HomeMy WebLinkAboutNCC203851_ESC Approval Submitted_20200903Sa $iAafir 4 ROY COOPER Governor y� MICHAEL S. REGAN 4 Secretary BRIAN WRENN NORTH CAROLINA Director Environmental Quality August 28, 2020 LETTER OF APPROVAL WITH MODIFICATIONS The Association for the Advancement of Education ATTN: Mya Ciccotti Geiss, Executive Director 1735 Saxapahaw-Bethlehem Church Rd. Saxapahaw, NC 27340 RE: Project Name: The Hawbridge School - New Upper School Acres Approved: 8 Project ID: ALAMA-2020-035 County: Alamance City: Saxapahaw Address: 1735 Saxapahaw-Bethlehem Church Rd. River Basin: Cape Fear Stream Classification: WS-V; NSW - Jordan Lake Watershed Submitted By: CLH Design, P.A. Date Received by LQS: August 20, 2020 Plan Type: Revised Dear Ms. Geiss: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. ��A North Carolina Department of Environmental Quality 1 Division of Energy, Mineral and Land Resources _,,/ Winston-Salem Regional Office 1 450 Hanes Mill Road, Suite 3001 Winston-Salem, North Carolina 27103 a %�� / 336.776.9800 Letter of Approval with Modifications The Association for the Advancement of Education August 28, 2020 Page 2 of 3 Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely ' Za6Y ar�,Le tz, El - Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCG01 Fact Sheet c: CLH Design, P.A. ATTN: Keith Downing, PLA 400 Regency Forest Dr., Suite 120 Cary, NC 27518 WSRO file Letter of Approval with Modifications The Association for the Advancement of Education August 28, 2020 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: The Hawbridge School - New Upper School Project ID: ALAMA-2020-035 County: Alamance Modifications pursuant to applicable North Carolina General Statutes and/or Regulations: 1. The outlet pipe downstream of TSSB-A must be installed at the same time as the basin to convey the flow from the basin off -site, otherwise the basins downstream of TSSB-A must be redesigned to accommodate the flow from TSSB-A. [G.S. 113A-57(3)] 2. Approval by a representative of the Land Quality Section will be required prior to removal of erosion control measures and/or conversion of the sediment basin(s) to post - construction stormwater SCMs. [15A NCAC 4B .0106(a)(5)] 3. Additional measures may be required - The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] Additional Comments: 1. Any off -site borrow and waste required for this project must come from a site with an approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid Waste Management. Trash/debris from demolition activities or generated by any activities on site must be disposed of at a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste Management or Division of Water Resources rules and regulations. [15A NCAC 413.0110] 2. Be advised the 7/14-day soil stabilization requirements apply to any section of the project where land -disturbing activities have temporarily or permanently ceased and shall supersede any less stringent stabilization requirement on the plans. [G.S. 143-215.1] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities