HomeMy WebLinkAbout20061931 Ver 1_Triage Comments_20070104.................... 13~V'~#~ ~ • j ~ ~ 1 Dais (. ~~~. per. Who Reviewed: ..,~i+~'_ f ~,'~~..
Plan Detail Incomplete - ~ '
^ Please provide a location map for the project.
Please show alI stream impacts including all fill slopes, dissipaters, and bank stabilization on the site plan. / ~ .
('/Please show all wetland impacts including fill elopes on the site plan. ~'~- ~ iJ ~ L' - •. ~J ~ G ~!J~ I
^ Please indicate all buffer impacts on the site plan.
^ Please indicate proposed lot layout as overlays on the site plan. ~ ~ •
Please indicate the location of the protected buffers as •overlays oa the site plan. ~~.. 5 ~'~'~. ~ ~C~ Q~ ~°y`"° ~
. ~ 1. a..
^ Please locate ail isolated. or non-isolated wetlands, ~atreams and other waters of the State as overlays on the site plan.
^ Please provide cross section details showing the provisions for aquatic life passage.
~Pleaso locate any planned•sewer lines on the sifa plea. ~ . '
^ Please provide the location of any proposed stormwatcr management practices ea raquirai by C3C Q
^ Please provide detail for the stonnwata manag~ncnt practices as roquired by (3C ~ v ~a
.~
lease specify the percent of project imperviousness area based on the estimated built-out conditions: ' ~ s
~leaso indicate all stormwates o~}tfalla on the site pla~•
loa'se indicate the diilbso flow provision measures do the site plea. l'~ V~
^ Please indicate whoth~ ar not the proposed impacts alns<dy been conducted. ` ~ ~
Avoidance•and/or Minimization Not Provided ~ ~ ~ ~6 Cz ~~
.~c.,•~ •~~~.Ns~s ~~y
• The labeled as on the plane doss not appear to bo necessary. Please eliminate the . or provide additional
information as to why it is necessary for this project ,
• . ^ This Office belio~es that the labeled on tha plans as can be moved, or reconfigured to avoid the impacts to the
• .Please revise the plans to avoid the impacts. • , .
^. This Office believ6s that the •labeled on the plena as~ ~ can bo moved or recFnFmfigured to:minimize the impacts to'tho
• . Please revise the plane to minimize the impacts.
^ The stormwata discharges at the location on the plans labeled will. not provide diflpse flow through the buffer becausa
• . Please iroviae the plane and provide calculations to show that diffi,ise flow w911 bo achieved through the entirebuflier. If it
• is not possible to achievo~diffuse flow through. the entire buffer then it may bm neoesssary to provide atormwater management
Y~ _ practices that reanove nut /rie~nts~.before the atonnwatar ~ discharged through the. buffer.
Other •~ ~--<-~~ ~ ~ ~~ee~ ~y(~:z~~'`~ ~a1.J G'i'g '~~5~ 1. cdw d-~-
^•. The application fee was insuf>5eiont because over 150 foot of stream and/or over 1 acre ofwetland'impacts were requested. Please
pravido $ ~ .This additional fee must be rexivod before j ur application can be rovi ed. •
~ n [%
't' ~ ~ rS ~f ar'7t'v ~ t l -, d ~ ~' '~-_ ,
^ Pleasse complete Section(s) on the application. .. ~~
^ Please provide a signed copy of the application.' G ,I~'~,~-~~.;
^ Please provide _, copies of the application, . copies of the site pleas and other supporting information:
_ ^ ~ Plessesubmit electronic CAD files showing ~ ;.via email to ian.mctnillan~ncmail.net and CD: ~ .
Mitigation ~ .
• ^ of compensatory ~ mitigation is required for this projdct. Please provid'e's c~npensatory mitigation plan.. Tho
plan must conform the•requireanenta in 15 A NCA 2H ~.OSOO and must b¢¢ appropriate to the typo•of impacts proposed.
Car?.3~t,~ ~~ ~',-F-l~ -l-L, e . (,(5.~~ ~- re~, gct~G.fr~ .
~Pleaso ice which 404 Permit the USACE would use to authorise this project (v~ ~ au !° -~ k~ /~ e..,, (` 2 r '"
.~ ~ ~ .
~i I~ rC' . -e. O~ ~r-- l~ /CJ~ G~~ Q'°'t~i
~., ~
,~
~ ~ ~` ~ '
~ ~
~~~
c+t(FSS, :37 3o -3~c~a 1~0-v_5 a~4 `-~ aF~~nv~/
/ / ~/ / .
J /
~~ ~~ .R.
G ~rti~
~~~ °~
r ~'~~ / r
~ ., ~' ~ /~
,.
~~ ~~ ~~