A PIPE - 6 12 4 1.5 3.0 5.7 A PIPE 7 18 6 1.5 4.5 8.5 A PIPE TABLE PIPE NAME SIZE LENGTH SLOPE INVERTS INV. IN = 558.70 PIPE - 1 24 INCH CONCRETE PIPE 49.35' 2.06% INV. OUT = 557.68 INV. IN = 562.50 PIPE - 2 15 INCH CORRUGATED HDPE PIPE 55.51' 0.50% INV. OUT = 562.20 INV. IN = 562.50 PIPE - 3 15 INCH CORRUGATED HDPE PIPE 49.40' 0.56% INV. OUT = 562.20 INV. IN = 562.10 PIPE - 4 15 INCH CORRUGATED HDPE PIPE 139.81' 0.50% INV. OUT = 561.38 INV. IN = 561.28 PIPE - 5 15 INCH CORRUGATED HDPE PIPE 21.18' 9.91% INV. OUT = 559.00 INV. IN = 562.50 PIPE - 6 15 INCH CORRUGATED HDPE PIPE 106.32' 3.23% INV. OUT = 559.00 INV. IN = 556.50 PIPE - 7 18 INCH CORRUGATED HDPE PIPE 33.36' 2.12% INV. OUT = 555.75 -1�o33E N.C.GRID-NAD83(2011' BEFORE YOU DIG! 'i E=1,766,162.4% 55 50 CALL 1-800-632-4949 1.5" I FOUNIDE 54 40 N.C. ONE -CALL CENTER -0+1b 0+00 1+00 ITS THE LAW! ©COPYRIGHT 2020 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE. ABBREVATIONS TC TOP OF CURB BC BOTTOM OF CURB TOR TOP OF RAMP BOR BOTTOM OF RAMP TOW TOP OF WALL BOW BOTTOM OF WALL BOD BOTTOM OF DITCH HP HIGH POINT EX. TC EXISTING TOP OF CURB EX. BC EXISTING BOTTOM OF CURB EP EDGE OF PAVEMENT EC EDGE OF CONCRETE \ H CARD'%'� pQ' Essi . <i �REVIEW 035736 = %vGs;•�'�GINE��•.G 08/24/2020 BREC: Pq. p0 NCBELS#C-3448? Z �'•. CARP W ti z � U W z CN � z w w � � w OII­__ J GRADING PLAN PREPARED FOR: TERAMORE DEVELOPMENT, LLC PO BOX 6460 THOMASVILLE, GA 31758 DATE: REVISIONS: SHEET SIZE: 24"x36" DATE: 06/15/2020 PROJECT NUMBER: 3160632019 DRAWN BY: J.EDWARDS APPROVED BY: J.CHURCH SCALE: 1" = 20' (H) (V) 20 10 0 20 40 SHEET: iiaTTEiiia C200 PRE -CONSTRUCTION DA s / 1 i / \\v�L(� \\`\`� 1 �/i// /` � // ` ����/) `~�. i ��`J/////ice--/^\\`, •/,�// j/i �, o �— \^ —� tIL / I l \ �-�. � 1? �/ S / // �/ // // �•'�` `,^` � /�//%ter E-CO STFj Tl I / Il 1111 \ 1 11 f `��t (v f � 1� j lfj rt L\� � �`� ti � \ \ \ \ � \ \ \ ` � • r 4A POST -CONSTRUCTION DA s �'0000,1 / / \�\ t / \ (r C'4 /rmac, CJ /I�.\\\ \\ r/ � cP / n/ 1\\� (ram—� /J/ / / / // l�� \`% \ \•\��, // PgST-.,CO3NSTR CT10N �i ` �� • �r zal fill { sue° ss' zs"' A.ss 1 (�rA \ \ \ \\\ IN ,�� v��\ PbS ON§TRUC ONY. 2 co • • • • .�.• • t ^ / I J Ind i l f •••� � i t x � � 1 I{ OUTFACE #1 ph 1 OST - CO9STRUCTION 1) / / I STo OON9TR I N \ � 1 )1 I � �' :.�•: ��'•• . l .� ram- N J '� ' A. \3 Il f \\ • :.•.: •.•. � k -� / � / � / 1 III( { \ ..... , / 1 \NJ OUTFALL #1 • • \\ \ Sly^ � N •w ///' /��/� I�� l�—�^..-, /�//( /'Vlj°41�I}Ijr/ LEGEND — — PROPERTY LINE goo EXISTING CONTOURS goo — PROPOSED CONTOURS BUILDING SETBACK — — — — — — — — — LANDSCAPE BUFFER P EX. OVERHEAD ELECTRIC SS EX. SANITARY SEWER W EX. WATER FO EX. FIBER OPTICS GAS EX. NATURAL GAS r� l STREAM CENTERLINE WETLAND N ��t1111111/// H CARO pQ' Essi <i REVIEW 035736 �'/GINE��'.•'. S ���'�� TAN C . CN`�� .•��• 08/24/2020 BREC: Pq. NCBELS#C-3448? Z �'•. CARD W z W M U � Z CV Z � W w C) w 0 C!) DRAINAGE AREAS PREPARED FOR: TERAMORE DE' PO BOX 6460 THOMASVILLE, JELOPMENT, LLC GA 31758 DATE: REVISIONS: 20 40 SHEET SIZE: 24" x36" DATE: 06/15/2020 PROJECT NUMBER: 3160632019 DRAWN BY: J.EDWARDS APPROVED BY: J.CHURCH SCALE: 1" = 20' (H) (M SHEET: C201 W CJ� W w n 75 0 U Q Q 0 W W m U� z a_ J U Cl� 0 z 0 © COPYRIGHT 2020 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE. WETLAND POINT TABLE WETLAND POINTTABLE Point Number Longitude Latitude Point Number Longitude Latitude 1 W 79. 795340 (d) N 36.476309 (d) 51 W 79. 795405 (d) N 36.477200 (d) 2 W 79. 795345 (d) N 36.476280 (d) 52 W79.795384 (d) N 36.477141(d ) 3 W 79. 795336 (d) N 36.476250 (d) 53 W 79. 795369 (d) N 36.477094 (d) 4 W 79.795300 (d) N 36.476224 (d) 54 W 79.795335 (d) N 36.477029 (d) 5 W 79. 795269 (d) N 36.476218 (d) 55 W 79. 795345 (d) N 36.477024 (d) 6 W79.795214 (d) N36.476180 (d) 56 W79.795353 (d) N36.477015 (d) 7 W 79. 795189 (d) N 36. 476171(d) 57 W79.795402 (d) N 36.477003 (d) 8 W 79. 795153 (d) N 36.476163 (d) 58 W 79. 795395 (d) N 36.476973 (d) 9 W 79.795121(d) N 36.476159 (d) 59 W 79.795363 (d) N 36.476948 (d) 10 W79.795085 (d) N36.476194 (d) 60 W79.795326 (d) N36.476927 (d) 11 W79.795124 (d) N36.476224 (d) 61 W79.795301(d) N36.476913 (d) 12 W 79. 795151 (d) N 36.476248 (d) 62 W 79. 795284 (d) N 36.476916 (d) 13 W79.795155 (d) N 36.476304 (d) 63 W 79. 795247 (d) N 36.476835 (d) 14 W 79.795137 (d) N 36.476336 (d) 64 W 79.795235 (d) N 36.476818 (d) 15 W 79. 795103 (d) N 36.476377 (d) 65 W 79. 795250 (d) N 36.476812 (d) 16 W79.795127 (d) N36.476455 (d) 66 W79.795228 (d) N 36.476771 (d) 17 W 79. 795143 (d) N36.476476 (d) 67 W 79. 795220 (d) N 36.476741(d ) 18 W79.795135 (d) N36.476506 (d) 68 W79.795229 (d) N36.476719 (d) 19 W 79. 795143 (d) N 36.476535 (d) 69 W79.795203 (d) N 36.476715 (d) 20 W 79. 795147 (d) N 36.476550 (d) 70 W 79. 795209 (d) N 36.476673 (d) 21 W 79. 795144 (d) N 36.476560 (d) 71 W79.795196 (d) N 36.476630 (d) 22 W 79. 795144 (d) N 36.476571(d) 72 W 79. 795197 (d) N 36.476585 (d) 23 W 79.795143 (d) N 36.476582 (d) 73 W 79.795195 (d) N 36.476565 (d) 24 W 79. 795147 (d) N 36.476592 (d) 74 W 79. 795200 (d) N 36.476549 (d) 25 W 79. 795147 (d) N 36.476609 (d) 75 W 79. 795194 (d) N 36.476530 (d) 26 W 79. 795143 (d) N 36.476627 (d) 76 W79.795188 (d) N 36.476507 (d) 27 W 79. 795147 (d) N 36. 476641(d) 77 W 79. 795194 (d) N 36.476482 (d) 28 W 79.795144 (d) N 36.476674 (d) 78 W 79.795206 (d) N 36.476478 (d) 29 W79.795118 (d) N36.476680 (d) 79 W79.795223 (d) N36.476404 (d) 30 W 79. 795086 (d) N 36.476679 (d) 80 W79.795257 (d) N 36.476445 (d) 31 W 79. 795052 (d) N 36.476706 (d) 81 W79.795288 (d) N 36.476460 (d) 32 W79.795040 (d) N 36.476744 (d) 82 W 79. 795308 (d) N 36.476445 (d) 33 W 79. 795068 (d) N 36.476768 (d) 83 W79.795315 (d) N 36.476423 (d) 34 W 79. 795069 (d) N 36.476785 (d) 84 W 79. 795376 (d) N 36.476468 (d) 35 W 79.795111 (d) N 36.476789 (d) 85 W 79.795423 (d) N 36.476478 (d) 36 W 79. 795162 (d) N 36.476795 (d) 86 W 79. 795437 (d) N 36.476472 (d) 37 W 79. 795201(d) N 36.476832 (d) 87 W 79. 795423 (d) N 36.476435 (d) 38 W 79. 795221(d) N 36.476827 (d) 88 W79.795408 (d) N 36.476392 (d) 39 W 79. 795231(d) N 36.476840 (d) 89 W 79. 795382 (d) N 36.476354 (d) 40 W 79. 795233 (d) N 36.476855 (d) 90 W79.795353 (d) N 36.476333 (d) 41 W 79. 795269 (d) N 36.476922 (d) 42 W 79.795288 (d) N 36.476945 (d) 43 W 79. 795308 (d) N 36.476995 (d) 44 W 79. 795323 (d) N 36.477047 (d) 45 W 79. 795335 (d) N 36.477075 (d) 46 W 79.795353 (d) N 36.477099 (d) 47 W 79.795368 (d) N 36.477146 (d) 48 W 79. 795387 (d) N36.477199 (d) 49 j W 79. 795378 (d) N 36.477231(d ) 50 1 W 79. 795397 (d) N 36.477224 (d) 1520 MEADOWVIEW DRIVE WILKESBORO, NC 28697 336.844.4088 http://brec.biz .�H CARD . of o y .'L9 REVIEW 035736 = S C. uro 08/24/2020 ,,••••,•.••••,, BREC: P;9. p0 NCBELSK-34481. Z �'•. CARD ZS OF THE US �ELOPMENT, SHEET SIZE: 24"x36" DATE: 06/15/2020 PROJECT NUMBER: 3160632019 DRAWN BY: J.EDWARDS APPROVED BY: J.CHURCH SCALE: 1" = 20' (H) (N) © COPYRIGHT 2020 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE. SHEET: C202 1520 MEADOWVIEW DRIVE WILKESBORO, NC 28697 336.844.4088 http://brec.biz �REVI EW 035736 = 08/24/2020 .•'�� BREC: Pq. ���'-. p0 NICBELSK-3448i �'•. � CARO ��. SGS MAP �ELOPMENT, SHEET SIZE: 24"x36" DATE: 06/15/2020 PROJECT NUMBER: 3160632019 DRAWN BY: J.EDWARDS APPROVED BY: J.CHURCH SCALE: 1" = 20' (H) (N) SHEET: C203 © COPYRIGHT 2020 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE. GENERAL NOTES 1. CONTRACTOR IS TO VERIFY ALL UTILITY LOCATIONS PRIOR TO BEGINNING WORK. 2. ALL WORK IS TO BE IN ACCORDANCE WITH ALL STATE AND LOCAL REGULATIONS. 3. ALL PERMITS ARE TO BE OBTAINED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. 4. CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL PERMIT CONDITIONS. 5. EXISTING UTILITIES ON SITE SHALL BE RELOCATED AS REQUIRED. CONTRACTOR SHALL PAY ALL COSTS ASSOCIATED WITH RELOCATION. 6. CONTRACTORS ARE TO FULLY ACQUAINT THEMSELVES WITH ALL UTILITIES WITHIN THE CITY AND STATE ROW AND WITHIN THE PROPERTY BOUNDARIES WHICH WILL REQUIRE RELOCATION. ALL COSTS ASSOCIATED WITH RELOCATION SHALL BE INCLUDED IN THE BASE BID. 7. ALL WORK PERFORMED WITHIN NCDOT ROW SHALL BE PER NCDOT SPECS AND SHALL BE INSPECTED FOR COMPLIANCE BY STATE INSPECTORS AT THEIR DISCRETION. II II II II II 000 P �ON�O TEMP. CLEANWATER DIVERSION SEE DET. \ 2/C905 \ �• pMC p\ SILT FENCE SEE pM0- \\ V• \ DET. 2/C903 I 1J•\'� ` LIMITS OF DISTURBANCE \ ♦QMEBAR SET \ � s N.C. GR D NAD 83 (2011) 1.91±ACRES ` N=993,536.98' ` \ r• �\ \ \ .• pL \ \ \ ` E=1,766,028.32' 1 \ \ STOCKPILE \ ems\ \\� \\ \\ \ \ \ WESTSIDE STORAGE, LLC D.B. 945, PG. 2303 LOTS 21 thru 24- P.B. 03, PG. 53 TAX PARCEL #133468 I \ / �: I I / / I' �,� w •' ` ♦ ° � \ sus � \ \ 4 FORsm� \ \ \ \ \ \ \ \ \ \ \ \ \ \ 10 10 I I I I TEMPORARY _ 570- ■ `■I■ ■ ■ ■ ■ ■ ■ 1/I /I I I / MUT MAT SEE I \ TEMP. INLET \ \ S�0 DET.4/C905 PROTECTION SEE \\ \\ \\ \\ \\ \\ \\\ I cam, ) / 1 DET. 5/C905 \ \ TEMP. 15"CMP \ \\ \\ \\ \ \ \ \\ \\ 1 I I e REBAR SET N-993RID-NtD83(2011)/ \\ i IW• \ W W / \\ \\ \\ \ \\ \\ �� \\ E=1,76X78.64' / (/' •tr \ •�• \ •tr •tr / \ \ \ \ \ \ \ \ s6s I I I �/ / / / �• I I 1 I+• ' \\ TEMP. DIVERSION \ \ \ \ I i i / ` / \ / / �` I I .r ♦ \ . \ SEE DET. 3/C903 \\ \\ \ \ TEMPORARY EXCLUSION / \ INV. 15" RCP =563.39' , \ I \ '�A,�/ FENCE SEE DET. 6/C902 GiA� W;11 ♦ � a C\ \ \\ \ \\ c vo I� ) INV. 15 ' RCP \ / I I I I k� Z' - ' _ R ESC/15 1 r• / -' ♦ \ \ \\ \ \ '' \ I I I I I Y (EMPORP I I �• / +• + o` \ CLASS A RIPRAP '0 AO I I 1 '>t1 r• \r• I r• r• r•/ i\ I r• r• I r• I r• ; \ \ \ I / \\ I p- 8" REBAR SET \ SKIMMER BASIN CALCULATIONS 1. DA = 1.54 ACRES 2. DU = 1.34 ACRES 3. to = 5 minutes 4, i = 6.8 nr 5. C = 0.6 6. Q10 = CiDA = (0.6)(6.8)(1.54) = 6.28 fC3/s 7. SA,q = 325Q1 p = (325) (6.28) = 2,041 ft2 8. V,q = 1800DU = (1800)(1.4) = 2,520 ft3 9. L:W = 5.0 10. depth = 3.0 11. SApvd = 2,435 ft 12. Vpva 4,879 ft 13. LINEtR = 10' 14. V@top 2 ft 3 777 ft3 15. Tde.ter 3 days 16. Qde-ter = V @ top 2 ff T dewater 1, 259 fh3/d ANY OFF -SITE BORROW AND WASTE REQUIRED FOR THIS PROJECT MUST COME FROM A SITE WITH AN APPROVED EROSION CONTROL PLAN, A SITE REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT. TRASH/DEBRIS FROM DEMOLITION ACTIVITIES OR GENERATED BY ANY ACTIVITIES ON SITE MUST BE DISPOSED OF AT A FACILITY REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT OR PER DIVISION OF SOLID WASTE MANAGEMENT OR DIVISION OF WATER RESOURCES RULES AND REGULATIONS. WESTSIDE STORAGE, LLC D.B. 945, PG. 2303 LOTS 21 thru 24 - P.B. 03, PG. 53 TAX PARCEL#133468 CONCRETE WASHOUT SEE DET. 3/C905 / 1-1 1-1 1/ / / z 1-1 N \ \ kv TEMP. INLET PROTECTION SEE DET.5/C905 �\ / LEGEND - - PROPERTY LINE too EXISTING CONTOURS 10o PROPOSED CONTOURS BUILDING SETBACK _----- = LANDSCAPE BUFFER P EX. OVERHEAD ELECTRIC SS EX. SANITARY SEWER W EX. WATER FO EX. FIBER OPTICS GAS EX. NATURAL GAS - STREAM CENTERLINE WETLAND SILT FENCE -C>- TD --C>- TD - TEMPORARY DIVERSION � CWD TEMPORARY CLEANWATER DIVERSION LIMITS OF DISTURBANCE 2" PIPE FOUND N.C. GRID-NAD 83 (2011) N=993,284.25' E=1,766,463.03' -130 I I I 1 � / * * /.r ,r r•/ r• ` ,r .r1 \ a \ \ y� 60 f "Ir�� - - - 562-/ \ \ ! -L 1 r• r• /4 r• {r r• r• r• r• r• '` \ \ O i \ / o �� 1 1 1 1 1 \ * *� / \ * * I *WETLI ND �'�''. \ \41 'RREA Z �I \ �1 \ \ \ py 0d/Q/ / TEMP. 15" CMP �. �. I *0.27 AWES .�. ) �, I ,,� 1 r, / ♦ \ \ a / .� I I I I � �•. % �.r .r \.r ,�. .r .r rl I I +� 1 �• 1 ✓ ♦ \ y 1 55� _ _ - � - � f, 1 1\ I I I \• ` r• /r' /'YRAPI I �W ` } T TEMP. CONSTRUCTION ENTRANCE SEE DET. 1/C903 / \ \ \ \ \ I r• r• r• \r r• r• 1 r• r• �` I .. ` - / e 66y QO 555� D SKIMMER BASIN IPA \ \ \ \ \ \� �' '�'/I I \ I • 1 .�� / 8°\3e3"l� ��G� / . 1.5" FAIRCLOTH \ \ \ \ \ \ r• .r .r �r� .r I .r I I \ �\ I`Qv� / SKIMMERW/1.3" KNOCKOUT ORIFICE / IPA ���� p\I�l \ .� II .�• / /NOO�PRo,� 22�,�160 / / \ \ \ \ �\ epG T'l'F �,,� \ • I �• ) / SEE DET. 1-2/C904 IPA I 406 067- IPA HARDWARE CLOTH INLET PROTECTION 0 PIPE INLET PROTECTION SITE VICINITY MAP (NTS) EROSION CONTROL CONSTRUCTION SEQUENCE 1. OBTAIN NECESSARY PERMITS FROM ALL REGULATORY AUTHORITIES. CONTRACTOR RESPONSIBLE FOR ALL DEMO PERMITS AS WELL AS WASTE OR BORROW SITE SELECTION AND PERMITTING. 2. CONTRACTOR SHALL LOCATE ALL UNDERGROUND UTILITIES PRIOR TO ANY EXCAVATION. SOFT DIG ALL UTILITIES WITHIN GRADING AREA TO IDENTIFY POTENTIAL CONFLICTS. 3. STAKE -OUT ALL EROSION CONTROL MEASURES PRIOR TO CONSTRUCTION. 4. MAINTAIN NPDES TEMPORARY SEEDING SCHEDULE (SHEET C001) FOR ALL EXPOSED SOILS FOR THE DURATION OF CONSTRUCTION. 5. INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE AND TEMPORARY 15" CMP WITH INLET & OUTLET PROTECTION TO PROVIDE ACCESS FROM NC HWY 135. 6. INSTALL TEMPORARY MUD MAT OVER JURISDICTIONAL CHANNEL TO PROVIDE WORKING PATH BETWEEN EASTERN AND WESTERN PORTIONS OF SITE. DO NOT CROSS CHANNEL AT ANY LOCATION OTHER THAN MUD MAT CROSSING PRIOR TO INSTALLING PIPE-1. 7. INSTALL CLEAN WATER DIVERSIONS. 8. INSTALL SILT FENCE AND STONE OUTLET(S) AT INDICATED AREAS. 9. INSTALL SKIMMER BASIN WITH FAIRCLOTH SKIMMER. DO NOT DISTURB WETLAND WITH FAIRCLOTH SKIMMER OUTLET PIPE. SKIMMER BASIN TO REMAIN IN PLACE UNTIL ALL AREAS HAVE BEEN ADEQUATELY STABILIZED AND APPROVAL TO REMOVE MEASURE HAS BEEN RECEIVED BY NCDEQ AND THE CITY OF EDEN. 10. INSTALL TEMPORARY DIVERSIONS TO CONVEY RUNOFF TO SKIMMER BASIN. MODIFY TEMPORARY DIVERSIONS AS NEEDED DURING GRADING OPERATIONS TO ENSURE CONSTRUCTION RUNOFF IS DIRECTED TO SKIMMER BASIN WITH POSITIVE DRAINAGE. MAJORITY OF RUNOFF WILL BE DIRECTED TO WESTERN INLET OF BASIN DURING INITIAL GRADING. INSPECT DAILY AND REMOVE SEDIMENT AS NEEDED. 11. REMOVE EXISTING VEGETATION WITHIN GRADING LIMITS AND DISPOSE AT AN APPROVED SITE. 12. COMPLETE PARTIAL SITE GRADING LOCATED EAST AND WEST OF THE UNNAMED TRIBUTARY AND DEPICTED IN THE PHASE 1 GRADING PLAN. DO NOT DISTURB THE UNNAMED TRIBUTARY DURING THESE GRADING OPERATIONS. 13. AS PARTIAL GRADING AREAS REACH SUBGRADE ELEVATIONS INSTALL STONE BASE TO PROTECT EXPOSED SOILS. 14. REMOVE TEMPORARY MUD MAT CROSSING TO INSTALL PIPE-1 WITH RETAINING WALL-1 AND RETAINING WALL-2. INSTALLATION MUST UTILIZE A PUMP AROUND TO WORK IN DRY CONDITIONS. EACH DAY'S WORK MUST BE LIMITED TO THE AMOUNT OF DISTURBANCE THAT CAN BE STABILIZED BEFORE THE WORK DAY ENDS. PARTIAL PIPE AND WALL CONSTRUCTION MUST BE LEFT IN A STABLE STATE AT THE END OF EACH DAY. ANY RUNOFF COLLECTED BEHIND WALL INSTALLATION MUST BE DEWATERED INTO THE SKIMMER BASIN THROUGH AN EFFLUENT BAG. 15. INSTALL PIPE NETWORK WITH INLET AND OUTLET PROTECTION. PIPE NETWORK MUST DISCHARGE TO SKIMMER BASIN DURING CONSTRUCTION ACTIVITIES. 16. INSTALL ALL UNDERGROUND UTILITIES. ANY RUNOFF COLLECTED IN UTILITY TRENCHES MUST BE DEWATERED TO THE SKIMMER BASIN THROUGH AN EFFLUENT BAG. 17. STABILIZE ALL EXPOSED SOILS WITH SEEDING OR PERMANENT LANDSCAPING. 