Loading...
HomeMy WebLinkAboutNCG080792_DMR_20200530Semi-annual Stormwater ulscharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG080000 Date Submitted May 30, 2020 CERTIFICATE OF COVERAGE NO. NCG080792 SAMPLE COLLECTION YEAR 2020 FACILITY NAME USF Holland - CLT SAMPLE PERIOD Q Jan -June ❑ July -Dec COUNTY MECKLENBURG ^� or ❑ Monthly' (month) PERSON COLLECTING SAMPLES _1 Frei/ SwSGC �'�13.?�� DISCHARGING TO CLASS []ORW ❑HQW [:]Trout❑PNA LABORATORY Pace Analytical Lab Cert. # 12 633 1" []zero -flow ❑ Water Supply [:]SA Comments on sample collection or analysis: pH measured in field by IUN 1 ZOL� 0 Other C Stormwater Services Group (Lab Cert #5054) Ft�F-, - tDVVtt PLEASE REMEMBER TO SIGN ON THE REVERSE 4�L-�,TIO Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? ✓ yes _no (if yes, report your analytical results in the table immediately below) Part A: Vehicle Maintenance Areas Monitoring Requirements (If applicable) No discharge this period' Outfall No. Date Sample Collected, mo/dd/yr 00530 00400 00556 Total Suspended Solids, mg/L pH, Standard units Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L New Motor Oil Usage, Annual average gal/mo Benchmark - 100 Within 6.0 - 9.0 15 - 001 05/18/20 268 6.81 24.2 +/- 350 Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals (If applicable) Outfall No. Date 00556 Sample Collected, Non -Polar Oil and Grease/TPH EPA Method mo/dd/yr 1664 (SGT-HEM), mg/L 00530 00400 Total Suspended Solids, mg/L pH, Standard units Permit Limit - 15 50 or 100 see permit 6.0 - 9.0 1 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. S WU-250 last revised April 11, 2013 Page 1 of 2 STORM E'—. l CHARACTERISTICS: Date May 18, 2020 (first event sampled this reporting period) Total Event Precipitation (inches): 0.29" Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO Q IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR including all "No Discharge" reports within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: NCDEQ/ Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penaltie&4or sAnitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) ,/, /.7 Jo (Date) Additional copies of this form may be downloaded at: http://portal.ncdenr.org/web/wq/ws/su/npdessw#tab-4 SWU-250 last revised April 11, 2013 Page 2 of 2