Loading...
HomeMy WebLinkAbout20201019 Ver 1_Revised Scope of Work Sketches_20200902Strickland, Bev From: Donna Hrko<donna.lancasterdocks@gmail.com> Sent: Wednesday, September 2, 2020 2:35 PM To: Perez, Douglas J Cc: Johnson, Alan Subject: Re: [External] Re: 1300 Roundstone Rd. (DWR - 20-1019) Attachments: Handy Revised Scope of Work Sketches with Boat Ramp and Boat House Remaining.pdf External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Doug, Please find the attached work scope sketch leaving the boat ramp and boat house for your review and consideration. Please let me know if you have any questions or concerns. Thank you, Donna On Tue, Sep 1, 2020 at 5:00 PM Perez, Douglas J <doug_perezkncdenr.gov> wrote: Hi Donna, Thanks for clarifying all that for us. If you could send me the revised sketch with the new potential impacts, I can add that to the file we currently have. Once I get that, I can continue working on the application. Thanks again, Doug From: Donna Hrko [mailto:donna.lancasterdocks@gmail.com] Sent: Tuesday, September 1, 2020 2:11 PM To: Perez, Douglas J <doug.perez@ncdenr.gov> Cc: Johnson, Alan <alan.iohnson@ncdenr.gov> Subject: [External] Re: 1300 Roundstone Rd. (DWR - 20-1019) External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov 1 Hi Doug and Alan, I just talked to Mark Lancaster (the contractor) about the boat house in order to answer your question. He indicated that the scope of work has changed and now the homeowner has decided that the boat house and ramp are going to remain. Do I need to send a revised sketch showing that they won't be removed? Also, the engineering drawings for the new dock were an fyi inclusion in the packet. I understand that information does go to Duke for their review and approval. I also discussed with Mark the height of the refresh and he stated that there would be no area that goes above 2-3 feet above normal pond. Please let me know if you have any more questions or concerns. Thank you, Donna On Mon, Aug 31, 2020 at 3:34 PM Perez, Douglas J <doug_perez o,ncdenr.gov> wrote: Hello Donna, I'm emailing you today about the shoreline application at 1300 Roundstone Rd. The "deck" or new dock appears to be out in the lake. That would be something that you would need to contact Duke and get their approval of. The removal of the boat ramp and house is ok, however it will need to be turned into a natural area. If that is indeed what is going on, please let us know. Is the boat ramp going into the boat house? The banks look to be sloped, stable and fairly natural. I have included a picture. In it is a red line that depicts where the rip rap should stop (-2-3 ft. above full pond). Typically, the docks are connected at full pond elevation. Are you planning on going to the height of the old rip rap? I don't think that's necessary and I believe that you should just let nature take its course here. If you could clarify these issues with either Alan or myself, that would be most appreciated. Sincerely, Doug Perez L 117 0 1 I i L TJ Din of Wsoter Resources Doug Perez — Environmental Specialist NC Dept. of Environment & Natural Resources (NCDENR) Division of Water Resources - Water Quality Regional Operations 610 East Center Ave., Suite 301, Mooresville, NC 28115 Phone: (704) 235-2162 Fax: (704) 663-6040 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. Donna P. Hrko Lancaster Custom Docks and Lift Systems, Inc. 1156 Perth Road Troutman, NC 28166 Phone: (704) 528-7400 Fax: (704) 528-3400 Cell: 304-629-6096 IMPORTANT NOTICE - This E-Mail and the information that it contains is private and confidential. Access by the intended recipient only is authorized. If you are not the intended recipient, please notify the sender hereof immediately and do not disclose the contents to any other person or use it for any purpose or store or copy the information onto any medium whatsoever. This e-mail and its attachments are intended for the above named recipient and or recipients only and this information may contain private, confidential, proprietary and or privileged material and may be subject to confidentiality agreements. Donna P. Hrko Lancaster Custom Docks and Lift Systems, Inc. 1156 Perth Road Troutman, NC 28166 Phone: (704) 528-7400 Fax: (704) 528-3400 Cell: 304-629-6096 IMPORTANT NOTICE - This E-Mail and the information that it contains is private and confidential. Access by the intended recipient only is authorized. If you are not the intended recipient, please notify the sender hereof immediately and do not disclose the contents to any other person or use it for any purpose or store or copy the information onto any medium whatsoever. This e-mail and its attachments are intended for the above named recipient and or recipients only and this information may contain private, confidential, proprietary and or privileged material and may be subject to confidentiality agreements. 4 State of North Carolina Department of Environment and Natural Resources Division of Water Resources Water Resources 15A NCAC 02H .0500 —Water Quality Certification, Shoreline Stabilization ENVIRONMEN1AL QUALITY FORM: SSGP 02-2017 Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Full Pond/ Normal Water Le Shoreline Plan View FORM: SSGP 02-2017 La ke (At Full Pond/ Normal Water Level) No��-�1P W 1 I n t rl r Z-3 +a now a�ctll rrP 1� re hcdor feplac�ed.�� + b� rnadc loynq 4RXjens, Ve- bhD'"e qv. Tocy, FT-rew-m- .50% Vo% (! prri or. Lake {AT rWI Pond/ Normal wam, 1-1) Existing Dock 3a Ra 7 ft 3f1x150ft 9el&& Tull W W NW l Full Pond/Normal Water Level — — — _ ]hore7Re _— aft. 150h Riprap gpow full ooncV NWL 2h,.150h eddltlora$ elearing N necessary Ej'(AMPLE Page 1 of 3 Plan View La ke (At Full Pond/ Normal WaterTe vei) �2 r� Side View 3 ft, below full pond water level 4 ft. above full pond water level 2 ft• additional clearing `if necessary Existing bank 10 ft. bank a height 0�2 OQ MPLE �t Side Vi FORM: SSGP 02-2017 Page 2 of 2