18. AFTER SITE STABILIZATION AND APPROVAL BY NCDEQ AND THE CITY OF EDEN, REMOVE SKIMMER BASIN TO COMPLETE CONVERSION TO PERMANENT SAND FILTER FOR POST CONSTRUCTION STORMWATER CONTROL AND COMPLETE FINE GRADING. DO NOT ALLOW DISCHARGE INTO SAND FILTER UNTIL SITE IS COMPLETELY STABILIZED. 19. INSTALL REMAINING PERMANENT LANDSCAPING. 20. REMOVE REMAINING EROSION CONTROL MEASURES AFTER RELEASE BY PERMITTING AUTHORITIES. MAINTENANCE PLAN 1. EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO ANY EXISTING BUILDING DEMOLITION. 2. CONTRACTOR IS RESPONSIBLE FOR ALL EROSION AND SEDIMENTATION CONTROL REQUIREMENTS AND SHALL COMPLY WITH THE LATEST EDITION OF THE NORTH CAROLINA EROSION AND SEDIMENTATION CONTROL MANUAL. 3. PER NPDES REQUIREMENTS, CHECK ALL EROSION AND SEDIMENTATION CONTROL DEVICES AND STORMWATER RUNOFF DISCHARGES FROM EACH OUTFALL SHOULD BE INSPECTED EVERY SEVEN DAYS AND WITHIN 24 HOURS AFTER ANY STORM EVENT. A RAINFALL GAUGE SHALL BE KEPT ON SITE, AND A RECORD OF RAINFALL AMOUNTS AND DATES MUST BE RECORDED AND KEPT ON SITE. RECORDS OF INSPECTIONS OF DEVICES AND OUTFALLS SHOULD BE KEPT AND VISIBLE SEDIMENTATION OUTSIDE THE DISTURBED LIMITS SHOULD BE NOTED. ANY ACTIONS TO CONTROL FUTURE RELEASES AND CLEANUP OF SEDIMENT MUST BE RECORDED. A SAMPLE LOG FOR RECORD KEEPING IS AVAILABLE FROM NCDEQ DIVISION OF WATER QUALITY, STORMWATER AND GENERAL PERMITS UNIT. 4. CHECK ALL EROSION CONTROL DEVICES WEEKLY AND AFTER EACH RUNOFF PRODUCING STORM EVENT AND MAKE ANY NECESSARY REPAIRS AS NEEDED TO ENSURE DEVICES ARE FUNCTIONING AS INTENDED. 5. REMOVE SEDIMENT DEPOSITS FROM SILT FENCE AND STONE OUTLETS WHEN DEPOSITS REACH HALF CAPACITY, REPAIR ANY BREAKS IMMEDIATELY. 6. REPLACE GRAVEL CONSTRUCTION ENTRANCE AS NECESSARY. 7. CONTRACTOR WILL BE FINANCIALLY RESPONSIBLE FOR ANY AND ALL FINES LEVIED DUE TO NOT MAINTAINING PROPER EROSION CONTROL MEASURES AT ALL TIMES. STABILIZATION TIMEFRAMES INV.-.2-4" RCP SITE AREA DESCRIPTION 'r553.24' *- . S• / / / / / / N / 10 EMERGENCY SPILLWAY / / / / / PERIMETER DIKES, SWALES, DITCHES, / i ihlW 18' � / / / N \ \ �i / / / ELEV. = 557.00 LINED WITH SLOPES \ \ / \ / / / CLASS A RIPRAP �� HIGH QUAILTY WATER (HQW) ZONES 1 - i i 3 Lax 4 W OUTLET SLOPES STEEPER THAN 3:1 PROTECTION SEE / / � / / / DET. 4/C903 \ BEFORE YOU DIG! S� ' / / / / �a ♦�- N;� -' / / / / \\ SLOPES 3:1 OR FLATTER CATCH BASIN CALL 1-800-632-4949 \ RCP / / RIM=560.57 INV N=556 64' STABILIZATION I TIMEFRAME EXCEPTIONS 7 DAYS NONE 7 DAYS NONE IF SLOPES ARE 10' OR LESS IN 7 DAYS LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS AREA ALLOWED. 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50' LENGTH INV OUT=556.22' \ N . C . 0 N E-CALL CENTER ALL OTHER AREAS WITH SLOPES NONE, EXCEPT FOR PERIMETERS / z i / / / / / COORDINATE WITH NCDOT AND/OR LOCAL TRANSPORTATION FLATTER THAN 4:1 14 DAYS AND HQW ZONES AUTHORITY AND FOLLOW TRAFFIC MANAGEMENT PLAN FOR 1 ALL WORK WITHIN AND ADJACENT TO PUBLIC RIGHT OF WAY. ITS THE LAW! SEE SHEET C001 FOR COMPLETE NDPES PERMIT INFORMATION 11 \���111111/1j�/ \ H CARD'%'� pQ' REVIEW 035736 = %vGs;•�'�GINE���G �. C. cNv 771111110�`\\ 08/24/2020 BREC: Pq. NCBELS#C-34481- q. �'•. CARD o. W z W M U C-0 Z N Z � L.I.J W 0 w 0 U) PHASE 1 ESC PLAN PREPARED FOR: TERAMORE DEVELOPMENT, LLC PO BOX 6460 THOMASVILLE, GA 31758 DATE: REVISIONS: 20 10 0 20 SHEET SIZE: 24"x36" DATE: 06/15/2020 PROJECT NUMBER: 3160632019 DRAWN BY: J.EDWARDS APPROVED BY: J.CHURCH SCALE: 1" = 20' (H) (M 40 SHEET: C300 © COPYRIGHT 2020 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE 1.GE NOTES ACTOR IS TO VERIFY ALL UTILITY LOCATIONS PRIOR TO BEGINNING WORK. �oN� PFv v WESTSIDE STORAGE, LLC 7 2. ALL WORK IS TO BE IN ACCORDANCE WITH ALLSTATE AND LOCAL REGULATIONS. D.B. 945, PG. 2303 3. ALL PERMITS ARE TO BE OBTAINED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. LOTS 21 thru 24- P.B. 03, PG. 53 4. CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL PERMIT CONDITIONS. . TAX PARCEL#133468 5. EXISTING UTILITIES ON SITE SHALL BE RELOCATED AS REQUIRED. CONTRACTOR SHALL PAY ALL COSTS ASSOCIATED WITH RELOCATION. TEMP. CLEANWATER 6. CONTRACTORS ARE TO FULLY ACQUAINT THEMSELVES WITH ALL UTILITIES WITHIN THE CITY AND STATE ROW AND DIVERSION SEE DET. \ • t. WITHIN THE PROPERTY BOUNDARIES WHICH WILL REQUIRE RELOCATION. ALL COSTS ASSOCIATED WITH 2/C905 \\ MG RELOCATION SHALL BE INCLUDED IN THE BASE BID. !� 7. ALL WORK PERFORMED WITHIN NCDOT ROW SHALL BE PER NCDOT SPECS AND SHALL BE INSPECTED FOR \ \\ .y�• MG 0- COMPLIANCE BY STATE INSPECTORS AT THEIR DISCRETION. SILT FENCE SEE ��• G 0- \\ .01 V• \ DET. 2/C903 I 1J•\'\ ` LIMITS OF DISTURBANCE \ \ ♦ QM EBAR SET\ N.0 GRID NAD 83 (2011) 1.91± ACRES \ \ \ y�� M p� \\ \ \ ` N=993,536.98' ` \ r• �\ \ \ .• pL \ \ \ ` E=1,766,028.32' ` \�� �\ \ � \ \ ...\• pM`� p \ ' \ \ \ STOCKPILE SAS\ \ • 4 Ica ` / �, ` l�� I � \•, \ \ `�, \ \ �` per' \ \� \ \ \ \ ♦o \ sou, \ I 0AD •/ \\ N \ \\ \\ \\ \ \\ \\\ \\\ 8" REBAR SET SKIMMER BASIN CALCULATIONS 1. DA = 1.54 ACRES 2. DU = 1.34 ACRES 3. to = 5 minutes 4, i = 6.8 nr 5. C = 0.6 6. Q10 = CiDA = (0.6)(6.8)(1.54) = 6.28 fC3/s 7. SA,q = 325Q1 p = (325) (6.28) = 2,041 ft2 8. V,q = 1800DU = (1800)(1.4) = 2,520 ft3 9. L:W = 5.0 10. depth = 3.0 11. SApvd = 2,435 ft 12. Vpva 4,879 ft 13. LINEIR = 10' 14. V@top 2 ft 3 777 ft3 15. Tde.ter 3 days 16. Qde-ter = V @ top 2 ff T dewater 1, 259 fh3/d ANY OFF -SITE BORROW AND WASTE REQUIRED FOR THIS PROJECT MUST COME FROM A SITE WITH AN APPROVED EROSION CONTROL PLAN, A SITE REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT. TRASH/DEBRIS FROM DEMOLITION ACTIVITIES OR GENERATED BY ANY ACTIVITIES ON SITE MUST BE DISPOSED OF AT A FACILITY REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT OR PER DIVISION OF SOLID WASTE MANAGEMENT OR DIVISION OF WATER RESOURCES RULES AND REGULATIONS. r o �• G�� I .•� \r' rc \4 \ . \ \ \ \\ \ \ \ \ II I I 110'• \ \ \ \ \ \ m I I G TEMPORARY \ I \• � \ \ \ \ ■ I■ �I■ ■ ■ ■ ■ ■ ■ �jp / I MUT MAT SEE I \ TEMP. INLET \\ \\ \\ \' \S�p \ \ \ \ \ \ 570 -Lf CWD-� C / / DET. 4/C905 PROTECTION SEE \ \ \ \ \ \ DET. 5/C905 \ \ \ \ \ \ WESTSIDE STORAGE, LLC \ D.B. 945, PG. 2303 \\\A LEGEND - - PROPERTY LINE too EXISTING CONTOURS 10o PROPOSED CONTOURS - - BUILDING SETBACK - - - - - - - - -LANDSCAPE BUFFER EX. OVERHEAD ELECTRIC P EX. SANITARY SEWER SS W EX. WATER FO EX. FIBER OPTICS GAS EX. NATURAL GAS STREAM CENTERLINE - WETLAND SILT FENCE -C>- TD --C>- TD - TEMPORARY DIVERSION -C>- CWD TEMPORARY CLEANWATER DIVERSION LIMITS OF DISTURBANCE 1 IIv/ / TEMP. 15" CMP \ \ \ \ \ \ LOTS 21 thru 24- P.B. 03, PG. 53 1 I REB / I \ r, :,\ \ \ \ \ \ \ \ TAX PARCEL #133468 1 / GRID-N D 83 (2011)/ n \ r, Ir. • .� \ \ \ \ \ _ N-993,395 s, / i I r \� E=1,6X78.64' / \ •�• \ If \ \ r• r• r• \ \ \ \ , • STONE OUTLET SEE DET. 6/C903 4 I \ \ \ \ o I I I / \\ / . �\ ♦ 1 \ f \ 56 \ \ i CONCRETE WASHOUT 1 a a 6 SEE DET. 3/C905 TEMP. DIVERSION \ / I i / / �` I �• 'i' :\ • SEE DET. 3/C903 / -A \ I I 1 ' �• / INV. 15" RCP TEMPORARY EXCLUSION I ^ '� / GiA =563.39' , \ I '�A,�/ FENCE SEE DET. 6/C902 \ C.�p��1 \ \ C �� \ \ 565 T \ .0 �� N / \ / r• 1 \ - ' 566 2" PIPE FOUND I� \) =562.49' ,\ / I II I I / / • \� SG BU , �\ W \ m • • 4 \ \ N.C. GRID-NAD 83 (2011) INV. 15" RCP I Y / pRPRY E I I / ) I) ° \ CLASS A RIPRAP / / \ N=993,284.25' \ �co E=1,766,463.03' 1 I \ \ � o P �• � o � � I W ! 1 ��� • \\ \\ \ \ `\ // \ If \ � � ��► I 1 I I I •\ �' � \\.' � � �'' � / ii �' �' I �' �:1 ��` � 1 \ \\ \\\ _ - 565 / i / / /� I I I I \ / r• \r• I r• r• '&/ i\ I r• r• I r• I r• ; \ \ \ I I i - / / �-ram\ �o � I I I \ '\I � � � �I � � / � ••� � w I� � \ � \ �6p � /_' ___ /.r .r .r/ ` .r .r1 ` \ \ 562 .0_ 562 -_ o �� WETLND �•\ '�' �'�' \ r• r• ' • \ ` \ f \ 62 / / *REA �. Z �I \ �•1 �. / � \ \ 55� / oI I I 1 �• r �. I *0.27AWEs r. ) "r I 'r1 1',. / ♦ \ / a / RAP 1 1/ ♦ / \ 1 CO ED /m /r. I I /r. \ T TEMP. CONSTRUCTION 1-40 i G \ \ I \ r' r' r' r' r'/ / /♦ \ 560 / / , ENTRANCE SEE DET. 1/C903 / IWO Z \ \ \ \ \ I r• r• r• �• r• r• 1 r• r• i` 1 ���:� '/ / e66y93555� 04 D SKIMMER BASIN / IPA \ \ \ \ \ \� �' '�/I I \ I ♦ 1 .�� / 00�383"�0 / . 1.5" FAIRCLOTH \ \ \ \ \ \ r• .r .r �r� .r .r I I \ ♦\ I ♦� / c�6 `Qv� / SKIMMERW/1.3" / IPA���� p\I�l \ .� II .�• i /Noo�PRo,� 22�,�160 / / KNOCKOUT ORIFICE \ \ \ \ �\ e�p0 T'l'F �,,� \ • I �• ) / / SEE DET. 1 2/C904 NApG 4os ���� ♦ l ..�� �„ 20 / _ �� / /' ROP� HARDWARE CLOTH INLET PROTECTION PIPE INLET PROTECTION SITE VICINITY MAP (NTS) EROSION CONTROL CONSTRUCTION SEQUENCE 1. OBTAIN NECESSARY PERMITS FROM ALL REGULATORY AUTHORITIES. CONTRACTOR RESPONSIBLE FOR ALL DEMO PERMITS AS WELL AS WASTE OR BORROW SITE SELECTION AND PERMITTING. 2. CONTRACTOR SHALL LOCATE ALL UNDERGROUND UTILITIES PRIOR TO ANY EXCAVATION. SOFT DIG ALL UTILITIES WITHIN GRADING AREA TO IDENTIFY POTENTIAL CONFLICTS. 3. STAKE -OUT ALL EROSION CONTROL MEASURES PRIOR TO CONSTRUCTION. 4. MAINTAIN NPDES TEMPORARY SEEDING SCHEDULE (SHEET C001) FOR ALL EXPOSED SOILS FOR THE DURATION OF CONSTRUCTION. 5. INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE AND TEMPORARY 15" CMP WITH INLET & OUTLET PROTECTION TO PROVIDE ACCESS FROM NC HWY 135. 6. INSTALL TEMPORARY MUD MAT OVER JURISDICTIONAL CHANNEL TO PROVIDE WORKING PATH BETWEEN EASTERN AND WESTERN PORTIONS OF SITE. DO NOT CROSS CHANNEL AT ANY LOCATION OTHER THAN MUD MAT CROSSING PRIOR TO INSTALLING PIPE-1. 7. INSTALL CLEAN WATER DIVERSIONS. 8. INSTALL SILT FENCE AND STONE OUTLET(S) AT INDICATED AREAS. 9. INSTALL SKIMMER BASIN WITH FAIRCLOTH SKIMMER. DO NOT DISTURB WETLAND WITH FAIRCLOTH SKIMMER OUTLET PIPE. SKIMMER BASIN TO REMAIN IN PLACE UNTIL ALL AREAS HAVE BEEN ADEQUATELY STABILIZED AND APPROVAL TO REMOVE MEASURE HAS BEEN RECEIVED BY NCDEQ AND THE CITY OF EDEN. 10. INSTALL TEMPORARY DIVERSIONS TO CONVEY RUNOFF TO SKIMMER BASIN. MODIFY TEMPORARY DIVERSIONS AS NEEDED DURING GRADING OPERATIONS TO ENSURE CONSTRUCTION RUNOFF IS DIRECTED TO SKIMMER BASIN WITH POSITIVE DRAINAGE. MAJORITY OF RUNOFF WILL BE DIRECTED TO WESTERN INLET OF BASIN DURING INITIAL GRADING. INSPECT DAILY AND REMOVE SEDIMENT AS NEEDED. 11. REMOVE EXISTING VEGETATION WITHIN GRADING LIMITS AND DISPOSE AT AN APPROVED SITE. 12. COMPLETE PARTIAL SITE GRADING LOCATED EAST AND WEST OF THE UNNAMED TRIBUTARY AND DEPICTED IN THE PHASE 1 GRADING PLAN. DO NOT DISTURB THE UNNAMED TRIBUTARY DURING THESE GRADING OPERATIONS. 13. AS PARTIAL GRADING AREAS REACH SUBGRADE ELEVATIONS INSTALL STONE BASE TO PROTECT EXPOSED SOILS. 14. REMOVE TEMPORARY MUD MAT CROSSING TO INSTALL PIPE-1 WITH RETAINING WALL-1 AND RETAINING WALL-2. INSTALLATION MUST UTILIZE A PUMP AROUND TO WORK IN DRY CONDITIONS. EACH DAY'S WORK MUST BE LIMITED TO THE AMOUNT OF DISTURBANCE THAT CAN BE STABILIZED BEFORE THE WORK DAY ENDS. PARTIAL PIPE AND WALL CONSTRUCTION MUST BE LEFT IN A STABLE STATE AT THE END OF EACH DAY. ANY RUNOFF COLLECTED BEHIND WALL INSTALLATION MUST BE DEWATERED INTO THE SKIMMER BASIN THROUGH AN EFFLUENT BAG. 15. INSTALL PIPE NETWORK WITH INLET AND OUTLET PROTECTION. PIPE NETWORK MUST DISCHARGE TO SKIMMER BASIN DURING CONSTRUCTION ACTIVITIES. 16. INSTALL ALL UNDERGROUND UTILITIES. ANY RUNOFF COLLECTED IN UTILITY TRENCHES MUST BE DEWATERED TO THE SKIMMER BASIN THROUGH AN EFFLUENT BAG. 17. STABILIZE ALL EXPOSED SOILS WITH SEEDING OR PERMANENT LANDSCAPING. 18. AFTER SITE STABILIZATION AND APPROVAL BY NCDEQ AND THE CITY OF EDEN, REMOVE SKIMMER BASIN TO COMPLETE CONVERSION TO PERMANENT SAND FILTER FOR POST CONSTRUCTION STORMWATER CONTROL AND COMPLETE FINE GRADING. DO NOT ALLOW DISCHARGE INTO SAND FILTER UNTIL SITE IS COMPLETELY STABILIZED. 19. INSTALL REMAINING PERMANENT LANDSCAPING. 20. REMOVE REMAINING EROSION CONTROL MEASURES AFTER RELEASE BY PERMITTING AUTHORITIES. MAINTENANCE PLAN 1. EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO ANY EXISTING BUILDING DEMOLITION. 2. CONTRACTOR IS RESPONSIBLE FOR ALL EROSION AND SEDIMENTATION CONTROL REQUIREMENTS AND SHALL COMPLY WITH THE LATEST EDITION OF THE NORTH CAROLINA EROSION AND SEDIMENTATION CONTROL MANUAL. 3. PER NPDES REQUIREMENTS, CHECK ALL EROSION AND SEDIMENTATION CONTROL DEVICES AND STORMWATER RUNOFF DISCHARGES FROM EACH OUTFALL SHOULD BE INSPECTED EVERY SEVEN DAYS AND WITHIN 24 HOURS AFTER ANY STORM EVENT. A RAINFALL GAUGE SHALL BE KEPT ON SITE, AND A RECORD OF RAINFALL AMOUNTS AND DATES MUST BE RECORDED AND KEPT ON SITE. RECORDS OF INSPECTIONS OF DEVICES AND OUTFALLS SHOULD BE KEPT AND VISIBLE SEDIMENTATION OUTSIDE THE DISTURBED LIMITS SHOULD BE NOTED. ANY ACTIONS TO CONTROL FUTURE RELEASES AND CLEANUP OF SEDIMENT MUST BE RECORDED. A SAMPLE LOG FOR RECORD KEEPING IS AVAILABLE FROM NCDEQ DIVISION OF WATER QUALITY, STORMWATER AND GENERAL PERMITS UNIT. 4. CHECK ALL EROSION CONTROL DEVICES WEEKLY AND AFTER EACH RUNOFF PRODUCING STORM EVENT AND MAKE ANY NECESSARY REPAIRS AS NEEDED TO ENSURE DEVICES ARE FUNCTIONING AS INTENDED. 5. REMOVE SEDIMENT DEPOSITS FROM SILT FENCE AND STONE OUTLETS WHEN DEPOSITS REACH HALF CAPACITY, REPAIR ANY BREAKS IMMEDIATELY. 6. REPLACE GRAVEL CONSTRUCTION ENTRANCE AS NECESSARY. 7. CONTRACTOR WILL BE FINANCIALLY RESPONSIBLE FOR ANY AND ALL FINES LEVIED DUE TO NOT MAINTAINING PROPER EROSION CONTROL MEASURES AT ALL TIMES. \ /� \ \ \ \ s \' \ / ♦� / �� 32i �N' STABILIZATION TIMEFRAMES 00 IPA ` / \ v INV.-.2-4" RCP / SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS r / \ '�. *r 53.24' * . It N / \ \ \ \ \\j0 /� / / / / PERIMETER DIKES, SWALES, DITCHES, lrlw 110EMERGENCY SPILLWAY 5�99 � --� / �✓/ / / / � /' SLOPES 7 DAYS NONE N \ \ J �� / / / ELEV. = 557.00 LINED WITH � \ /� \ / CLASS A RIPRAP � HIGH QUAILTY WATER (HQW) ZONES 7 DAYS NONE _ / / / / IF SLOPES ARE 10' OR LESS IN 1 - / I 3 Lax 4 W OUTLET PROTECTION SEE / / / / SLOPES STEEPER THAN 3:1 7 DAYS LENGTH AND ARE NOT STEEPER N 00s� / ' \ // / \ BEFORE YOU DIG! THAN 2:1, 14 DAYS AREA ALLOWED. \ DET. 4/C903 / / \ 51\ / THAN LENG _ / / SLOPES 3:1 OR FLATTER 14 DAYS 7 DAY SLOPES BEATER CATCH BASIN \ 1aRCP '� ��� N it i' / / \ ALL - - I - 4949 RM-560.57' INV N=556.64' \ ' -j / '/ / ' / \ N.C. ONE -CALL CENTER ALL OTHER AREAS WITH SLOPES NONE, EXCEPT FOR PERIMETERS INV OUT=556.22' \-' / I / / / / COORDINATE WITH NCDOT AND/OR LOCAL TRANSPORTATION 14 DAYS FLATTER THAN 4:1 AND HQW ZONES _ AUTHORITY AND FOLLOW TRAFFIC MANAGEMENT PLAN FOR i ALL WORK WITHIN AND ADJACENT TO PUBLIC RIGHT OF WAY. ITS THE LAW! SEE SHEET C001 FOR COMPLETE NDPES PERMIT INFORMATION 11 \���111111/tt�/ \ H CARD'%'� pQ' REVIEW 035736 = %vGs;•�'�GINE���G �. ,/At C. c\A 08/24/2020 BREC: Pq. NCBELS#C-3448? �'•. CARO I000I0001••••,♦ W z W M U C-0 Z N Z � L.I.J W 0 w 0 PHASE 2 ESC PLAN PREPARED FOR: TERAMORE DEVELOPMENT, LLC PO BOX 6460 THOMASVILLE, GA 31758 DATE: REVISIONS: SHEET SIZE: 24"x36" DATE: 06/15/2020 PROJECT NUMBER: 3160632019 DRAWN BY: J.EDWARDS APPROVED BY: J.CHURCH SCALE: 1" = 20' (H) (V) 20 10 0 20 40 SHEET: C301 r LU W J 2i 0 Q Q 0 W LINN..I L.I. m C� z J a_ J U U� 0 z 0 © COPYRIGHT 2020 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE 1.GE NOTES ACTOR IS TO VERIFY ALL UTILITY LOCATIONS PRIOR TO BEGINNING WORK. �oN� PFv v WESTSIDE STORAGE, LLC p 2. ALL WORK IS TO BE IN ACCORDANCE WITH ALLSTATE AND LOCAL REGULATIONS. D.B. 945, PG. 2303 3. ALL PERMITS ARE TO BE OBTAINED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. LOTS 21 thru 24- P.B. 03, PG. 53 4. CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL PERMIT CONDITIONS. TAX PARCEL#133468 5. EXISTING UTILITIES ON SITE SHALL BE RELOCATED AS REQUIRED. CONTRACTOR SHALL PAY ALL COSTS .