HomeMy WebLinkAboutNC0020737_SOC Status Report_20200312City of Kings Mountain WWTP Pilot Creek '• :•. • Kings Mountain, NC 28086 March 12, 2020 Derek Denard North Carolina Department of Environmental Quality Water Quality Division 1617 Mail Service Center Raleigh, NC 27699-1617 Subject: April 2020 Status Report for Pilot Creek WWTP Mr. Denard, The City of Kings Mountain holds NPDES Permit NC0020737. After receipt of the extended Special Order of Consent (SOC) by the Environmental Management Commision, Pilot Creek has submitted quarterly Status Reports; informing the State, of ongoing efforts made to reduce thallium in the collection system for the City of Kings Mountain. These reports will be submitted quarterly until May 31, 2020, as stated in the Scheduled Activity section, Section 2. (b). Coremetech and City of KM TI data to date: The following monthly data is from January 2019 until January 2020 regarding testing results for Cormetech and the POTW's effluent sampling events: 0.18 0.16 0.14 0.12 0.1 E 0.08 0.06 0.04 0.02 0 C 1 T� etech vs�lVF- C5 ti� ti� P ti� ti� ti� ti� ,y0 o,,LO eG,LOa�,LO ■ Coremetch TI Resu Its ■ KM TI Results Coremetech SOC info: Cormetech was put on a Consent Order and Complaince Schedule on December 20, 2019. Cormetech was put under this order due to falsifying flow data during 2016-2017 timeframe in order to avoid non-complaince with the City. During these events, Cormetech was found to be in non-compliance for arsenic as mentioned in the previous status report submitted. The Order increased monitoring frequency for thallium and arsenic to twice weekly. Below is the Compliance Schedule listed in this order: COMPLIANCE SCHEDULE Activities (i) Prepare and submit a plan of action to achieve continuous Compliance flow monitoring and reporting 0i) Increase monitoring for Thallium and Arsenic for the duration of the Consent Order. Submit results with monthly report. (iii) Complete and submit Pilot Studies and identify alternatives chosen to achieve compliance. (iv) Begin construction (Upon ApprovaP and/or implement identified process alternative(s). (v) Achieve_ compliance with final (IUP #032), with all requirements in Permit No. 032. Deadline for Completion January 14, 2020 Dec. 20, 201 9-June 6, 2020 February 7, 2020 March 6, 2020 June 6, 2020 To date, Cormetech has submitted all required documentation according to this agreement. Cormetech's monthly status reports: Cormetech continues to submit monthly status reports to the Citywhich contains their plans in reducing thallium atthe facility. All reports have been received by the Pretreatment Department on -time. Additional Information regarding Cormetech: Cormetech requested a permit modification to reduce their permitted flow limit to 0.175MGD in order to increase permitted limits on other concentration based parameters. This modification was completed on 11/14/2019 and the effective date on this permit was 12/2/2019. Cormetech has since requested an additional flow reduction to 0.125MGD which would also include the City's new NPDES permitted limits. This modification has not been approved by PERCS unit at this time. The Director of Water Resources has required the Pretreatment Coordinator to monitor flow and collect samples at Cormetech at a minimum of monthly going forward. These samples will be analyzed by Sheally and will be used to judge compliance. Improvements to the POTW The POTW has received pH monitoring devices for three of our main pump stations. Thiswill allow the pretreatment department to directly locate pH issues when needed and give the abilityto quicker locate the user at fault. These monitors are scheduled to be put in by the end of April 2020. The POTW has also purchased DO and pH monitors for our three aeration basin. This will give the ORC around -the -clock reports on the process of the facility. In the event these readings are out of range, an alarm will sound and send notification of the issue. The City of Kings Mountain's POTW has completed the SCADA updates and are in the process of having all monitoring additions installed. The Huffstetler Group has been hired by the Cityto rehab our #3 & #4 clarifiers. This project begin on March 9t", 2020. The scope of work for this project includes: #4 Clarifier Reolacina the following clarifier mechanism carts: • Influent well • Scum trough/beach (includes all rubber) • Skimmer arm • Skimmer assembly • Tie bars Additional repairs: • Coat all items above in epoxy paint • Fill-in trough about 2.5" of concrete (for optimal cleaning capabilities) ft2 rinrifior- • Remove all weirs and baffles • Replace new weirs, baffles, supports and hardware As always, it is the City's number one priority to maintain a compliant effluent at the Pilot Creek facility. We will continue to operate our Klam press to remove solids from the facility in order to produce the highest quality effluent. If you have any questions, feel free to contact me anytime. Sincerely, Richelle Meek City of Kings Mountain WWTP Superintendent/ORC/Pretreatment Coordinator Richelle.meek@cityofkm.com Office #: (704)739-7131