♦• ASSOCIATED WITH RELOCATION. TEMP. CLEANWATER .� 6. CONTRACTORS ARE TO FULLY ACQUAINT THEMSELVES WITH ALL UTILITIES WITHIN THE CITY AND STATE ROW AND DIVERSION SEE ET. \ \ ♦•• /. WITHIN THE PROPERTY BOUNDARIES WHICH WILL REQUIRE RELOCATION. ALL COSTS ASSOCIATED WITH RELOCATION SHALL BE INCLUDED IN THE BASE BID. 7. ALL WORK PERFORMED WITHIN NCDOT ROW SHALL BE PER NCDOT SPECS AND SHALL BE INSPECTED FOR COMPLIANCE BY STATE INSPECTORS AT THEIR DISCRETION. SILT FENCE SEE DET.2/C903 LIMITS OF DISTURBANCE \ \\ ��• p�� \ \ \ \\ 8 REBAR SET 1.91± ACRES N.C. GRID-NAD 83 (2011) N \ \ ` N=993,536.98' ` E=1,766,028.32' ` \� �;\ \ \ \ .♦\• pM� \ \ \ \\ \ \ \ I \ \ .� \\ \\ ♦ \ \\ \\\ \ STOCKPILE I I / RETAI G WALL - 1 TO BE \ `� \ \ 66 a2 ♦ \ \ \ \ \ \ \ / I / DEED BY OTHERS. \ c) SAFE��I'' FENCE ALON ` ♦off EXTENTSgEE DET. 6/C901 \ \ ♦ \ ��', \ \ \�/ \ I II i I JUNCTION BOX- 1 i �• \� / 6� N6�° 1�E \ \\ \\ \ \ \ \ \ I I \ I RIM: 567.00 \ ♦� . n 5 \ \ \ \ \ \ I I I I 15" HDPE INV IN: 56220 ♦ \ \� \ ���o \ ' \ I I 15" HDPE INV IN: 56120 15" HDPE INV OUT: 562.1Q'♦ SEE DET. 3/C902 10 1z. I ♦G�� / \ �, \ YARD INLET 1 \ \ \ I I / I ♦� / ��o \� QQ \\ RIM: 565.50 \\ \ 15 HDPE INV OUT: 562.50 \ \ ■ I■ ■I■ ■ ■ ■ ■ ■ ■ 1•�0� / i \ \ -'�v- • _.. r SEE DET. 5/C902 \S�p \ \ 570- -0 CWD-� C �� G I 565 I ,r \� �01 \ \\ \ REB / GRID-N D 83 (2011\ N-993,39�I, CURB INLET- 1 /• '�I \ 1 \ \ cam, \ E=1,6X78.64' RIM: 565.50 i I I \ \ \ \ \ \ 8" REBAR SET 15 HDPE INVOUT.562.50 I \ / SEE DET. 4/C902 OUTLET PROTECTION \ \ \ \ SEE TABLE FOR SIZE \ SEE DET. 4/C903 SKIMMER BASIN CALCULATIONS 1. DA = 1.54 ACRES 2. DU = 1.34 ACRES 3. to = 5 minutes 4, i=6.8f 5. C = 0.6 6. Q10 = CiDA = (0.6)(6.8)(1.54) = 6.28 fC3/s 7. SA,q = 325Q1 p = (325) (6.28) = 2,041 ft2 8. V,q = 1800DU = (1800)(1.4) = 2,520 ft3 9. L:W = 5.0 10. depth = 3.0 11. SApvd = 2,435 ft 12. Vpva 4,879 ft 13. LINEIR = 10' 14. V@top 2 ft 3,777 ft3 15. Tde.ter 3 days 16. Qde-ter = V @ top 2 ff T dewater 1, 259 fh3/d ANY OFF -SITE BORROW AND WASTE REQUIRED FOR THIS PROJECT MUST COME FROM A SITE WITH AN APPROVED EROSION CONTROL PLAN, A SITE REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT. TRASH/DEBRIS FROM DEMOLITION ACTIVITIES OR GENERATED BY ANY ACTIVITIES ON SITE MUST BE DISPOSED OF AT A FACILITY REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT OR PER DIVISION OF SOLID WASTE MANAGEMENT OR DIVISION OF WATER RESOURCES RULES AND REGULATIONS. YARD INLET-2 RIM: 565.50 15" HDPE INV OUT: 562.50 SEE DET. 5/C902 WESTSIDE STORAGE, LLC D.B. 945, PG. 2303 LOTS 21 thru 24 - P.B. 03, PG. 53 TAX PARCEL#133468 LEGEND - - PROPERTY LINE too EXISTING CONTOURS 10o PROPOSED CONTOURS BUILDING SETBACK _----- = LANDSCAPE BUFFER EX. OVERHEAD ELECTRIC P EX. SANITARY SEWER SS W EX. WATER FO EX. FIBER OPTICS GAS EX. NATURAL GAS STREAM CENTERLINE - WETLAND SILT FENCE -C>- TD --C>- TD - TEMPORARY DIVERSION -C>- CWD TEMPORARY CLEANWATER DIVERSION LIMITS OF DISTURBANCE CONCRETE WASHOUT SEE DET. 3/C905 �� • I I� ) \ \ \ \ \ 566 INV. 15" RCP I I TEMPORARY EXCLUSION =563.39' \ I �♦ 'rn� ,� FENCE SEE DET. 6/C902 / \ A� �� RETAINING WALL - 2 TO BE / \ 100 / / �� DESIGNED BY OTHERS. 1 / I'!' I I \ v \ \ 565 / �0 \ I / a SAFETY FENCE ALONG 1 I r \ / \ I I I I / �`p� EXTENTS SEE DET. 7/C901 �, \ / 2" PIPE FOUND INV. 15"RCP / �� 2 15 6V FER �\ \ 1• • 566 OUTLET PROTECTION N.C. GRID-NAD 83 (2011) =562.49' \/ I I I I ( Y e'er j �EMPpRPR Sri I I /'�,/+' )W +1 I • \\ \\ CURB INLET 2 (SEE TABLE DET.R SIZE) 4 C903 �P / / `\ �co/ E=996646303' �` \ \\ RIM: 564.50 / \\ 7� I I I II ,' `.•` \. 1F I I. I N` • \\ \ [_15" HDPE INV IN:561.38 \\ \ I I* r n • 15" HDPE INV OUT : 561.28 SEE DET. 4/C90.2 �► 1 1 I I' \' /j, �\ \ / N I \.. .. .. .. .. I �. .. _ -)03II II I I\ \'•\ I r• �� r• \ r•� r• r• / /r• �•.� r• I ,r '�' \• \ \ \ ✓ \ / 2 - 562- _ \ r. r. r. � / r. r. /r. r. �r/ � �r ` r. �r1 • \ 0 f � 56 / _ - _ *WETLIrND r\ 'V �'�• \ r r '. • �O� f \ / 'RREA * * ./ r w r(J 27 AWES R141 IcS6,O CO ED � /r' /�RAPI /� /. \ Ar / 55� T TEMP. CONSTRUCTION ENTRANCE SEE DET. 1/C903 / OUTLET PROTECTION r* r' \ r' r' 4 (SEE TABLE FOR SIZE) � / \ \ s \ I a• �' SEE DET. 4/C903 f \ �• P / / 5551 20' W x 130' L x 3' D Z t:t : I �: 665PG SKIMMER BASIN ✓ NA \\ r / \\ �\ � �•�� / 01383 L�G� 1.5" FAIRCLOTH SKIMMER W/1.3 IPA���� p el- i /Noo�PRog 22�,�160 / / KNOCKOUT ORIFICE \ \ \ \ �\ ep0 T'l'F �,,� \ • I �• ) / / / / SEE DET. 1 2/C904 16 IPA � wry \ \ \ \ \ \ �`' .'r /FF96 pG 4os HARDWARE CLOTH INLET PROTECTION 0 PIPE INLET PROTECTION SITE VICINITY MAP (NTS) EROSION CONTROL CONSTRUCTION SEQUENCE 1. OBTAIN NECESSARY PERMITS FROM ALL REGULATORY AUTHORITIES. CONTRACTOR RESPONSIBLE FOR ALL DEMO PERMITS AS WELL AS WASTE OR BORROW SITE SELECTION AND PERMITTING. 2. CONTRACTOR SHALL LOCATE ALL UNDERGROUND UTILITIES PRIOR TO ANY EXCAVATION. SOFT DIG ALL UTILITIES WITHIN GRADING AREA TO IDENTIFY POTENTIAL CONFLICTS. 3. STAKE -OUT ALL EROSION CONTROL MEASURES PRIOR TO CONSTRUCTION. 4. MAINTAIN NPDES TEMPORARY SEEDING SCHEDULE (SHEET C001) FOR ALL EXPOSED SOILS FOR THE DURATION OF CONSTRUCTION. 5. INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE AND TEMPORARY 15" CMP WITH INLET & OUTLET PROTECTION TO PROVIDE ACCESS FROM NC HWY 135. 6. INSTALL TEMPORARY MUD MAT OVER JURISDICTIONAL CHANNEL TO PROVIDE WORKING PATH BETWEEN EASTERN AND WESTERN PORTIONS OF SITE. DO NOT CROSS CHANNEL AT ANY LOCATION OTHER THAN MUD MAT CROSSING PRIOR TO INSTALLING PIPE-1. 7. INSTALL CLEAN WATER DIVERSIONS. 8. INSTALL SILT FENCE AND STONE OUTLET(S) AT INDICATED AREAS. 9. INSTALL SKIMMER BASIN WITH FAIRCLOTH SKIMMER. DO NOT DISTURB WETLAND WITH FAIRCLOTH SKIMMER OUTLET PIPE. SKIMMER BASIN TO REMAIN IN PLACE UNTIL ALL AREAS HAVE BEEN ADEQUATELY STABILIZED AND APPROVAL TO REMOVE MEASURE HAS BEEN RECEIVED BY NCDEQ AND THE CITY OF EDEN. 10. INSTALL TEMPORARY DIVERSIONS TO CONVEY RUNOFF TO SKIMMER BASIN. MODIFY TEMPORARY DIVERSIONS AS NEEDED DURING GRADING OPERATIONS TO ENSURE CONSTRUCTION RUNOFF IS DIRECTED TO SKIMMER BASIN WITH POSITIVE DRAINAGE. MAJORITY OF RUNOFF WILL BE DIRECTED TO WESTERN INLET OF BASIN DURING INITIAL GRADING. INSPECT DAILY AND REMOVE SEDIMENT AS NEEDED. 11. REMOVE EXISTING VEGETATION WITHIN GRADING LIMITS AND DISPOSE AT AN APPROVED SITE. 12. COMPLETE PARTIAL SITE GRADING LOCATED EAST AND WEST OF THE UNNAMED TRIBUTARY AND DEPICTED IN THE PHASE 1 GRADING PLAN. DO NOT DISTURB THE UNNAMED TRIBUTARY DURING THESE GRADING OPERATIONS. 13. AS PARTIAL GRADING AREAS REACH SUBGRADE ELEVATIONS INSTALL STONE BASE TO PROTECT EXPOSED SOILS. 14. REMOVE TEMPORARY MUD MAT CROSSING TO INSTALL PIPE-1 WITH RETAINING WALL-1 AND RETAINING WALL-2. INSTALLATION MUST UTILIZE A PUMP AROUND TO WORK IN DRY CONDITIONS. EACH DAY'S WORK MUST BE LIMITED TO THE AMOUNT OF DISTURBANCE THAT CAN BE STABILIZED BEFORE THE WORK DAY ENDS. PARTIAL PIPE AND WALL CONSTRUCTION MUST BE LEFT IN A STABLE STATE AT THE END OF EACH DAY. ANY RUNOFF COLLECTED BEHIND WALL INSTALLATION MUST BE DEWATERED INTO THE SKIMMER BASIN THROUGH AN EFFLUENT BAG. 15. INSTALL PIPE NETWORK WITH INLET AND OUTLET PROTECTION. PIPE NETWORK MUST DISCHARGE TO SKIMMER BASIN DURING CONSTRUCTION ACTIVITIES. 16. INSTALL ALL UNDERGROUND UTILITIES. ANY RUNOFF COLLECTED IN UTILITY TRENCHES MUST BE DEWATERED TO THE SKIMMER BASIN THROUGH AN EFFLUENT BAG. 17. STABILIZE ALL EXPOSED SOILS WITH SEEDING OR PERMANENT LANDSCAPING. 18. AFTER SITE STABILIZATION AND APPROVAL BY NCDEQ AND THE CITY OF EDEN, REMOVE SKIMMER BASIN TO COMPLETE CONVERSION TO PERMANENT SAND FILTER FOR POST CONSTRUCTION STORMWATER CONTROL AND COMPLETE FINE GRADING. DO NOT ALLOW DISCHARGE INTO SAND FILTER UNTIL SITE IS COMPLETELY STABILIZED. 19. INSTALL REMAINING PERMANENT LANDSCAPING. 20. REMOVE REMAINING EROSION CONTROL MEASURES AFTER RELEASE BY PERMITTING AUTHORITIES. MAINTENANCE PLAN 1. EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO ANY EXISTING BUILDING DEMOLITION. 2. CONTRACTOR IS RESPONSIBLE FOR ALL EROSION AND SEDIMENTATION CONTROL REQUIREMENTS AND SHALL COMPLY WITH THE LATEST EDITION OF THE NORTH CAROLINA EROSION AND SEDIMENTATION CONTROL MANUAL. 3. PER NPDES REQUIREMENTS, CHECK ALL EROSION AND SEDIMENTATION CONTROL DEVICES AND STORMWATER RUNOFF DISCHARGES FROM EACH OUTFALL SHOULD BE INSPECTED EVERY SEVEN DAYS AND WITHIN 24 HOURS AFTER ANY STORM EVENT. A RAINFALL GAUGE SHALL BE KEPT ON SITE, AND A RECORD OF RAINFALL AMOUNTS AND DATES MUST BE RECORDED AND KEPT ON SITE. RECORDS OF INSPECTIONS OF DEVICES AND OUTFALLS SHOULD BE KEPT AND VISIBLE SEDIMENTATION OUTSIDE THE DISTURBED LIMITS SHOULD BE NOTED. ANY ACTIONS TO CONTROL FUTURE RELEASES AND CLEANUP OF SEDIMENT MUST BE RECORDED. A SAMPLE LOG FOR RECORD KEEPING IS AVAILABLE FROM NCDEQ DIVISION OF WATER QUALITY, STORMWATER AND GENERAL PERMITS UNIT. 4. CHECK ALL EROSION CONTROL DEVICES WEEKLY AND AFTER EACH RUNOFF PRODUCING STORM EVENT AND MAKE ANY NECESSARY REPAIRS AS NEEDED TO ENSURE DEVICES ARE FUNCTIONING AS INTENDED. 5. REMOVE SEDIMENT DEPOSITS FROM SILT FENCE AND STONE OUTLETS WHEN DEPOSITS REACH HALF CAPACITY, REPAIR ANY BREAKS IMMEDIATELY. 6. REPLACE GRAVEL CONSTRUCTION ENTRANCE AS NECESSARY. 7. CONTRACTOR WILL BE FINANCIALLY RESPONSIBLE FOR ANY AND ALL FINES LEVIED DUE TO NOT MAINTAINING PROPER EROSION CONTROL MEASURES AT ALL TIMES. \ /� \ \ \ \ . '� '� s \' \� / ♦♦ / �� 32i �N' - STABILIZATION TIMEFRAMES IPA INV.-.2-4" RCP / SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS IPA /� / 10 EMERGENCY SPILLWAY PERIMETER DIKES, SWALES, DITCHES, 7 DAYS NONE ` / I \ \ \ � � lrlw 15�99 � --� �/ � / �✓/ / / / � SLOPES N ELEV. = 557.00 LINED WITH C-o CLASS A RIPRAP � HIGH QUAILTY WATER (HQW) ZONES 7 DAYS NONE / / / / IF SLOPES ARE 10' OR LESS IN � - / i 3 La x 4 W OUTLET / / / / / \ PROTECTION SEE / / / / SLOPES STEEPER THAN 3:1 7 DAYS LENGTH AND ARE NOT STEEPER / \ // / \ BEFORE YOU DIG! THAN 2:1, 14 DAYS AREA ALLOWED. 's� DET. 4/C903 � / / \ / / ?� / / / \ 7 DAYSTFOR HAN LOLENG GREATER s� _ / / SLOPES 3:1 OR FLATTER 14 DAYS CATCH BASIN \ 1aR�P '� ��� � � N j � i � / / \ ALL - - - RIM=560.57' INV IN=556.64' \ ' ���'' N . C . ONE -CALL CENTER ALL OTHER AREAS WITH SLOPES NONE, EXCEPT FOR PERIMETERS INV OUT=556.22' \-' / � 1 / / / / [AUTHORITY OORDINATE WITH NCDOT AND/OR LOCAL TRANSPORTATION � 14 DAYS z FLATTER THAN 4:1 AND HQW ZONES _ AND FOLLOW TRAFFIC MANAGEMENT PLAN FOR i/LL WORK WITHIN AND ADJACENT TO PUBLIC RIGHT OF WAY. ITS THE LAW! _��/ / /^PQ� SEE SHEET C001 FOR COMPLETE NDPES PERMIT INFORMATION 11 \ H CARO'%'� pQ''' REVIEW 035736 = S C. cilro ///j/1IIIIk\\\\\ 08/24/2020 .REC:Pq. pO NCBELS#C-3448? -,L0. ......••���P: �'•. CARO W z W M U C-0 Z N Z � LU W 0 O. w 0 C!) PHASE 3 ESC PLAN PREPARED FOR: TERAMORE DEVELOPMENT, LLC PO BOX 6460 THOMASVILLE, GA 31758 DATE: REVISIONS: SHEET SIZE: 24"x36" DATE: 06/15/2020 PROJECT NUMBER: 3160632019 DRAWN BY: J.EDWARDS APPROVED BY: J.CHURCH SCALE: 1" = 20' (H) (V) 20 10 0 20 40 SHEET: C302 r LU W J 2i 0 Q Q 0 W LINN..I L.I. m C� z a_ J U U� 0 z 0 © COPYRIGHT 2020 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE 1.GE NOTES ACTOR IS TO VERIFY ALL UTILITY LOCATIONS PRIOR TO BEGINNING WORK. �oN� PFv v WESTSIDE STORAGE, LLC 7 2. ALL WORK IS TO BE IN ACCORDANCE WITH ALL STATE AND LOCAL REGULATIONS. D.B. 945, PG. 2303 3. ALL PERMITS ARE TO BE OBTAINED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. LOTS 21 thru 24- P.B. 03, PG. 53 4. CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL PERMIT CONDITIONS. TAX PARCEL#133468 5. EXISTING UTILITIES H RELOCATION. SITE HALL BE RELOCATED AS REQUIRED. CONTRACTOR SHALL PAY ALL COSTS ASSOCIATED WITH \ ..�• 6 CONTRACTORS FULLY WHICH SWILLs EITUIREL WITHIN THE CITY AND STATE ROW AND RELOCATION ALL COSTS ASSOCIATED WITH UTILITIES E\ ` �••• Q RELOCATION SHALL BE INCLUDED IN THE BASE BID. \ �� 7. ALL WORK PERFORMED WITHIN NCDOT ROW SHALL BE PER NCDOT SPECS AND SHALL BE INSPECTED FOR COMPLIANCE BY STATE INSPECTORS AT THEIR DISCRETION. SILT FENCE SEE DET. 2/C903 LIMITS OF DISTURBANCE \ \ �� ` \ ` `\ \ 81" REBAR 8" REBAR SET I �' ` \ \ \ SET 1.91± ACRES \ \ .yam \ `\ `\ \ `\ \ \ N.C. GRID 83 (2011) N ` N=993,536.98' ` E=1,766,028.32' ` \� �\ \ .\• \ \ \ \ \ \ \ I \••IAA \•. \ 1 Ica I I / RETAI G WALL - 1 TO BE I / DEED BY OTHERS. \ ♦ \ \ \ �C ♦ \ \ \ \ \ SAFE��I'' FENCE ALONG, EXTENTSgEE DET. 6/C901 ,� \` \ ♦ \ ��', \ \ \ �/ 56l \ ANY OFF -SITE BORROW AND WASTE REQUIRED FOR THIS PROJECT MUST COME FROM A SITE WITH AN APPROVED EROSION CONTROL PLAN, A SITE REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT. TRASH/DEBRIS FROM DEMOLITION ACTIVITIES OR GENERATED BY ANY ACTIVITIES ON SITE MUST BE DISPOSED OF AT A FACILITY REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT OR PER DIVISION OF SOLID WASTE MANAGEMENT OR DIVISION OF WATER RESOURCES RULES AND REGULATIONS. LEGEND - - PROPERTY LINE too EXISTING CONTOURS PROPOSED CONTOURS BUILDING SETBACK - - - - - - - - - LANDSCAPE BUFFER EX. OVERHEAD ELECTRIC P EX. SANITARY SEWER SS W EX. WATER FO EX. FIBER OPTICS GAS EX. NATURAL GAS STREAM CENTERLINE - WETLAND SILT FENCE TD --C>- TD - TEMPORARY DIVERSION -C>- CWD TEMPORARY CLEANWATER DIVERSION LIMITS OF DISTURBANCE HARDWARE CLOTH INLET PROTECTION SITE VICINITY MAP (NTS) JUNCTION BOX- 1 / N61 \ \ \ \ \ \ - EROSION CONTROL CONSTRUCTION SEQUENCE RIM: 567.00 \ �\ ° : \ \\ \ \ \ 1. OBTAIN NECESSARY PERMITS FROM ALL REGULATORY AUTHORITIES. CONTRACTOR RESPONSIBLE FOR I 1 I 15 HDPE INV IN: 562.20 \ \\ 56� . \ \ ALL DEMO PERMITS AS WELL AS WASTE OR BORROW SITE SELECTION AND PERMITTING. I 15" HDPE INV IN: 562.20 \ 0 2. CONTRACTOR SHALL LOCATE ALL UNDERGROUND UTILITIES PRIOR TO ANY EXCAVATION. SOFT DIG ALL ( / 15 HDPE INV OUT: 562.1 6 6" PVC ROOF UTILITIES WITHIN GRADING AREA TO IDENTIFY POTENTIAL CONFLICTS. t / SEE DET. 3/C90�/� / ci\ s \ \ DRAINS 3. STAKE -OUT ALL EROSION CONTROL MEASURES PRIOR TO CONSTRUCTION. G ♦� � / ••�• �,° A A: a . W/SPLASHBLOCKS \ < \ 4. MAINTAIN NPDES TEMPORARY SEEDING SCHEDULE (SHEET C001) FOR ALL EXPOSED SOILS FOR THE r _ / 11A ( .*��� Q�?� \. • SEE DET. 8/C901 \ DURATION OF CONSTRUCTION. o �♦ G / o, \ Q�i" \ YARD INLET-1 \ \\ \\ w �I YARD INLET - 2 5. INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE AND TEMPORARY 15 CMP WITH INLET & 1 .° ,. .. Qom\ \ RIM: 565.50 \ \ \ I I .�� G�N� / �•. ,� ''` \ 15" HDPE INV OUT: 562.50 \ \ \ RIM : 565.50 OUTLET PROTECTION TO PROVIDE ACCESS FROM NC HWY 135. I \ r, \ W -•� 1 �' `SEE DET. 5/C902 DOLLAR GENERAL > \ \ 15" HDPE INV OUT: 562.50 6. INSTALL TEMPORARY MUD MAT OVER JURISDICTIONAL CHANNEL TO PROVIDE WORKING PATH BETWEEN 0_ ■ �■ �I■ ■ ■ ■ ■ ■ ■ / ( \ \ \ \ -• . \a�. ' \ SEE DET. 5/C902 EASTERN AND WESTERN PORTIONS OF SITE. DO NOT CROSS CHANNEL AT ANY LOCATION OTHER THAN 57 -p C �� 9,100 SQ. FT. \ \ W/,�,\ `\\ 7,302 SQ.FT. RETAIL SPACE \ \ \ \ MUD MAT CROSSING PRIOR TO INSTALLING PIPE 1. F.F.E. - 567.75 \ s WESTSIDE STORAGE, LLC 7. INSTALL CLEAN WATER DIVERSIONS. 567 t a "'Q�P� ;� " \ \ \ D.B. 945, PG. 2303 8. INSTALL SILT FENCE AND STONE OUTLET(S) AT INDICATED AREAS. LOTS 21thfu24-P.B.03,PG. 53 9. INSTALL SKIMMER BASIN WITH FAIRCLOTH SKIMMER. DO NOT DISTURB WETLAND WITH FAIRCLOTH TAX PARCEL #133468 I a" RE / J "' \ s \ \ \ \\ \ \ \ i SKIMMER OUTLET PIPE. SKIMMER BASIN TO REMAIN IN PLACE UNTIL ALL AREAS HAVE BEEN ADEQUATELY -N D 83 (2011\ I .•. Ir / a' \ , e. \ \ °. STABILIZED AND APPROVAL TO REMOVE MEASURE HAS BEEN RECEIVED BY NCDEQ AND THE CITY OF _ I \-993,39 t CURB INLET 1 /• \ \ \ \ \ \ \ \ \ . I r E=1,76X78.64' RIM: 565.50 \ \ \ \ 1 ° EDEN. 15" HDPE INV OUT: 562.50 10. INSTALL TEMPORARY DIVERSIONS TO CONVEY RUNOFF TO SKIMMER BASIN. MODIFY TEMPORARY I \ / SEE DET. 4/C902 OUTLET PROTECTION a \ ` \ ° \ DIVERSIONS AS NEEDED DURING GRADING OPERATIONS TO ENSURE CONSTRUCTION RUNOFF IS (SEE TABLE FOR SIZE) \\ `\ `\ \ S6] DIRECTED TO SKIMMER BASIN WITH POSITIVE DRAINAGE. MAJORITY OF RUNOFF WILL BE DIRECTED TO SEE DET. 4/C903 . _ WESTERN INLET OF BASIN DURING INITIAL GRADING. INSPECT DAILY AND REMOVE SEDIMENT AS NEEDED. 11. REMOVE EXISTING VEGETATION WITHIN GRADING LIMITS AND DISPOSE AT AN APPROVED SITE. 12. COMPLETE PARTIAL SITE GRADING LOCATED EAST AND WEST OF THE UNNAMED TRIBUTARY AND DEPICTED IN THE PHASE 1 GRADING PLAN. DO NOT DISTURB THE UNNAMED TRIBUTARY DURING THESE GRADING OPERATIONS. f \ Q 13. AS PARTIAL GRADING AREAS REACH SUBGRADE ELEVATIONS INSTALL STONE BASE TO PROTECT (7 EXPOSED SOILS. �/ / �' •' I j ` < .' `S\ \ i 14. REMOVE TEMPORARY MUD MAT CROSSING TO INSTALL PIPE-1 WITH RETAINING WALL-1 AND RETAINING WALL-2. INSTALLATION MUST UTILIZE A PUMP AROUND TO WORK IN DRY CONDITIONS. EACH DAY'S WORK I I / �♦ i I I . \ \ \ \ \ MUST BE LIMITED TO THE AMOUNT OF DISTURBANCE THAT CAN BE STABILIZED BEFORE THE WORK DAY 566 _ ENDS. PARTIAL PIPE AND WALL CONSTRUCTION MUST BE LEFT IN A STABLE STATE AT THE END OF EACH \ �� II I ��• \ \ \ \ \\ \ - DAY. ANY RUNOFF COLLECTED BEHIND WALL INSTALLATION MUST BE DEWATERED INTO THE SKIMMER I y♦♦ \ I \ / X \ \ , ` / BASIN THROUGH AN EFFLUENT BAG. ( ' �• / INV. 15" RCP TEMPORARY EXCLUSION / �\ / ,✓ ^� \ i 15. INSTALL PIPE NETWORK WITH INLET AND OUTLET PROTECTION. PIPE NETWORK MUST DISCHARGE TO � ^ '� / ,�, =563.39' \ I rn� ,� FENCE SEE DET. 6/C902 I S66 \ \ \ �, \ t / sm SKIMMER BASIN DURING CONSTRUCTION ACTIVITIES. RETAINING WALL - 2 TO BE �'� '�' \ I 1� ( \ \ \ �� 16. INSTALL ALL UNDERGROUND UTILITIES. ANY RUNOFF COLLECTED IN UTILITY TRENCHES MUST BE DESIGNED BY OTHERS. I / '!' I 1 \ \ h / \ -o DEWATERED TO THE SKIMMER BASIN THROUGH AN EFFLUENT BAG. TI-��� 1 I a SAFETY FENCE ALONG / "'1 \ '�' I ( 1 : \ 66 \ \ \ / �/ 17. STABILIZE ALL EXPOSED SOILS WITH SEEDING OR PERMANENT LANDSCAPING. �`� EXTENTS SEE DET. 7/C901 �, \ 5 2" PIPE FOUND THE INV. 15" RCP \ / I I I / / • �� -� iESC�15 6V FER %\ \ \ OUTLET PROTECTION \ / N.C. 3,28 25 D 83 (2011) 18' AFTER SITE ETEACONVERS ON TO PERMANENT SAND FL TDER OF EDEN, REMOVE I t �=562.49' ( Y A •RPR`! ) 1) (SEE TABLE FOR SIZE) / \ O I I /* / r,1 ,� I p` \ CURB INLET - 2 SEE DET. 4/C903 E=1,766,463.03' CONTROL AND COMPLETE FINE GRADING. DO NOT ALLOW DISCHARGE INTO SAND FILTER UNTIL SITE IS / +� W ` RIM : 564.50 \ COMPLETELY STABILIZED. /J� I I I I �'L ` 15" HDPE INV IN : 561.38 \ I 19. INSTALL REMAINING PERMANENT LANDSCAPING. \ I* \ n`• \ 15" HDPE INV OUT: 561.28 20. REMOVE REMAINING EROSION CONTROL MEASURES AFTER RELEASE BY PERMITTING AUTHORITIES. I ,r I �I I s \ \ SEE DET. 4/C902 / I / \ I \ 0 \ / MAINTENANCE PLAN 1. EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO ANY EXISTING BUILDING DEMOLITION. Ai 0 2 I \� / I I �'•\ > 65 ' / J \- / 2. CONTRACTOR IS RESPONSIBLE FOR ALL EROSION AND SEDIMENTATION CONTROL REQUIREMENTS AND SHALL COMPLY WITH THE LATEST EDITION OF THE NORTH CAROLINA EROSION AND SEDIMENTATION `\ CONTROL MANUAL. ` 3. PER NPDES REQUIREMENTS, CHECK ALL EROSION AND SEDIMENTATION CONTROL DEVICES AND m /'�' '�' '�'/ '�'� "' ` '�' '�'\ \ { 562 _ STORMWATER RUNOFF DISCHARGES FROM EACH OUTFACE SHOULD BE INSPECTED EVERY SEVEN DAYS AND WITHIN 24 HOURS AFTER ANY STORM EVENT. A RAINFALL GAUGE SHALL BE KEPT ON SITE, AND A �WETLND �\ ' � . ' RECORD OF RAINFALL AMOUNTS AND DATES MUST BE RECORDED AND KEPT ON SITE. RECORDS OF \ *REA � �• +�/ \ WI � � \ \ �, "� ;:. ' .. n / INSPECTIONS OF DEVICES AND OUTFACES SHOULD BE KEPT AND VISIBLE SEDIMENTATION OUTSIDE THE *0.27 AWES r. ) � � ,� \ r, / :.. SA D FILTER .<,':'. ' \ 3�' DISTURBED LIMITS SHOULD BE NOTED. ANY ACTIONS TO CONTROL FUTURE RELEASES AND CLEANUP OF •. � fir. r. r. r. r. ..SEE DET. 1/C902...'...:�',.�'.•;.;:'.'. : .... I I\ X. \,I I 1 W I \ co ED i SEDIMENT MUST BE RECORDED. A SAMPLE LOG FOR RECORD KEEPING IS AVAILABLE FROM NCDEQ Cp \ I I I I ) /�TS UNIT. RAPI( I 1� � \\ \ %: T i ��s� 4. CHECK ALDIVISION L FEROSIOWATERN�CONTROL DEVICES WEEKUALITY, STORMWATER LY AND AFTERR AICH RUNOFF PRODUCING STORM EVENT s �O I \\ \ I \ r, r.� r, r, r./ / / \ i i AND MAKE ANY NECESSARY REPAIRS AS NEEDED TO ENSURE DEVICES ARE FUNCTIONING AS INTENDED. i\ G i \ \ I r. */ r. r. * / * i i i --' 5. REMOVE SEDIMENT DEPOSITS FROM SILT FENCE AND STONE OUTLETS WHEN DEPOSITS REACH 1 \ t OUTLET PROTECTION ♦� i t* 4'�' (SEE TABLE FOR SIZE) HALF CAPACITY, REPAIR ANY BREAKS IMMEDIATELY. S \ I �' �'I r' r' r' r' \r' SEE DET. 4/C903 \ ` ., P -' / 51 6. REPLACE GRAVEL CONSTRUCTION ENTRANCE AS NECESSARY. tl` 7. CONTRACTOR WILL BE FINANCIALLY RESPONSIBLE FOR ANY AND ALL FINES LEVIED DUE TO ' IPA \ . 1 ♦♦� / 801383,1Og'66yPG ``QQ��G� NOT MAINTAINING PROPER EROSION CONTROL MEASURES AT ALL TIMES. 0. IPA 6pG 4/�/FIB,\ 560 ♦♦ / J� 10' EMERGENCY /'�s• �' �' ' (c/Tk"O'ba 9sFNT� \ �♦ J SPILLWAY ELEV. = 561.00IPA a,`O \ \\ \ \ \ �`'� +r r• r• /• F�FNI� AG 4�6 ♦� / SEE DET. 4/C904 _ - �\ /� \ \ \ \ ` •.'� '� s �'�' r►� / �32/� N STABILIZATION TIMEFRAMES IPA NV.-.2,4 ���'� �j/ �' OUTLET STRUCTURE �' ' SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS t53.24 S / RIM: 560.75 IPA\ \ \ \\ \ 18" HDPE INV OUT: 556.50 � PERIMETER DIKES, SWALES, DITCHES, \ \ \ \� \ 18 j i SEE DET. 2/C902 ' SLOPES 7 DAYS NONE IPA \A \ --'//� / OUTLET PROTECTION `�� / SIZE TABLE FOR SEE '' � ( ) � � � � � O� HIGH QUAILTY WATER (HQW) ZONES 7 DAYS NONE i SEE DET. 4/C903 / IF SLOPES ARE 10' OR LESS IN / SLOPES STEEPER THAN 3:1 7 DAYS LENGTH AND ARE NOT STEEPER \ ' THAN 2:1, 14 DAYS AREA ALLOWED. N� �S\ , , \ BEFORE YOU DIG! CATCH BASIN \ �a RCP ' \ ��/ N j i ' ' , / /' \\ CALL 1-800-632-4949 SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYSTHAN 50FOR 0 ENGTHPES EATER IN RIM=560.57' s� /' INV OUT=556.22' fi / N.C. ONE -CALL CENTER � ALL OTHER AREAS WITH SLOPES 1 A nAVQ NONE, EXCEPT FOR PERIMETERS i / rnnRnlnlnTF tnnTN nlr.nnT nnlnmR I nrnl TRnnISPnRTnTlnnl20 10 0 20 11 \ H CARD'%'� o ''oF�ss�oti'•�y REVIEW 035736 = %vGs;•�'�GINE���G �. 08/24/2020 BREC: Pq. NCBELS#C-3448? 0. �'•. CARO W ti z � U W z , � z w w � � w O 11­­ J FINAL PHASE ESC PLAN PREPARED FOR: TERAMORE DEVELOPMENT, LLC PO BOX 6460 THOMASVILLE, GA 31758 DATE: REVISIONS: SHEET SIZE: 24"x36" DATE: 06/15/2020 PROJECT NUMBER: 3160632019 DRAWN BY: J.EDWARDS APPROVED BY: J.CHURCH SCALE: 1" = 20' (H) (V) 40 SHEET: C303 © COPYRIGHT 2020 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE /e �e / / REBAR SET N.C. GRID-NAD 83 (2011) N=993,536.98' E=1,766,028.32' LEGEND \ PROPERTY LINE loo EXISTING CONTOURS I ;�•\ \\ \\ \\ \\ \\ a"REBAR goo PROPOSED CONTOURS SET - BUILDING SETBACK - - - - - - - - - LANDSCAPE BUFFER P EX. OVERHEAD ELECTRIC 1 •\I� �.\\ \1 \ \ \ \ \ \ \ \ \ \ \ \ sus SS EX. SANITARY SEWER EX. WATER � s FO EX. FIBER OPTICS GAS EX. NATURAL GAS / STREAM CENTERLINE 'r \ '�\ \ \ \ \ \\ \\ 6' WOOD FENCE \ \�\ WETLAND I Z / RETAINING WALL - 1 TO BE '\ \ \ \ SEE DET. 6/C901 T. DESIGNED 9I GNED BY OTHERS SITE VICINITY MAP (NTS) SAFETY FENCE ALONG \ / \ \ �. \ \ \ \ TILITY OLE \ EXTENTS SEE DET. 6/C901 • \ ��' \ /\ / � \ \ \ 6 \ ` \ _ I �.55 �. o\ \s\ \ \ \ \ UTILITY POLE \ N \� 1\roI / \a, \ e.. \\ \ \\ L \ N % O � o I I / _�.\\ \\ \ \\\ \ GENERAL NOTES DOLLAR GENERAL > I m �, EXISTING SEWER \ \ °. e �. 1. CONTRACTOR IS TO VERIFY ALL UTILITY LOCATIONS PRIOR TO BEGINNING WORK. 570- � \ � I m � � w r, -y, �, \ r, •r, \ ':. \. \ \ 9,100 SQ.FT. \ \ MANHOLE TO BE RAISED \ \ 2. ALL WORK IS TO BE IN ACCORDANCE WITH ALL STATE AND LOCAL REGULATIONS. \ N m I ( \ \ \ \ 7,302 SQ.FT. RETAIL SPACE \ e - ' TO RIM ELEV. = 567.00 / '� '� \ r' 1 °1. .' \ �\ SAT. IS WESTSIDE STORAGE, LLC 3. ALL PERMITS ARE TO BE OBTAINED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. SEE DET. 7/C902 F.F.E. = 567.75 \ i. a s . .0 ILITY \ � 567 t � �• �• y� � \ \ \ \ \ � � � \ \ e D.B. 945, PG. 2303 4. CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL PERMIT CONDITIONS. c N� E `' SAT. DISH e \°\ _ LOTS 21 thru 24- P.B. 03, PG. 53 5. EXISTING UTILITIES ON SITE SHALL BE RELOCATED AS REQUIRED. CONTRACTOR SHALL PAY ALL COSTS TAX PARCEL #133468 ASSOCIATED WITH RELOCATION. ( )/ +r l� \ A\ " \ . ITY \. °. 6. CONTRACTORS ARE TO FULLY ACQUAINT THEMSELVES WITH ALL UTILITIES WITHIN THE CITY AND STATE ROW AND E-1937864' / / /=,39/ \\ 1 'FOIE WITHIN THE PROPERTY BOUNDARIES WHICH WILL REQUIRE RELOCATION. ALL COSTS ASSOCIATED WITH 4" SCH 40 PVC \ \ s . \ RELOCATION SHALL BE INCLUDED IN THE BASE BID. �� \ / ` / / �, \r, \ / • . a \ \ SEWER INV. = 564.75 . " :. ; \ _ / \ 7. ALL WORK PERFORMED WITHIN NCDOT ROW SHALL BE PER NCDOT SPECS AND SHALL BE INSPECTED FOR \ ` \ \' COMPLIANCE BY STATE INSPECTORS AT THEIR DISCRETION. N \ MANHOLE \ RI5.94' 5\ .• 1 � I \� ON -SITE UTILITY NOTES IN�IN�60.341. FOR GENERAL SITE WORK, SEE SHEET C100. u�v 2. ALL WATER DISTRIBUTION PIPE SHALL BE DUCTILE IRON WATER PIPE CONFORMING TO ALL STATE AND LOCAL /), STANDARDS. I INN / / \ / < 1 r% \ \ 1P�G \ 56 \ \ 3. ALL DUCTILE IRON PIPE SHALL BE PRESSURE CLASS 50 OR GREATER. 4. ALL SANITARY SEWER PIPE SHALL BE SDR 35 PVC PIPE FOR GRAVITY FLOW AND SCH 40 FOR PRESSURED FLOW (BEDDED IN STONE) CONFORMING TO ALL STATE AND LOCAL STANDARDS. 5. FITTINGS 4" AND LARGER SHALL BE DUCTILE IRON (PUSH -ON TYPE JOINT) CONFORMING TO ANSI AND AWWA o \� \ \ GAS �^ \ / STANDARD SPECIFICATIONS. \ \ \\ MTR. 566 6. PIPE AND FITTINGS 3" AND SMALLER ARE TO BE EITHER PVC SCHEDULE 40 WITH SOLVENT WELD JOINTS OR SOFT ° a \ �✓ \ I N q PEDF \ �' •\ \� \ \ \ \ \ \ K-COPPER. GATE VALVES SHALL BE TELESCOPE TYPES. ALL VALVES MUST BE MUELLER, M&H OR KENNEDY AND BE EXISTING \ N / \ RATED 175 PSI WORKING PRESSURE AND 300 PSI HYDROSTATIC TEST PRESSURE. ALL VALVES WILL BE OPEN LEFT WELL TO BE \ \ \ FAN- / AND BE CAST OR DUCTILE IRON BODIED. /F TIL V I / \ / I �I \ / \ ABANDONED \ NN / 7. ALL WATER MAINS SHALL HAVE A MINIMUM COVER OF 3' ABOVE THE TOP OF THE PIPE. \ ° �% ° P N \ °I / NN / / \� RETAINING WALL - 2 TO BE �'� '�' \ 1 C\ `\ CLEANOUT (TYP. \ \\ �� \ / s / 8. THE MINIMUM HORIZONTAL SEPARATION BETWEEN THE CLOSEST TWO POINTS OF THE WATER AND SEWER LINE IS �j P / I \ I \ DESIGNED BY OTHERS. I �'�' / 'r \ \ \ \ c� Wr / \ �° TEN FEET (10'). THE MINIMUM VERTICAL SEPARATION BETWEEN THE CLOSEST TWO POINTS OF THE WATER AND \ \ v AT ALL BENDS) MTR. SEWER LINE IS EIGHTEEN INCHES (18"). /\o� N SAFETY FEN 5F SEE DET. 3/C904 CE ALONG \ \ i N \� N 2" PIPE FOUND "� �' '� \ \ 9. THRUST BLOCKS SHALL BE PROVIDED AT ALL BENDS. EXTENTS SEE DET. 7/C901 / ' (, / \ W ;\ \ \ \ \ N N.C. GRID-NAD 83 (2011) N=993,284.25' 10. DIMENSIONS SHOWN ARE CENTERLINE OF PIPE OR FITTINGS. � � %) \ \ \ � N � q G �coh E=1,766,463.03' 11. ALL SPRINKLER, DOMESTIC, AND SANITARY LEADS TO THE BUILDING SHALL END 5 FROM THE EDGE OF BUILDING AS N \ y \ I I� I 1\N \` 06 J I ,�,� ,�, l \ \ \ N \ A SHOWN ON PLAN AND SHALL BE PROVIDED WITH A TEMPORARY PLUG AT END (FOR OTHERS TO REMOVE AND / / I I \ \ \ / 4 EXTEND AS NECESSARY). / \ \ ` 7� \ \� / // b.+• I I \ \ \ / / N \ \� I / 4 / 12. ALL WATER MAINS SHALL BE HYDROSTATICALLY TESTED AND DISINFECTED BEFORE ACCEPTANCE. SEE SITE \ ` \ \ h��� \ IM• r r // �.! / I I �I I / \ \l i� \ / / / ° / /: WORK SPECIFICATIONS. 13. ALL GATE VALVES/BOXES SHALL BE TO TOWN/CITY STANDARDS. 14. ALL TRENCHING PIPE LAYING, AND BACKFILLING SHALL BE IN ACCORDANCE WITH FEDERAL OSHA REGULATIONS. �/ \ \/ 2 O I I 11 \ I\•. � / 'Y Y I FYI Y \I • \ /I � \ / L N- I / � / / \ �, / / / G 4 _ �� 15. SEE SITE SPECIFICATIONS FOR BACKFILLING AND COMPACTION REQUIREMENTS. A 16. SITE CONTRACTOR SHALL HAVE APPROVAL OF ALL GOVERNING AGENCIES HAVING JURISDICTION OVER THIS \N16 SYSTEM PRIOR TO COMPLETION. o ?. \ o I r• ye r• r r r r I r r \ i - r \ o / �\ Q \ / 17. INSTALLATION OF THIS PLAN SHALL BE DONE IN STRICT ACCORDANCE WITH SITE WORK SPECIFICATIONS. � � W � � o � _ '. � _// � � � __-562--� N /� �/ �' +� ` W �\ \ v �v ur 562/ 18. SEE ELECTRICAL PLAN FOR SITE LIGHTING LAYOUT. • v / 19. SEEM' SHEETS FOR CONTINUATION OF FACILITIES INTO AND OUT OF THE BUILDING. / o �\ I N 1 1� 1 1\ "' "'/ �'` \ "' "' I WETLAND �\ ' \� � .' ' " ol 20. CONTRACTOR IS RESPONSIBLE FOR COORDINATION WITH LOCAL POWER PROVIDER FOR THE LOCATION OF THE AREATRANSFORMER AND ANY NECESSARY CONDUITS. r r, r, 0.27ACRES .•. ) �. I ,� I W / ; , .' / N / N / 21. CONTRACTOR IS RESPONSIBLE FOR COORDINATION WITH LOCAL TELECOMMUNICATION PROVIDER THE LOCATION - / � / \ GPs' OF ANY PEDESTALS AND NECESSARY CONDUITS. 5 rn CO ED P 1 G o I T ' \ \ .•r \ Y /* /* I I w /* 1 \°\ \ \. I \ !\ SEWER MANHOLE •Y Y I \ NN 4 // �% / /�N / / Ps//ss�ss j / \ \ / / 1 \ \ \ \ I N r,•, RIM=556.57' I \ \ I / / i -TN' \ �i INV IN=551.47'ss 1 \ �S> \ ° I `•� \�r r• \ I f oP.% / GP ass e MTR. / \ \ \ 'N I I,NV OUT=551.37 \ 4 / N� 51 / 5 N � 55 / GP ,Ss j / UTILITY \ \ e / / ALL EXISTING UTILITY POLE / ✓ / IPA \ v\ \ \ •Y\N \� 4 / lo• GPS ` IRRIGATION TO BE 10 / I ��� /� / 83• / / GPS/ SERVICE CONNECTIONS / `\ \ N \ \\ \\\° �'�" \ ' \DESIGNED BY OTHERS II 1 e / 4 X / QRo�Ec� 60` �\ / / GPS/ SS/SSA TO BE ABANDONED \ \\ ss A I / FIRE I / 0� ` 1 e / NA \ \ \ -� � ss`` � � p 520- \ � l• HYD I 1�" /NcoR `ZZ c / S/ /� /REMOVED PER UTILITY \C9N \ \ \ •\ G,6lA��/�/ •\ 560 / \/c°� // \/N /N // .- / yN GPS/GPS /c�NP / / PROVIDER STANDARDS 48 ,6FFM / ° N'�' \ GPS 55 a'p / �c/Ty 8 3 FNr ��i / / 9 55 e / Nl. (p' y \ \ \ \ \ ..\� S ��rSF�.F �FFpF \s AG \\ / �23\ N / } GPS/ 55 / 4 \ \ \ \ e o \ s\�7�F N� is 406 \ \ ` ���' �"o /� I ���;`` Nam\ / \ \ \ \ \\ Fp \�•• \� �S �•\ \ / / /�� / \ /GPS 5/55/ .��.y 5 P \ \ NUy\ �� F•o�• \ \ '•s3•\, / \�9 / / \ b' /GPS ss / ANCHOR CLEAN- j OUT / / \ \ UIT�� 4 \ J p /� \ UTILIT 'O ° ` / \ �\ EXISTING FIRE N\ IPA v POLE\ '1` \// 0/ / / NN / HYDRANT �55/ UTILITY ANHOLE \ ^°s lNr // TELE POLE / \ WrR �/ RIM=556.48' / 1" RPZ (DOMESTIC) WITH / FED. / N / � N 11 \���111111/��77 \ H CARD'%'� \� pQ'••�•Essi� <i REVIEW 035736 %vGs;•�'�GINE���G �. /////I111111•\\\\\ 08/24/2020 BREC, Pq. p0 NCBELS#C-3448? �'•. CARD %% W ti z � U W z �, � z w w � � w O � J UTILITY PLAN PREPARED FOR: TERAMORE DEVELOPMENT, LLC PO BOX 6460 THOMASVILLE, GA 31758 DATE: REVISIONS: \ \ / INV IN=550.98 \ I Na VLV. �Q I uTPo- \ - J/ / / \ INV OUT=550.78' HEATED ENCLOSURE, \ d e -' / I NN / / GPS/ 1" WATER METER COORD. NN SHEET SIZE: CONNECT TO EXISTING SEWER % G WITH PROVIDER SEWER MANHOLE \ 24"x36" aIlk e RIM=561.49' / c9N / MANHOLE INV. = 551.00 3 / \ DATE: s� a RPZ (IRRIGATION) WITH INV IN=553.09' I�� e / �� w I N\ COORDINATE WITH PROVIDER / j ; HEATED ENCLOSURE \ INV OUT=552.99 06/15/2020 WTR. tv I / \ VT vI LIGHTED GPS/ `MTR. e /55/ PROJECT NUMBER: PYLON SIGN /�- %ss/��"�� / \ 3160632019 "I/ / / s5 a / \ DRAWN BY: d LOCAL UTILITY COMPANIES J.EDWARDS P / �v VR. C9N I \/ •� / I GP5/ / � / / / 55/ \ POLE UTILITY a \ 4 / ���' GRo�No1 /.� \\ .�- .56 I/ s"�/ SS/ , oPoP UTILITY COMPANY NAME PHONE APPROVED BY: Gl / ///\ i \ J.CHURCH 40�S WATER TOWN OF EDEN (336) 613-4749 MAG NAIL SETc' N.C. GRID-NAD 83 (2011) \6 GP5 j=. i/ / �/ \ WATER DAN RIVER WATER, INC (336) 623-2526 SCALE: 66 N=993,160.01' E=1,766162.4j� POWER DUKE ENERGY (800) 452-2777 1" = 20' (H) drluTY P L �\ / RIM SEWER \ TELEPHONE CENTURYLINK (800) 778-9140 (V) 1.5" PIPE INV IN=550.46' \ TELEPHONE TIME WARNER ( 800) 778-9140 FOUND INV OUT=550.36 \ COORDINATE WITH NCDOT AND/OR LOCAL TRANSPORTATION 20 10 0 20 40 SHEET: 4 \ AUTHORITY AND FOLLOW TRAFFIC MANAGEMENT PLAN FOR NATURAL GAS PIEDMONT NATURAL GAS COMPANY (980) 266-0375 \// / \ ALL WORK WITHIN AND ADJACENT TO PUBLIC RIGHT OF WAY. SANITARY SEWER TOWN OF EDEN (336) 613-4749 " o0 r cw Ll Ll 2i 0 Lu Q 0 W W Lu U) z a_ J V ) IIII- z 0 © COPYRIGHT 2020 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE / / / / / e REBAR SET N.C. GRID-NAD 83 (2011) ` N=993,536.98' E=1,766,028.32' 0 (1A m 0 0 ki k1 ki ..1 1 1 �1 8" REBAR SET F • v o 6' WOOD rt �,�! NCE RETAINING WALL - 1 TO BE / w vvv v SEE DET. 6/C901 DESIGNED BY OTHERS. \1/ SAFETY FENCE ALONG, EXTENTS SEE DET. 6/C901 \ v v v� ••� �1/ �1/ �1/ �1/ �1/ �1/ / y y y y y y y y v v v ••�'•, \ / �� w w y w w w w w w v v v v v '•\ \ NT NL v v v v v vvv ` f i\ � '.\ ` f ' ���PNN�NCj aN � �Y ° °..�Y y .b y .b y .b y .b y .b y .b 1• w .b .b v v v v� � •\ � ���F�Rw y .. . ° s y y y y y vvv v v v v 44. VVVVNV A: ° w w v v v 1 v ° a .° ° . ° . ° . y y y v v v v v v v v `.,� ° .1/ \1/ w w w w \ r• r• r• r: - ir- . _ • ' :..A ° .: �. DOLLAR GENERAL y y �v v v 9,100 SQ. FT. w SOD y W W + +' +' °s. ° 7,302 SQ.FT. RETAIL SPACE y y y y w w •Y r• d• •Y •Y •Y` F.F.E. = 567.75 s y y\ t � ' SOD a. . : ° .' . ° ° y y N ° w y -NAD 83 (2011) y w E=1,766,078.64' �" :4 " w 'w w w w a w\ w 1 A. °. . \ w 11 w w `. �r• � �Y �Y �r - .. ° ' 1 w w w Ar y W �Y�.. yc .. �'- ° ° SM-1 A 1 \ w w w w w ° .° e ° o ° s w 1 w\ w` w w SOD w w w w w �r �r s ... SM - 1 w \ y` w w w w � �Y �Y • SEED w I I w �V � \ �• I w �o RETAINING WALL - 2 TO BE y y DESIGNED BY OTHERS. \o� a SAFETY FENCE ALONG SM 1 w y EXTENTS SEE DET. 7/C901 !�' +' '! w w y y ��A�2�A y y \` �61 j �! w w w SDD y \\ Ae I'• W ♦ I w w w w w w w w w �� \ W `•Y \. W ♦ % \ w w w w w w w w w \ ` � '\ % �, �Y \\\� : ��Y �Y • \ I �Y �Y W d! w w w w w w w W W W 4 y Y Q \ W W W W 2 2 r. \ \ a• y •\� •. /• �\ W •\ Y \ Y Y Y Y Y W W V W W W W Y O S M- 1 y Y Y Y Y W W W W W W W W W y Y, fg �� •\..Y .Y ` .Y .4N \ _ .Y .Y .Y ••I .Y �Y .Y •\ �Y �Y �Y Y �Y �Y �Y �, �' �, �' �, �' �, �' � �' �, Y \ # �� •\ • � � �� �Y �Y �Y �Y �Y �Y �Y '1 �Y �Y �Y �Y �Y Y �Y W W W W W y W W W W W '� •\ .Y .Y \ .Y .� .Y ./. .Y w w w w w w w `Y W W W W W W y/ o � WETLAND � 2 W W W W W w w w w w w w w w w w w � C \ AREA .�. .�. .�. 0.27 ACRES o .� • � � ` \ Pso niD V p���M w w w w w w w y G MVO W W V y y y cS� \ �Y ` �Y �Y �Y �Y �Y �Y �Y ��'• w w w w w w w W Q�V� .. •W ,�. .y W C MPUIFED* w w w J T / w w w w w W W W W W W W W W W y w w I � \ ••\ � � � � � � � � � w w w w W W � .� W .., .,.W. • W W W W W w w w W WESTSIDE STORAGE, LLC D.B. 945, PG. 2303 LOTS 21 thru 24 - P.B. 03, PG. 53 TAX PARCEL#133468 LEGEND - - PROPERTY LINE loo EXISTING CONTOURS goo PROPOSED CONTOURS - - BUILDING SETBACK - - - - - - - - - LANDSCAPE BUFFER P EX. OVERHEAD ELECTRIC SS EX. SANITARY SEWER W EX. WATER FO EX. FIBER OPTICS GAS EX. NATURAL GAS - STREAM CENTERLINE WETLAND SITE VICINITY MAP (NTS) GENERAL NOTES 1. CONTRACTOR IS TO VERIFY ALL UTILITY LOCATIONS PRIOR TO BEGINNING WORK. 2. ALL WORK IS TO BE IN ACCORDANCE WITH ALL STATE AND LOCAL REGULATIONS. 3. ALL PERMITS ARE TO BE OBTAINED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. 4. CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL PERMIT CONDITIONS. 5. EXISTING UTILITIES ON SITE SHALL BE RELOCATED AS REQUIRED. CONTRACTOR SHALL PAY ALL COSTS ASSOCIATED WITH RELOCATION. 6. CONTRACTORS ARE TO FULLY ACQUAINT THEMSELVES WITH ALL UTILITIES WITHIN THE CITY AND STATE ROW AND WITHIN THE PROPERTY BOUNDARIES WHICH WILL REQUIRE RELOCATION. ALL COSTS ASSOCIATED WITH RELOCATION SHALL BE INCLUDED IN THE BASE BID. 7. ALL WORK PERFORMED WITHIN NCDOT ROW SHALL BE PER NCDOT SPECS AND SHALL BE INSPECTED FOR COMPLIANCE BY STATE INSPECTORS AT THEIR DISCRETION. DOLLAR GENERAL LANDSCAPE NOTES: A. GRADING NOTES 1. CONTRACTOR TO GRADE ALL AREAS SHADED IN THE PLANS INCLUDING R.O.W. 2. TOP SOIL SHALL BE STRIPPED FROM ALL CUT AND FILL AREAS, STOCKPILED AND REDISTRIBUTED OVER GRADED AREAS. PROVIDE EROSION AND SEDIMENTATION CONTROLS AROUND STOCKPILES DURING CONSTRUCTION. 3. TILL SOIL TO A DEPTH OF 4" MINIMUM. 4. REMOVE ALL ROCKS LARGER THAN 1" MEASURED IN LARGEST DIRECTION. 5. GRADE ALL AREAS TO MAINTAIN POSITIVE SLOPE AWAY FROM BUILDING. 6. ALL GRADED AREAS TO RECEIVED SEED OR SOD, TOP SOIL, STRAW AND WATER UNTIL A HEALTHY STAND OF GRASS IS OBTAINED. 7. REFER TO GRADING SHEET FOR MAXIMUM SLOPES. B. LAWN SEEDING & SODDING NOTES: 1. ALL LAWNS FROM FACE OF THE BUILDING AND ON THE SIDE WHERE THERE IS PARKING OR A STREET ARE REQUIRED TO BE FULLY SODDED. ALL OTHER LANDSCAPE ARES TO RECEIVE SEED. 2. AREAS TO RECEIVE SEED OR SOD SHALL BE CLEAN OF DEBRIS AND FREE OF WEEDS. 3. SEED MIX TO BE DROUGHT TOLERANCE FESCUE OR REGIONAL SPECIFIC BLEND. 71TO7OF THE SEED MIXTURE TO BE ANNUAL RYE TO AIDE IN LIMITING EROSION OF PERENNIAL SEEDING DURING GERMINATION. 4. STRAW SHALL BE THRESHED STRAW OF HAY, OATS, WHEAT, BARLEY OR RYE. SPREAD AT A RATE OF 2-1/2 TONS PER ACRE. STRAW, NETTING AND OTHER ANTI -EROSION MATERIALS TO BE REMOVED AFTER ESTABLISHED LAWN. 5. MAINTENANCE SHALL BE BEGIN IMMEDIATELY AFTER SEEDING. WATER REGULARLY TO KEEP LAWN AREAS MOIST TO MAXIMIZE GERMINATION AND MAINTAIN OPTIMUM GROWTH AND SURVIVAL TO ACHIEVE AN ACCEPTABLE STAND OF ESTABLISHED LAWN PRIOR TO THE STORE POSSESSION DATE, FREE OR ERODED OR BARE AREAS. C. LANDSCAPE NOTES 1. ALL SOILS USED FOR PLANTING SHALL CONSIST OF REGIONALLY APPROPRIATE SOILS. 2. ALL PLANTING BEDS SHALL HAVE A MINIMUM OF 3" DEPTH OF MULCH, WITH EDGING AS REQUIRED. 3. ALL TREES LOCATED IN SOD AREAS SHALL HAVE A MULCH RING WITH EDGING AS REQUIRED. 2" PIPE FOUND 4. ALL PLANTINGS SHALL BE THOROUGHLY WATERED BY THE LANDSCAPE CONTRACTOR AT THE TIME OF THE N.C. GRID-NAD 83 (2011) PLANTINGS. N=993,284.25' 5. PRIOR TO FINAL ACCEPTANCE OF STORE BY DOLLAR GENERAL. THE SITE SHALL BE CLEAN OF ALL DEBRIS AND E=1,766,463.03' TRASH, AND MEET ALL REQUIREMENTS OUTLINED IN SECTIONS A-C ABOVE. 6. MAXIMUM SLOPE CUTS SHALL NOT EXCEED 4:1. ALL DISTURBED GRADES GREATER THAN 8:1 SHALL BE STABILIZED BY SODDING. SODDING PINS ARE TO BE USED ON ALL 4:1 GRADES. - 7. VEGETATION AT ENTRY SHOULD BE LOW TO ENSURE VISIBILITY OF STORE. / 8. IF TREES ARE REQUIRED IN FRONT OF BUILDING, SELECT SMALL LEAFED, NON DENSE SPECIES THAT WILL NOT INTERFERE WITH THE VISIBILITY OF STORE. THE SPACING SHALL CREATE VISUAL CORRIDORS TO STORE AND / PYLON OR MONUMENT SIGN. D. IRRIGATION NOTES 1. ALL LANDSCAPE AREAS AND LAWNS ADJACENT TO PAVED AREAS AND/OR STREET ARE TO BE FULLY IRRIGATED. 2. IRRIGATION SYSTEM TO INCLUDE ALL SPRAY HEADS, VALVES AND CONTROLLERS. A SEPARATE METER AND BACKFLOW PREVENTER WILL BE REQUIRED. 3. A SEPARATE METER AND BACKFLOW PREVENTER WILL BE REQUIRED. 4. LOCATE HEADS A MINIMUM OF 2'-0" FROM EDGE OF PAVEMENT/CURB. 5. LOCATE RAINBIRD CONTROL PANEL IN RECEIVING AREA NEXT TO ELECTRICAL PANELS. \ /c I- \* •�• •�• •�• �• w y y y W W W W •F •Y •Y w y y / / I Y Y Y Y Y Y Y I Y Y y W W W W W W W W W W W W Y `Y Y Y Y ��cCj[ Y Y / / 66y QG•C�s c. � / / / �� / \ : ./. ./. ./. �• \ ./. ./. �. I w w w w w w w w w y w w w / c, #. 6 • ` / / / \ 1 Y Y Y \ Y w w w w w w w w w / O,� QRDsE c"o �• /•� 1 ' B6�AG �/TYF\�. w w w w w w y/ � / •ls• /�' / .�. (C/Ty 'QB SFMFiyT� \ w w w w w 0-1 ` •\` oFFCFNI s pG q� \ \ 1396 w w w w 2 . NIS \ ./r ./r \ dC •r w \ \ / .00 / / \ / / 0-1 / MAGNAIL SET LANDSCAPE PLANTING LEGEND N.C. GRID-NAD 83 (2011) N66 N=993,160.01' / -'i E=1,766,162.41' / \ SYMBOL LABEL QTY. SCIENTIFIC NAME COMMON NAME SIZE AT PLANTING \ / 1.5" PIPE FOUND SM 4 Acer saccharum SUGAR MAPLE 8-10' HEIGHT/B&B © COPYRIGHT 2020 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE. 11 �H CARD pQ' REVIEW 035736 %vGs;•�'�GINE��4,G�: TAN C. uro /////IIIIlk\\\\\ 08/24/2020 BREC: Pq. op0 � Rai ••.• z NCBELS#C-3448? 0. i •. �'•. CARD ��• W z W U cfl z CV Z � Lu W 0 w 0 W LANDSCAPE PLAN PREPARED FOR: TERAMORE DEVELOPMENT, LLC PO BOX 6460 THOMASVILLE, GA 31758 DATE: REVISIONS: SHEET SIZE: 24"x36" LANDSCAPE PLANTING LEGEND DATE 06/15/2020 BERMUDA SOD (2,050 SQ.FT.) PROJECT NUMBER: 3160632019 •� �•�•���•� DRAWN BY: W W W W J.EDWARDS W W W W FESCUE SOD (24,820 SQ.FT.) W . W W APPROVED BY: * W * * J.CHURCH FESCUE SEED (10,500 SQ.FT.) SCALE: 1" = 20' (H) MULCH (V) 20 10 0 20 40 SHEET: LIRIOPE PLANTED 2' O.C. °°°°°°° (MAINTENANCE FREE VEGETATION) °°°°°°°°°°°° °°°°°°°°°°°° r U) W J 2i O U Lu Q 0 W W m U) z J a_ J U U) O z 0 1 C900 4 C900 7 C900 HEAVY-DUTY ASPHALT PAVING 1" ASPHALT SURFACE COAT (S9.513) 2" ASPHALT SURFACE COAT (S9.513) 8" ABC COMPACTED STONE BASE (COMPACTED TO 100% MODIFIED PROCTOR) COMPACTED SUB -GRADE (PER SPECS.) GENERAL NOTES: 1. VERIFY EXACT PAVING DESIGN WITH GEOTECHNICAL ENGINEER FOR PROJECT VAN ACCESSIBLE PARKING SIGN THIS SIGN TYPICAL AT ALL "VAN ACCESSIBLE" PARKING SPACES STANDARD ALUM. HANDICAPPED PARKING SIGN R7-8 BOLT TO STEEL TUBE WITH 3/8" - CADIUM PLATED NUTS, BOLTS, & WASHERS. STANDARD ALUM. MAXIMUM PENALTY SIGN R7-8D BOLT TO STEEL TUBE WITH 3/8" _ CADIUM PLATED NUTS, BOLTS, & WASHERS. (IF REQUIRED) 2"x2"x188'STL. TUBE EXTEND INTO CONC. FILLED PIPE 2'. PROVIDE WELDED WATER- TIGHT CAP PAINT P&L #6118 "BLACK COFFEE" PAINT PIPE BASE OSHA YELLOW 6" DIA. STL. PIPE FILLED WITH CONCRETE PAVEMENT 1.5' CONC. BASE #6 BARS 14" LONG THRU PIPE EACH WAY z II � II r` v II u 1 2" VAN ACCESSIBLE RESERVED PARKING MAXIMUM PENALTY $250 12" ONE SIGN PER HANDICAP PARKING SPACE/ WHERE 2 SPACES FACE EACH OTHER, ONE POST SHALL BE USED WITH SIGNAGE ON EACH SIDE. CURB AND GUTTER 6" 18" ASPHALT PAVING SEE DETAIL 6" a ; 1 RAID. a III I O O ASPHALT SHALL BE"' -� ABOVE GUTTER EDGE I I I I I t311000 PSI CONC. COMPACTED ABC CURB AND GUTTER z C900 5 C900 8 C900 STANDARD ASPHALT PAVING GENERAL NOTES: 1. VERIFY EXACT PAVING DESIGN WITH GEOTECHNICAL ENGINEER FOR PROJECT HANDICAP RAMP COLORED TOOLED/SERRATED SLIP RESISTANT SURFACING AND/OR TACTILE WARNING DEVICE AS REQUIRED BY AMERICANS WITH DISABILITIES ACT ACCESSIBILITY GUIDELINES AND CODE REQUIREMENTS C a ACCESSIBLE/ — 7 SHOPPING CART RAMP RAMP TO BE SLOPE CENTERED C /SIDEWALK 1:12 MAX ABOUT THE FRONT DOOR. �\ 2'- - J 0 4' MIN. 6 6' MIN. 1:10 MAX. SLOPE PAINTED YELLOW SEE PLAN BOLLARD WITH ACCESSIBLE PARKING SIGN, AS REQUIRED. STRIPING TOP COAT SHERWIN WILLIAMS - PROMAR TRAFFIC MARKING LUC 1:10 MAX. SLOPE J '-BOLLARD WITH PAINTED YELLOW ACCESSIBLE PARKING SIGN, NOTE: AS REQUIRED. ALL ACCESSIBLE RAMPS AND ACCESS AISLES SHALL MEET ALL CODES AND ADAAG REGULATIONS. 3 C900 6 C900 HANDICAPPED PARKING SIGN STANDARD ALUM. HANDICAPPED PARKING SIGN R7-8 BOLT TO STEEL TUBE WITH 3/8" - CADIUM PLATED NUTS, BOLTS, & WASHERS. STANDARD ALUM. MAXIMUM PENALTY SIGN R7-8D BOLT TO STEEL TUBE WITH 3/8" CADIUM PLATED NUTS, BOLTS, & WASHERS. — (IF REQUIRED) 2"x2"x188'STL. TUBE EXTEND INTO CONC. FILLED PIPE 2'. PROVIDE WELDED WATER- TIGHT CAP PAINT P&L #6118 "BLACK COFFEE" PAINT PIPE BASE OSHA YELLOW 6" STD.STL. PIPE FILLED WITH CONCRETE PAVEMENT 1.5' #6 BARS 14" LONG THRU PIPE EACH WAY z ti 2" RESERVED PARKING MAXIMUM PENALTY 250 12" SIDEWALK/CURB SECTION 1.5" REVEAL DROP AWAY FROM ENTRY 3000 PSI FIBER REINFORCED CONCRETE ALL SIDEWALKS TO HAVE SEALED ISOLATION JOINTS r SIDEWALKS TO HAVE BROOM FINISH PAINT H.C. BLUE O° 1/2 "ROUND ASPHALT PAVING MAX 2% SLOPE F . F . E 2%SLOPE SEE DETAIL STANDARD ACCESSIBLE PARKING SYMBOL PAINTED ON PAVEMENT. PAINT 4 COLOR TO BE PER THE - AUTHORITY HAVING JURISDICTION. y a 4" STRIPES @ 24" O.C. AT45 DEGREES. PAINT - -ao— d a COLOR TO BE PER THE _ AUTHORITY HAVING I� JURISDICTION. - a STANDARD ACCESSIBLE PARKING SYMBOL PAINTED - ON PAVEMENT. PAINT - 6 COLOR TO BE PER THE AUTHORITY HAVING \,-- JURISDICTION. BOLLARD 4" PARKING SPACE PLASTIC COVER STRIPE. PAINT COLOR BY OTHERS TO BE PER THE AUTHORITY HAVING JURISDICTION. DUMPSTER PAD SECTION- 4000 PSI CONCRETE WITH W2.9 X W2.9 W.W.F. OR # 3'S AT 18" ASPHALT PAVING SEE DETAIL _x_ _x__ x_`. D ifr:::: —� —8"— I i COMPACTED SUB -GRADE 9 C900 BOLLARD x.-41-xX 6" ROUND CONC. TOP OF PIPE SMOOTH 60 GA. STEEL BOLLARD FILLED SOLID WITH 3000 PSI CONCRETE COVERED BY YELLOW PLASTIC (PROVIDED BY OTHERS) FINISH GRADE/PAVING CONCRET 3000 PSI N CARD'%'� Qom'' �REVIEW 035736 = S / TAN C . CN`0 08/24/2020 BREC: Pq. p0 NCBELS#C-3448 i �'•. TN CARD ,�. 11 W ti z � U W z , � z w w � � w O � J m DETAILS PREPARED FOR: TERAMORE DE' PO BOX 6460 THOMASVILLE, JELOPMENT, LLC GA 31758 DATE: REVISIONS: SHEET SIZE: 24"x36" DATE: 06/15/2020 PROJECT NUMBER: 3160632019 DRAWN BY: J.EDWARDS APPROVED BY: J.CHURCH SCALE: NTS (H) (N) SHEET: C900 r W CJ� W w 0 U Q W Q 0 W W W m H U) z Q J i J U U) H 0 0 0 © COPYRIGHT 2020 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE. 1 C901 4 C901 NCDOT ASPHALT PAVING d d /1" nr (l(1 Cn DUMPSTER SCREENING - 2" 4" 'I PACING 4x4 1X6 FRONT 2X4 TOP VIEW GATES SHALL BE CONSTRUCTED OUT OF STEEL FRAME TUBING WITH PIVOT HINGES MOUNTED ON 6" STEEL PIPE BOLLARDS. PROPER LATCHING AND LOCK HARDWARE SHALL BE PROVIDED IN ORDER TO RESTRAIN AND/OR LOCK ENCLOSURE GATES SHADOW BOX FENCING, ATTACHED WITH 71r' GALC. CARRIAGE BOLTS, (SOLID COLOR STAIN) lil��llll�lll�111 2"-3" DIRT BACKFILL 0.31 UAIt PAINT PROVIDE SOLID 4" SUPPO WHEEL AND GALV. BRACK WOOD GA II PROVIDE SOLID 4" II SUPPORT WHEEL AND GALV. BRACKET 12'-0" 4x 1N 2x4 1 "-2" SPACE IF AN UNOBSTRUCTED VIEW EXISTS OF A RESIDENTIAL BUILDING BETWEEN TENANT PARCEL AND ADJACENT PARCEL, THEN LESSOR SHALL CONSTRUCT A PRIVACY FENCE IN ACCORDANCE WITH TENANT'S PROTOTYPE CRITERIA SET PLANS AND ANY APPLICABLE GOVERNMENTAL REQUIREMENTS. SIDE VIEW NOTE: 1. WOOD TO BE TREATED PINE. USE GALVANIZED NAILS FOR FASTENING. 2. NUMBER OF BOARDS WILL VARY DEPENDING ON SPACE BETWEEN BOARDS AND ACTUAL WIDTH OF BOARDS. — 4" DIA. SCHED. 40 PIPE W/SLOPED MTL. CAP ON TOP MAXIMUM 6-0" O.C. SET PIPE IN CONCRETE FOOTING MIN. V-0" DIA. TO FROST DEPTH (FILL PIPE W/CONC. TO 4'-0" ABOVE FIN. CONC. IN HIGH WIND LOAD LOCATIONS.) NOTES: 1. FOOTINGS SHALL EXTEND 3'-6" MINIMUM BELOW FINISH GRADE. 2. SEE CIVIL DRAWINGS FOR DUMPSTER ENCLOSURE LOCATION. 3. 8" THICK CONCRETE SLAB OVER 6" THICK CRUSHED AGGREGATE. 12"X12" THICKENED EDGE FOR APPROACH SLAB. #4 REBAR @ 2'-0" O.C. EACH WAY. 4. BOLLARDS IN TRASH ENCLOSURE TO BE PAINTED SAFETY YELLOW. 8" x 8" THICKENED EDGE GATE POSTS TO BE PAINTED BLACK EQ. EQ, 8" CONC. SLAB REINF. W/ W.W.F. 6"x6" - W2.9 TRASH ENCLOSURE PLAN xW2.9ON6" AGGREGATE BASE �L d w 6" BOLLARDS GATE POSTS TO BE PAINTED BLACK 6" BOLLARDS 0 60 o1 w d w z C901 5 C901 7 C901 RECEIVING DOOR RAMP STRIPING LEGEND YELLOW SURFACES SHOULD BE CLEAN, DRY AND CURBING METAL SURFACES FREE OF HEAVY RUST 2 AND BOLLARDS COATS SHERWIN WILLIAMS - KEM 4000 ACRYLIC ALKYD ENAMEL SAFETY YELLOW PARKING LOT B55Y300 STRIPING - SURFACES SHOULD BE CLEAN, DRY. TOP PARKING LOT COAT SHERWIN WILLIAMS - PROMAR TRAFFIC MARKING PAINT YELLOW TM5495 HANDICAP SURFACES SHOULD BE CLEAN, DRY. TOP STRIPING - COAT SHERWIN WILLIAMS - PROMAR PARKING LOT TRAFFIC MARKING PAINT "H.C." BLUE CONTRACTOR IS RESPONSIBLE FOR ALL PUBLIC UTILITY CONNECTIONS (ELECTRIC, WATER, GAS, SEPTIC, SEWER) AS WELL AS PROVIDING ALL INFRASTRUCTURES REQUIRED BY UTILITY COMPANY DEPRESSED CURB CHAIN LINK FENCING 10'-0" MAX. -�- 10'-0" MAX. CORNER POST RAIL END LINE POST 1-3/4" DIA. TOP CAP (TYP.) ASSEMBLY CAP (TYP.) RAIL (GALVANIZED STEEL PIPE) TENSION BANDS TENSION BAR — 3-1/2" DIA. TERMINAL POST (GALVANIZED STEEL PIPE) 8" DIA. 5000 P.S.I. (28 DAYS) CONCRETE PIERS @ CORNER POSTS (TYP.) EXISTING GRADE NOTE: FENCING TO BE TIED TO TOP RAILS AND LINE POSTS WITH # 9 GA. WIRE SPACED AT 12". BRACE ALL CORNERS & TERMINAL POSTS WITH 1-3/4" DIAMETER GALVANIZED STEEL PIPE & APPROPRIATE FASTENERS. 4'-0" - 9 GA. 2" MESH GALV. CHAIN LINK FENCE # 6 GA. TENSION WIRE -6" DIA. 5000 P.S.I. (28 DAYS) CONCRETE PIER @ EACH POST (TYP.) GRANULAR MATERIAL 12" 2-1/2" DIA. INTERMEDIATE POST (GALVANIZED STEEL PIPE) 0 v 2" MAX. 3 C901 6 C901 8 C901 CONCRETE SIDEWALK JOINTS TOOLED JOINTS WITH JOINT SEALER WOOD SCREENING FENCE _14LSPACING 4x4 1X6 FRONT 2X4 6" ROOF 8'-0" MAX. POST SPACING IF AN UNOBSTRUCTED VIEW EXISTS OF A RESIDENTIAL BUILDING BETWEEN TENANT PARCEL AND ADJACENT PARCEL, THEN LESSOR SHALL CONSTRUCT A PRIVACY FENCE IN ACCORDANCE WITH TENANT'S PROTOTYPE CRITERIA SET PLANS AND ANY APPLICABLE GOVERNMENTAL REQUIREMENTS. REARVIEW NOTE: 1. WOOD TO BE TREATED PINE. USE GALVANIZED NAILS FOR FASTENING. 2. NUMBER OF BOARDS WILL VARY DEPENDING ON SPACE BETWEEN BOARDS AND ACTUAL WIDTH OF BOARDS. SPLASHBLOCK 4 'REVIEW 035736 = S ���'�� TAN C . CN`�� .•��• 08/24/2020 4,4100II0III, �REC:Pq. NICBELSK-3448i 0. .....••.�P� �'•. CARP o" W Z W DETAILS PREPARED FOR: TERAMORE DE' PO BOX 6460 THOMASVILLE, JELOPMENT, LLC GA 31758 REVISIONS: SHEET SIZE: 24' x36" DATE: 06/15/2020 PROJECT NUMBER: 3160632019 DRAWN BY: J.EDWARDS APPROVED BY: J.CHURCH SCALE: NTS (H) (N) SHEET: C901 r W CJ� W w 0 U Q U� Q 0 \W\ W W m H U) z Q a_ 1 J U U) H 0 0 0 © COPYRIGHT 2020 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE. DETAIL4 CUCCT44 SAND FILTER SEE PLANS FOR ACTUAL LAYOUT MIN. 3FROM SOD TOE OF SLOPE SOD J- J J J CLEANOUTS I J J SEDIMENT CHAMBER I ! w . :; FILTERCHAMBER..: w SAND MEDIA ~ DAM DAM SEDIMENT CHAMBER .A. UTL`ET s o 0 OUTLET STRUCTURE SEE DETAIL 4" PERFORATED J J J S0DJ J J J PVC UNDERDRAINS J SOD J 562.00 TOP OF DAM #57 WASHED STONE 1r 2' DAM — CLEANOUTS Q� EMERGENCY SPILLWAY 560.00 / �O ELEV.=561.00 559.00 558.00 SOD �' 8 3' ::.;...: ; :; .`' 3' 8 SOD 3" WASHED STONE SHWT < = 550.00 (SEE GEO-TECH REPORT) SECTION VIEW W OUTLET STRUCTURE SOD SOD T CLEANOUTS PVC CAP 11 559.00 TOP OF SAND .III=III= 111111111E III II I. =1II=1 557.50 TOP OF #57 STONE 1�1 �11111 II1 OUTLET111� CLEANOUT DETAIL -"'-' 556.50 NOTES: 18" OF COURSE MASONRY SAND 1. ENSURE OUTLET STRUCTURE IS INSTALLED OUTSIDE OF CONFORMING TO ASTM C33 STANDARD SAND MEDIA. 2. ALL DRAINAGE AREAS TO THE SAND FILTER ARE TO BE #57 STONE STABILIZED PRIOR TO INSTALLATION OF AMENDED SAND. 3. PVC UNDERDRAIN PIPE SHOULD HAVE 3/8" 4" PERFORATED PVC PERFORATIONS SPACED AT 6" CENTERS. MIN. 4 HOLES UNDERDRAINS @ 0.5% SLOPE PER ROW. MAX SPACING OF UNDERDRAIN PIPE IS 10 ALL MATERIAL LAYERS TO BE SEPARATED BY 80Z FEET ON CENTER. HDPE SHALL ADHERE TO AASHTO M252 SPECS. NON -WOVEN GEO-TEXTILE FILTER FABRIC 4. UNDERDRAIN CLEANOUTS SHOULD EXTEND A MIN. OF 6" SECTION VIEW'B' ABOVE SAND SURFACE. 5. ALL SOD WITHIN BASIN SMALL BE BERMUDA GRASS OR EQUALIANT GROWN IN SANDY SOIL. 6 C902 TEMPORARY EXCLUSION FENCE FENCE MATERIAL: ORANGE, UV RESISTANT HIGH TENSILE STRENGTH POLYETHYLENE LAMINAR n n nM—A— rn Mn I I i _ ­1.. v .... . vv . z C902 GROUT INTERIOR WALLS 3' x 3PRE-CAST CATCH BASIN MEETING OR EXCEEDING NCDOT STD. 840.45 STORM RAX PEAK ROOF STRUCTURE TRASH RACK OR APPROVED EQUAL i SCM OUTLET STRUCTURE STORM RAX PEAK ROOF STRUCTURE TRASH RACK OR APPROVED EQUAL WEIR ELEV. = 559.75 18" HDPE I I I NV. = 556.50 4" PVC INV. = 556.50 9" CONCRETE • : 555.75 #57 WASHED STONE COMPACTED I NOTES: 1. USE MONOLITHIC STRUCTURE WHERE POSSIBLE. IF RISERS ARE REQUIRED, THEY MUST BE MECHANICALLY ANCHORED TO PRIMARY STRUCTURE. 2. ENSURE ALL STRUCTURE JOINTS AND PIPE PENETRATIONS ARE WATER TIGHT. USE BUTYL SEALANT OR OTHER GASKET METHOD TO SEAL JOINTS BETWEEN STRUCTURE SECTIONS. GROUT INTERIOR STRUCTURE WALLS AND PIPE CONNECTIONS. 4 C902 CONCRETE BRICK OR PRE -CAST BOX #4 BAR AT 8" 0.C.E.W. 6" #57 STONE COMPACTED 7 C902 CURB INLET 1" RADIUS UNLESS OTHERWISE SPECIFIED INLET FRAME & GRATE USF 5181-6420 FOR SAG INLETS & USF 5130-6431 FOR ON GRADE INLETS UNLESS SPECIFIED OTHERWISE CONC.GROUT blidUCENMROWliff m Z Isle] I[exel:Ze1111 MANHOLE CONCRETE COLLAR J 3 C902_ JUNCTION BOX MANHOLE LID AND FRAME ( USF 669 KL COVER UNLESS PAVEMENT OR BACKFILL OTHERWISE SPECIFIED) (SEE PLAN) OOTING BEYOND I I=ICI—ICI—ICI—ICI ! .. I I I —I I I —ICI � ' •: •' ' •• ••. •...:. •. :: ..=1�1=1�1 ;I� III=1 I I=1 I I —III —I ... •...:• , 4 • ::. �..:.. '. • .... _ •, .• , 1 I _III ..III=1 1=1 11 .. GROINI-III—III—I I d III —III —I . ° ,�. .:. IEI I IE] I I _: „ :. :. .. * •: •� : d .� . UT TEROR_ _ _III=III-, . •• „ :. •' • , , . ' WALLS I11=1 I I— d • I=1 �_ - � I, � I I I —III 4, • : •' =III-_ STEP REQ D FOR ' !Rl .••BOXES > 4'DEEPPRE-CAST CATCH BASIN" • • a' IAT 10 O.C. PER D.O.T. HEAVY DUTY •.•. ; TRAFFIC RATING. ROUND I i4 ' •...• PRE -CAST CAN BE " • "!'" • SUBSTITUTED FOR SQUARE '' a •. ''• ° .'• a . d i a , .:•:: • r r • : • - L•• ... . Aw LPRECAST LID #4 BAR AT 8" O.C.E.W. 6" #57 STONE COMPACTED 5 C902 STEP REQ'D FOR GROUT INTERIOR BOXES > 4' DEEP WALLS AT 10" O.C. BASIN: NDS# 1200&1216 PRE -CAST CATCH BASIN PER D.O.T. HEAVY-DUTY TRAFFIC RATING. ROUND PRE -CAST CAN BE SUBSTITUTED FOR SQUARE 6" OF #57 STONE COMPACTED YARD INLET L-- #4 REBAR AT 8" O.C.E.W. INLET FRAME AND GRATE (USF 4131-6259) L— FOOTING BEYOND 000 o00 • � o00 •1 0 0 0 . o00 0 0 0 •I o00 •� I• 000 . • I.. o0o 0 0 0 0 0 0 • o00 . • o00 0 0 0 CONC. GROUT CAR REVIEW 035736 A/GINE��G�: ��'�� TAN C . cN� �•• 08/24/2020 .•'�� BREC: Pq. ���'-. NCBELS#C-3448? Z �'•. CARD W ti z � U W z , � z w w � � w O� J DETAILS PREPARED FOR: TERAMORE DE' PO BOX 6460 THOMASVILLE, JELOPMENT, LLC GA 31758 DATE: REVISIONS: SHEET SIZE: 24"x36" DATE: 06/15/2020 PROJECT NUMBER: 3160632019 DRAWN BY: J.EDWARDS APPROVED BY: J.CHURCH SCALE: NTS (H) (N) SHEET: C902 r W w W w 2i 0 U Q U� Q 0 W W m U� z J a_ J U U� 0 O 0 © COPYRIGHT 2020 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE. 1 C903 TEMPORARY GRAVEL CONSTRUCTION ENTRANCE GENERAL NOTES: 1. A STABILIZED ENTRANCE PAD OF COARSE AGGREGATE OR RAILROAD BALLAST SHOULD BE LOCATED WHERE TRAFFIC WILL ENTER OR LEAVE THE CONSTRUCTION SITE ONTO A PUBLIC STREET. 2. FILTER FABRIC OR COMPACTED CRUSHER RUN STONE SHOULD BE USED AS A BASE FOR THE CONSTRUCTION ENTRANCE. 3. THE ENTRANCE SHOULD BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC STREETS OR EXISTING PAVEMENT. THE MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS WARRANT AND REPAIR OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 4. ANY SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO PUBLIC STREETS MUST BE REMOVED IMMEDIATELY. 5. WHEN APPROPRIATE, WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET. WHEN WASHING IS REQUIRED, IT SHOULD BE DONE IN AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT BASIN. 6. CDOT MAY REQUIRE A STANDARD COMMERCIAL DRIVEWAY TO ACCESS THE CONSTRUCTION SITE IF THE DRIVEWAY IS ON A THROUGHFARE. 7. PLEASE REFER TO NCESCPDM SECTION #6.06 FOR ADDITIONAL DESIGN SPECIFICATIONS REGARDING TEMPORARY GRAVEL CONSTRUCTION ENTRANCES/EXITS. MAINTENANCE NOTES: MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. 4 C903 3 X Do 6" MIN EXISTING GROUN 50' MIN PUBLIC STREET SOIL STABILIZATION FABRIC UNDER 2-3" COARSE AGGREGATE LL LL U J m STANDARD PIPE OUTLET MINIMUM_ TAILWATER IF L/'114 VILVV LA GENERAL NOTES: 1. LA = THE LENGTH OF THE RIPRAP APRON. 2. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6" (INCHES). 3. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. MAINTENANCE NOTES: W = Do+ LA INSPECT RIPRAP OUTLET STRUCTURES WEEKLY AND AFTER SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENTS TO SEE IF ANY EROSION AROUND OR BELOW THE RIPRAP HAS TAKEN PLACE, OR IF STONES HAVE BEEN DISLODGED. IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER DAMAGE. z C903 WIRE FEil'! WOVEN FILTER FABF SILT FENCE 8' MAX mi GENERAL NOTES: 1. USE A SYNTHETIC FILTER FABRIC OF AT LEAST 950/c BY WEIGHT OF POLYOLEFINS OR POLYESTER, WHICH IS CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THE REQUIREMENTS IN ASTM D 6461, WHICH IS SHOWN IN PART IN TABLE 6.62b. 2. SYNTHETIC FILTER FABRIC SHOULD CONTAIN ULTRAVIOLET RAY INHIBITORS AND STABILIZERS TO PROVIDE A MINIMUM OF 6 MONTHS OF EXPECTED USABLE CONSTRUCTION LIFE AT A TEMPERATURE RANGE OF 0 TO 120• F. 3. ENSURE THAT POSTS FOR SEDIMENT FENCES ARE 1.25 LB/LINEAR FT MINIMUM STEEL WITH A MINIMUM LENGTH OF 5 FEET. MAKE SURE THAT STEEL POSTS HAVE PROJECTIONS TO FACILITATE FASTENING THE FABRIC. 4. FOR REINFORCEMENT OF STANDARD STRENGTH FILTER FABRIC, USE WIRE FENCE WITH A MINIMUM 14 GAUGE AND A MAXIMUM MESH SPACING OF 6 INCHES. 5. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS. 6. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24 INCHES ABOVE THE GROUND SURFACE. (HIGHER FENCES MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE.) 7. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4 FEET MINIMUM OVERLAP TO THE NEXT POST. 8. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS. EXTEND THE WIRE MESH SUPPORT TO THE BOTTOM OF THE TRENCH. FASTEN THE WIRE REINFORCEMENT, THEN FABRIC ON THE UPSLOPE SIDE OF THE FENCE POST. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. 5 C903 NC W STEEL POST WIRE FENCING FILTER FABRIC #57 STONE 30" MIN Lu OQ� ��m 5� N U- 1 LaiF-FkA 8" MIN 4" MIN 9. WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS A MAXIMUM OF 8 FEET APART. SUPPORT POSTS SHOULD BE DRIVEN SECURELY INTO THE GROUND A MINIMUM OF 24 INCHES. 10. EXTRA STRENGTH FILTER FABRIC WITH 6 FEET POST SPACING DOES NOT REQUIRE WIRE MESH SUPPORT FENCE. SECURELY FASTEN THE FILTER FABRIC DIRECTLY TO POSTS. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. 11. EXCAVATE A TRENCH APPROXIMATELY 4 INCHES WIDE AND 8 INCHES DEEP ALONG THE PROPOSED LINE OF POSTS AND UPSLOPE FROM THE BARRIER. 12. PLACE 12 INCHES OF THE FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH. 13. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT. THOROUGH COMPACTION OF THE BACKFILL IS CRITICAL TO SILT FENCE PERFORMANCE. 14. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES. MAINTENANCE NOTES: 1. INSPECT SEDIMENT FENCE AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. 4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. HARDWARE CLOTH AND GRAVEL INLET_ PROTECTION_ 4' MAX 1A-rl IArF HARnkA/ARF ri (NTH 3 C903 6 C903 TEMPORARY DIVERSION nnRMnAnTCn CnH 2' MIN GENERAL NOTES: 1. REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS AND OTHER OBJECTIONABLE MATERIAL. 2. ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION MEETS ALL DESIGN REQUIREMENTS. 3. ENSURE THAT THE TOP OF THE DIKE IS NOT LOWER AT ANY POINT THAN THE DESIGN ELEVATION PLUS THE SPECIFIED SETTLEMENT. 4. PROVIDE SUFFICIENT ROOM AROUND DIVERSION TO PERMIT MACHINE REGARDING AND CLEANOUT. 5. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION, UNLESS IT WILL REMAIN IN PLACE LESS THAN 30 WORKING DAYS. MAINTENANCE NOTES: 1. INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE LOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVED THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE IT. STONE OUTLET GENERAL NOTES: 1. STRUCTURAL STONE SHALL BE (CLASS B) STONE FOR EROSION CONTROL PURPOSES. 2. SEDIMENT CONTROL STONE SHALL BE #5 OR #57 STONE. STEEL FENCE POST GENERALNOTES: 1. UNIFORMLY GRADE A SHALLOW DEPRESSION APPROACHING THE INLET. #57 STONE 12 L NC DOT #5 OR #57 2. DRIVE 5-FOOT STEEL POSTS 2 INTO THE GROUND SURROUNDING THE INLET. SPACE POSTS EVENLY AROUND THE V-6" MIN. A WASHED STONE PERIMETER OF THE INLET, A MAXIMUM OF 4 FEET APART. 3. SURROUND THE POSTS WITH WIRE MESH HARDWARE CLOTH. SECURE THE WIRE MESH TO THE STEEL POSTS AT THE VV TOPS, MIDDLE AND BOTTOM. PLACING A 2-FOOT FLAP OF THE WIRE MESH UNDER THE GRAVEL FOR ANCHORING IS FL 3 MAX. RECOMMENDED. 4. PLACE CLEAN GRAVEL (NCDOT #5 OR #57 STONE) ON A 21 SLOPE WITH A HEIGHT OF 16 INCHES AROUND THE WIRE, AND II SMOOTH TO AN EVEN GRADE. SEDIMENT 5. ONCE THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVED ACCUMULATED SEDIMENT, AND ESTABLISH CONTROL STONE FINAL GRADING ELEVATIONS. II 6. COMPACT THE AREA PROPERLY AND STABILIZED IT WITH GROUND WATER STRUCTURAL STONE MAINTENANCE: u FILTER FABRIC INSPECT INLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICATION (z INCH OR GREATER) RAINFALL EVENT. CLEAR THE MESH SECTION VIEW SECTION'A-A' WIRE OF ANY DEBRIS OR OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. TAKE CARE NOT TO DAMAGE OR UNDERCUT THE WIRE MESH DURING SEDIMENT CONTROL. REPLACE STONE AS NEEDED. 0 m z O 1O0' TO 200' P REPARED ~Q .4 Z Dco O 4BX X Q mZ�'=1 2W 20' LLJdHZ = m a © DI DI W Q z LL = q- .. Tz- H-U�00 0-n ZH�or- N21-z111 (7 m D y' ♦ ♦ WORK AREA ♦ M� 0 0 z P-1 i 110 b B IQ ® llYO-MY OONX d ED-i y 0 i RAFFEc STREAM TTAPER W p z N BO' BUFFER BUFFER TAPER Mix. so'-1o0' � sracE SPACE ioa' HSE E PREPAEED � TQ STOP O 4-4 4B ,B x 4B^ iB X 4B INSET FOR 2 LANE ROADWAYS o WITH 2-WAY TURN LANE Uj ALL OTHER DEVICES ARE THE SAME AS ABOVE N O Z m z Cr o W v .. 3 G) y LL M r N O H-I CBJI® IANE ♦ CENEBt 4NE ttosEo Sr WORK AREA ♦ Jr ct05ED I=w W of z = W20-6 ♦ W20-5 iB^ x ee" F-1 0 Q 2 ie" x ie'• ♦♦ ♦ J Q J < m d V T o..R TRAFFI o yr o TAPERQ BUFFER BUFFER TAPER Q Z y 0 >D m 50'-100' BPAQE BPACE iBB' CC 'Q Q D 0 J ¢O m GENERAL NOTES FOR FLAGGER OPERATIONS GENERAL NOTES FOR PILOT CAR OPERATIONS z 0 1- REFER TO STD. 1101.11 SHEET 4 FOR SIGN SPACING. 1- USE PILOT CARS WHEN DIRECTED BY THE ENGINEER. Q 2 j (7 = D 2- INSTALL LANE CLOSURES WITH THE TRAFFIC FLOW, BEGINNING WITH DEVICES ON THE 2- IF ROADWAY WIDTH IS LESS THAN 22 FEET (EDP TO EDP) CONES MAY NOT BE REQUIRED UPSTREAM SIDE OF TRAFFIC. ALONG WORK AREA AND AT THE DISCRETION OF THE ENGINEER, CONES MAY BE OMITTED ALONGdr G7 �. i O � 3- REMOVE LANE CLOSURES AGAINST THE TRAFFIC FLOW, BEGINNING WITH DEVICES ON THE THE WORK AREA I� USING A PILOT CAR. = C}� Zy z DOWNSTREAM SIDE OF TRAFFIC. 3- CONES ARE ALWAYS REQUIRED IN THE UPSTREAM AND DOWNSTREAM TAPERS. 2 O M C O 4- PLACE CONES 7HRU THE WORK AREA AT THE MAXIMUM SPACING EQUAL IN FEET TO 2 TIMES 4- MOUNT SIGN G20-4 "PILOT CAR FOLLOW ME" AT A CONSPICUOUS POSITION ON THE REAR OF N J a .A m THE POSTED SPEED LIMIT. THE PILOT VEHICLE. C7 r0 5 PROVIDELANMILE TSHEETT2�PING SIGHT DISTANCE IS 5- OF THE ME GE TAPERETOf1THE ONE (1) TO THESFRLAGGER REFERFTO ELANE CLOSURE. " MEASURED FROM THE BEGINNING W P. Q STD.1 101.11 CD 6- DO NOT STOP TRAFFIC IN ANY ONE DIRECTION FOR MORE THAN 5 MINUTES AT A TIME. 6 ADVISm SAFE EGRESS RESIDENTSBUSSS FHOMSDRIVEWAYS DURING ELCLOSURE AGGING ALIMIND TS ABOUT T CAR METHODS OF. NS J 7- DRUMS OR SKINNY -DRUMS MAY BE USED IN LIEU OF CONES. REFER TO ROADWAY STANDARD DRAWING 1180.01 FOR SKINNY -DRUM REQUIREMENTS. N 8- USE FLAGGERS TO CONTROL TRAFFIC AT INTERSECTIONS AFFECTED BY THE LANE CLOSURE. LEGEND SUPPLEMENT FLAGGERS LOCATED AT INTERSECTIONS WITH FLAGGER AHEAD SIGNS W20-7a) PLACED APPROXIMATELY 25U FT. IN ADVANCE OF THE FLAGGER. FOR SIGNALIZE r FLAGGER INTERSECTIONS PLACE SIGNALS IN THE FLASH MODE AND RECOMMEND THE USE OF LAW ENFORCEMENT. ♦ GONE 9- REFER TO 2009 MUTCD, CHAPTER 6, FOR FLAGGER CONTROL, REQUIREMENTS, AND PROCEDURES. IQ PORTABLE SIGN 10- DO NOT EXCEED A 1 MILE LANE CLOSURE LENGTH UNLESS OTHERWISE SHOWN IN THE TMP OR DIRECTION OF TRAFFIC FLOW AS DIRECTED BY THE ENGINEER. HEET 1 OF 15 SHEET 1 OF 15 11101.021 1101 .OS CONTINUOUS LINES 10'-30'/SP SKIP LINE 2'-6'/SP MINI -SKIP LINE z m o� o} -I UNLESS OTHERWISED SHOWN, USE 10'-30'/SP SKIPS FOR SKIP LANE LINES AND SKIP CENTER LINES. UNLESS OTHERWISED SHOWN, USE 2'-6'/SP MINI -SKIPS FOR LANE LINE EXTENSIONS THROUGH INTERSECTIONS, EDGE LINE r py Z .Z1� 0 EXTENSIONS THROUGH INTERSECTIONS AND MINI -SKIPS Q Q H- D EH 0 0 EDGE LINE 10 30' USED FOR BICYCLE LANE LINES. H U 0 _ M Z D Cm YELLOW OR WHITE 4 /6 LL J 8 C' z O cc DDT Q 0�4"/6" 2' 6' HUQOx Cn O zH=-n o0 LANE LINE YELLOW OR WHITE T o 0 4"16" Q i0y ��LLzo J C) E0 ~ 2 z 4"/6" YELLOW OR WHITE lL O Pti Q O O ' � D D WHITE � z EH 3'-3'/SP MINI -SKIP LINE 3'-9'/SP MINI -SKIP LINE m~ r OL W Z CENTER LINE 4' 15' UNLESS OTHERWISED SHOWN, USE 3'-3'/SP MINI -SKIPS FOR THE WHITE EDGE LINE EXTENSTONS AT ROUNDABOUTS. UNLESS OTHERWISED SHOWN, USE 3'-9'/SP MINI -SKIPS FOR MINI -SKIP LANE LINES AND LINE EXTENSIONS THROUGH TAPERS. YELLOW GORE LINE 3 9 O O 4"(6" 81,112" 7-7 12' WHITE WHITE WHITE 00 LINE -1 12" 45 MPH OR HIGHER 2 o LL Pti z O 8" LESS THAN 45 MPH Z ca W m C = YELLOW OR WHITE F-E Z y �3cn ¢MUL M n UL o o m Z zo -4 CROSSWALK LINE l J- 8" o z D z O WHITE TRANSVERSE 24" LONGITUDINAL QO I-- N o 0 �z`Za D ~ -n RxR LINE IS In Z E� _ w Lu mC)z 1 O In N 16" Inaz �"i J CL O WHITECD J z 2 W STOP OR TRANSVERSE BA GENERAL NOTES: 1- USE 6" LANE, EDGE, AND CENTER LINES ON ALL FULL CONTROL OF ACCESS FACILITIES AND OTHER ROUTES 24" AS DIRECTED BY THE ENGINEER. WHITE 2- LANE LINES INDICATED AS "WIDE" ON THE ROADWAY STANDARD DRAWINGS SHALL BE AT LEAST TWICE THE WIDTH OF THE NORMAL LINE. 3- GORE LINES SHALL BE TWICE THE WIDTH OF THE NORMAL LINE. SHEET 1 OF 2 SHEET 1 OF 2 1205.01 1205.01 0 STRAIGHT ARROW1 RIGHT OR LEFT COMBINATION STRAIGHT AND COMBINATION LEFT AND z orri TURN ARROW LEFT OR RIGHT TURN ARROW RIGHT TURN ARROW O r~ -n --j CD M f-E Z = D 20" 8' 4r� 36" 8,r 20 3B' DIMENSIONS APPLY AS FOR THE LEFT/RIGHT TURN ARROW Z F Hy 2 C7 U LL � 0- = Z Do�n� xTDDm - z N e" _ 1W-V¢ox c�==z m N m Qpl Q COMBINATION LEFT AND STRAIGHT D 14" AND RIGHT TURN ARROW z N O H rz, i�y R=40" m CL LLIZ a a N R=28" N 4"FOR SAME DIMENSIONS APPLY AS THE COMBINATION STRAIGHT12° AND LEFT/RIGHT TURN ARROW 0 32' 12" 6'-4" MERGE ARROW RAMP ARROW U) Z -< O r m o FOR WRONG -WAY MOVEMENTS 10'-0., ON FREEWAY AND EXPRESSWAY RAMPS Cr LL W p C = ED PAVEMENTCRYSTAL R MARKER H Z In rn a o 8,p0,. 1 Co 2'-6" v �r1r" 'Y N W �SG� D3- m D z 8r__. �- LOF RAMP OO OY¢< Wm Z 16-8 O W N U) z my0 TDO• N O �,Qm a -n 0 GENERAL NOTES: 1- USE THE COLOR WHITE FOR ALL PAVEMENT MARKING SYMBOLS. RAMP ARROW AT EXIT RAMP J 0 W In 2- 00 NOT LOCATE PAVEMENT MARKING SYMBOLS AS TO ENCROACH INTO INTERSECTION AREAS. - 3- DO NOT PLACE PAVEMENT MARKING SYMBOLS ACROSS TRANSVERSE EXPANSION JOINTS ON PORTLAND CEMENT CONCRETE PAVEMENTS, « UNLESS APPROVED BY THE ENGINEER. 4- CONFORM ALL SYMBOLS TQ THE FHWA "STANDARD ALPHABETS FOR HIGHWAY SIGNS AND PAVEMENT MARKINGS", (REFER TO SHEETS 5 THRU 8). SYMBOL DIMENSIONS CAN VARY AMONG MANUFACTURERS, THEREFORE SLIGHT VARIANCES ARE ACCEPTABLE, HOWEVER, ALL SYMBOLS ARE REQUIRED TO BE APPROVED BY THE DEPARTMENT. RAMP ARROW AT EXITRAMP A..,,/ 1pOY "205 HEE/T�1 O S11205 1205. Up I� 1), RAAY FRONT VIEW nil T rrNlr r: �N CARP S . <�2 \ Q •FE S/O . �O rREVIEW 035736 = ••�NG1NE��'� Gam: S .... ///1111110 \\ 08/24/2020 t"'4469100", BREC: P;9. p0Pq r ; NCBELSK-34481 Z �'•. � CARO ,�. W Z W r-� DETAILS PREPARED FOR: TERAMORE DE' PO BOX 6460 THOMASVILLE, M U C-0 Z N z LU LU 0 ry w 0 W JELOPMENT, LLC GA 31758 DATE: REVISIONS: SHEET SIZE: 24"x36" DATE: 06/15/2020 PROJECT NUMBER: 3160632019 DRAWN BY: J.EDWARDS APPROVED BY: J.CHURCH SCALE: NTS (H) (N) SHEET: C903 © COPYRIGHT 2020 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE. 1 C904 PL INFLOW AVERAGE_ WIDTH * AREA OF SURFACE / PRIMARY S INFLOW FILTER FABRIC SKIMMER SEDIMENT BASIN 1' rKtttiUHKU BAFFLES 6" MIN. INVERT ELEV. OF EMERGENCY SPILLWAY 2' DEWATERING r ZONE ARM ASSE""' " IIII- I "' 1' SEDIMENT CLASS B STONE PAD STORAGE ZONE (4' x 4' x V MIN.) CROSS-SECTION VIEW PERSPECTIVE VIEW PVC END CAP PVC ELBOW Z7PVC END CAP PVC PIPE 1/2" HOLES IN PVC TEE UNDERSIDE FLEXIBLE HOSE WATER SURFACE SCHEDULE 40 PVC PIPE A RGENCY -LWAY EMBANKMENT EMERGENCY SPILLWAY - "C" ENCLOSURE WATER ENTRY UNIT PVC VENT SCHEDULE 40 PIPE _N, ,-, PVC PIPE PVC TEE END VIEW FRONT VIEW NOTE: 1. ALL SKIMMERS SHALL BE FAIRCLOTH SKIMMERS UNLESS OTHERWISE SPECIFIED. ORIFICE PLATE BOTTOM SURFACE GENERAL NOTES: 1. CLEAR, GRUB AND STRIP THE AREA UNDER THE EMBANKMENT OF ALL VEGETATION AND ROOT MAT. REMOVE ALL SURFACE SOIL CONTAINING HIGH AMOUNTS OF ORGANIC MATTER AND STOCKPILE OR DISPOSE OF IT PROPERLY. HAUL ALL OBJECTIONABLE MATERIAL TO THE DESIGNATED DISPOSAL AREA. PLACE TEMPORARY SEDIMENT CONTROL MEASURES BELOW BASIN AS NEEDED. 2. ENSURE THAT FILL MATERIAL FOR THE EMBANKMENT IS FREE OF ROOTS, WOODY, VEGETATION, ORGANIC MATTER AND OTHER OBJECTIONABLE MATERIAL. PLACE THE FILL IN LIFTS NOT TO EXCEED 9 INCHES, AND MACHINE COMPACT IT. OVER THE FILL EMBANKMENT 6 INCHES TO ALLOW FOR SETTLEMENT. 3. SHAPE THE BASIN TO THE SPECIFIED DIMENSIONS. PREVENT THE SKIMMING DEVICE FROM SETTLING INTO THE MUD BY EXCAVATING A SHALLOW PIT UNDER THE SKIMMER OR PROVIDING A LOW SUPPORT UNDER THE SKIMMER OF STONE OR TIMBER. 4. PLACE THE BARREL *TYPICALLY 4-INCH SCHEDULE 40 PVC PIPE) ON A FIRM, SMOOTH FOUNDATION OF IMPERVIOUS SOIL. DO NOT USE PERVIOUS MATERIAL SUCH AS SAND, GRAVEL OR CRUSHED STONE AS BACKFILL AROUND THE PIPE. PLACE THE FILL MATERIAL AROUND THE PIPE SPILLWAY IN 4-INCH LAYERS AND COMPACT IT UNDER AND AROUND THE PIPE TO AT LEAST THE SAME DENSITY AS THE ADJACENT EMBANKMENT. CARE MUST BE TAKEN NOT TO RAISE THE PIPE FROM THE FIRM CONTACT WITH ITS FOUNDATION WHEN COMPACTING UNDER THE PIPE HAUNCHES. 5. ASSEMBLE THE SKIMMER FOLLOWING THE MANUFACTURES INSTRUCTIONS OR AS DESIGNED. 6. LAY THE ASSEMBLED SKIMMER ON THE BOTTOM OF THE BASIN WITH THE FLEXIBLE JOINT AT THE INLET OF THE BARREL PIPE. ATTACH THE FLEXIBLE JOIN TO THE BARREL PIPE AND POSITION THE SKIMMER OVER THE EXCAVATED PIT OR SUPPORT. BE SURE TO ATTACHED A ROPE TO THE SKIMMER AND ANCHOR IT TO THE SIDE OF THE BASIN. THIS WILL BE USED TO PULL THE SKIMMER TO THE SIDE FOR MAINTENANCE. 7. EARTHEN SPILLWAYS - INSTALL THE SPILLWAY IN UNDISTURBED SOIL TO THE GREATEST EXTENT POSSIBLE. THE ACHIEVEMENT OF PLANNED ELEVATIONS, GRADE, DESIGN WIDTH AND ENTRANCE AND EXIT CHANNEL SLOPES ARE CRITICAL TO THE SUCCESSFUL OPERATION OF THE SPILLWAY. THE SPILLWAY SHOULD BE LINED WITH LAMINATED PLASTIC OR IMPERMEABLE GEOTEXTILE FABRIC. THE FABRIC MUST BE WIDE AND LONG ENOUGH TO COVER THE BOTTOM AND SIDES AND EXTEND ONTO THE TOP OF THE DAM FOR ANCHORING IN A TRENCH. THE EDGES MAY BE SECURED WITH 8-INCH STAPLES OR PINS. THE FABRIC MUST BE LONG ENOUGH TO EXTEND DOWN THE SLOPE AND EXIT ONTO STABLE GROUND. THE WIDTH OF THE FABRIC MUST BE ON PIECE, NOT JOINED OR SPLICED; OTHERWISE THE WATER CAN GET UNDER THE FABRIC. IF THE LENGTH OF THE FABRIC IS INSUFFICIENT FOR THE ENTIRE LENGTH OF THE SPILLWAY, MULTIPLE SECTIONS, SPANNING THE COMPLETE WIDTH, MAY BE USED. THE UPPER SECTION(S) SHOULD OVERLAP THE LOWER SECTIONS(S) SO THAT WATER CANNOT FLOW UNDER THE FABRIC. SECURE THE UPPER EDGE AND SIDES OF THE FABRIC IN A TRENCH WITH STAPLES OR PINS. 8. INLET - DISCHARGE WATER INTO THE BASIN IN A MANNER TO PREVENT EROSION. USE TEMPORARY SLOPE DRAINS OR DIVERSION WITH OUTLET PROTECTION TO DIVERT SEDIMENT LADEN WATER TO THE UPPER END OF THE POOL AREA TO IMPROVE BASIN TRAP EFFICIENCY. 9. EROSION CONTROL - CONSTRUCT THE STRUCTURE SO THAT THE DISTURBED AREA IS MINIMIZED. DIVERT SURFACE WATER AWAY FROM THE BARE AREAS. COMPLETE THE EMBANKMENT BEFORE THE AREA IS CLEARED. STABILIZE THE EMERGENCY SPILLWAY EMBANKMENT AND ALL OTHER DISTURBED AREAS ABOVE THE CREST OF THE PRINCIPAL SPILLWAY IMMEDIATELY AFTER CONSTRUCTION. 10. INSTALL POROUS BAFFLES AS SPECIFIED IN PRACTICE 6.65. 11. AFTER ALL THE SEDIMENT -PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS AND STABILIZE PROPERLY. MAINTENANCE NOTES: 1. INSPECT SKIMMER SEDIMENT BASINS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVED SEDIMENT AND RESTORE THE BASIN TO ITS ORIGINAL DIMENSIONS WHEN SEDIMENT ACCUMULATES TO ONE-HALF THE HEIGHT OF THE FIRST BAFFLE. PULL THE SKIMMER TO ONE SIDE SO THAT THE SEDIMENT UNDERNEATH IT CAN BE EXCAVATED. EXCAVATE THE SEDIMENT FROM THE ENTIRE BASIN, NOT JUST AROUND THE SKIMMER OR THE FIRST CELL. MAKE SURE VEGETATION GROWING IN THE BOTTOM OF THE BASIN DOES NOT HOLD DOWN THE SKIMMER. 2. REPAIR THE BAFFLES IF THEY ARE DAMAGED. RE -ANCHOR THE BAFFLES IF WATER IS FLOWING UNDERNEATH OR AROUND THEM. 3. IF THE SKIMMER IS CLOGGED WITH TRASH AND THERE IS WATER IN THE BASIN, USUALLY JERKING ON THE WILL MAKE THE SKIMMER BOB UP AND DOWN AND DISLODGE THE DEBRIS AND RESTORE FLOW. IF THIS DOES NOT WORK, PULL THE SKIMMER OVER TO THE SIDE OF THE BASIN AND REMOVE THE DEBRIS. ALSO CHECK THE ORIFICE INSIDE THE SKIMMER TO SEE IF IT IS CLOGGED; IF SO REMOVE THE DEBRIS. 4. IF THE SKIMMER ARM OR BARREL PIPE IS CLOGGED, THE ORIFICE CAN BE REMOVED AND THE OBSTRUCTION CLEARED WITH A PLUMBER'S SNAKE OR BY FLUSHING WITH WATER. BE SURE AND REPLACE THE ORIFICE BEFORE REPOSITIONING THE SKIMMER. 5. CHECK THE FABRIC LINED SPILLWAY FOR DAMAGE AND MAKE ANY REQUIRED REPAIRS WITH FABRIC THAT SPANS THE FULL WIDTH OF THE SPILLWAY. CHECK THE EMBANKMENT, SPILLWAYS AND OUTLET FOR EROSION DAMAGE, AND INSPECT THE EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE ALL TRASH AND OTHER DEBRIS FROM THE SKIMMER AND POOL AREAS. 6. FREEZING WEATHER CAN RESULT IN ICE FORMING IN THE BASIN. SOME SPECIAL PRECAUTIONS SHOULD BE TAKEN IN THE WINTER TO PREVENT THE SKIMMER FROM PLUGGING WITH ICE. z C904 INLET PLAN VIEW FENCE AND FABRIC BURIED IN TRENCH 6"X6" TRENCH, BACKFILLED AND COMPACTED SECTION VIEW AT OPENING STEEL POST 2' BAFFLE GENERAL NOTES: 1. BAFFLE MATERIAL SHOULD BE SECURED AT THE BOTTOM AND SIDES USING STAPLES OR BY TRENCHING AS FOR SILT FENCE. 2. MOST OF THE SEDIMENT WILL ACCUMULATE IN THE 1 ST BAY, WHICH SHOULD BE READILY ACCESSIBLE FOR MAINTENANCE. 3. PROVIDE 3 BAFFLES (USE TWO IF LESS THAN 20 FEET IN LENGTH). PROVIDE 5 BAFFLES FOR DRAINAGE AREAS GREATER THAN 10 ACRES. 4. BAFFLE SHALL BE 700 G/M2 COIR EROSION BLANKET. 5. TOPS OF BAFFLES SHOULD BE 2 INCHES LOWER THAN THE TOP OF THE BERMS. 6. INSPECT BAFFLES FOR REPAIR ONCE A WEEK AND AFTER EACH RAINFALL. 7. PLEASE REFER TO NCESCPDM SECTION #16.65 FOR ADDITIONAL DESIGN SPECIFICATIONS REGARDING BAFFLES. OUTLET MAINTENANCE NOTES: 1. INSPECT BAFFLES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. BE SURE TO MAINTAIN ACCESS TO THE BAFFLES. SHOULD THE FABRIC OF A BAFFLE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3. REMOVE SEDIMENT DEPOSITS WHEN IT REACHES HALF FULL TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE BAFFLES. TAKE CARE TO AVOID DAMAGING THE BAFFLES DURING CLEANOUT. SEDIMENT DEPTH SHOULD NEVER EXCEED HALF THE DESIGNED STORAGE DEPTH. 4. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED, REMOVE ALL BAFFLE MATERIALS AND UNSTABLE SEDIMENT DEPOSITS, BRING THE AREA TO GRADE AND STABILIZE IT. SUPPORT ROPE TO WIRE TO PREVENT I SAGGING SUPPORT POST, 24" INTO BOTTOM OR SIDE STAKE TO SUPPORT WIRE COIR MESH OR SIMILAR, STAPLED OR TRENCHED INTO BOTTOM OR SIDE E&SC PERMANENT SEEDING SCHEDULE, * DO NOT USE WITHIN 25RIPARIAN BUFFER. SEE RIPARIAN SEEDING SCHEDULE FOR BUFFER SEEDING SPECS MOUNTAINS SEEDING DATES SPECIES RATE (lb/acre) AUG. 15 - MAY 1 TALL FESCUE 100 **RYE GRAIN 40 SEPT. 1 -JUNE 1 SERICEA LESPEDEZA 15 **RYE GRAIN 40 JUNE 2 -AUG. 14 -GERMAN MILLET 10 *SUPPLEMENT WITH IRRIGATION PIEDMONT SEEDING DATES SPECIES RATE (lb/acre) SEPT. 1 -MAY 1 TALL FESCUE 100 **RYE GRAIN 40 SERICEA LESPEDEZA 15 APRIL 15 - JUNE 30 BERMUDA GRASS 25 ***GERMAN MILLET 10 JULY 1 -AUG. 30 -GERMAN MILLET 10 *SUPPLEMENT WITH IRRIGATION COASTAL PLAIN SEEDING DATES SPECIES RATE (lb/acre) SEPT. 30 -APRIL 1 TALL FESCUE 100 **RYE GRAIN 40 SERICEA LESPEDEZA 15 APRIL 15 - JUNE 30 BERMUDA GRASS 25 ***GERMAN MILLET 10 JULY 1 -SEPT. 29 ***GERMAN MILLET 10 *SUPPLEMENT WITH IRRIGATION *RESEED WITH NON -NURSE CROPS WITHIN ACCEPTABLE DATES **MAY BE SUBSTITUTED WITH WHEAT AT 30 LBS/ACRE ***MAY BE SUBSTITUTED WITH BROWNTOP MILLET AT 10 LBS/ACRE COMPLETE SEEDING EARLIER IN THE FALL, AND START LATER IN THE SPRING ON NORTH AND EAST FACING SLOPES. SOIL AMENDMENTS APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS OR APPLY 4000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 1000 LB/ACRE 5-10-10 FERTILIZER. MULCH APPLY 4000-5000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCHING MATERIAL. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR ROVING. NETTING IS THE PREFERRED ANCHORING METHOD ON STEEP SLOPES. MAINTENANCE REFERTILIZE THE SECOND YEAR UNLESS GROWTH IS FULLY ADEQUATE. MOW NO MORE THAN ONCE PER YEAR. RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY. SOIL PREPARATION: SOIL TEST: SOIL TESTING WILL DETERMINE WHETHER THE SOIL PH AND NUTRIENT (PHOSPHORUS, POTASSIUM, CALCIUM AND MAGNESIUM) LEVELS ARE IN A RANGE THAT FAVOR TURFGRASS GROWTH. THE SOIL TEST REPORT WILL INDICATE NEEDED AMOUNTS OF FERTILIZER AND/OR LIME. CLEAN AND ROUGH GRADE: REMOVE ALL DEBRIS FROM THE LOCATION TO BE PLANTED. THIS INCLUDES ROCKS, BOTTLES, LARGE ROOTS AND OLD TREE TRUNKS. IF EXTENSIVE GRADING IS NEEDED, REMOVE THE TOPSOIL AND STOCKPILE IT FOR REPLACEMENT AFTER THE ROUGH GRADE IS ESTABLISHED. THE SUBSURFACE MAY BECOME COMPACTED DURING ROUGH GRADING, ESPECIALLY IF THE GROUND IS WET. THIS COMPACTED LAYER MUST BE BROKEN UP. A SPRING -TOOTH HARROW WORKS WELL ON LIGHTLY COMPACTED SOILS; A SMALL ROTOTILLER MAY BE NEEDED FOR MORE HEAVILY COMPACTED SITES. DEEP TILLAGE: ROTOTILLING LOOSENS COMPACTED SOIL AND IMPROVES THE SPEED AND DEPTH OF ROOTING. A TRACTOR -MOUNTED OR SELF-PROPELLED TILLER WILL ADEQUATELY TILL THE SOIL. TAKE CARE NOT TO DESTROY THE EXISTING TREES IN THE LAWN. CUTTING TOO MANY TREE ROOTS DURING SOIL TILLAGE CAN SEVERELY DAMAGE OR KILL A TREE. TREES CAN ALSO BE SUFFOCATED BY DEEPLY COVERING THE ROOTS WITH SOIL. IF ADDITIONAL SOIL IS NECESSARY AT A TREE BASE, CONSTRUCT A "TREE WELL." REPLACE THE TOPSOIL: ONCE THE SUBSURFACE IS ESTABLISHED, RETURN THE TOPSOIL AND SPREAD UNIFORMLY OVER THE ENTIRE AREA. ALLOW FOR AT LEAST 6 TO 8 INCHES OF DEPTH AFTER THE SOIL HAS SETTLED. THIS MEANS PLACING ABOUT 8 TO 10 INCHES OF TOPSOIL OVER THE SUBSURFACE. IMPROVE THE SOIL BY ADDING ORGANIC MATTER. THIS IMPROVES WATER RETENTION IN SANDY SOILS AND DRAINAGE IN CLAY SOILS AND REDUCES FERTILIZER LEACHING. E&SC TEMPORARY SEEDING SCHEDULE MOUNTAINS SEEDING DATES SPECIES RATE (lb/acre) ABOVE 2500 FEET: FEB. 15 -MAY 15 BELOW 2500 FEET: FEB. 1 MAY 1 RYE (GRAIN) 120 ANNUAL LESPEDEZA (KOREAN) 50 MAY 15 - AUG. 15 GERMAN MILLET 40 AUG. 15 - DEC. 15 RYE (GRAIN) 120 PIEDMONT SEEDING DATES SPECIES RATE (lb/acre) JAN. 1 -MAY 1 RYE (GRAIN) 120 ANNUAL LESPEDEZA (KOBE) 50 MAY 1 -AUG. 15 GERMAN MILLET 40 AUG. 15 - DEC. 20 RYE (GRAIN) 120 COASTAL PLAIN SEEDING DATES SPECIES RATE (lb/acre) DEC. 1 -APRIL 15 RYE (GRAIN) 120 ANNUAL LESPEDEZA (KOBE) 50 APRIL 15 -AUG. 15 GERMAN MILLET 40 AUG. 15 - DEC. 30 RYE (GRAIN) 120 MAINTENANCE REFERTILIZE IF GROWTH IN NOT FULLY ADEQUATE. RESEED, FERTILIZER, AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. TOPDRESS WITH 50 LB/ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB/ACRE KOREAN LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. SOIL PREPARATION: SOIL TEST: SOIL TESTING WILL DETERMINE WHETHER THE SOIL PH AND NUTRIENT (PHOSPHORUS, POTASSIUM, CALCIUM AND MAGNESIUM) LEVELS ARE IN A RANGE THAT FAVOR TURFGRASS GROWTH. THE SOIL TEST REPORT WILL INDICATE NEEDED AMOUNTS OF FERTILIZER AND/OR LIME. CLEAN AND ROUGH GRADE: REMOVE ALL DEBRIS FROM THE LOCATION TO BE PLANTED. THIS INCLUDES ROCKS, BOTTLES, LARGE ROOTS AND OLD TREE TRUNKS. IF EXTENSIVE GRADING IS NEEDED, REMOVE THE TOPSOIL AND STOCKPILE IT FOR REPLACEMENT AFTER THE ROUGH GRADE IS ESTABLISHED. THE SUBSURFACE MAY BECOME COMPACTED DURING ROUGH GRADING, ESPECIALLY IF THE GROUND IS WET. THIS COMPACTED LAYER MUST BE BROKEN UP. A SPRING -TOOTH HARROW WORKS WELL ON LIGHTLY COMPACTED SOILS; A SMALL ROTOTILLER MAY BE NEEDED FOR MORE HEAVILY COMPACTED SITES. DEEP TILLAGE: ROTOTILLING LOOSENS COMPACTED SOIL AND IMPROVES THE SPEED AND DEPTH OF ROOTING. A TRACTOR -MOUNTED OR SELF-PROPELLED TILLER WILL ADEQUATELY TILL THE SOIL. TAKE CARE NOT TO DESTROY THE EXISTING TREES IN THE LAWN. CUTTING TOO MANY TREE ROOTS DURING SOIL TILLAGE CAN SEVERELY DAMAGE OR KILL A TREE. TREES CAN ALSO BE SOIL AMENDMENTS SUFFOCATED BY DEEPLY COVERING THE ROOTS WITH SOIL. IF ADDITIONAL SOIL IS FOLLOW RECOMMENDATIONS OF SOIL TEST OR APPLY 2000 LB/ACRE GROUND NECESSARY AT A TREE BASE, CONSTRUCT A "TREE WELL." AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER. INCREASE FERTILIZER RATE TO 1000 LB/ACRE IN THE FALL. REPLACE THE TOPSOIL: ONCE THE SUBSURFACE IS ESTABLISHED, RETURN THE MULCH TOPSOIL AND SPREAD UNIFORMLY OVER THE ENTIRE AREA. ALLOW FOR AT LEAST APPLY 4000-5000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER OR ANOTHER SUITABLE 6 TO 8 INCHES OF DEPTH AFTER THE SOIL HAS SETTLED. THIS MEANS PLACING MULCHING MATERIAL. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ABOUT 8 TO 10 INCHES OF TOPSOIL OVER THE SUBSURFACE. IMPROVE THE SOIL BY ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A ADDING ORGANIC MATTER. THIS IMPROVES WATER RETENTION IN SANDY SOILS MULCH ANCHORING TOOL. AND DRAINAGE IN CLAY SOILS AND REDUCES FERTILIZER LEACHING. 3 C904 4 C904 CLEANOUT ICK, 12" DIA. APRON PAVING SUB -PAVING - GRAVEL BASE COMPACTED OR UNDISTURBED SO iICK, 24"x24" C.APRON COMPACTED OR UNDISTURBED SOIL PAVED AREAS PAVED AREAS (2-WAY CLEANOUT) OJOSAM SERIES 58860-22 ACCESS COVER AND CLEANOUT WITH TAPER THREAD BRONZE PLUG SERIES 58540-20 AND "SAN." ON COVER (OR APPROVED EQUIVALENT). OB NEENAH MODEL R-6660-DP LIGHT DUTY ACCESS COVER WITH TWO (2) JOSAM SERIES 58190-22 CLEANOUTS WITH TAPER THREAD BRONZE PLUG SERIES 58540-20 (OR APPROVED EQUIVALENT). EMERGENCY SPILLWAY 19 T _ �d� GENERAL NOTES: 1. T=16' 2. B=10' 3. LINE WITH CLASS A RIPRAP. PRECAST CONCRETE POURED IN PLACE OF CONCRETE COLLAR SCH. 40 PVC CAP LANDSCAPED AREAS SCH. 40 PVC -�N CARP Z/ . ss ; REVIEW = 035736 = /'i sr7/1/ C. CNo 08/24/2020 BREC: Pq. O G F ; NCBELS#C-3448? Z �� ......••���P: �'•. TN CARP o W z W m DETAILS PREPARED FOR: TERAMORE DE' PO BOX 6460 THOMASVILLE, JELOPMENT, LLC GA 31758 DATE: REVISIONS: SHEET SIZE: 24"x36" DATE: 06/15/2020 PROJECT NUMBER: 3160632019 DRAWN BY: J.EDWARDS APPROVED BY: J.CHURCH SCALE: NTS (H) 00 SHEET: C904 r W CJ� W w 0 0 Q w Q 0 W W W m v ) z Q J J U U) 0 z 0 0 © COPYRIGHT 2020 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE. 1 C905 STEP 1 - SITE PREPARATION PREPARE SITE TO DESIGN PROFILE AND GRADE. REMOVE DEBRIS, ROCKS, CLODS, ETC.. GROUND SURFACE SHOULD BE SMOOTH PRIOR TO INSTALLATION TO ENSURE BLANKET REMAINS IN CONTACT WITH SLOPE. STEP 2 - SEEDING SEEDING OF SITE SHOULD BE CONDUCTED TO DESIGN REQUIREMENTS OR TO FOLLOW LOCAL OR STATE SEEDING REQUIREMENTS AS NECESSARY. STEP 3 - STAPLE SELECTION AT A MINIMUM, 6" LONG BY 1" CROWN, 11 GAUGE STAPLES ARE TO BE USED TO SECURE THE BLANKET TO THE GROUND SURFACE. INSTALLATION IN ROCKY, SANDY OR OTHER LOOSE SOIL MAY REQUIRE LONGER STAPLES. STEP 4 - EXCAVATE ANCHOR TRENCH AND SECURE BLANKET EXCAVATE A TRENCH ALONG THE TOP OF THE CHANNEL SIDE SLOPES AND THE UPSTREAM TERMINAL END OF THE CHANNEL TO SECURE THE EDGES OF THE BLANKET. THE TRENCH SHOULD RUN ALONG THE LENGTH AND WIDTH OF THE INSTALLATION, BE 6" WIDE AND 6" DEEP. STAPLE BLANKET ALONG BOTTOM OF TRENCH, FILL WITH COMPACTED SOIL, OVERLAP BLANKET TOWARDS TOE OF SLOPE AND SECURE WITH ROW OF STAPLES (SHOWN IN FIGURES A, H, E AND F). STEP 5 - SECURE BODY OF BLANKET ROLL BLANKET DOWN SLOPE FROM ANCHOR TRENCH. STAPLE BODY OF BLANKET FOLLOWING THE PATTERN SHOWN IN FIGURE D AND I. LEAVE END OF BLANKET UNSTAPLED TO ALLOW FOR OVERLAP SHOWN IN FIGURE B. PLACE DOWNSTREAM BLANKET UNDERNEATH UPSTREAM BLANKET TO FORM SHINGLE PATTERN. STAPLE SEAM AS SHOWN IN FIGURE E. SECURE DOWNSTREAM BLANKET WITH STAPLING PATTERN SHOWN IN FIGURE D AND I. STAPLING PATTERN SHOWN IN FIGURE D AND I REFLECTS MINIMUM STAPLES TO BE USED. MORE STAPLES MAY BE REQUIRED TO ENSURE BLANKET IS SUFFICIENTLY SECURED TO RESIST MOWERS AND FOOT TRAFFIC AND TO ENSURE BLANKET IS IN CONTACT WITH SOIL SURFACE OVER THE ENTIRE AREA OF BLANKET. FURTHER, CRITICAL POINTS REQUIRE ADDITIONAL STAPLES. CRITICAL POINTS ARE IDENTIFIED IN FIGURE G AND J. STEP 6- CONTINUE ALONG SLOPE - COMPLETE INSTALLATION OVERLAP ADJACENT BLANKETS AS SHOWN IN FIGURE C AND REPEAT STEP 5. SECURE TOE OF SLOPE USING STAPLING PATTERN SHOWN IN FIGURE E. SECURE EDGES OF INSTALLATION BY STAPLING AT 1.0' INTERVALS ALONG THE TERMINAL EDGE. MAINTENANCE NOTES: 1. INSPECT ROLLED EROSION CONTROL PRODUCTS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAIN FALL EVENT REPAIR IMMEDIATELY. 2. GOOD CONTACT WIT THE GROUND MUST BE MAINTAINED, AND EROSION MUST NOT OCCUR BENEATH THE RECP. 3. ANY AREAS OF THE RECP THAT ARE DAMAGED OR NOT IN CLOSE CONTACT WITH THE GROUND SHALL BE REPAIRED AND STAPLED. 4. IF EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE, THE PROBLEM SHALL BE FIXED AND THE ERODED AREA PROTECTED. 5. MONITOR AND REPAIR THE RECP AS NECESSARY UNTIL GROUND COVER IS ESTABLISHED. 4 C905 FIGURE F- PROFILE VIEW STREA TIMBER MUD MA' 4' FROM BANK pp f ROLLED EROSION CONTROL MATTING INSTALLATION FIGURE F FIGURE A - BED INSTALLATION BLANKET 3 BLANKET 2 FIGURE E FIGURE B/ FIGURE E / •'' FIGURE C BLANKET 3 =1GURE C / • •• :'•r GROUND :'' •�Lf�7KET 1 �, • • SURFACE ,. FIGURE B/ FIGURE E GROUND SURFACE FIGURE F FIGURE I *SLOPE INSTALLATION - APPROXIMATELY 200 STAPLES PER ROLL (8' OR 4' *BED INSTALLATION - APPROXIMATELY 300 STAPLES PER ROLL (8' M1 WIDTH) REQUIRED - WIDE BLANKET SHOWN OR 4' WIDTH) REQUIRED - WIDE BLANKET SHOWN FIGURE E 8" 4" FIGURE H - SLOPE INSTALLATION GROUND SURFACE FIGURE B - PROFILE VIEW FLOW �3"� BLANKET 1 BLANKET 2 GROUND SURFACE FIGURE C - CROSS SECTION VIEW CREST OF CREST OF SLOPE SLOPE TOE OF SLOPE f w FIGURE G- CRITICAL POINTS - BED INSTALLATION TIMBER MUD MAT SINGLE ROAD WIDTH 4' FROM BANK X- DENOTES STAPLE LOCATION FIGURE D - PLAN VIEW- BED INSTALLATION FIGURE I - PLAN VIEW - SLOPE INSTALLATION 5 C905 �o CLASS B RIPRAP FLOW 8" _ 1_x_ 1 x 1 -x- 1 -x- 1 -x- 1 -x- 4 1" -x_ 1" _x_ 1" _x_ 1" FIGURE E- PLAN VIEW CRITICAL POINT CRITICAL POINT TERMINAL END GROUND GROUND SURFACE SURFACE FIGURE J - CRITICAL POINT SECURING - SLOPE INSTALLATION ROCK PIPE INLET PROTECTION RIPRAP GENERALNOTES: 1. CLEAR THE AREA OF ALL DEBRIS THAT MIGHT HINDER EXCAVATION AND DISPOSAL OF SPOIL. 2. INSTALL THE CLASS B OR CLASS I RIPRAP IN A SEMI -CIRCLE AROUND THE PIPE INLET. THE STONE SHOULD BE BUILT UP HIGH ON EACH END WHERE IT TIES INTO THE EMBANKMENT. THE MINIMUM CREST WIDTH OF THE RIPRAP SHOULD BE 3 FEET, WITH A MINIMUM BOTTOM WIDTH OF 11 FEET. THE MINIMUM HEIGHT SHOULD BE 2 FEET, BUT ALSO 1 FOOT LOWER THAN THE SHOULDER OF THE EMBANKMENT OR DIVERSION. 3. A 1 FOOT THICK LAYER OF NCDOT #5 OR #57 STONE SHOULD BE PLACED ON THE OUTSIDE SLOPE OF ROUND THE RIPRAP. 4. THE SEDIMENT STORAGE AREA SHOULD BE EXCAVATED AROUND THE OUTSIDE OF THE STONE HORSESHOE 18 INCHES BELOW NATURAL GRADE. 5. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, FILL DEPRESSION AND ESTABLISH FINAL GRADING ELEVATIONS, COMPACT AREA PROPERLY, AND STABILIZE WITH GROUND COVER. PIPE INVERT, 36" MAINTENANCE NOTES: PIPE MAX 1. INSPECT ROCK PIPE INLET PROTECTION AT LEAST WEEKLY AND AFTER SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE SEDIMENT STORAGE AREA TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACUMULATED TO ONE-HALF THE DESIGN DEPTH OF TH TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISPOSALAREAAND REPLACE THE CONTAMINATED PART OF THE GRAVEL FACING. 2. CHECK THE STRUCTURE FOR DAMAGE. ANY RIPRAP DISPLACED FROM THE STONE HORSESHOE MUST BE REPLACED. 3. AFTER ALL THE SEDIMENT -PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED REMOVE THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE C ADJOINING AREAS AND PROVIDE PERMANENT GROUND COVER. WASHED STONE o� �v NC DOT #5 OR #57 WASHED STONE U&I NATURAL GROUND RIPRAP HEADWALL, 1' MIN HEIGHT FROM ROAD SHOULDER �13'� 2' / =' I IklPE RT CLASS B RIPRAP z C905 TEMPORARY CLEAN WATER DIVERSION 2' MIN STEEP CUT OR FILL SLOPE +,.:�_:•,�:;._- 6" FREEBOARD h �I 2:1 SLOPE (MAXIMUM) I I B GENERAL NOTES: 1. h= 2. B= 3. PLEASE REFER TO NCESCPDM SECTION #6.21 FOR ADDITIONAL DESIGN SPECIFICATIONS REGARDING DIVERSIONS. ABOVE GROUND CONCRETE WASHOUT. A PLAN CLEARLY MARKED CONCRETE SIGNAGE NOTING WASHOUT DEVICE (18" X 24" MIN.) 6" SANDBAGS (TYP.) OR STAPLES HIGH COHESIVE & LOW FILTRATION SOIL BERM SILT FENCE SANDBAGS (TYP.) OR STAPLES 10 MIL PLASTIC LINING (ALL SIDES) 1' FREEBOARD � 1:1 SIDE SLOPE (TYP.) 3' MIN. SECTION A -A NOTES: 1. ACTUAL LOCATION DETERMINED IN FIELD. 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY TO PROVIDE ADEQUATE HOLDING CAPACITY WITH A MINIMUM 12 INCHES OF FREEBOARD. 3. CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARLY MARKED WITH SIGNAGE NOTING DEVICE. CARD'%'� Qom'' REVIEW 035736 = ��vGs;•�NGINE��''G� �, C. CNJ� 08/24/2020 BREC: Pq. p0 O� �T •% Z NCBELS#C-3448? 0. �'•. CARD 08644401,4 W z W DETAILS PREPARED FOR: TERAMORE DE' PO BOX 6460 THOMASVILLE, fl z CV Z � w w C) � 0 cn JELOPMENT, LLC GA 31758 DATE: REVISIONS: SHEET SIZE: 24°X36" DATE: 06/15/2020 PROJECT NUMBER: 3160632019 DRAWN BY: J.EDWARDS APPROVED BY: J.CHURCH SCALE: NTS (H) (V) SHEET: C905 © COPYRIGHT 2020 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE.